HomeMy WebLinkAboutSW6210701_Plansheet - Misc. Detail_20210721 (3)MAIN POOL PERMANENT POOL WATER LEVEL 281.00 C V #57 WASHED STONE PAD TO c NT CICIMMFR FpnM CZMI Mir IN lull If) CONNECT FLEXIBLE PIPE TO POND DRAIN. i GATE VALVE SHALL REMAIN OPEN. REMOVE SKIMMER ONCE POND IS NO LONGER USED AS A TEMPORARY, SEDIMENT BASIN TRASH RACK 10 yr PEAK S AGE: 283.69 TEMPORARY POOL WATER LEVEL 283.00 3 T DIA RISER TOP 283.00 4" SCH. 4� PVC TEE INV.=281. 0 CAPPED N END INSTALL WIRE SCREENING ON BOTTOM OF TEE INLET• RUNOFF CALCULATIONS: DRAINAGE AREA TO POND: 21.0 AC. PRE -CONSTRUCTION (10-YR STORM): 21.0 AC. (WOODS/FIELD) C= 0.30 Q10=(0.3)(7.2 IN/HR)(21.0 AC.)=45.4 CFS POST -CONSTRUCTION (10-YR STORM): DRAINAGE AREA TO POND: 21.0 AC, 21.0 AC. @ 15% IMPERVIOUS WEIGHTED C= (0.15)(0.95)+(0.85)(0.30)=0.40 Q10(POST -TO POND)=(0.40)(7.21N/HR)(21.OAC.)=60.5 Q10 OUTFLOW FROM POND=32.7 CFS PRE DEVELOPMENT VS. POST DEVELOPMENT RUN( 45.4CFS > 32.7CFS ':`•I BOTTOM RISER=275A0 �I K'QXK/�,K/, 5' DIA. ANTI:FLOATATION BLOCK N POND CR NTS MINOR ORIFICE CALCULATIONS TOP OF RISER: 283.00 PPE: 281.00 TOTAL VOL: 68,409 cu.ft. MIN. DEWATERING TIME: 2 days or 172800 sec. MAX. DEWATERING TIME: 5 days or 432000 sec. Cd: 0.60 g: 32.2 ft/s' USING A 4" (r = 2") OUTLET PIPE, "Q" IS AS FOLLOWS: Ho/3 = [283.00 - (281.00 + (2/12))] / 3 Ho/3: 0.61 A=3.14(2/12)A2 A=0.087 sf Q=Cd*A*(2*g*Hol3)AO.5 68,409 cf = (0.6)(0.087)[(2*32.2"0.61)AO.5] time 68,409 cf = 0.327 time drawdown time=209,201 seconds=2.4 days 2"RCP 0 1.7% TOP OF DAM 285.00 3 THE DAM STRUCTURE, INCLUDING FRONT AND BACK EMBANKMENT 1.0' MIN. F EEBOARD \\ SLOPES, OF THE POND SHALL BE EMERGENCY SPILLWAY 283.00 VEGETATED WITH NON -CLUMPING TURF GRASS (HYBRID BERMUDA OR CENTIPEDE) CORE TRENCH (MIN 4' DEEP) ALONG ENTIRE LENGTH OF POND DAM RISER BUOYANCY CALCULATIONS INSIDE DIAMETER: 36" = 3.0 ft WALL THICKNESS: 4" = 0.33 ft TOP ELEVATION: 283.00 INVERT ELEVATION: 275.00 Yconcrete: 1501b/cu ft Ywater: 62.4 Ib/cu.ft. DISPLACEMENT (d) VOLUME AND WEIGHT Vd = (3.14159) (2.5)A2 (h) + (3.14159) (1.83)A2 (8.00) Vd = (19.63h + 84.17) cu.ft: Wd = 62.409.63h + 84.17) Wd = (1224.9h + 5252.2) lb CONCRETE (c) VOLUME AND WEIGHT Vc = (3.14159) (1.83)A2 (8.00) - (3.14159) (1.5)A2 (8.00) + (3.14159) (2.5)^2 (h) Vc = 09.63h + 27.62) cu.ft. We = 15009.63h + 27.62) We = (2944.5h + 4143.0) lb REQUIRED BUOYANCY PREVENTION FACTOR = 1.1 Wc= 1.lWd (2944.5h + 4143.0) = 1.1(1224.9h + 5252.2) h =1.02 ft. USE 1.1' SASE THICKNESS a��a�ids��Jm��r, A _ w L 4 w ". z w /tee O z 6i w U) U QC) F 2 Q 2CC CO 0 CD O0 N - w w I Q O O > Z O z � O m m 2i Z a- Q Z 0- Lu~ O oZ Qwv � z 0W0 0w U Q > a co O co N 0 4 w U C✓ ' O 0 O U z a O w p Z r`) C _j LW W _J_j J(b c L O�� w W -j r 1 QN L LLJ Z p z (n D Z 0- �'U C0Of O~ (n©0z Of O X J Q L O OwLW � =sU6 H (n>z w F- NW s OJ 0CCD a- mQL0ll� C C C L L V) C O � C W � z S c c �/y v 1 I c Z i c NoW'p f W � W 1 C f ti l _ ® C /"mil G I�l C C C a7 E O O a L EE PROJECT: 5058 '- w S-4 O z OF 4