HomeMy WebLinkAboutSW4210702_Design Calculations_20210729Stormwater Calculations Southern Alamance High School Additions & Renovations Project Location: Alamance County, North Carolina Project #: 20-040 July 7, 2021 I_riaddesigngroup ARCHITECTURE ENGINEERING IINTERIOR DESIGN 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-218-8282 F - 336-218-8010 I www.triad-designgroup.com CL Q H Z U 7 EROSION CONTROL NARRATIVE: PROJECT DESCRIPTION: The project is located at 631 Southern High School. Road south of Graham, NC in Alamance County. The project will consist of the construction of a 30,1 g0 SF +/- classroom building, an 8,940 SF +I_ classroom building., and a 3,300 SF +I_ cafeteria addition. Site improvements will include replacing existing sidewalks between thie. buildings,. additional student and teacher parking, new bus lot, and. student drop-off drives at the high school and middle school. Grading the site for the proposed facility will require cuts up to 6 ft. and fills up to 11 ft. The site is expected to balance therefore eliminating the need to haul off or bring in fill material to reach finished grades. A series of dra.inage swales and pipe networks capture and direct the storm runoff to proposed stormwater control measures and existing pipe networks. The proposed stormwater control measure will be used as primary.emsion control devices for the site during construction. EXISTING SITE CONDITIONS: The subject project is proposed on the current campus of Southern High School and Southern Middle School. The total site area is 89.50 acres +1-. The site contains existing buildings associated with the middle.school and high school, drives., parking lots, and athletic fields. Portions of the site are wooded areas containing a combination of evergreens. and. hardwoods. Grades range from 626 down to 58.3 msl. Public utilities (water aid sewer) are available to. the site to serve the proposed facilities. STREAM AND WETLAND PERMITTING There are no streams or wetlands impacted by the. proposed construction. ADJACENT AREAS: The site is. bordered primarily by wooded areas and farmland to the north, .south, east and west. Southern High. School Road forms the southern border. SOILS: The soils present within the project area are: CnB2, CnC2, CnD2, Ud, and Ur PROPOSED CONDITIONS: A 30,100 SF +/- classroom building, an 8,940 SF +1- classroom building, and. a 3,300 SF +/- cafeteria addition are being proposed on the. subject site and will disturb 14.38 acres during construction. Site improvements will include replacing existing sidewalks: between the buildings, additional student and teacher parking,. new bus lot, and student drop-off drives at the high school and. middle school. The site has 21.133 acres of existing built -upon area. Approximately 4.713 acres of existing built=upon. area will be demolished during construction., Proposed built -upon area is 7.515 acres bringing the total built upon .area on the site to .23.935 acres. or 26.74% of the total site. On -.site stormwater runoff will be collected in existing and proposed stormwater. systems consisting of pipes and swales. Approximately 6.29'acres will be directed to the proposed stormwater control... measure and treated for bath water quality and quantity. The stormwater control measure meets NCDEQ requirements. The .site water is: served by an existing Well.. Sewer will be served by the City of Graham.. CONSTRUCTION SEQUENCE The site will be developed according to the construction sequence shown Sheets. EC101, EC103, EC103A, EG103B, and EC1 07 of the plans. Some deviations from this sequence may be required dine to local site conditions, or unanticipated problems. These changes will be coordinated through the engineer and NCDEQ inspections staff. All work must meat NCDEQ standards. A pre -construction meeting between the grading contractor and the NCDEQ. inspection staff maybe required.. A copy of the approved. plans must be kept on the job site at. all times. Additional pre -construction meetings with other interested parties may be required. CALCULATIONS .All calculations necessary for the desigri of the proposed wet pond are in accordance with the NCDEQ BMP manual. All calculations. are attached and summarized. within this report. SUMMARY Pred evelopment. Flow From. Site (Existing Conditions) 1 yr 81.31 cfs 2yr 125.70 cfs 10yr 294.26 cfs. 100yr 551.42 cfs Post Development to Pond — 1 yr 13.44 cfs 2yr 17.65 cfs 1 Oyr• 31.75 cfs I00yr 50.71 cfs Routed Flows Leaving Pond — 1 yr 3.29 cfs 2yr 9.08 cfs. 10yr 20.47 cfs 100yr 22.53 cfs Post Development Bypass — 1 yr 75:59 cfs 2yr 116.87 cfs 1Oyr 273.58 cfs 100yr 512.66 cfs Total Post Development From Site 1 yr 75.66 cfs 2yr 119.64 cfs 1 Oyr 293.09 cfs 100yr 534.05. cfs. Southern Alamance High School Additions and Renovations Summary of Site arid Built -Upon Area Total Site Area = 89.50 Acres = 3,898,620 sf Existing Built -upon Area = 21.133 .Acres = 920,553: sf (23.61%) Existing Suiit-upon Area Rem oved:= 4.713 Acres = 205,298 sf (5.27%) Proposed New Built -upon Area = 7.5.15 Acres := 327,353-sf (&40%) Total Built-upon.Area = 23.935. Acres .= 1,042,609 sf (26.74%) Net New Built -upon Area for entire Site = 2.802 Acres=122,055 sf (3.13%) Drainage Area 1 (To Pond) Site Area W .6.290 Acres = 273,992 sf Existing 3uilt-upon Area to Pond = 0.871 Acres.= 37,918 sf Proposed Built -upon Area to. Pond = 3.030 Acres = 18 1,9 6.6 sf Total Built -upon Area to Pond = 3.901.:Acres = 169,88.4 sf The tota1.8dilt-upon Area treated is greater than th6 proposed additional Built -upon Area: 3.901 Acres > 2.802 Acres Pond Check State Rev 2020-01-17-qpw 07/28/21 PERMANENT WET DETENTION POND DESIGN - RISER/BARREL Revised B-24-99 o. Alamance High School_ CHECKED BY: LAH LOCATION: I Graham, NC DATE: September 22, 2020 REVISED: I SITE DATA TOTAL SITE AREA =' 89.501 WATERSHED = NIA PROPOSED BUILT UPON AREA 2.80' CLASSIFICATION. WS - NIA FUTURE BUILT UPON AREA = 0.00 ! GWAIWCA = NIA TOTAL ON -SITE BUILT UPON AREA = 23.94 PERCENT BUILT -UPON = 26.74%, ON -SITE DRAINAGE AREA TO POND = 6.29 ON -SITE BUA TO POND = 3.90 ONSITE % BUA FOR POND SUB -BASIN = 62.00% OFF -SITE DRAINAGE AREA TO POND =' 0.00 MAX. OFF -SITE B.U.% = TOTAL WATERSHED AREA TO POND = 6.29 0% _ ❑ISTURBE❑ AREA = i 4.23 TEMP. SED. STOR. USED YIN i DESIGN DATA TEMPORARY SEDIMENT STORAGE 0.5 acre -inch per disturbed acre PERMANENT SEDIMENT STORAGE 0.125 acre -in per total drainage are PERMANENT WATER QUALITY COMPOSITE B.U. % = 62.00 percent DEPTH minimum 3 feet): 3.5 feet Averse Depth) SA1DA (Figure 5.6-2 2.01 percent .TEMPORARY WATER QUALITY 1.0 rainfall to be controlled PRINCIPAL SPILLWAY TYPE X corrugated aluminum DESIGN STORM 10 reinforced concrete year RAINFALL INTENSITY 7.04 RUNOFF COEFFICIENT 0.8 inches per hour EMERGENCY SPILLWAY 1 TYPE X DESIGN STORM 100 concrete box rip-raprip-rap lined year RAINFALL INTENSITY' 8.3 inches per hour RUNOFF COEFFICIENT 0.8 POND DESIGN TEMPORARY SEDIMENT STORAGE VOLUME REQUIRED 7677 PERMANENT SEDIMENT STORAGE VOLUME REQUIRED 2854 PERMANENT WATER QUALITY SURFACE AREA REQ'D 5507 TEMPORARY WATER QUALITY STORAGE REQUIRED Rv= 0.608 VOLUME REQUIRED = 13883 Page 1 So. Alamance High School Average ❑epth Option 1 Permanent pool voulme divided by permanent pool surface area Pool Volume Pv = 22533 Hydra Flow Perm Pool Surface Area PSA = 8172 Pond Check Sheet Avg Depth Option 2 A bottom shelf A perm pool A bottom pond Depth davg = 2 757342 Ab5 = 7388 App = 8172 Abp = 3703 D= 4 davg = 3.478452 Water Quality Draw Down Time Size of Hole 1 1.5 0.012272 Storage Volume 14162 Surface Area of Pond ft"2 (As) 7944 Head of Water above Hole, ft (h) 1.5 Coefficient of Contraction of an orrifrce (0.6) 0.6 Time to ❑ewater Days 2.26496 Q= 0.07237 cfs Qmin 0.03278 5 days Qmax 0.08196 2 days RISER ANCHOR CALCULATIONS RISER DIAMETER = 30 IN. BARREL DIAMETER = 18 IN. TOP OF RISEL EL = 605.5 BOTTOM OF PSS EL = 599 RISER HEIGHT = 6.5 FT. VOLUME OF RISER (V=Trr2h) = 31.91 CF VOL OF BARREL (V=Trr2 x 10') = 17.67 CF TOTAL VOLUME = 49.58 CF 50% FOS (150%) = 74.37 CF WT. OF WATER IN SYSTEM (62.4 x VOL) = 4640.53 LBS. WT. OF CONCRETE = 150 - 62.4 = 87.6 LBS VOL OF CONCRETE REQUIRED - CF LENGTH 4.5 FT VOL PROVIDED = CF WIDTH 4.5 FT DEPTH 3 FT C a o cx. E m w ❑ O 0: P � 4 � 0 O O' . 0 a ¢ (n m a q LP' Q O o ri .O in Q N M N T In Ln 00 cN 00 '.d'. 100 0 v sn to m Ln c' N `A CV N N cll n o M N E ij k C � H.a 7 Ln DQ. to a ' M Ln o-� m in v4 .w mn oho- n to tia mLn v c m N w H'N r. ri 0 N :n .m n. Ln 0) lu H E m ..a A T O tD 0 .Ln 00 N w N co 91' N m 0 pj O1 ❑A 5' m 5 O b to rq Ln %D N t0. 'I1r1 4 Q 'W r• T as 1-v N m o n n ry M rn o0 n❑ r-[ N. d C7 us al c Lo n N :CO 00 m ri rn m � c v E :2 ° 0 U 7 u q b Q H i, CN 00 1.9 rq 'q' N: W rn n Q al N co N rn o I,-m 'a .N N oa CV ¢ 00 A M M 1p. N oO LAC of O n. cr m m� K N M 0r y E .4.. yl .0 ❑. 'ra u o Q Q M : E5 Q b. o N LCI CO tJ �. u� DO 'L] c E^ u 7 U Q "7 LO oa cY co N .kP n. rq rq N .N. C N' H' m' Lnm d M E to 7 C °L i Q N :M ht �. to N 010 CD6 n M � M. : C !. M. L LOH L .�. 'd 00 W. rq'N Q N i• in d m r3. .w Lan .00 n of n 'v n 1� t+l 'm r1i o: + rQ M CO N to Q n r 1 no Q m -a' .m H I O� m G Q H r-1 u n w C U Ln h .m b Lp Ln. Ln C. d oo G6 Q Q w of b Q r. . !Q m m m N. n] r"E DQ n H CO O Q1 .y 67 ,.aN C ¢ rVil M M .V t[7 N' Q1 Q1 H 'm R. v' w C 'C' co' 00 CD.N rp b C1 Q m m N Q tr 0't in m ra u. o � iL N N cP n0 00 ko N f 4 to Q 'b Q Q m �1 'F• N M N V 01 6n !n ' 0, 01 Q m CT a v O. 7 u. vl w m Q ;: N m Ln V..u'] O C Ol b d Q 4 a 4 6 ui t0 1p LD ED :In to tj7 'Q u LD to 7 a °/ a w }..