Loading...
HomeMy WebLinkAboutSW6210302_Supplement-EZ Form_20210602SUPPLEMENT-EZ COVER PAGE L E011 MS LOADE D -PROJECT INFORMATION Project Name Utility Improvements to Serve Maxwell Ridge Project Area (ac) 14.229 Coastal Wetland Area (ac) - Surface Water Area (ac) 0.008 1 2 3 4 5 Is this pro*ect High or Low Density? High 6 j Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4)_____ 7 Wid.th of vegetated setbacks provided (feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BLIA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System Bioretention Cell I 0 12 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 0 25 Bayfilt r 26 Filterra 0 I FORMS LOADED DESIGNER CERTIFICATION 27 JNameandTitle: 28 lOrganization: 29 Istreetaddress: 30 ICity,State.ZiD 31 1 Phone number(s) 32 lEmail: Matt Lowder, PE 4004 Barrett Drive, Suite 101 Raleiqh. NC 27609 Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 24434 I fill; /-R /"-� L�'/ SigAture jA Designer Date be I I /V DRAINAGE AREAS I ITS this �'�high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No I FORMS LOADED ;DRAINAGE AREA INFORMATION Entire Site i 4 Type of SCM - Infiltration Basin 5 Total drainage area (sq ft) 392290 sf 392290sf 6 Onsite drainage area (sq ft) 392290 sf 392290sf 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 96311 sf 96311 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (sf) 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: —Parking (sq ft) Sidewalk (sq ft) 3805 sf 3805 sf Roof (sq ft) 64000sf 64000 sf Roadway (sq ft) Future (sq ft) 28506sf 28506sf Other, please specify in the comment box below (sq ft) — 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq 4) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 16% 26% 19 Design torm (inches) 1.0 in 20 Design volume of SCM (cu ft) 8858 ef 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 -1Please use this space to provide a�—y —additional information about the drainage area(s): INFILTRATION SYSTEM 1 JDrainage area number I 2 1 Minimum reauired treatment volume (cu ft) 8868 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical" for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No — 7 Are the inlets, outlets, and receiving stream protected from erosion (1 0-year ston-n)? Yes — 8 Is there an overflow or bypass for inflow volume in excess of the desiqn volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If aeplicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8�? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCIM desiqned bv an NC licensed professional? Yes 18 Proposed slope of the subgrade surface(%) 19 Are te races or baffles provided? No 20 IType of pretreatment: I Forebay Snits Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation (fmsl) 344.00 23 Depth to SHWT per soils report (in) 84.00 24 Ground elevation at boring in soils report (fmsl) 351.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 Soil infiltration rate (in/hr) 6.00 r27�Factor 7 of safety (FS) (2 is recommended)� —2-00---1 IFlavatinn-z 29 Bottom elevation (fmsI) 347 ft 30 Storage elevation (fmsl) 349. fl. 31 Bypass elevation (fmsl) 351.8 ft For Basins On!y 32 Bottom surface area (ft) 4720 ft 33 Storage elevation surface area (ft2 7885. ft Fnr Trt-nchps Oniv 34 Length (ft) 35 Width 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated pjpinq 39 tone type, if applicable 40 Stone orosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection pDrt been provided? 1 44 IDesign volume of SCM (cuft) 8858 ef 1 45 1 Time to draw down (hours) 8 hrs 46 Please use this space to provide any additional information about the � infiltration system(s): Infiltration 1 10:13 AM 6/1/2021