Loading...
HomeMy WebLinkAboutSW6210505_Supplement 1_20210524Permit No. (to be provided by DWQ) �� OF W A T�c9 ^�`�T� ���A"`` NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name FTCC EmergenncyServices Campus Contact person Richard Lee Phone number (910)-237-5758 Date 5/12/2021 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 93,304 ftz Impervious area, post -development 74,636 ftz % impervious 79.99 % Design rainfall depth in Storage Volume: Non -SA Waters Minimum volume required 4,919 ft3 Volume provided 5,027 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 1.0 in Rational C, pre -development 0.40 (unitless) Rational C, post -development 0.72 (unitless) Rainfall intensity: 1-yr, 24-hr storm 1.36 in/hr OK Pre -development 1-yr, 24-hr peak flow 6.05 ft3/sec Post -development 1-yr, 24-hr peak flow 3.26 ft3/sec Pre/Post 1-yr, 24-hr peak flow control -2.79 ft3/sec Elevations Temporary pool elevation 87.38 fmsl Permanent pool elevation 85.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 1 Oft vegetated shelf elevation 86.50 fmsl Bottom of 1 Oft vegetated shelf elevation 85.50 fmsl Sediment cleanout, top elevation (bottom of pond) 79.00 fmsl Sediment cleanout, bottom elevation 78.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, Aps n_pW Area, bottom of 1 Oft vegetated shelf, Aba shelf Area, sediment cleanout, top elevation (bottom of pond), Abot_pood Volumes Volume, temporary pool Volume, permanent pool, Vpertn_pool Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpertn_pool Area provided, permanent pool, Aperml,00l Average depth calculated Average depth used in SA/DA, d_ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Aperml,00l Area, bottom of 1 Oft vegetated shelf, Aba shelf Area, sediment cleanout, top elevation (bottom of pond), Abot_pond "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, de,,, (Round to down to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 6,631 ft' 2,743 ft' 2.94 (unitless) 2,887 ft` OK 2,887 ft' 424 ft, 5,027 ft' OK 8,981 ft' 1,796 ft' 20.0% % OK 90 % N (Y or N) N (Y or N) 2.94 (unitless) N (Y or N) 8,981 ft' 2,887 ft' ft Need 3 ft min. ft Y (Y or N) 2,887 ft' 2,887 ft' 424 ft' 6.50 ft 4.26 ft OK 4.5 ft OK Y (Y or N) Do not enter data for both an orifice and a weir. 4.00 in In z 0.60 (unitless) 1.88 ft Y (Y or N) Do not enter data for both an orifice and a weir. RISER (unitless) 3.33 (unitless) 12.56 ft 0.53 ft 6.05 ft3/sec 3.26 ft3/sec 0.02 ft3/sec 3.30 days OK, draws down in 2-5 days. 10 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 4.0 :1 OK N (Y or N) Trash rack or similar device recommended. 0.6 ft Insufficient freeboard, minimum of 1-ft required Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2