Loading...
HomeMy WebLinkAboutSW3210803_O&M Agreement/Plan_20210810Operation & Maintenance Agreement Project Name: J Belle Mar Subdivision Project Location: L Old Mill Road, Weddington, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: 0 0 0 0 0 0 0 i0 0 0 0 0 0 g O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: oe aaaee a I Vegetated swales/roadside ditches I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phon 5-0uT ber(s): I Email: Kent Olson Member/Manager, Development Solutions Group, Inc. 11121 Carmel Commons Blvd, Suite 360 Charlotte, NC 28226 704-543-0760 kent@developmentsolutionsgroup.com Signature: Date: - (i "` f I, 11� a Notary Public for the State Iof Nof*il &Yfill'og { County of d1C&Y\h.AE0 do hereby certify that I� �pT t�� n VX\'q C-) personally appeared before me this - IL day of _. Ll ki �[^]� and acknowledge the due execution of the O erations and Maintenance Agreement. Witness my hand and official seal, ►►►1ft%III ! III Ihyl� ,.•�� TT••.,,, ,�,, �NNE Seal STORM-EZ Version 1.5 My commission expires 11r4- I 2o2 O&M Agree ent 7/8/2021 Page 1 of 3 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. section activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation is too short Maintain grassed vegetation such that the swale or Vegetation or too long. vegetated area does not erode during the peak flow from the 10-year storm Remove the trash/debris. Areas of bare soil egra e e soili necessary o remove the gully, an and/or erosive gullies then re -sod (or plant with other appropriate species) Vegetated receiving have formed. and water until established. Provide lime and a one - areas time fertilizer application. Trees and/or other Remove the trees and woody vegetation from the woody vegetation are swale, regrade the swale if necessary and re-establish present in the swale. grass as shown on the approved plans. Trash/debris is Remove the trash/debris. present. Areas of bare soil egra e the soil it necessary to remove the gully, an and/or erosive gullies then re -sod (or plant with other appropriate species) have formed. and water until established. Provide lime and a one- time fertilizer application. Sediment covers the grass at the bottom of Remove sediment and dispose in an area that will not Vegetated the swale. impact streams or SCMs. Re -sod if necessary. conveyances / The side slope is Regrade the slopes to the permitted configuration per swales / roadside ditches (other than steeper than the the approved plan and reestablish vegetation. If as - curb outlet swales) approved built or existing conditions do not allow the slopes to configuration. be regraded, contact the applicable permitting Determine the source of the problem: soils, Grass is dead, hydrology, disease, etc. Remedy the problem and diseased or dying. replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Trees andior other Remove the trees and woody vegetation trorn the woody vegetation are vegetated conveyance, regrade the vegetated present in the conveyance if necessary and re-establish grass as ve etated shown on the approved plans. Clogging has Clean out the outlet device. Dispose of the sediment occurred. off -site. The outlet device (if applicable) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damage have Repair the damage and improve the flow dissipation occurred at the outlet. structure. The receiving water Discharges from the site are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.