Loading...
HomeMy WebLinkAboutNCC213965_NOI Application_20210709Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/5/2021 3:08:10 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 7/6/2021 8:13:38 AM (Review- Construction NOI 58343) . The task was assigned to Broussard, Brooklyn C by round robin distribution 7/5/2021 3:09 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 7, 2021 5:00 PM 7/5/2021 3:09 PM Submit by Selkane, Aziza 7/9/2021 9:09:04 AM (Payment Verification for NCC213965) * Dewberry Engineers • Selkane, Aziza assigned the task to Selkane, Aziza 7/9/2021 8:58 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 17, 2021 5:00 PM 7/6/2021 8:14 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Parmer RTP Campus Improvements 1 b. Specific Lot This field nay be used to list specifc lot nunbers. Numbers 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 0749-05-70-3200 0749-06-62-8419 2. County* Durham 3. Highway or Street 40 Moore Dr Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township* Durham 5. State * NC 6. Zip Code* 27709 7. Latitude* Enter the latitude in decimal degrees 35.9350 8. Longitude * Enter the longitude in decinal degrees (MJST be negative) -78.8620 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/30/2021 Estirrated Construction Project Start Date 10. Date to End * 05/30/2022 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Developrrent 12. Acres to be 19.00 d istu rbe d * (including off -site borrow and waste areas) 13. Total site area 104.00 (acres) * 14. Post- 54.00 construction (Estimated) impervious area (acres) * NCC Project NCC-DURHA-2021-Parmer RTP Campus Improvements Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Northeast Creek Waterbody* Narreof waterbody into which storrrwater runoff will discharge 15b. Waterbody 16-41-1-17-(.03) Index No. * NCWaterbody Index Nurrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. P;rmttee Inforrration - Legally Fbsponsible Entity and Individual ........................................................................................................................................................... Important: The person vvho signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who ovvns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * ARE -NC REGION NO. 19, LLC If pernittee is an individual (i.e., organization does not apply), enter first and last nave in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Oliver If Corporation, enter Faegistered Agent First Narre 3. Last Name* Sherrill If Corporation, enter Fbgistered Agent Last I\brre 3b. Title Senior Vice President - Regional Market Director 4. Permitee E-mail osherrill@are.com Address* 5. Permittee 919-609-7323 Telephone No.* 6. Permittee Mailing Street Address Address* P.O. Box 13329 Address Line 2 City Research Triangle Park Postal / Zip Code 27709 Check box if the street address the same as mailing address 7. Permittee Street Address* r" Yes Street Address 5 Laboratory Drive Address Line 2 Suite 3200 city Research Triangle Park Postal / Zip Code 27709 State / Province / Fbgion NC Country us State / Province / Pegion NC Country us 8. Type of Ojvnership is only individual if an individual is named in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site John Contact - First Name * 2. Primary Site Martell Contact - Last Name * 3. Title Senior Project Manager 4. Site Contact E- jmartell@are.com mail Address* 5. Site Contact 984-569-6252 Telephone No. 6. Organization Alexandria Real Estate Equities, Inc Name 7. Site Contact Street Address Mailing Address* 5 Laboratory Drive Address Line 2 Suite 3200 city Durham Fbstal / Zip Code 27709 8. Consultant Name (Optional) Bentley Ruggles First and Last narre 9. Consultant E-mail bruggles@dewberry.com This person will be copied on all correspondence. 10. Consultant 984-833-4833 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) jmartell@are.com Default is legally responsible person e-rrail 12. Billing (For Annual Fee correspondence) Telephone 984-569-6252 Default is legally responsible person telephone State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 05/07/2021 Approved * 2. E&SC Plan Project 6118-08 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Durham City/County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan 6118 RTP Campus Improvements Amendment Approval letter or 198.39KB Approval (1).pdf Grading Permit Mast be FL7Fforrrat 6. Site Location Map Wst be RDFforrret (lint 201VB) (1) 2021.06.02-Parmer RTP Site 0001 Rev 19.pdf 3.09MB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. The Ownership of the property has changed and we are having the new Owner file for their COC to allowthe previous Owner to file the NOT. 8. NOI Certification 20210617162238227.pdf 563.29KB Form Mast be RFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Legally Responsible Person named on this Notice of Intent IT Authorized Responsible Person' (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 6L91-0�11 Type Name* Oliver Sherrill ale Senior Vice President Regional Market Director Organization Legally Ibsponsible Entity ARE -NC REGION NO. 19. LLC 07/05/2021 F. Tracking and COC Info NOI Tracking No. 58343 NC Reference No. NCG01-2021-3965 Uses 'count _nur ber' variable (increrrented by SP) Certificate of NCC213965 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3965 Sequential nunber for subnittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC213965-2021 Invoice Due Date 8/5/2021 Initial Fee $ 100.00 Invoice Status OPEN