Loading...
HomeMy WebLinkAboutSW6210601_Design Calculations (Tc)_202106031656 — Graceland Subdivision Ditch Tc Calculations Ditch #1 DI-39 inlet Tc = 27.0 + 4.2 min = 31.2 min, use 30 min Kerby: L = 412 ft; n = 0.5; s = 0.009 Kirpich: L = 252 ft; s = 0.005 Ditch #2 DI-37 inlet Tc = 19.9 +5.6 min = 25.4 min, use 30 min Kerby: L = 303 ft; n = 0.4; s = 0.018 Kirpich: L = 362 ft; s = 0.005 Ditch #3 DI-65 Tc = 28.1 + 2.5 min, use 30 min Kerby: L = 472 ft; n = 0.4; s = 0.01 Kirpich: L = 125 ft; s = 0.01