Loading...
HomeMy WebLinkAboutNCG030664_COMPLETE FILE - HISTORICAL_20190411Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY April 22, 2019 Southwire-Huntersville Attention: Jamie McGrath 12331 Commerce Station Drive Huntersville, North Carolina 28078 Subject: NPDES Stormwater Permit Southwire-Huntersville Stormwater Certificate of Coverage No. NCG030664 Representative Outfall Status Request Mecklenburg County Dear Ms. McGrath: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director RECEIVED APR 302019 LAND QUALITY MINING PROGRAM 1?Fr-r��f MAY 02 2019 STORVWATER PQUAL17Y Rl'v117 ING The Mooresville Regional Office staff have reviewed your April 11, 2019 request for a determination that stormwater discharge outfall 2 be granted representative outfall status for stormwater outfalls 1 and 3. Based on the information provided and an April 11, 2019 site inspection by MRO staff, we are approving this request. In accordance with 40 CFR § 122.2 1 (g)(7), you are authorized to sample outfall number 2 as representative for the entire site. This approval is effective with the next sampling event. Please append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit to document that representative outfall status has been approved. If changes in drainage areas, structures, processes, storage practices, or other activities occur that significantly alter the basis of this approval, representative outfail status may no longer be valid. You should either resume sampling at all SDOs, or reapply to this office for representative outfall status based on updated information. If you have any questions or comments concerning this letter, please contact our office at (704) 663-1699. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section cc: AWetW-lLucw,.Storrnwdtei Permitting-P-rog' aam-'N—CG030664 cc: File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resourcts Mooresville Regional Olfioe � 610 East Center Ave Ste 301 i Mooresville, NC 28115 704 663 1699 T J . . 5outhwi June 5, 2018 Division of Water Quality Attn: DWQ Centrai Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Permit No: NCG0300000 Certificate of Coverage: NCG030664 Southwire 12331 Commerce Station Dr. Huntersville, NC 28078 Dear Sir/Madam: JUN 0 B 2016 DENR-LAND QUALITY STORMWATER PERMITTING RECEIVED JUN I 2018 CENTRAL FILES DWR SECTION Enclosed is the Semi-annual Stormwater Discharge Monitoring Report and associated analytical results for this facility. This report covers required sampling for 2018 January —June Semi Annual. Thank you, Allan Oracion EHS Manager Southwire Huntersville Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 06/05/18 CERTIFICATE OF COVERAGE NO. NCG030664 FACILITY NAME Southwire- Huntersville COUNTY Mecklenburg PERSON COLLECTING SAMPLES Allan Oracion LABORATORY Pace Labs Lab Cert. # 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ® Jan -June ❑ July -Dec or ❑ Monthly) (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA []Zero -flow ❑Water Supply ❑SA ®Other C-Waterbody PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -) ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yrj 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics; Benchmarks =__> _ - 100 mg/L or 50 mg/L° 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 05/16/18 .23 6.5 7.1 <.0050 <.0050 .032 <5 N/A 2 05/16/18 .23 2.7 4.7 <.0050 <.0050 .050 <5 N/A 3 05/16/18 .23 14.7 7.2 .024 <.0050 .062 <S N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). RECEIVED JUN 0 8 2018 DENR-LAND QUALITY Permit Date: 11/1/2012-10/31/2017 STORMWATER PERMITTING SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Allan Oraclon Name (Print name) EHS Manager Title (Print title) 5.A 06105L18 (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mX/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier T, Tier 2, or Tier 3 responses. See General Permit text. Part B; Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (ma/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G/TPH by EPA 1664 SGT-HEM ( j Total Suspended Solids pH Benchmarks ==_> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 5U Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: il/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. w FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFF€CE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of this DMR, including all "No Di_schargeH reports within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharae" reports) to: Division of Water Quality Attn,. DWQ Central Files 1b17 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (signature of Permittee) 6/5/2018 (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 r Southwire' May 14, 2018 Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1 b 12 MAY 12 2018 CENTRAL FILES I)WR SECTION SUBJECT: Southwire Huntersville Plant 12331 Commerce Station Drive, Huntersville, NC 28078 NPDES Permit Certification of Coverage #NCG030664 - Permit Owner Affiliation Designation Form - Delegation of Authority - Solvent Management Plan To whom it may concern, Southwire Huntersville Plant located at the address specified above, NPDES Permit Certification of Coverage #NCG030664, has a new plant manager, Chris McGill, effective May 2018. Please note the attached (1) Permit Owner Affiliation Designation Form, (2) DeIegation of Authority letter, and (3) Solvent Management Plan_ Please contact me at (704) 379- 9626 if you have any questions or need any additional information. Sincerely, Allan Oracion RECEIVE Southwire Huntersville Plant MAY 172018 EHS Manager DENR-LAND QUALITY STORMWATER PERMITTING ll� Energy, Mineral & Land Resources ENVIRONMENTAL OUAUTY Division of Energy, Mineral, and Land Resources Land Quality Section 1 Stormwater Program National Pollutant Discharge Elimination System (NPDES) PERMIT OWNER AFFILIATION DESIGNATION FORM (Individual Legally Responsible for Permit) Use this form if there has been: FOR AGENCY USE ONLY Date Received Year MDnth Da NO CHANGE in facility ownership or facility name, but the individual who is legally responsible for the permit has changed. If the name of the facility has changed, or if the ownership of the facility has changed, do NOT use this form. Instead, you must Fill out a Name -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual" mean? The person is either: • the responsible corporate officer (for a corporation); • the principle executive officer or ranking elected official (for a municipality, statiErEIDlic agency); • the general partner or proprietor (for a partnership or sole proprietorship); MAY 17 2018 • or, the duly authorized representative of one of the above. pENR-LAND QUALITY 1) Enter the permit number for which this change in Legally Responsible Individ19 W9WXW a&fR-) applies: Individual Permit [N]CIS] 2) Facility Information: Facility name: Company/Owner Organization: Facility address: (or) Certificate of Coverage N. J.0 I G a 1 s a 6 6 4 Southwire Huntersville PIant Southwire Company LLC 12331 Commerce Station Dr. Address Huntersville NC 28078 City State Zip To find the current legally responsible person associated with your permit, go to this website: htt ://de .nc. ov/about/divisions/ener -mineral-land-resources/ener -mineral-land- ermits/stormwater- ro and run the Permit Contact Summary Report. 3) OLD OWNER AFFILIATION that should be removed: Previous Iegally responsible individual: Jim First 4) NEW OWNER AFFILIATION (legally responsible for the permit): Person legally responsible for this permit: Chris First Page 1 of 2 Perdue Mf Last McGill Mf Last 5WU-0WNERAFFIL-23Mar&2017 NPDES Stormwater Permit OWNER AFFILATION DESIGNATION Form (if no Facility Name/Ownership Change) Plant Manager _ Title 12331 Commerce Station Dr. Mailing Address Huntersville NC 28078 City State Zip (704) 379-9726 chris.mcgill@southwire.corn Telephone E-mail Address Fax Number 5) Reason for this change: ® Employee or management change A result of: ❑ Inappropriate or incorrect designation before ❑ Other Ifotherplease explain: The certification below must be completed and signed by the permit holder. PERMITTEE CERTIFICATION: I, Claris McGill, attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this form are not completed, this change may not be processed. May 14, 2018 Signature Date PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 For more information or staff contacts, please tali (919) 707-9220 or visit the website at: http.1/deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Page 2 of 2 SW U-OW N E RAFFi L-23Mar209 7 sottflnviw www ws ast rvf. wWew .s frowsirn May 14, 2018 Division of Energy, Mineral, and Land Resources Storrnwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 SUBJECT: Southwire Huntersville Plant 12331 Commerce Station Drive, HuntersvMe, NC 28078 NPDES Permit Number: NCGO30664 Delegation of Authority To whom it may concern: 1, Chris McGill, hereby designate the specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental reporting requirements included in the NPDES Permit Certificate of Coverage #NCG030664. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. EHS Manager Southwire Huntersville Plant 12331 Commerce Station Drive Huntersville, NC 28078 (704)379-9600 By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in NPDES Permit #NCG030664, and that the designee above meets the definition of a "duly authorized representative" as set forth in NPDES Permit #NCG030664. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine 'and imprisonment for knowing violations. Chris McGill Southwire Huntersville Plant Plant Manager ENERGY DIVISION SoutMiW ENV-405 Prepared: Allan Oracion Prepared (late: Approved: Aporoved date: 2018-05-14 Chris McGill 5114118 lang: Revision: ?age: en 1 Replaces: Applicabie far_ NIA Huntersville, North Carolina USA Status' Approved Solvent Management Plan 1. General Information Southwire- Huntersville Plant 12331 Commerce Station Drive, Huntersville, NC 28078 NPDES Permit Certificate of Coverage #NCG030664 Primary facility contact with 24-hour phone number Allan Oracion 704-792-8762 Secondary facility contact with 24-hour phone number Chris McGill 704-491-4226 2. Facility Description Nature of Business: Manufacture of medium and high voltage underground cable Operating Hours: 24 hour 7 days a week Number of Employees: 77 Drawing of Facility includes locations of the following: • Location of all raw materials: o Compound Polymer Pellets located inside PEX Warehouse o Copper Reels and Rolls located in Manufacturing Areas, Wire Draw Building and Main Warehouse o Water Block Drums and Bads located in Manufacturing Areas Location of all chemicals o Diesel Fuel Storage Tank located on NE area of plant double wall tank] o Diesel Fuel Day Storage Tank located inside Fire Pump Building o Nitrogen Storage Tank located on NE area of plant o Used Oil and Hazardous Waste Containers located inside the Shipping Airlock_ (secondary containment) o Xylene Bottles located inside lab hoods in the Materials Lab o Propane Cylinders located inside Propane Cylinder Storage o Ink Bottles located inside flammable cabinets in Manufacturing Area. n Oil and Emulsion Containers located inside Wire Draw Building (secondary containment) o Lubrication Oil Containers located inside Lube Building (secondary containment) 3. Purpose and Scope The purpose of the plan is to identify sources of toxic organics in the plant wastewater and describe controls necessary to ensure that these chemicals are not intentionally or accidentally discharged in the facility wastewater system. Refer to Appendix A for the toxic organic list. a. Process Description The Southwire Huntersville Plant manufactures medium to heavy duty underground cable using vertical continuous vulcanization (VCV). The manufacturing process begins at the wire drawing line in which copper or aluminum rod is drawn down to smaller wire size specifications. At stranding, the copper or aluminum wire is twisted to form a conductor_ The conductor can be additionally twisted together at the drum twisting line for large size conductors. At VCV line and tower, up to three (3) layers of insulation are extruded onto the conductor usually involving an inner layer of insulation / black polyethylene conductor shield, a layer of colorless insulation, and a black outer layer 1 black polyethylene insulation shield. Ground wire is added over the cable at the screening line. At the jacketing line, an outer copper shield layer is added over the cable and an outer layer black polyethylene insulation shield is extruded onto the cable. The wire draw line uses oill water / emulsion solutions from a closed system to draw the wire down. The water solution is changed out periodically in which the solution is pumped out a cleaning tank and into totes or vacuum truck for waste to energy disposition. Stranding, screening and drum twist lines do no require water. The VCV process located at the tower utilizes a closed loop water and nitrogen system to cure the insulation layers from the extrusion process. Water is recirculated and stored in a recirculation tank Waste process water is collected in a clean out tank. When full, the waste water is pumped into a tote for a waste to energy disposition. Water that overflows during change -over is captured in a sump pit and transferred to the sewer line. Water is used to cool the cable from the extrusion process in the jacketing line_ This is a closed loop system. Water is not discharged. The jacketing line is in the main manufacturing area. b. Inventory of Total Toxic Organic Chemicals present on site Currently there are no Toxic Organic Chemicals present on site. See "Annual TTO Review" in "section c" below. c. Management Procedures and Engineering Measures for assuring that toxic organics do not spill or leak into stormwater. • Chemical Approval: Prior to purchasing, a new chemical is reviewed through an approval process in Southwire's Safetec SIDS system. An EHS review is performed on the chemical to determine the environmental impact, including TTO. Safety Process Review: All new processes or significant modifications to processes are reviewed through a Management of Change procedure. Any new chemicals are identified and reviewed for environmental impact, including TTO. • Employee Training: Annually, employees are trained on Spill, Stormwater, and Waste Management procedures. Spill clean-up, chemical storage and chemical waste management are topics that are reviewed. • Engineering Controls: Liquid chemicals are stored inside the plant or within building structures with spill containment, inside flammable cabinets, and/or in double wall design containers. • Spill Control: Response to spills is immediate and considers containment, proper clean-up of spill, proper disposal of waste and notification to Southwire and regulatory officials. Storage of chemicals follows practices identified in "Engineering Controls" in this plan. Annual TTO Review: Annually using the Southwire Safetec database, the CAS numbers of chemicals for this site is compared to the TTO list (Appendix A) for usage of TTO chemicals. This Solvent Management Plan is reviewed annually and updated when applicable. With no inventory of TTO's and no discharging of chemicals into stormwater, the following statement will be included for the year's discharge monitoring reports after validation: Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), l certify that to the best of my knowledge and belief, no leak, spill, or dumping of concentrated toxic organics into the stormwater or onto areas which are exposed to rainfall or stormwater runoff has occurred since filling the last discharge monitoring report. 1 further certify that this facility is implementing all the provisions of the Solvent Management Plan included in the Stormwater Prevention Plan. Rev. ind. Chapt (C) Description Date Dept/Name - Initial Release of Policy May 14, 20181 Oracion APPENDIX A: CHEMICALS REGULATED UNDER TOTAL TOXIC ORGANICS (TTO) Chemical Compound CAS Number Acenaphthene 83-32-9 Acenaphthylene 208-96-8 Acrolein 107-02-8 Acrylonitrile 107-13-1 Anthracene 120-12-7 Benzene 7143-2 Benzidine 92-87-5 benzo(a) anthracene 56-55-3 Benzo(a)pyrene 50-32-8 benzo(b) luoranthene 203-33-8 benzo(k)Muoranthene 207-08-9 benzo(g,h,i)peryiene 191-24-2 Bis(2-chloroethoxy) methane 111-91-1 Bis(2-chloroethyl) ether 111-44-4 Bis(2-chloroisopropyl) ether 108-60-1 B+s(2-ethylhexyl) phthalate 117-81-7 Bromoform 75-25-2 4-bromophenylphenyl ether 101-55-3 Butyl benzyl phthalate 85-68-7 Carbon Tetrachloride 56-23-5 Chlordane 57-74-9 Chlorobenzene 108-90-7 Chlorodi brornomethane 124-48-1 Chloroethane 75-00-3 2-chloroethylvinyl ether (mixed) 110-75-8 Chloroform 67-66-3 2-chloronaphthaiene 91-58-7 2-chlorophenol 95-57-8 4-chlorophenylphenyl ether 7005-72-3 Chrysene 218-01-9 Dibenzo(a,h)anthracene 53-70-3 1,2-dichiorobenzene 95-50-1 1,3-dichiorobenzene 541-73-1 1,4-dichlorobenzene 106-46-7 3,3'-dichlorobenzidine 91-94-1 Chemical Compound CAS Number Dichlorobromomethane 75-27-4 1,1-dichloroethane 75-34-3 1,2-dichloroethane 107-06-2 1,1-dichloroethene 75-35-4 trans-1, 3-dichloropropene 10061-02-6 2,4-dichlorophenol 120-83-2 1,2-dichloropropane 78-87-5 cis-1,3-dichloropropene 10061-01-5 Diethyl Phthalate 84-66-2 2,4-dimethylphenol 105-67-9 Dimethyl phthalate 131-11-3 Di-n-butyl phthalate 84-74-2 Di-n-octyl phthalate 117-84-0 4,6-dinitro-o-cresol 534-52-1 2,4-dinioophenol 51-28-5 2,4-dinitrotoluene 121-14-2 2,6-dinitrotoluene 606-20-2 1,2-diphenylhydrazine 122-66-7 E` Obenzene 100-41-4 Fluoranthene 206-44-0 Fluorene 86-73-7 Hexachlorobenzene 118-74-1 Hexachlorobutadiene 87-08-3 Hexachlorocyclopentadiene 77-47-4 Hexachloroethane 67-72-1 Indeno (1,2,3-od) pyrene 193-39-5 Isophorone 78-59-1 Bromomethane 74-83-9 Chloromethane 74-87-3 Methylene chloride 75-09-2 Naphthalene 91-20-3 Nitrobenzene 98-95-3 2-nitrophenol 88-75-5 4-nitrophenol 100-02-7 N-nitrosodimethylamine 62-75-9 N-nitrosodi-n-propylam ine 621-64-7 Chemical Compound CAS Number N-nitrosodiphenylamine 86-30-6 4-ch loro-3-m ethyl phenol 59-50-7 PC B-1016 12674-11-2 PCB-1221 11104-28-2 PCB-1232 11141-16-5 PCB-1242 53469-21-9 PCB-1248 12672-29-6 PCB-1254 11097-09-1 11096-82-5 PCB-1260 PCB Total 1336-36-3 Pentachlorophenol 87-86-5 - Phenanthrene 85-01-8 Phenol 108-95-2 Pyrene 129-00-0 1,1,2,2-tetrachloroethane 79-34-5 Tetrachloroethylene 127-18-4 Toluene 108-88-3 1,2-Trans-Dichloroethylene 156-60-5 1,2,4-trichlorobenzene 120-82-1 1,1,1-trichloroethane 74-55-6 1,1,2-trichloroethane 79-00-5 Trichlorcethylene 79-01-0 2,4,6-trichlorophenol 88-06-2 Vinyl chloride 75-01-4 bi s(chlorom ethyl) ether 542-88-1 Dichlorodifluoromethane 75-71-8 Trichlorofiuoromethane 75-69-4 Chemical Compound CAS Number Aldrin 30"0-2 Alpha-BHC 319-84-6 Beta-BHC 319-85-7 Delta-BHC 319-86-8 Gamma-BHC (Lindane) 58-89-9 4,4'-DDD (p.p-TDE) 72-54-8 4,4'-DDE (p.p-DDX) 72-55-9 4,4'-DDT 50-29-3 Dieldrl n 60-57-1 Endosulfan, Total 115-29-7 Alpha-endosulfan 959-98-8 Beta-endosulfan 33213-65-9 Endosulfan sulfate 1031-07-8 Endrin 72-20-8 Endrin aldehyde 7421-93-4 Heptachlor 76-44-8 Heptachlor epoxide 1024-57-3 Toxaphene 8001-35-2 2,3,7,8-Tetrachlorodibenzo-p-dioxin 1746-01-6 Attachment C Nitrogen 510 1 Tank Diesel Fuel Day Tank inside Fire mp Building. OFFICES MAIN MANUFACTURING AREA VCV TOWER Used uoi and Hazerdaus Haste Waller Brack Drums and Bags Coppe• A eels and Rolls located m omamers bts da Sn3�png Airlock n Manufacturing Area Vonoue ]ocaiions ur Manulfwul peurrrt polymer BasEdenQ (seeadary ranta,nmenti ;Ares and Matn As a2 a ise s • rside pEX r*hs ��. Slormwaler f SMra � grew ' '� Lu!in- inside ""•=• Starmwafer �..... .,,.. t.._. ..� 1I BuilLuddcation Oil conla0ers LUbe Building f�_ 'C'� (seconder wntalnmenL ��,�,,,. Cap :,lw- MATERI S LABORATORY HEAT TREATMENT & ROUTI TEST - - ink Bottles inside j-•�' a -_ �• flammable cabinets on------------- Manufacturing Area nSlde lab hoed it .. -- — I and Emulsion Materials Lab - caManers mside Wire nneCylinder Drawl neClsecrbary Energy, Mineral & Land Resources ENVIRONMENTAL =AUTY Division of Energy, Mineral, and Land Resources Land Quality Section / Stormwater Program. National Pollutant Discharge Elimination System (NPDES) PERMIT OWNER AFFILIATION DESIGNATION FORM (Individual Legally Responsible for Permit) Use this form if there has been: FOR AGENCY USE ONLY Date Received Yrar Momb Day AA��16111 NO CHANGE in facility ownership or facility name, but the individual who is legally responsible for the permit has changed. If the name of the facility has changed, or if the ownership of the Facility has changed, do NOT use this form. Instead, you must fill out a Name -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual" mean? The person is either: • the responsible corporate officer (for a corporation); • the principle executive officer or ranking elected official (for a municipality, state, a ixtblic agency); 0 `1 2 the general partner orproprietor fora ershi or soleproprietorship); ©�� ' g P� ( partnership GIN • or, the duly authorized representative of one of the above. SrOR 9V��p fiI - D QU44' 1) Enter the permit number for which this change in Legally Responsible Individual ("OwerAftihation") applies: Individual Permit N C S 2) Facility Information: Facility name: Company/Owner Organization: Facility address: (or) Certificate of Coverage N C G 0 3 0 fi 6 4 Southwire Huntersville Plant Southwire Company LLC 12331 Commerce Station Dr. Address Huntersville NC 28078 City State Zip To find the current legally responsible person associated with your permit, go to this website: htt://d nc. ov/about/divisions/ener -mineral-land-resources/ener-rninerai-land- ermits/stormwater- ro and run the Permit Contact Summary Report. 3) OLD OWNER AFF11L1I4,7ION that should be removed: Previous legally responsible individual: Tom First M I 4) NEW OWNER AFFILIATION (legally responsible for the permit): Person legally responsible for this permit: Jim First MI Page 1 of 2 Hcberline Last Perdue Last 5W U-OW N E RAF F I L-23Ma rch2U17 'M NPOES Stormwater Permit OWNER AFFILATION DESIGNATION Form (if no Facility Name/Ownership Change) Sr. Director Manufacturing Title 12331 Commerce Station Dr. Mailing Address Huntersville NC 28078 City State Zip (704) 379-9655 Jim.perdue@southwire.com Telephone E-maii Address Fax Number 5) Reason for this change: A result of ❑ Employee or management change ❑ Inappropriate or incorrect designation before ® Other If other please explain: Updating designation with Huntersville plant manager. The certification below must be completed and signed by the permit holder. PERMITTEE CERTIFICATION: I, Jim Perdue, attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge_ I understand that if all required parts of this form are not completed, this change may not be processed. ep'-O-��1 o -3d Signature Date PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 For more information or staff contacts, please call (919) 707-9220 or visit the website at: htt://d .nc. ov/about/di,visions/ener -mineral-land-resources/stormwater Page 2 of 2 5W U-0W NFRAFFI1.-23Mar2017 . t Energy, Mineral and Land Resources ENVIRONMENTAL QUALIFY Mr. Tom Heberling Southwire Company, LLC 1 Southwire Drive Carrollton, GA 30119 Dear Mr. Heberling: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary TRACY DAVIS Director April 11,RECEIVED APR 15 2016 CENTRAL.F,iLES MAIR:SECTION Subject: NPDES Stormwater Permit NCG030664 Southwire Company, LLC Formerly ABB, Inc. Mecklenburg County Division personnel received your request to revise your stormwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 1.43-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 707-9220. Sincerely, liii�64- for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Mooresville Regional Office Stormwater Permitting Program Files Central Files cc - M94194 " " State of North Carolina I Environmental Quality I Encrgy, Mineral and Land Resources 1612 Mail Service Center 1 512 Nonh Salisbury Street I Raleigh, North Carolina 27699-1612 M 767 9226 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030664 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Southwire Company, LLC is hereby authorized to discharge stormwater from a facility located at: Southwire Huntersville Plant 12331 Commerce Station Drive Huntersville Mecklenburg County to receiving waters designated as Cane Creek, a class C water in the Yadkin Pee -Dee River Basin; in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective April 11, 2016. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 11, 2016. , -.0"C'o for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission Division of Water Quality 1 Surface Water Protection National Pollutant Discharge Elimination System NCDENR "°`. """"°` PERMIT NAMEIOWNERSHIP CHANGE FORM ENNi1CMMVIi •!m NR JIi+L fi�lAeGC3 FOR AGENCY USE ONLY Date Received Year Month Day I. Please enter the permit number for which the change is requested. G iJ 3 " NPDES Permit (or) Certificate of Coverage i0 3 0 0 4 0 II. Permit status prior to requested change. a. Permit issued to (company name): ABB Inc. b. Person legally responsible for permit: John E Moore First MI Last EHS Manager Title 12331 Cotrtmerce Station Drive Permit Holder Mailing Address Huntersville NC 28478 City state Zip (704) 379-9626 (704) 379-9605 Phone Fax c. Facility name (discharge): ABB US High Voltage Cable d. Facility address: �T 12331 Commerce Station Drive Address Huntersville NC 2$078 City State Zip e. Facility contact person: John E. Moore (704) 379-4626 First / MI /Last Phone IIh Please provide the following for the requested change (revised permit). a. Request for change is a result of: ®Change in ownership of the facility ElName change of the facility or owner If other please explain: b. Permit issued to (company name): _ Southwire Company, LLC mit: c. Person legally responsible for per Torn Heberling First Mi Last Vice President, Energy Manufacturing RECEIVED Title 1 Southwire Drive AUG 112015 Permit Holder Mailing Address Carrollton GA 30119 pENR LAND QUALITY City State Zip BTORMWATER PERMITTINGITTENG (770) 832-4880 tom.heberling@southwire.com - Phone E-mail Address d. Facility name (discharge): Southwire Huntersville Plant e_ Facility address: 12331 Commerce Station Drive Address Huntersville NC 2$078 City State Zip f. Facility contact person: Chris McGill First MI Izst (704) 379-9726 chris.mcgill@southwire.eom Phone E-mail Address NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 IV. Permit contact information (if different from the person legally responsible for the permit) ✓ Permit contact: Bo Quick First M1 Last Director, Environmental Title I Southwire Drive Mailing Address Carrollton GA 30119 City State Zip (770) 832-4657 bo.quick@southwire.com Phone E-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ® This completed application is required for both name change and/or ownership change requests. ® Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): I, John E. Moore, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be re as incomplete. _1;7g V�cr13 Signature Date APPLICANT CERTIFICATION I, Tom Heberlin , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. k/ ho Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Quality Surface Water Protection Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Revised 70008 ASSET PURCHASE AGREEMENT BY AND BETWEEN SOUTHWIRE COMPANY, LLC (as Buyer) and ABB INC. (as Seller) JULY 4, 2015 NAI-1500395914v12 TABLE OF CONTENTS Page ARTICLE 1 PURCHASE OF ASSETS................................................................................ 1 1.1 Purchase and Sale of Assets ...............•-------------.....---•............----...................-----.... t 1.2 Excluded Assets..................................................................................................... 2 1.3 Assumed Liabilities............................................................................................... 4 1.4 Excluded Liabilities.....-----•---------------••-----.....---....----•-------.....-----..........----•-............ 5 1.5 Purchase Price........................................................................................................ 5 1.6 The Closing. ............................... ........................................................................... 5 1.7 Allocation of Purchase Price.....................................................................•...-----.--- 7 1.8 Closing Inventory Value Adjustment.................................................................... 7 19 Payment of Certain Monies---------------••----.....-----....----•-------...----....•---.....----•----------- $ 1.10 Further Assurances ....................... -------•----............................................................ 8 ARTICLE 11 REPRESENTATIONS AND WARRANTIES OF SELLER ...........................9 2.1 Organization, Qualification and Power.................................................................. 9 2.2 Authority.............................•----....----.............---....----•-••----.....---•..........-----....-----•.... 9 2.3 Noncontravention......................................... ............. ......................................... ..10 2.4 Tax Matters ...... .......................................... ........ .................................................. 10 7.5 Tangible Property; Sufficiency of Assets............................................................ to 2.6 Transferred Real Property ..................... ................ ....... 11 2.7 Intellectual Propem........................................................................... I ....... •........ 12 2.8 Contracts............................................................................................................. 13 2.9 Litigation..............................................................................................................14 2.10 Employment Matters .......... ................ ........ ................ .......................................... 14 2.11 Employee Benefits............................................................................................... 15 2.12 Environmental Matters......................................................................................... 15 2.13 Legal Compliance......... .............. ................ ............ ............................................ 16 2.14 Permits................................................................................................................. 16 2.15 Suppliers............................................................................................................. 16 2.16 Brokers' Fees....................................................................................................... 16 ARTICLE III REPRESENTATIONS AND WARRANTIES OF BUYER .......................... 16 3.1 Organization ......................................................................................................... 16 3.2 Authority..................................................._.......-_,.----..................---................---•-- 16 NA1-1 M395814v 12 i TABLE OF CONTENTS (continued) Page 3.3 Noncontravention—..............................................................................................17 3.4 Litigation.. ....................... _ ............................................ ................................ 17 3.5 Availability of Funds........................................................................................... 17 3.6 Solvency........................................................................................--....................17 3.7 Due Diligence...................................................................................................... 18 ARTICLE IV PRE -CLOSING COVENANTS..................................................................... 18 4.1 Closing Efforts..---..........-----.....................................---...----....----.......................... 18 4.2 Conduct of Operations ................ ................ ........ ............................ I.................... 19 4.3 Access.........................................................................—....................................._ 20 4A Pre -Closing Title Commitment and Survey.......................................................... 21 ARTICLE V CONDITIONS PRECEDENT TO CLOSING ............................................... 22 5.1 Conditions to Obligations of Buyer..................................................................... 22 5.2 Conditions to Obligations of Seller...................................................................... 23 5.3 Deemed Waiver................................................................................................... 23 5A Frustration of Closing Conditions.. .............................. ....................................... 23 ARTICLE VI INDEMNiFICATION..................................................................................... 24 6.1 [nderrinification by Seller .................. 24 6.2 Indemnification by Buyer ..................... ....................................... ........................ 24 6.3 Claims for Indemnification.................................................................................. 24 6.4 Survival................................................................................................................25 6.5 Limitations ........................................... ................................................................25 6.6 Treatment of Indemnification Payments.. --- __ .................................... ................ 28 6.7 Manner of Payment ............... .-------------- ------------- .....----------- ................... ............... 28 ARTICLE VII TAX MATTERS.......................................----...----....------......----...---................_ 28 7.1 Preparation and Filing of Tax Returns; Payment of Taxes .................................. 28 7.2 Allocation of Certain Taxes................................................................................ 29 7.3 Refunds and Carry•backs...................................................................................... 29 7.4 Cooperation on Tax Matters; Tax Audits............................................................ 29 7.5 Scope of Article VII............................................................................................. 30 ARTICLE Vlll TERMINATION ...................................... ....................................................... 30 8.1 Termination of Agreement................................................................................... 30 NAB 1500395814v 12 it TABLE OF CONTENTS (continued) Page 8.2 Effect of Termination........................................................................................... 30 ARTICLE IX EMPLOYEE MATTERS.. ............................................................ ................. 31 9.1 Offer of Employment; Continuation of Employment... ............... - ............. ..... _ 31 9.2 Compensation; Employee Benefits; Severance Plans .......................................... 31 9.3 Eligibility ............................................ .................. .................................... ----••--- 32 9.4 Accrued Vacation Time........................................................._......._......._.......... 32 9.5 Employment -Related Liabilities.......................................................................... 32 9.6 Workers Compensation ................................................. ...................................... 32 9.7 U.S. WARN Act ............................................................................ .................... 32 9.8 U.S. COBRA ..................... ..................................................................... .............. 33 9.9 No Third -Party Beneficiary Rights ..................... ARTICLE X OTHER POST -CLOSING COVENANTS..................................................... 33 10.1 Claims Against Directors, Managers, Officers and Employees .......................... 33 10.2 Right to Assert or Waive Privilege...................................................................... 33 10.3 Use of Names ...................................... ................... ........ ...................................... 34 10.4 Post -Closing Access and Cooperation................................................................. 34 10.5 Non -Competition by Seller .... ............................ ..................................... ...,........ 34 10.6 Non -Competition by Buyer............................................................................. .... 35 10.7 Employee Non -Solicitation ............................................. ......................... ............ 35 10.8 Assignment of Rights..............................................................................---.......--- 35 10.9 Transition Services........................................................................••----............... 36 ARTICLE XI DEFINITIONS................................................................................................ 36 11.1 Certain Definitions ............................ -.................................................................. 36 11.2 Certain Additional Definitions............................................................................. 41 ARTICLE XII MISCELLANEOUS....................................................................................... 42 12.1 Press Releases and Announcements.................................................................... 42 12.2 No Third Party Beneficiaries.............................................................................. 43 12.3 Entire Agreement................................................................................................. 43 12.4 Succession and Assignment................................................................................. 43 12.5 Notices................................................................................................................. 43 12.6 Amendments and Waivers.. ................................................................................. 44 NAi-M0395814v12 iii TABLE OF CONTENTS (continued) 12.7 Severabiiity.................................................................... 12.8 Expenses........................................................................ 12.9 Specific Performance ...................................... 12.10 Governing Law ............................................... 12.11 Submission to Jurisdiction .............................. 12.12 Bulk Transfer Laws ......................................... 12.13 Construction.................................................... 12.14 No Solicitation; Acquisition Proposals........... 12.15 Waiver of Jury Trial ........................................ 12.16 Further Representations .................................. 12.17 Counterparts and Facsimile Signature ............ Disclosure Schedule Schedules Schedule 1.1(b) Certain Acquired Assets Schedule 1.2(f) Excluded Inventory Schedule 1.2(u) Certain Excluded Assets Schedule 1.6(b) Transition Services Agreement Schedule D-I Acquired Contracts Schedule D-2 Designated Intellectual Property Schedule D-3 Closing Inventory Schedule D-4 Seller's Knowledge Persons Schedule D-5 Buyer's Knowledge Persons Schedule D-6 Operations Employees Schedule D-7 Transferred Real Property NA1-1500395814V12 1v Page •..................................... 44 ...................................... 45 .................................... 45 ...................................... 45 -------------------------------------- 45 ...................................... 45 ...................................... 45 ...................................... 46 ...................................... 47 ...................................... 47 ...................................... 47 ASSET PURCHASE AGREEMENT This ASSET PURCHASE AGREEMENT (thus "Agreement„) is entered into as of July 4, 2015 by and between Southwire Company, LLC, a Delaware limited liability company ("Buyer„), as buyer, and ABB Inc., a Delaware corporation ("Seller,), as seller. Seller and Buyer are each individually referred to herein as a "Ear! ,, and are collectively referred to herein as the "Parties.,, INTRODUCTION 1. Seller is the owner of a high voltage power cable manufacturing plant located at 12331 Commerce Station Drive, Huntersville, North Carolina (the "Facili „ ). For purposes of clarity, "Facility„ includes the Transferred Real Property, and all improvements thereon and made thereto. 2. Buyer desires to purchase from Seller, and Seller desires to sell to Buyer, the Acquired Assets. 3. Buyer desires to assume the Assumed Liabilities upon the terms and subject to the conditions set forth herein. 4. In connection with the purchase and sale of the Acquired Assets, Buyer and Seller desire to enter into the Ancillary Agreements. 5. Each capitalized term used in this Agreement has the meaning ascribed to it in Article Xl. In consideration of the representations, warranties, covenants and agreements contained in this Agreement and other good and valuable consideration, the receipt of which is hereby acknowledged, the Parties, intending to be legally bound, agree as follows: ARTICLE I PURCHASE OF ASSETS 1. l Purchase and Sale of Assets. On the basis of the representations, warranties, covenants and agreements and subject to the satisfaction or waiver of the conditions set: forth in this Agreement, at the Closing Seller will convey, assign, transfer and deliver to Buyer, and Buyer will purchase from Seller, free and clear of all Security Interests other than Permitted Liens, all of Seller's right, title and interest in, to and under, solely to the extent not an Excluded Asset, those assets, properties and rights existing as of the Closing and set forth in or described in the following clauses Ca) through (h) (collectively, the "Acquired Assets„): (a) except for the Excluded Inventory, all inventory of raw materials, work -in - process and finished goods, together with office supplies, maintenance supplies, manufacturing supplies and packaging materials, in each case that are located at the Facility and held primarily in connection with the Operations; NAI-1500345 S [ 4v l 2 NOTE: Pages 2 to 46 redacted as confidential business information knowingly encourage submission of proposals or offers from any person relating to any acquisition or purchase of a r6terial amount of the assets of, or any equity interest in, or any merger, consolidation or business combination with, the Facility (an "Acquisition Proposal"); (b) participate in any discussions or negotiations regarding, or furnish to any other Person any information with respect to, or otherwise cooperate in any way with or assist, facilitate or encourage any Acquisition Proposal by any Person; (c) enter into any agreement, arrangement or understanding with respect to an Acquisition Proposal; or (d) except for the sale of inventory or obsolete property, plant or equipment in the ordinary course of business, sell, transfer or otherwise dispose of any interest in the Facility. 12.15 Waiver of Jury Trial. To the extent permitted by applicable Law, each Party hereby irrevocably waives all rights to trial by jury in any action, proceeding or counterclaim (whether based on contract, tort or otherwise) arising out of or relating to this Agreement or the Transactions or the actions of any Party in the negotiation, administration, performance and enforcement of this Agreement. 12.16 Further Representations. Each of Seller and Buyer acknowledge and represent that it has been represented by its own legal.counsel in connection with the Transactions, with the opportunity to seek advice as to its legal rights from such counsel. Each of Seller and Buyer further represent that it is being independently advised as to the tax consequences of the Transactions and is not relying on any representation or statements made by the other as to such tax consequences. 12.17 CounterRarts and Facsimile Signature. This Agreement may be executed in one or more counterparts, and by the parties hereto in separate counterparts, each of which when executed will be deemed to be an original but all of which taken together will constitute one and the same agreement. Delivery of an executed counterpart of a signature page to this Agreement by telecopy or by electronic delivery in Adobe Portable Document Format or other electronic format based on common standards will be effective as delivery of a manually executed counterpart of this Agreement. (Signature page follows; NAi-15 00395914v 12 47 The Parties hereby execute this Agreement as of the date first above written. SOUTHWiRE COMPANY, LLC By: N : s+ Aga s•nic.t;, .la,� �...� ABB INC. By: Name: True: BY: Name: Title: Asset Purchase Agreement - Southwire Company, LLC and ABB Inc. The Parties hereby execute this Agreement as of the date first above written. SOUTHWIRE COMPANY, LLC By: Name: Title: ABB INC. By: Name: 74vi,D ..eEr&nNA Title: plea Asset Purchase Agreement — Southwire Company, LLC and ABB Inc. Energy, Mineral and Land Resources ENVIRONMENTAL OLIALITV Mr. Tom Heberling Southwire Company, LLC 1 Southwire Drive Carrollton, GA 30119 Dear Mr. Heberling: AP,q k��7 192016 L` iTCIlYr1f�'_ r Fyn =_�-►� April 11, 2016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secrerary TRACY DAVIS Director Subject: NPDES Stormwater Permit NCG030664 Southwire Company, LLC Formerly ABB, Inc. Mecklenburg County Division personnel received your request to revise your stormwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 707-9220, Sincerely, ORIGINAL SIGNED BY BETHANY GEORGOULIAS for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Mooresville Regional Office Stormwater Permitting Program Files Central Files State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 161'1 Mail Service Center 1 512 North Salisbury Street I Raleigh, North Carolina 27699-1612 919 707 9220 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES,: s. GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCGO30664 STORMWATER DISCHARGES ale NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEMC. In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Southwire Company, LLC is hereby authorized to discharge stonnwater from a facility located at: Southwire Huntersville Plant 12331 Commerce Station Drive Huntersville Mecklenburg County to receiving waters designated as Cane Creek, a class C water in the Yadkin Pee -Dee River Basin; in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, I1I, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective April 11, 2016. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 11, 2016, ORIGINAL SIGNED BY BETHANY GEORGOULIAS for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY April 11, 2016 Mr. Tom Heberling Southwire Company, LLC 1 Southwire Drive Carrollton, GA 30119 PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretan TRACY DAVIS Director Subject: NPDES Stormwater Permit NCG030664 Southwire Company, LLC Formerly ABB, Inc. Mecklenburg County Dear Mr. Heberling: Division personnel received your request to revise your storrnwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 707-9220, Sincerely, ORIGINAL SIGNED BY BETHANY GEORGOULIAS for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Mooresville Regional Office Stormwater Permitting Program Files Central Files State of North Carolina I Environmental Quality 1 Energy, Mineral and Land Resources 1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, North Carolina 27699-1612 919 707 9220 T ': STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030664 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Southwire Company, LLC is hereby authorized to discharge stormwater from a facility located at: Southwire Huntersville Plant 12331 Commerce Station Drive Huntersville Mecklenburg County to receiving waters designated as Cane Creek, a class C water in the Yadkin Pee -Dee River Basin; in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, II1, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective April 11, 2016, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 11, 2016. ORIGINAL. SIGNED BY BED ANY GFnRCOuL[AS for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission Division of Water Quality 1 Surface Water Protection r� +� National Pollutant Discharge Elimination System NCDENR PERMIT NAME/OWNERSHIP CHANGE FORM ��RpMM£}I� wKp NdlYLL iiEsawaCES FOR AGENCY USE ONLY Dale Received Year I Month I Da ( :�> I. Please enter the permit number for which the change is requested. h( GC, V 3 0 6 NPDES Permit (or) Certificate of Coverage N O M Q N Q G 0 3 0 0 0 0 U. Permit status arior to requested change. a. Permit issued to (company name): ABB Inc. b. Person legally responsible for permit: John E Moore First MI Last EHS Manager Title 12331 Commerce Station Drive Permit Holder Mailing Address Huntersville NC 28078 City State Zip (704)379-9626 (704)379-9605 Phone Fax c. Facility name (discharge): ABB US High Voltage Cable d. Facility address: 12331 Commerce Station Drive Address Huntersville NC 28078 City state Zip e. Facility contact person: John E. Moore (704) 379-9626 First / MI /Last Phone III. Please provide the following for the requested change (revised permit). a. Request for change is a result of: ®Change in ownership of the facility ❑ Name change of the facility or owner If other please explain: b. Permit issued to (company name): Southwire Company, LLC c. Person legally responsible for permit: Tom Heberling _ � First MI Last Vice President, Energy Manufacturing RECEIVED Title Sguthwire Drive A' +G 112015 U 1 �Q�� Permit Holder Mailing Address Carrollton GA 30119 DENR City State Zip S70RMW �R p�RMI+TM _(770) 832�$$0 torn.heberiing@so_uthwire.com ���G Phone E-mail Address d. Facility name (discharge): Southwire Huntersville Plant e. Facility address: 12331 Commerce Station Drive Address Huntersville NC 28078 City State Zip f. Facility contact person: Chris McGill First MI Last (704) 379-9726 chris.mcgill@southwire.com _ Phone E-mail Address NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 W. Permit contact information (if different from the person legally responsible for the permit) ✓ Permit contact: Bo Quick First MI Last Director, Environmental Title 1 Southwire Drive Mailing Address Carrollton GA 30119 City State Zip (770) 8324657 bo.quick@southwire.com Phone E-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) VI. Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ® This completed application is required for both name change and/or ownership change requests. ® Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. ..................................................................................................................... The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): I, John E. Moore, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be retu as incomplete. g f zcr13 Signature Date APPLICANT CERTIFICATION 1, Tom Heberling, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Quality Surface Water Protection Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Revised 72008 ASSET PURCHASE AGREEMENT BY AND BETWEEN SOUTHWIRE COMPANY, LLC (as Buyer) and ABB INC. (as Seller) JULY 4, 2015 NAI-1500395814vl2 TABLE OF CONTENTS Page ARTICLE I PURCHASE OF ASSETS..........................••----.................------------................... I 1.1 Purchase and Sale of Assets.............................•----...........................-----................. 1 1.2 Excluded Assets.........................................••------..---...................--------.----...............2 1.3 Assumed Liabilities............................................................................................... 4 [A Excluded Liabilities............................................................... .......... ...................... 5 1.5 Purchase Price...........................................................................----------...................5 1.6 The Closing.....................................................•-----....................--------..................... 5 1.7 Allocation of Purchase Price.................................................................................. 7 1.8 Closing Inventory Value Adjustment.................................................................... 7 1.9 Payment of Certain Monies................................................................•--................ 8 1.10 Further Assurances. ............................ ................................................................... 8 ARTICLE 11 REPRESENTATIONS AND WARRANTIES OF SELLER ...........................9 2.1 Organization, Qualification and Power.................................................................. 9 2.2 Authority..... ..................... ..................... ................................................................ 9 2.3 Noncontravenxion...............................................•.................................................10 2.4 Tax Matters..........--•--------•-•.......................................................-----•------............... 10 2.5 Tangible Property; Sufficiency of Assets ............. ......... ........-. 10 2-6 Transferred Real Property.................................................................................... 11 2.7 Intellectual Property..................................................................•---....................... I2 2,8 Contracts.............................................................................................................. 13 29 Litiaation................................ ............................................................................ 14 2.10 Employment Matters ................................................................................... ......... 14 2,11 Employee Benefits..........................................................................••-------............ 15 2.12 Environmental Matters........................................................................................ 15 2.13 Legal Compliance................................................................................................ 16 2.14 Permits..........................-......................-----.....--------..................... 115 Suppliers.............................................................................................................. 16 116 Brokers' Fees ................................................... ................ ARTICLE III REPRESENTATIONS AND WARRANTIES OF BUYER .......................... 16 3.1 Organization.................................................... 3.2 Authority—. .................... ................................. — .... — ...... -- ............................... 16 NA1-1 i00395814v 12 1 TABLE OF CONTENTS (continued) Page 3.3 Noncontravention...............................................................................................1.17 3.4 Litigation.............................................................................................--------- ...... 17 3.5 Availability of Funds................................................................ 3.6 Solvency............................................................................................................... 17 3.7 Due Diligence................................................................................. 18 ARTICLE IV PRE -CLOSING COVENANTS ............................................... 18 4.1 Closing Efforts.................................................................................................... 18 4.2 Conduct of Operations......................................................................................... 19 . 4.3 Access................................................................................. .... 20 4.4 Pre -Closing Title Commitment and Survey......................................................... 21 ARTICLE V CONDITIONS PRECEDENT TO CLOSING ............................................... 22 5.1 - Conditions to Obligations of Buyer..................................................................... 22 5.2 Conditions to Obligations of Seller...................................................................... 23 5.3 Deemed Waiver................................................................................................. 23 5.4 Frustration of Closing Conditions.......................:................................................ 23 ARTICLE VI INDEMNIFICATION..................................................................................... 24 6.1 Indemnification by Seller, ... ................................................... z ................ ............ 24 6-2 Indemnification by Buyer.................................................................................... 24 6-3 Claims for Indemnification..................................................................................24 6-4 Survival................................................................................................. ..25 6.5 Limitations...........................................................................................................25 6.6 Treatment of Indemnification Pavments.............................................................. 28 6.7 Manner of Payment.............................................................................................. 28 ARTICLE V1I TAX MATTERS.............................................................................................. 28 7.1 Preparation and Filing of Tax Returns; Payment of Takes .................................. 28 T2 Allocation of Certain Taxes................................................................................. 29 7.3 Refunds and Carrybacks...................................................................................... 29 7-4 Cooperation on Tax Matters; Tax Audits............................................................ 29 7.5 Scope of Article VI1............................................................................................. 30 ARTICLE VIII TERMINATION............................................................................... ...30 8.1 Termination of Agreement................................................................. ----- 30 NAI-1500395814vU 11 TABLE OF CONTENTS (continued) Page 8.2 Effect of Termination........................................................................................... 30 ARTICLE IX EMPLOYEE MATTERS................................................................................ 31 9.1 Offer of Employment; Continuation of Employment .......................................... 31 9.2 Compensation; Employee Benefits; Severance Plans. ......................................... 31 9-3 Eligibility ....... ................................... ................................. ................. ............... 32 9.4 Accrued Vacation Time....................................................................................... 32 9.5 Employment -Related Liabilities.......................................................................... 32 9.6 Workers Compensation ...................... ................................. ................................. 32 9.7 U.S. WARN Act... ..... ............... ................................................. ....................... 32 9.8 U.S. COBRA........................................................................................................ 33 9.9 No Third -Party Beneficiary Rights...................................................................... 33 ARTICLE X OTHER POST -CLOSING COVENANTS. ................................... _ ............... 33 10.1 Claims Against Directors, Managers, Officers and Employees .......................... 33 10.2 Right to Assert or Waive Privilege ........................... 33 10.3 Use of Names....................................................................................................... 34 10.4 Post -Closing Access and Cooperation................................................................. 34 10.5 Non -Competition by Seller.................................................................................. 34 10.6 Non -Competition by Buyer.................................................................................. 35 10.7 Employee Non-Solicitation.................................................................................. 35 10_8 Assignment of Rights... ........ _ .......... 10.9 Transition Services............................................................................................. 36 ARTICLE Xi DEFINITIONS ............................... ................................................................. 36 11.1 Certain Definitions.......................................---..................................................... 36 11.2 Certain Additional Definitions............................................................................. 41 ARTICLE X11 MISCELLANEOUS ....................................... ......... ............................. .......... 42 12.1 Press Releases and Announcements.................................................................... 42 12.2 No Third Party Beneficiaries ....................................... .. 43 12.3 Entire Agreement ................... .... ........... ...................................................... I ........ 43 12.4 Succession and Assignment................................................................................. 43 12.5 Notices........................................................... ............. ......... .............. .................. 43 12.6 Amendments and Waivers................................................................................... 44 NAI-15003e58i4vE2 iii TABLE OF CONTENTS (continued) 12.7 Severability.............................................. 12.8 Expenses ................................................. 129 Specific Performance ................... 12.14 Governing Law ....................................... 12. l l Submission to Jurisdiction ...................... 12.12 Bulk Transfer Laws ................................. 12.13 Construction ............................................ 12.14 No Solicitation; Acquisition Proposals--- 12.15 Waiver of Jury Trial ................................ 12.16 Further Representations ........................ 12.17 Counterparts and Facsimile Signature .... Disclosure Schedule Schedules Schedule l.l(b) Certain Acquired Assets Schedule 1.2(f) Excluded Inventory Schedule 1.2(u) Certain Excluded Assets Schedule 1.6(b) Transition Services Agreement Schedule D-1 Acquired Contracts Schedule D-2 Designated Intellectual Property Schedule D-3 Closing Inventory Schedule D-4 Seller's Knowledge Persons Schedule D-5 Buyer's Knowledge Persons Schedule D-6 Operations Employees Schedule D-7 Transferred Real Property NA1.1500395814v12 iv Page .......................................................... 44 .......................................................... 45 .......................................................... 45 ........................ ................... .....45 ......................................................... 45 .......................................................... 45 .......................................................... 45 .......................................................... 46 I-- ... .-------- ..........................47 .......................................................... 47 .......................................................... 47 ASSET PURCHASE AGREEMENT This ASSET PURCHASE AGREEMENT (this "Agreement„) is entered into as of July 4, 2015 by and between Southwire Company, LLC, a Delaware limited liability company ("Buyer, ), as buyer, and ABB Inc., a Delaware corporation ("Seller„), as seller. Seller and Buyer are each individually referred to herein as a "Par ,, and are collectively referred to herein as the "Parties.,, INTRODUCTION 1. Seller is the owner of a high voltage power cable manufacturing plant located at 12331 Commerce Station Drive, Huntersville, North Carolina (the "Facili „). For purposes of clarity, "Facility„ includes the Transferred Real Property, and all improvements thereon and made thereto. 2. Buyer desires to purchase from Seller, and Seller desires to sell to Buyer, the Acquired Assets. 3. Buyer desires to assume the Assumed Liabilities upon the terms and subject to the conditions set forth herein. 4. In connection with the purchase and sale of the Acquired Assets, Buyer and Seller desire to enter into the Ancillary Agreements. 5. Each capitalized term used in this Agreement has the meaning ascribed to it in Article XI. In consideration of the representations, warranties, covenants and agreements contained in this Agreement and other good and valuable consideration, the receipt of which is hereby acknowledged, the Parties, intending to be legally bound, agree as follows: ARTICLE I PURCHASE OF ASSETS 1.1 Purchase and Sale of Assets. On the basis of the representations, warranties, covenants and agreements and subject to the satisfaction or waiver of the conditions set forth in this Agreement, at the Closing Seller will convey, assign, transfer and deliver to Buyer, and Buyer will purchase from Seller, free and clear of all Security Interests other than Permitted Liens, all of Seller's right, title and interest in, to and under, solely to the extent not an Excluded Asset, those assets, properties and rights existing as of the Closing and set forth in or described in the following clauses U through �W (collectively, the "Acquired Assets„): (a) except for the Excluded Inventory, all inventory of raw materials, work -in - process and finished goods, together with office supplies, maintenance supplies, manufacturing supplies and packaging materials, in each ease that are located at the Facility and held primarily in connection with the Operations; NAI-I500395914v 12 NOTE: Pages 2 to 46 redacted as confidential business information knowingly encourage submission of proposals or offers from any person relating to any acquisition or purchase of a material amount of the assets of, or any equity interest in, or any merger, consolidation or business combination with, the Facility (an "Acquisition Proposal"); (b) participate in any discussions or negotiations regarding, or furnish to any other Person any information with respect to, or otherwise cooperate in any way with or assist, facilitate or encourage any Acquisition Proposal by any Person; (c) enter into any agreement, arrangement or understanding with respect to an Acquisition Proposal; or (d) except for the sale of inventory or obsolete property, plant or equipment in the ordinary course of business, sell, transfer or otherwise dispose of any interest in the Facility. 12.15 Waiver of Jury Trial. To the extent permitted by applicable Law, each Party hereby irrevocably waives all rights to trial by jury in any action, proceeding or counterclaim (whether based on contract, tort or otherwise) arising out of or relating to this Agreement or the Transactions or the actions of any Party in the negotiation, administration, performance and enforcement of this Agreement. 12.16 Further Representations. Each of Seller and Buyer acknowledge and represent that it has been represented by its own legal counsel in connection with the Transactions, with the opportunity to seek advice as to its legal rights from such counsel. Each of Seller and Buyer further represent that it is being independently advised as to the tax consequences of the Transactions and is not relying on any representation or statements made by the other as to such tax consequences. 12.17 Counterparts and Facsimile Signature. This Agreement may be executed in one or more counterparts, and by the parties hereto in separate counterparts, each of which when executed will be deemed to be an original but all of which taken together will constitute one and the same agreement. Delivery of an executed counterpart of a signature page to this Agreement by telecopy or by electronic delivery in Adobe Portable Document Format or other electronic format based on common standards will be effective as delivery of a manually executed counterpart of this Agreement. [Signature page follows,, NAl- l 300395814v l2 47 The Parties hereby execute this Agreement as of the date first above written. SOUTH WIRE COMPANY, LLC By: N : se 44At ABB INC. By: Name: Title: By: Name: Title: Asset Purchase Agreement — 5outhwire Company, LLC and ABB Inc_ The Parties hereby execute this Agreement as of the date first above written. SOUTHW IRE COMPANY, LLC By: Name: Title: ABB INC. By: Name: Title: Y1 CQ /a/ddr po--it1T A4 Asset Purchase Agreement — Southwire Company, LLC and ABB Inc. Bennett, Bradley From: Priddy, Corey <Corey.Priddy@mecklenburgoountync.gov> Sent: Thursday, April 07, 2016 2:33 PM To: Bennett, Bradley Cc: Rozzelle, Rusty; Hodge, Tom Subject: ABB/Southwire Bradley, We now have approved asbuilts for the BMWs for this project. Thank you for all of your help with it. Sincerely, Corey T. Priddy, CPESC Environmental Supervisor Charlotte -Mecklenburg Storm Water Services Permitting & Compliance Program 2145 Suttle Avenue Charlotte, NC 28208-5237 Office: 980-314-3221 Cellular: 980-721-9058 coney_priddy@mecklenburgcountync.gov AConsider the environment before printing this email or the attachment Bennett, Bradley From: Priddy, Corey <Corey.Priddy@mecklenburgcountync.gov> Sent: Monday, March 14, 2016 10:54 AM To: 'Lynn Yeargin'; 'baucom c@mcadamsco.com; 'david.jenkins@us.abb.com' Cc: Hodge, Tom; Nowocin, Adam; Bennett, Bradley Subject: RE: Re. ABB Facility (EPM#359922) Lynn, I have spoken with both Adam and Tom and we are in agreement to forgo items 2 and 3 listed below. This is a onetime exception and not a rule to be used in the future. This is being allowed since I was at the site during the installation of all of the BMP's, and since they have been in the ground and functioning for several years. We have also reached out to the original engineer to see if we can get a copy of the design calculations for the BMWs. The design engineer seems agreeable to help us find these calculations. Once we get these calculations, we can determine if the BMP's that have been constructed match what was shown on the approved plan. Please let me know if you have any questions. Sincerely, Corey T. Priddy, CPESC Environmental Supervisor Charlotte -Mecklenburg Storm Water Services Permitting & Compliance Program 2145 Suttle Avenue Charlotte, NC 28208-5237 Office: 980-314-3221 Cellular: 980-721-9058 Corey.priddyCa)mecklenburgcountync.gov AConsider the environment before printing this email or the attachment. From: Nowocin, Adam Sent: Thursday, March 10, 2016 4:57 PM To: Hodge, Tom; david.ienkins@us.abb.com Cc: Baucom, Kevin; Bradley Priest Subject: RE: Re: ABB Facility'(EPM#359922) David, I was able to take a quick look at the as -built submittal items and noticed we are still missing some information. Please email me the missing BMP As -Built Submittal items: Copy of Approved Calcs with Proposed Info Crossed Out with As -Built Info Added a.Re-Run Calcs with As -Built Info and Provide Results [MISSING) 2. Mecklenburg County BMP Maintenance and Inspection Check Lists (Appendix 7-3) [MISSING) PROVIDE A CHECK LIST FOR EACH BMP AND EACH DRY DETENTION (AS APPLICABLE) http,://charmeck.org/stormwaterlregulationSLPap,esl ostConstructionAdminManualCountyTowns.asoxx 3. Post -Construction Storm Water Ordinance Compliance Certification (Appendix 12-1) [MISSING) httr_)://charmeck.or /stormwater/regulations/Pa es/PostConstructionAdminManuaICountyTowns.asox Thanks! Adam M. Nowocin, PE Project Manager Mecklenburg LUESA Land Use and Envirronme 2145 Suttle Avenue Charlotte, NC 28208 (980) 314-3232 Office From: Hodge, Tom Sent: Wednesday, March 09, 2016 3:37 PM To: david.ienkins@us.abb_com Cc: Baucom, Kevin; Nowocin, Adam Subject: Re: ABB Facility (EPM#359922) David, County, NC- 21 Services Aaencv I talked with Adam today and he was going to try and look at this project this week. Our standard review time goal is to have the review done within 21 calendar days after approval by both Town and County in intake. The County approved intake on 3/4/2016 and the Town on 3/7/2016. The 21 day goal would be 3/29/2016. David, I don't think you have access to EPM so I am also copying Adam and the surveyor so that you can be kept in the loop of correspondence about the review. 2 ��r:y Mecklenburg CouAnj NC Electronic Plan Management Prodecf Delafla Project Name: Address: Review Type: Project Status: Histo Graphical View Address Activity Assign ProlectCoordinator Edit Application Submitted Files Resubmit Package Chance Proied Status Manage Fees Enter Proied Note Email Noiiflution Pro-ect Explorgr Approved Package Thanks, ABB Fadl* (#359922) 12331 COMMERCE STATION OR HUNTERSVILLE AS -Built Storm Drainage & As -Build BMP Routing And Review Submitted Files Application tti FiieyA Namef Sutimsttii Application Form 20 10-13 Land Div Application. adf Brandon Plunkett C Uploaded Drawing;Project Files Review Cycle: 2 P w. � 61 Fii-T.ype rKira.:+:: ;�x i=r1e'Name`� a, r Submrttet g} Project File 2016-0-22 Storm As -built Brandon Pit Project File 2016-02-26 Plan With Asbuilt Cross-Thrus-W Brandon Pit Project File DB 27846-1. Recorded Maintenance Agreement. pdf Brandon Pli Project File PB 58-975- ABB Easement Plat, pd# Brandon Ph Tom Hodge, P.E. Lead Project Manager Charlotte -Mecklenburg Storm Water Services Permitting & Compliance Program Office Hours: 8:OOAM to 4:30PM 2145 Suttle Avenue Charlotte, NC 28208-5237 ph: (980)-314-3203 kA C resider the environment bafore pnnntina this email or tfia attnthment 3 i ti Bennett, Bradley From: Priddy, Corey <Corey.Priddy@mecklenburgcountync.gov> Sent: Monday, March 14, 2016 10:50 AM To: Bennett, Bradley Cc: Rozzelle, Rusty Subject: RE: Permit NCG030664 Bradley, I am going to copy you on an email that should hopefully let you see where we are at in the process. We are getting closer and hope to have all of our issues resolved shortly. I will let you know once we are good to go. Thank you again for helping us to get this matter resolved. Sincerely, Corey T. Priddy, CPESC Environmental Supervisor Charlotte -Mecklenburg Storm Water Services Permitting & Compliance Program 2145 Suttle Avenue Charlotte, NC 28208-5237 Office: 980-314-3221 Cellular: 980-721-9058 corey.priddy@mecklenburgcountync.gov AConsider the environment before printing this email or the attachment - From: Bennett, Bradley [mailto:bradley.bennett@ncdenr.gov] Sent: Friday, March 11, 2016 11:00 AM To: Priddy, Corey <Corey.Priddy@mecklenburgcountync.gov> Cc: Rozzelle, Rusty <Rusty. Rozzelle @mecklenburgcountync.gov> Subject: RE: Permit NCG030664 Hi Carey, Hope you are doing well. I wanted to check in on this one again and see where we stood. We have been holding their Name/Ownership change request since last August so I wanted to see if they are any closer to getting you guys what you need so we can move forward here. Thanks BB Bradley Bennett Stormwater Permitting Program NC Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, NC 27699-1612 Phone: (919) 807-6378 Fax: (919) 807-6494 Email: bradley.bennettcDncdenr.gov Web: hftp;llportal.ncdenr.or_g/webllr/storTnwater Email correspondence to and from this address may be subject to public records laws From: Priddy, Corey lmailto:Corey.Priddy &mecklenburgcounimc.gov] Sent: Wednesday, November 25, 2015 10:15 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> Cc: Rozzelle, Rusty <Rust .Rozzelle mecklenbur count nc. ov> Subject: RE: Permit NCG030664 Some plans were submitted, but were disapproved. There was additional information that was needed in order to perform the review. The additional information needed, was sent to the surveyor who submitted the plans on November2, 2015. Please note Land Use and Environmental Services Agency (LUESA) is relocating effective December 21, 2015. Our new address and my new phone number will be: 2145 Suttle Avenue Charlotte, NC 28208-5237 980-314-3221 Sincerely, Corey T. Priddy, CPESC Environmental Supervisor Charlotte -Mecklenburg Storm Water Services Permitting & Compliance Program 700 North Tryon Street Charlotte, NC 28202 Office: 704-336-6312 Cellular: 980-721-9058 Fax: 704-336-4391 Corey.priddy@mecklenburgcountync.p,ov sAConsider the environment before printing this email or the attachment From: Bennett, Bradley jmailto:bradley.bennett@ncdenr.povJ Sent: Wednesday, November 25, 2015 6:57 AM To: Priddy, Corey Cc: Rozzelle, Rusty Subject: FW: Permit NCG03O664 Corey, Just looked back at my emails and realized that maybe Southwire has submitted the plans, but they were under review. do you know if they have been finalized yet by Huntersville? BB Bradley Bennett Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resouroes ( Fax: (919) 807-6494 1612 Mail Service Center Email: bradley.benneit0mcdenr.gov Raleigh, NC 27699-1612 Web: http:!/Aortal.ngdgnr.or-qtwebAr/stormwater Email correspondence to and from this address may be subject to public records laws 2 { From: Todd Chikodroff [mailto:Todd.Chikodroff@southwire.com] Sent: Tuesday, November 24, 2015 8:34 PM To: Bennett, Bradley <bradley.bennett@ncdenr.eov> Cc: Rozzelle, Rusty<Rusty. RozzeIle@mecklenburgcou_ntync.pov>; Priddy, Corey <Core .Pridd mecklenbur count nc, ov>; John E Moore <John.E.Moore southwire.com> Subject: Re: Permit NCG030664 Hello Bradley Could you please advise what information is needed. I was not aware that anything was required from Southwire. Thanks in advance. Sent from my Whone On Nov 23, 2015, at 5:07 PM, Bennett, Bradley <bradley.bennettoa ncdenr.eov> wrote: Mr. Chikodroff Just wanted to touch base and see if there is any update to the information required for this permit transfer. Thanks Bradley Sennett Stormwater Permitting Program j Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494 1612 Mail Service Center Email: bradley.benneft@ncdenr.gov Raleigh, NC 27699-1612 Web: http://portal.ncdenr.org/webAr/stormwater Email correspondence to and from this address may be subject to public records laws From. Todd Chikodroff [maiIto :Todd.Chikodroff@southwire.com] Sent: Tuesday, October 20, 2015 12:24 PM To: Rozzelle, Rusty < Rusty. Rozzelle@mecklenburgcountync.eov>; Bennett, Bradley <bradtey.bennett2ncdenr.eov>; Priddy, Corey <Corey.Priddy@mecklenburpcountync,g_ov> Subject: RE. Permit NCG030664 I appreciate your quick response on this issue. Todd Chikodroff Quality & EHS Manager Energy Division 12331 Commerce Station Drive Huntersville, NC 28078 — United States Office: 704-379-9617 Cell: 919-412-1582 Email: todd.chikodroff@southwire.com From: Rozzelle, Rusty [mailto:Rusty. ROZZeIle @mecklenburgcountync.govl Sent: Tuesday, October 20, 2015 8:39 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov>; Priddy, Corey <Core . Prid dyP mecklenbur count nc. ov> Cc: Todd Chikodroff <Todd.Chikodroff@southwire.com> Subject: RE: Permit NCG030664 Bradley, l see that Corey responded to your email. I too want to thank you for working with us on this. It has been a very big help. From: Bennett, Bradley [mailto: brad ley. ben nett@ncdenr.govl Sent: Tuesday, October 20, 2015 8:21 AM To: Rozzelle, Rusty; Priddy, Corey Cc: Todd. Chikodroff0southwire.corn Subject: FW: Permit NCG030664 Rusty, Corey, Just wanted to check in with you on the ABB (now Southwire) facility and see if you have all the as -built info you need. I am forwarding this message from Todd Chikodroff with Southwire so you have his information also for contact. He indicated that they have submitted the as -built drawings (to Huntersville) and wants to know if you have all the information you need. Once we know that you have the information you need we can move forward with reissuing the permit to the new owners. Thanks BB Bradley Bennett Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources j Fax: (919) 807-6494 1612 Mail Service Center ) Email: bradley.bennetta@nodenr.gov Raleigh, NC 27699.1612 Web: http:iiportal.ncdenr.o[g/webAr/stormwater Email conwpondence to and from this address may be subject to public records laws From: Todd Chikodroff [mailto:Todd.Chikodroff@southwire.com Sent: Tuesday, October 20, 2015 8.14 AM To: Bennett, Bradley <bradley.bennettt2ncdenr.eov> Cc: John E Moore <John.E.Moore@southwire.com_> Subject: Permit NCG030664 Bradley 4 Can you please contact Rusty Razei to determine if he has the drawings from ABB and they are being reviewed. Thank you Todd Chikodroff Quality & EHS Manager Energy Division 12331 Commerce Station Drive Huntersville, NC 28078 — United States Office: 7G4-379-9617 Cell: 919-412-1582 Email: todd.chikodroff@southwire.com ?,,z4,(SoWhwiW (ham Sonflhwiw ima e002.i ima e002. ima e002. ima e002.' ima e002. ima e002. Strong. Sustainable. Southwire SouthwireSustainability.com Please click on this hyperlink to read our email security disdaimer htta:llwww.southwire,corMeaatlernail disclaimer.html 4 & cdrmIR North Carolina Department of Environment and Natural Resources Pat McCrory Governor John Moore ABB Inc. - US High Voltage Cable 12331 Commerce Station Drive Huntersville, NC 28078 Dear Mr. Moore: July 31, 2015 Donald R. van der Vaart Secretary r Subject: General Permit No. NCG030000 ABB US High Voltage Cable COC NCG030664 Mecklenburg County In accordance with your application for a discharge permit received on July 20, 2015, we are forwarding herewith the subject certificate of coverage to discharge under the subject state NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral and band Resources. The Division may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mineral and Land Resources or permits required by the Division of Water Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. Division of Energy, Mineral, and Land Resources Energy Section - Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX 919-715-MOO 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: hgp_l/portal.ncdenr.or, ebArl An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled L 10% Post Consumer Paper r Mr. John Moore July 31, 2015 Page 2 of 2 If you have any questions concerning this permit, please contact Bradley Bennett at telephone number (919) 807-6378 Sincerely, ORIGINAL SIGNED W KEN PICKLE for Tracy E. Davis, P.E., CPM cc: Mooresville Regional Office, Zahid Khan Central Files Stormwater Permitting Unit Files Mecklenburg County DEP, Water Quality, 700 N. Tryon Street, Charlotte, NC 28202 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO, NCG030000 CERTIFICATE,QF COVERAGE No. NCGO 0b64 STORMWATER DISCHARGES In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, ABB, Inc. is hereby authorized to discharge stormwater from a facility located at ABB US High Voltage Cable 12331 Commerce Station Drive Huntersville Mecklenburg County to receiving waters designated as Cane Creek, a class C water in the Yadldn Pee -Dee River -Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, I1,111 and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective July 31, 2015. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 31, 2015. ORIGINAL SIGNED B! KEN PICKLE for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission LOCATION MAP: PIVPI WOW. DR! ^mow ' O �` CFM ��b•� HU,DCTERSW LLE" t _ ff %r (A(AD RO �IAS.ST �' /l � ' Q�• � ', ...r SCE 1 ABB US High C r o Voltage Cable ^ ' J,� .�I j � � ram' .r �'�r I !\. /� O - �• �l. l� /~.F� S. ��4������. I +. ! ! _iti''-s�"i i i l \-']•. ! i ��S 1 1� ♦� / Ir�i V . USGS Maps: Cornelius Latitude: 35" 23' 35.51" N NCG030664 Facile `r Longitude: 80' 50' 01.91" W ABB Inc. -US High Voltage County: Mecklenburg Cable Location Stream Class: C Receiving Stream: Cane Creek Sub -basin: 03-07-11 (Yadkin 'Pee -Dee River Basin) _ `1 L �ottli Not to Scale Arm lC61 rN North Carolina Department of Environment and Natural Resources Pat McCrory Governor John Moore ABB Inc. — US High Voltage Cable 12331 Commerce Station Drive Huntersville, NC 28078 Dear Mr. Moore: Donald R. van der Vaart Secretary July 31, 2015 ' � Oj GI ��o � 4o'01 e 7//16 Subject: General Permit No. NCG030000 ABB US High Voltage Cable COC NCG030664 Mecklenburg County In accordance with your application for a discharge permit received on July 20, 2015, we are forwarding herewith the subject certificate of coverage to discharge under the subject state NPDES general permit This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral and Land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage. This.permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mineral and Land Resources or permits required by the Division of Water Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699.1612.919-707-9200I FAX 919-715-Mi 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:Ilgortal.nodenr.orgtwebArl An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Mr. John Moore July 31, 2015 Page 2 of 2 If you have any questions concerning this permit, please contact Bradley Bennett at telephone number (919) 807-6378 Sincerely, ORIGINAL SIGNED B) KEN PICKLE for Tracy E. Davis, P.E., CPM cc: Mooresville Regional Office, Zahid Khan Central Files Stormwater Permitting Unit Files Mecklenburg County DEP, Water Quality, 700 N. Tryon Street, Charlotte, NC 28202 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COYERAKiE.No. bUD30664 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, ABB, Inc. is hereby authorized to discharge stormwater from a facility located at ABB US High Voltage Cable 12331 Commerce Station Drive Huntersville Mecklenburg County to receiving waters designated as Cane Creek, a class C water in the Yadkin Pee -Dee River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, I1,111 and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective July 31, 2015. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 31, 2015. OWN& 1C1� gN KEN for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission LOCATION MAP: /LI f/ E. HUNTERSMI+LLrr M's • _�`�. F,��4" �'l{ % Jam. J� � o. �, �' e ,. � � �� 2� lit, % i � r.i.�"'_•. £ � '�� •� � i�� i Y � � � {: ' j .` ( �, < �l Aso � j•Z ti RfjSF�EtYD \ 1 ABB US High i K4 r Voltage Cable i i � ter° Q:/—�� ? :� } � ,!� � ✓ -} � { s —,. � ` � �C ` � l_�` � � 4 i��'+ �•J 71 iS i 1..� f ��I j)/�`\�1 r q lr i - }5 C� (�^ ii�J \� , USGS Maps: Comelius Latitude: 35a 23' 35.51" N NCG030664 Facility Longitude: 8(r 50' 01.91" W ABB Inc. -US Hlgh Voltage County: Mecklenburg Cable Location Stream .Class: C Receiving Stream: Cane Creek L Sub -basin: 03-07-11 (Yadkin Pee -Dee River Basin) Not to Scale Bennett, Bradley From: Rozzelle, Rusty Rusty.Rozzelle@mecklenburgcountync.gov> Sent: Wednesday, July 22, 2015 4:02 PM To: Bennett, Bradley Cc: Priddy, Corey Subject: RE: Questions on Permit Application That would be great. Thank you very much. From: Bennett, Bradley [mailto:bradley.bennett@ncdenr.gov] Sent: Wednesday, July 22, 2015 3:56 PM To: Rozzelle, Rusty Cc: Priddy, Corey Subject: RE: Questions on Permit Application Rusty, We will move forward with issuance of the permit. They are selling the facility and will be coming back in pretty soon for an ownership change. Maybe we can require that they show us completion of the as -built process with you before we process the ownership change. BB Bradley Bennett Stormwater Permitting Program J Phone: (919) 807-6378 NC Division of Energy, Mineral and land Resources Fax: (919) 807-6494 1612 Mail Service Center Email: bradley.ben nettcDncdenr.gov Raleigh, NC 27690,1612 Web: http:lipartal.ncdenr.orolwebllrlstormwater Email correspondence to and from this address may be subject to public records laws From: Rozzelle, Rusty [mailto:Rusty_Rozzelle@mecklenburecounty c.eov] Sent: Wednesday, July 22, 2015 3:28 PM To: Bennett, Bradley; Priddy, Corey Subject: RE: Questions on Permit Application We hope so. They have been aware of this for the past 2 years. We are closer than we have ever been before. I think you have done all you can do. Thank you very much! E From: Bennett, Bradley [mailto:bradley.bennett@ncdenr.eov] Sent: Tuesday, July 21, 2015 1:01 PM To: Rozzelle, Rusty; Priddy, Corey Subject: FW: Questions on Permit Application Rusty, Corey FYI Here is the response I got from Mr. Moore. Do you guys think they are on track to get this done? BB Bradley Bennett Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494 1612 Mail Service Center Email: bradley- ben neft§ncdenr.gov Raleigh, NC 27699-1612 Web: http:llportal_.ncdenr.org/webllrlstormwater Email correspondence to and from this address may be subject to public records laws From: John Moore f_mailto:iohn.moore@us.abb.coml Sent: Tuesday, July 21, 2015 10:52 AM To: Bennett, Bradley Cc: Todd Chikodroff Subject: RE: Questions on Permit Application Mr. Bennett, Yes there have been recent conversations with Corey Priddy, (Mecklenburg Stormwater Inspector) on the issue of the missing as built drawings. I had a conference call with the survey company(McAdams), pond maintenance company, facility manager and Mr. Priddy on July 8 to confirm that next steps are moving forward. This can be confirmed with Mr. Priddy if you wish. From: Bennett, Bradley[maiIto: brad ley. ben nett@ncdenr.eovI Sent: Tuesday, July 21, 2015 10:40 AM To: John Moore Subject: Questions on Permit Application Mr. Moore, After receiving your NCGO3OOOO permit application yesterday I checked with Mecklenburg County for information prior to our moving forward our review. Mecklenburg County has an agreement with our Department to assist with NPDES inspection efforts in their county jurisdiction so they are familiar with your facility. The county noted a number of inspections over time and while they didn't appear to have any concerns with the permit, they did have a concern about information that has not been provided to them. They noted that the facility was in non-compliance with the Huntersville post -construction ordinance because you have not provided required as -built information for the BMPs (Stormwater Best Management Practices) on your property. it will help our process forward with your permit to have assurances that you have resolved this issue with the County and Huntersville. Bradley Bennett Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494 16W Mail Service Center Email: bradle .bennett ncdenr. ov Raleigh, NC 27699-1612 j Web: hfp:ilportal.ncdenr.org/webAr/stormwater Email correspondence to and from this address may be subject to public records laws Bennett, Bradley From: Rozzelle, Rusty Rusty.Rozzelle@meeklenburgcountync.gov> Sent: Wednesday, July 22, 2015 3:28 PM To: Bennett, Bradley Subject: RE: Checking on a Facility Bradley, Thank you very much! From: Bennett, Bradley tmailto:bradley.bennett@ncdenr.gov] Sent: Tuesday, July 21, 2015 11:00 AM To: Rozzelle, Rusty Cc: Priddy, Corey Subject: RE: Checking on a Facility Rusty, I have contacted John Moore with ABB and passed along the concern with them meeting the local government requirements for as-bulit information. I have indicated that our process to move forward with the permit will be improved if we have assurances that they have met your needs. BB Bradley Bennett Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494 1612 Mail Service Center Email: bradley.bennett(tedenr.gov Raleigh, NC 27699-1612 Web: h:14?ortal.ncdenr.oMtwebllrlstormwater Email correspondence to and from this address may be subject to public records laws From: Rozzelle, Rusty (mailto:Rusty.Rozzelle@mecklenburgcountync_Rov] Sent: Monday, July 20, 2015 5:42 PM To: Bennett, Bradley Cc: Priddy, Corey Subject: RE: Checking on a Facility Bradley, We have been to the facility nine (9) times to inspect their onsite BMP. On two (2) other occasions we responded to spills at the facility and required corrective actions. No water quality impacts were documented. The only current outstanding issue that we have with ABB is that they have not submitted the required as-builts for their BMP. Until the as-builts are received and approved by the County they are in noncompliance with Huntersville's Post -Construction Ordinance. If you can help with this issue it would be much appreciated. Also, we didn't know they were trying to sell the facility. We would not want the property to change hands without the as-builts being approved. This will put a burden on the new owner of the BMP. If you need copies of any of our reports, please let me know. Thank you. From: Bennett, Bradley[maiIto: brad ley. bennett@ncdenr.govl Sent: Monday, July 20, 2015 3:56 PM To: Rozzelle, Rusty Subject: Checking on a Facility Hey Rusty, We have a facility that thought they had stormwater permit coverage but are just finding now that they don't. They were following the general permit, but just never went through the permit process. Anyway, they have submitted now and are working through the process quickly since they are selling the property at the end of the month. I'm just checking with you to see if you guys are familiar with the facility and have any comments/ concerns about permit coverage. Your input would help us to be able to move forward quickly with getting their coverage in place. The facility is ABB, Inc. — US High Voltage Cable located at 12331 Commerce Station Drive in Huntersville, NC. Thanks BB Bradley Bennet# Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494 1612 Mail Service Center Email: bradley.bennetta@ncdenr.gov Raleigh, NC 27699-1612 Web: htto:!/portal.ncdenr.oTgtwebfiristom water Email correspondence to and from this address may be subject to public records laws Division of Water Quality / Surface Water A74;- Protection Section Av NCDENRNational Pollutant Discharge Elimination System Frrreaarrr un Naur.lV�n=wa NCG030000 NOTICE OF INTENT MR AGENCY USE ONLY Date Received Year Month Da Certificate of Covers e N -fleck illit i�etIDlt Assihed to Men tie tt National Pollutant Discharge Elimination System application for coverage under General Permit NCG030000: STORMWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) 335 Rolling, Drawing, and Extruding of Nonferrous Metals SIC 3398 Metal Heat Treating 1,V 1 ^`�Q SIC 34 Fabricated Metal Products SIC 35 Industrial and Commercial Machinery � zt"s SIC 36 Electronic and Other Electrical Equipment 01L 2 ��N SIC37 Transportation Equipment D�tyRLp,NDW TClNG SIC 38 Measuring, Analyzing, and Controlling Instruments ST�tAg-L RP�.R�1 For questions, please contact the DWO Regional Office for your area. See page 4. (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence will be mailed): Name Street Address City Telephone No. ABB Inc. 12331 Commerce Station Drive Huntersville 704 379-9600 2) Location of facility producing discharge: Facility dame Facility Contact Street Address City County Telephone No. Email ABB US High Voltage Cable John Moore 12331 Commerce Station Drive Huntersville State NC Fax: 704 ZIP Code 28078 379-9605 State NC ZIP Code 28078 Mecklenburg _ 704 379-9626 Fax: 704 379-9605 n. moo re C us.abb. com 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From 1-77 take exit 23 Gilead Road travel 0.2 miles NE, turn right on South Statesville Road and travel 1.5 miles, turn left on Verhoeff Drive and travel 1 mile, turn left on Meacham Farm Road and travel 500 feet, turn left on Commerce Station Drive. (A copy of a county map or USGS quad sheet with the facility clearly located must be submitted with this application.) 4) Latitude 35 23' 35.51 ° Longitude 80 50' 01.91 " r � 53 Page 1 of 4 (deg, min, sec) SWU-21 "71408 Last revised 7/14/08 NCG030000 N.O.I. 5) This NPDES Permit Application applies to which of the following: 1K New or Proposed Facility L Existing 6) Standard Industrial Classification: Date operation is to begin 09/19/12 Construction Project ID # MECL-2011-029 Provide the 4-digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility. SIC Code: 3 3 5 7 7) Provide a brief narrative description of the types of industrial activities and products manufactured at this facility: _Manufacture of high voltage cable (polymer melting & forming, wire forming, polymer degassing)- 8) Discharge points-! 13eceiving waters: How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property? 3 What is the name of the body or bodies of water (creek, stream, river, lake, c.) that the facility stormwater -discharges'end up in? unnamed perennial tributaries to Cane Creek (Ca wba River Basin) Receiving water classification: C Is this a 303(d) listed stream? No Has a TMDL been approved for this watershed? No If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). fill 9) Does this facility have any other NPDES permits? C No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 10) Does this facility have any Non -Discharge permits (ex: recycle permit)? C No F-i Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 11) Does this facility employ any best management practices for stormwater control? L No Li Yes (Show any structural BMPs on the site diagram.) If yes, please briefly describe: Bio retention BMPs (rain gardens) 12) Does this facility have a Stormwater Pollution Prevention Plan? J No (will be prepared in January 2013) n Yes If yes, when was it implemented? 13) Are vehicle maintenance activities occurring at this facility? 0 No ❑ Yes 14) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? Ixl No ❑ Yes Page 2 of 4 SWU-218-071408 Last revised 7/14108 NCG030000 N.O.I. b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? Oxxl No U Yes (Conditionally exempt small quantity generator - less than 100 kg/month) c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? L No L. Yes d) Is hazardous waste stored in the 100-year flood plain? L No ❑ Yes If yes, include information to demonstrate protection from flooding. e) It you answered yes to questions b. or c., please provide the following information: Type(s) of waste: Universal, Used Oil, MEK (<1 gal per 6 months) How is material stored: Drums/Cans inside building with spill protection Where is materia) stored: Maintenance Area (inside building) How many disposal shipments per year: 2 maximum (0 shipments to date) Name of transport / disposal vendor:.CM Environmental Services Inc_ Vendor address: 106 River Wood Drive, Fort Mill, SC 29715 15) Certification: North Carolina General Statute 143-215.68 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. ,P. I certify that I am familiar with the information contained in this application and that to the best of my S41113 knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing Title: EHS Manager i of Applicant) John E. Moore (Date Si ned) This Notice of Intent must be accompanied by a check or money order for $100.00, made payable to: NCDENR Page 3 of 4 SWU-218-071408 Last revised P14/08 NCG030000 N.Q.I. Final Checklist This application will be returned as incomplete unless all of the following items have been included: N Check for $100 made payable to NCDENR. CxI This completed application and ail supporting documents. IE A site diagram showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater management structures, (c) location of stormwater outfalls corresponding to the drainage areas, (d) runoff conveyance features, (e) areas where materials are stored, (f) impervious areas, (g) site property lines. 0 Copy of county map or USGS quad sheet with the location of the facility clearly marked on the map. Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee coverage under the General Permit. For questions, please contact the DWQ Regional Office for your area. DWg Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office .........(919) 791-4260 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 4 of 4 5WU-218-071408 Last revised 7114108 sr� GEL DRAINAGE AREA i-. -w. I - CITY STORM TRANSFORMER #1 2,D00 GALLON DIESEL AS r— FIRE PUMP AST w¢ NORMAN HUNTERSVILLE • SITE 1. THE RECEIVING WATER BODIES ARE UNNAMED TRIBUTARIES THAT FEED CANE CREEK AS PART OF THE CATAWBA RIVER BASIN 2. CANE CREEK IS NOT ON THE NC 303(d) LIST OF IMPAIRED WATERES NOR IS CATAWBA RIVER BASIN ISENTIFIED AS A WATERSHED THAT HAS AN ESTIMATED TMDL 3. FACILITY LATITUDE: 35.2T 35.51" LONGITUDE: 80.50' 01.91" 4. RUNOFF COEFFICIENT (0) = 0.6 NOTES: • SIZE OF PROPERTY: 22.4 ACRES • NO SIGNIFICANT SPILLS OR LEAKS IN THE LAST 3 YEARS • OPEN TOP ROLL OFFS - CARDBOARD, CLEAN PE, STEEL, COPPER CABLE, COPPER WITH TAPES, COPPER BARE, ALUMINUM CABLE, ALUMINUM LAMINATE, ALUMINUM BARE, ALUMINUM WITH TAPES, WOOD PALLETS, CLEAN WOOD. OUTFALL 001 DRAINAGE AREA = 7.5 ACRES PERCENT IMPERVIOUS = 63% OUTFALL 002 DRAINAGE AREA = 8.7 ACRES PERCENT IMPERVIOUS = 47% OUTFALL 003 DRAINAGE AREA = 6.2 ACRES PERCENT IMPERVIOUS = 48% LEGEND DRAINAGE AREA TRANSFORMER TX6 OUTFAU Dos -1 -0-� SURFACE WATER FLOW OUTFALL 001 DRAINAGE AREA K� OUTFALL 003 SPILL KIT PAVED SURFACE APPROXIMATE SCALE: 1"= 140' — • DRAINAGE AREA BOUNDARY = 0' 70' 140' 290• NOTE: BASEMAP FROM SHEET C-400, PROJECT 2010-111-10041-ABB, DATED: NOV. 18, 2011. NC INC PROJECT: abbi00212 ®I Engineering of an affiliate of THE GEL GROUP INC Post Office Box 14262 ABB US HIGH VOLTAGE CABLE SITE LAYOUT MAP FIGURE ENVIRONMENTAL ■ ENGINEERING ■ SURVEYING Research Triangle Paris, NC 27709 HUNTERSVILLE, NORTH CAROLINA 2 P 919-544-11 DO problem solved F 919r237-9177 www.gel.com DATE: JaRuary22, 2013 DRAWN BY: TJP APPRV. BY: SC JOHN-SMOORE 8192 . DON"':MOORE / e6-7M312531 Pay..#o the !:v `� Order: a /�G�f"'...... OU Dollars . i $Bf,lOF @ R 111'A1`N,Tu.a. `�i•'�:�.:� �r �•'��.:� � ���_ J � 2'S�