HomeMy WebLinkAboutSW8010912_Historical File_20060109Michael F. Easley, Governor
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
January 9, 2006
W. Cecil Worsley, Jr.
Worsley Companies, Inc.
Post Office Box 3227
Wilmington, NC 28406
Subject: Stormwater Permit No. SW8 010912 Modification
Rocky Point Scotchman- Hwy 210
High Density Project
Ponder County
Dear Mr. Worsley:
The Wilmington Regional Office received a complete Stormwater Management Permit
Application for Rocky Point Scotchman- Hwy 210 on January 6, 2006. Staff review of the
plans and specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW8 010912 Modification dated January 9, 2006, for the construction of the subject project.
This permit shall be effective from the date of issuance until January 9, 2016, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system will result in
future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within thirty (30) days
following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of
Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact Rhonda Hall, or me at (910) 796-7215.
Sincere 3
Ed Beck
Regional Supervisor
Surface Water Protection Section
ENB/rbh: S:IWQSISTORMWATIPERMIT1010912Mod.jan06
cc: Scott Kennedy, Cape Fear Engineering, Inc.
Pender County Building Inspections
Rhonda Hall
Wilmington Regional Office
Central Files
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service1-877-623-6748
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet h2o.enr.state.naus Viurally
aCarolina
An Equal OpportunitylAfflnnative Action Employer— 50% Recycled110% Post Consumer Paper
State Stormwater Management Systems
Permit No. SW8 010912 Modification,
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
W. Cecil Worsley, Jr., Worsley Companies, Inc.
Rocky Point Scotchman- Hwy 210
Pender County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until January 9, 2016, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 383,328 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans. The built -upon area for the future
development is limited to 235,864 square feet.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 8
State Stormwater Management Systems
Permit No. SW8 010912 Modification
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
W. Cecil Worsley, Jr., Worsley Companies, Inc.
Rocky Point Scotchman- Hwy 210
Pender County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until January 9, 2016, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 383,328 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans. The built -upon area for the future
development is limited to. 235,864 square feet.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 8
State Stormwater Management Systems
Permit No. SW8 010912 Modification
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, cres: 10.25
Onsite, f� 446,490
Offsite, ft2: None
b. Total Impervious Surfaces, ft2: 383,328
Buildings 4,631
Parkimg 65,296
Streets 71,003
Sidewalks 6,534
Future Development 235,864
C. Design Storm, inches: 1
d. Pond Depth, feet: 7.5
e. TSS removal efficiency: 90%
f. Permanent Pool Elevation, FMSL: 21.0
g. Permanent Pool Surface Area, ft2: 13,872
h. Permitted Storage Volume, ft3: 31,037
i. Temporary Storage Elevation, FMSL: 23.4
j. Controlling Orifice: 2" 0 pipe
k. Permitted Forebay Volume, ft3: 8,537
I. Receiving Stream/River Basin: Northeast Cape Fear / Cape Fear
M. Stream Index Number: 18-74-(47.5)
n. Classification of Water Body: °°B;Sw"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
Page 3 of 8
State Stormwater Management Systems
Permit No. SW8 010912 Modification
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be availabie at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 1/6 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMP.
Major permit was sought.
Page 4 of 8
State Stormwater Management Systems
Permit No. SW8 010912 Modification
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change fore!?, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management racility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
Page 5 of 8
State Stormwater Management Systems
Permit No. SW8 010912 Modification
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 9th day of January, 2006.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Water Quality
By Authority of the Environmental Management Commission
Page 6 of 8
OFFICE USE ONLY
Date Remyed
F paid
Permit Number
/G-/O- zw.5
1 4L-o . '"' 9
1 5wf otoc z, MOO
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION:
1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project):
Worsley Companies, Inc.
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
W. Cecil Worsley, Jr.
3. Mailing Address for person listed in item 2 above:
P.O. Box 3227
City: Wilmington State: North Carolina.
Telephone Number: (910 ) 395-5300
Zip: 28406
4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Worsley Companies, Proposed Scotchman Store; Hwy 210, Rocky Point, NC
5. Location of Project (street address):
Off of Highway 210 and on the west side of Interstate 40
City: Rocky Point County:
6. Directions to project (from nearest major intersection):
Pender
Project is located on NC Hwy 210 approximately 600 feet east of the intersection with US Hwy. 117 at the
access ramp to Interstate 40
7. Latitude: 34°26.445'
Longitude: 77°52.524' of project
8. Contact person who can answer questions about the project:
Name: Scott Kennedy (Cape Fear Engineering) Telephone Number: (910) 383-1044
II. PERMIT INFORMATION:
1. Specify whether project is (check one):
,— New
Renewal Z Modification
Form: SWU-101 Version.3.99 Page 1 of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number --UV f 0/0 Cf M And its issue date (if known) ¢ - F-0'Z
3. Specify the type of project (check one):
Low Density X 1figh Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
Storm water will be treated by a wet detention pond on site
2. Stormwater runoff from this project drains to the Cape Fear River basin.
fl
3. Total Project Area: 9.37 acres 4. Project Built Upon Area: .830'0- g (' %
5. How many drainage basins does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area. 2
E222j!'S Stream Name
Northeast Cape Fear River
Receiving Stream Class
C SW
Drainage Area
446,490 s.f/10.25 ac.
Existing Impervious* Area
-0-
Proposed Impervious* Area
383,328.00 s.f./8.80 ac.
Impervious* Area total)
80%
Impervious* Surface Area
Area I
Drainage Area 2
On -site Buildings
4,631 s.f./0.I I ac
On -site Streets
71,002.80 s.f./1.63 ac.
On -site Parking
65 296.16 s.f./1.50 ac.
On -site Sidewalks
6534 s.f./0.15 ac.
Other on -site
235,864.04 s.f./5.41 ac.
Off site
-0-
Total: 383,328.00 s.f./8.80 ac.
Total:
Form: SWU-101 Version 3.99 Page 2 of 4
* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks,
gravel areas, etc.
7. How was the off -site impervious area listed above derived?
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will nm with the land , that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form: SWU-101 Version 3.99 Page 3 of 4
VI. SUBIVIITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment lmanagmumt
• Two copies of plans and specifications, including:
-Development/Project name
-Engineer and firm
-Legend
North Arrow
-Scale
-Revision number & date
-Mean high water line
-Dimensioned property / Project boundary
-Location map with named streets or NCSR numbers
-Original contours, proposed contours, spot elevations, finished floor elevations
-Details of roads, drainage features, collection systems, and stormwater control measures
Wetlands delineated, or a note on plans that none exist
-Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate submittal authority to another individual or firm so that they may provide information on you
behalf, please complete this section:
Designated agent (individual or firm): Cape Fear Engineering, Inc.
Mailing Address: 151 Poole Road
City: Belville State: North Carolina Zip:
Phone: 910-383-1044 Fax: 910-383-1045
VIII. APPLICANT'S CERTIFICATION
28451
I, (print or type name of person listed in General Information, item 2) W. Cecil Worsley; Jr.
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 211.1000. A _ _ A
Signature:
Date:
Form: SWU-101 Version 3.99 Page 4 of 4
Permit Application - SW8 010912 Modification (Scotchman Store ...
Subject: Permit Application - SW8 010912 Modification (Scotchman Store Rocky Point)
From: "Scott Kennedy" <scott.kennedy@capefearengineering.com>
Date: Thu, 5 Jan 2006 10:10:59 -0500
To: <Rhonda.Hall@ncmail.net>
Rhonda,
Below is the information you requested in your email dated December 30, 2005 concerning the Proposed
Scotchman Store on Hwy. 210 in Rocky Point.
1. The forebay volume will be at 20% (8537 C.F.) of the permanent pool volume.
2. In reference to Item #2, the 6.91 acres = 1.50 acres of on -site parking + 5.41 acres of on -site other as shown
page 2 of 4 in the application.
I am sending to you today a revised stormwater plan and revised wet detention basin supplement page 1 of 4 to
show corrections to the forebay calculations. I will also fax you a blow-up of the revised pond forebay size and
the revised wet detention basin supplement page 1 of 4.
Hopefully, this will help you in your continued review of the Stormwater Management Permit Application. Please
contact me if you have any further questions.
H. Scott Kennedy, Jr.
Cape Fear Engineering, !nc.
151 Poole Road
Belville, NC 28451
910-383-1044 (voice)
910-383-1045 (fax)
1 of 1 1/6/2006 11:59 AM
Permit Application - SW8 010912 Modification
Subject: Permit Application - SW8 010912 Modification
From: Rhonda Hall <Rhonda.Hall@ncmail.net>
Date: Fri, 30 Dec 2005 11:12:29 -0500
To: scott.kennedy@capefearengineering.com
Scott,
Please provide the following information so that 2 can continue my review of the
Stormwater Management Permit Application for Worsley Companies' Proposed Scotchman
Store, Hwy 210:
1. Please ensure that the required forebay volume is being met. The forebay
volume should be between 18 and 22 percent of the permanent pool volume.
2. The hydraulic calculations indicate that 6.91 acres of impervious area are
being proposed for future development. However, the application indicates
that 5.41 acres of impervious area are being proposed for future development.
Please explain this difference.
1 of 1 1/6/2006 12:00 PM
CAPE FEAR
Engineering, Inc.
December 21, 2005
North Carolina Department of Environment
And Natural Resources
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Attn: Rhonda Hall
Re: DWQ Stormwater Project Number: SW8 010912 Modification
Scotchman Store, Hwy. 210, Rocky Point
Dear Rhonda,
I am responding to your comments received via fax dated December 16, 2005
referencing the above project. I have completed the information you requested
and is summarized as follows:
1. 1 have provided dimensions for the permanent pool contour on the
proposed wet detention pond.
2. 1 have provided typical dimensions on the parking spaces in the parking
lot.
3. 1 have noted on the plans that all roof drainage must be directed so as to
be picked up by the pond, and the runoff from all impervious surfaces
must be directed to the forebay.
4. 1 have noted that there are no wetlands on this parcel.
5. 1 have provided a proposed wet detention pond detail.
6. 1 have dimensioned the proposed canopy areas.
7. 1 have provided details of both the gravel road and the existing asphalt
road.
Should you have any questions please do not hesitate to contact me at 383-1044
or you may email me at scoff.kennedy0capefearengineering.com.
151 Poole Road, Suite 100 • Belville, NC 2&451 • TEL: (910)3&3-1044 • FAX (910)363-1045
www.capefear-engineering.com
I have provided four (4) copies of the revisions for your use and consideration to
complete the review process. Thank you for your assistance in this matter.
Sincerely,
Scott Kennedy
Project Manager
Cape Fear Engineering, Inc.
P. 1
* * * COMMUNICATION RESULT REPORT ( DEC.16.2005
FILE MODE OPTION
---------------------------
677 MEMORY TX
REASON FOR ERROR
E-1) HANG UP OR LINE FAIL
E-3) NO ANSWER
O
ADDRESS (GROUP)
9-3831045 -----
1: 54PM ) *
TTI
RESULT
-------0 -
NCDENR WIRO
PAGE
--------P-1/1
E-2) BUSY
E-4) NO FACSIMILE CONNECTION
Michael F, Easley, Governor
William G, Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
FAX COVER SHEIET
Date: December 16, 2005
To: Scott Kennedy
Company: Cape Fear Engineering
FAX: 383-1045
Alan W. Klimek, P.E. Director
Division of Water Quality
No. of Pages: 1
From: Rhonda Hall
'dater Quality Section Stormwater
Fax 8; 910.350-2004
Phone #: 910-796-7401
CWC Stormwater Projeot Number: SW8 010912 Modification
Project Nance: Scotchman Store, Hwy 210, Rocky Point, NC
MESSAGE:
Scott:
The Wilmington Regional Office received a Stormwater Management Permit Application for
Worsley Companies, Proposed Sootchman Store, Hwy 210, Rocky Point, NC on October 10,
2005. A nraliminary mviaw of fhaf infeirrno}inn h�a Ao+errnvno%A fk-4 -&6— :- __a
WA7`F9
�
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
FAX COVER SHEET
Date: December 16, 2005
To: Scott Kennedy
Company: Cape Fear Engineering
FAX: 383-1046
No. of Pages: 1
From: Rhonda Hall
Water Quality Section Stormwater
Fax #: 910-360-2004
Phone #: 910-796-7401
DWQ Stormwater Project Number: SW8 010912 Modification
Project Name: Scotchman Store, Hwy 210, Rocky Point, NC
MESSAGE:
Scott:
The Wilmington Regional Office received a Stormwater Management Permit Application for
Worsley Companies, Proposed Scotchman Store, Hwy 210, Rocky Point, NC on October 10,
2005. A preliminary review of that information has determined that the application is not
complete. The following information is needed to continued the stormwater review:
Please provide dimensions for the permanent pool contour of the proposed wet
detention pond.
2. Please provide the typical dimensions of each parking space.
3. Please provide a note on the plans that all roof drainage must be directed so as to be
picked up by the pond, and the runoff from all impervious surfaces must be directed to
the forebay.
4. Please either delineate all wetlands on site, disturbed or undisturbed, or note on the
plans that none exist.
5. Please provide a detail of the proposed wet detention pond.
6. Please dimension the proposed canopy areas
7. Please provide a detail of the road.
ENB1rbh: S:IWQSISTORMWATIADDINF0120051010912MOD. 05
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Service1-877-623-6748 0
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733-2496 Internet: h2o.enr.state.nc.us I)Ipo Caro ' a
tural
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
CAPE FEAR
Engineering, Inc.
151 Poole Road, Suite 100
6elville, NC 28451
TEL (910) 383-1044
FAX (910) 383.1045
www.capefearengineering.com
To: JNCDENR
Attn: I Linda Lewis
$o��at2 N
Transmittal
Date: October 10, 2005
File: 900-08
Subject: Proposed Scotchman Store
Hwy 210 & 1-40 approach ramp
Pender County, NC
❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval
❑ Sent via Mail ® Sent via Courier
Quantity Drawing No. Description
2 Stormwater application with narrative and calcs
1 Check for $420.00
2 C-2 I Stormwater and Erosion Control Plan
REMARKS
10
CC: Cape/engineering, Inc.
Sig
Trans-1 01 005-LLewis.doc
NCDENR
NCDENR - Stormwater Fee
10/10/2005 13 519
420.00
Cape Fear Engineerin Stormwater Fee 900-08 420.00
Storm water
Design Narrative and Calculations
Subject:
Scotchman Store Site
Rocky Point
Pender County, North Carolina
Prepared for:
Worsley Companies, Inc.
P.O. Box 3227
Wilmington, NC 28406
(910) 395-5300
Date: October, 2005
Prepared by:
,�``` �N BAR .�'y�,
OFFS DO`i'�•�•
4 SEAL r
024908
RECEIVED
OCT 10 2005
Cape Fear Engineering, Inc. DWQ
151 Poole Road, Suite 100 pROJ #
Belville, North Carolina 28451
(910) 383-1044
P:\M900-08Wmin\STORM w,rR1900-08STORM-nary-dencdoc
DESIGN NARRATIVE
L GENERAL:
The project site is located near the west acceleration ramp to Interstate 40 and N.C. Highway 210
within Rocky Point in Pender County, North Carolina. The proposed development is a
commercial submittal with a project boundary of approximately 10.0 acres. It is a proposed
commercial development with a stormwater collection system and an on -site wet detention pond.
Drainage considerations are to be in accordance with state and county stormwater requirements.
2. EXISTING SITE:
The site currently is vacant. There is an existing gravel road on the west side of the property
within a 30 feet access easement. Site topography is relatively flat with a gentle slope from the
project's west boundary towards the east.
Vegetation consists primarily of minor ground cover. Subsurface soils are Meggett loam as
mapped in the USDA / SCS Soil Survey of Pender County, NC. The Engineering Data provided
therein show infiltration rates for the subject sands at a depth of approximately four feet:
Meggett >2 in/hr
3. PROPOSED IMPROVEMENTS:
Improvements proposed include the construction of a 4631 s.f. Convenience Store, a Gasoline
and Diesel Canopy and associated asphalt parking and a stormwater wet detention basin with
collection boxes and pipes. The site will be graded to divert all stormwater runoff from all
impervious surfaces to the proposed catch basins and detention area.
4. DRAINAGE CALCULATION CONSIDERATIONS:
Attached to this design narrative are the drainage calculations determining the amount of storm
water to be contained and treated in the stormwater system. The proposed wet detention design
should treat ail runoff from the first inch of rainfall to 90% efficiency.
5. MAINTENANCE CONSIDERATIONS:
During construction, the Contractor shall be required to inspect and repair as needed all erosion
and stormwater control devices after any significant rain event. Any measure found not
performing its intended function, shall be repaired immediately. Upon completion of
construction the establishment of permanent ground cover will be a priority.
P:\900\900-08\AdminlSTORMWTR1900-OSSTORM-norr-denr.doe
Wet Detention Basin
Calculations
P:\900\900-08\Admin\STORMWTR\900-08STORM-narr-denr.doe
WET DETENTION BASIN DATA 5HEET
WOR5LEY COMPANIES, INC. - 5COTCHMAN STORE - ROCKY POINT
POND # I
DRAINAGE AREA (Ad) =
10.25 ACRES
IMPERVIOUS AREA (Ai):
BUILDINGS:
0.1 1 ACRES
ROADS:
! .G3 ACRES
51DEWALK5:
0. 15 ACRES
OFF -SITE
0.00 ACRES
CONTINGENCY: 'S,y\ G-9-1 ACRES
TOTAL: 8.80 ACRES
PERCENT IMPERVIOU5 (1):
I Ad/Ai 85.85% (5AY66%)
(80% IMPERVIOUS - FUTURE DEVEI.
POND# 15HALL BE 7.5' DEEP AND DESIGNED TO REMOVE 90% T55.
5A/DA= 3.1000%
REQUIRED SURFACE AREA AT PERMANENT POOL:
5AUQ,= 0.31775 AC. = 13541 SF
SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 21)= 13872 SF
...........................................................................................................................
5A PROV'D= 13872 > 13841 =5A REQ'D OK
•...........................................................................................................................:
MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER):
Rv=0.05+0.009'(I)
Rv= 0.822G5
VOLUME= I "'RV'Acl = 0.702G8 AC -FT
30GO8.7 FT ^ 3
VOLUM PROVIDED AT TEMPORARY POOL:
INCREM.
TOTAL
EL.
5A 5F
VOL. (CF)
VOL. (CF)
21
13872
0
0
22
15540
7353
7353
23
17280
IG410
237G3
24
19092
1 618G
41 949 POND# I DATA SHEET
PAGE I OF 3
JUNE, 2004
SET TEMP, POOL ELEVATION.
REQ'D EL. = 23.37G43 *-- SAY 23.4
VOL. PROV'D = 31037 CF
......................................... ...................................................................................
VOL. PROV'D= 31037.4 > 30008.7 =VOL. REQ'D OK
............................................................................................................................:
FOREBAY SIZING:
PERMANENT POOL VOLUME:
INCREM.
TOTAL
5A15F)
VOL. (CF)
VOL. (CF)
13.5
1 305
0
0
14
177G
770
770
15
2772
2274
3044
16
3840
330E
G350
17
4980
4410
107GO
18
G192
558G
IG34G
19
747G
G834
23180
20
8832
8154
31334
21
13672
11352
42G8G
REQ'D VOLUME = 20% TOTAL =
G2G7
CIF
CHECK FOREBAY VOLUME:
INCREM.
TOTAL
SA (SF)
VOL. (CD
VOL. (CF)
14
195
0
0
15
432
314
314
IG
741
587
900
17
1122
932
1832
18
1575
1349
3180
'9
2100
1838
5018
20
2G97
2399
741G
4 (SA REQT MET!)
PROV'D VOLUME = 741 G CF (GDEEP FOREBAY)
...........................................................................................................................
VOL. PROV'D= 741 G G2G7 =VOL. KEQ'D POND# I DAMC TE7
............................................................................................................ PAS
JUNE, 2004
ORIFICE 51ZING: REQ'D DRAWDOWN TIME 2-5 DAYS
Q2 0. 177134 CF5 (FOR 2 DAY DRAWDOWN)
Q5 = 0.070854 CF5 (FOR 5 DAY DRAWDOWN)
SELECT A 2" CIRCULAR ORIFICE, EL. 2 1 .0' (PERM. POOL EL.)
Q PROV'D= Cd'A*(2gh) ^ 1 /2 WHERE: Cd= O.G
A= 0.0218 5F
9 = 3 2.2 1`1`5/5
h= AVE. HEAD (2.4' - (0.5)(2"/ 1 2))/2
1.1583
Q PROV'D= 0. 1 1 29G9
Q2> 0.I 129G9 >rQg; OK
.....................................................................
DRAWDOWN TIME:
TIME VOLUME = 3. 1359G DAY5
Q PROV'D
POND# I DATA SHEET
PAGE 3 OF 3
JUNE, 2004