Loading...
HomeMy WebLinkAboutSW6210505_Supplement 2_20210524Permit No. (to be provided by DWQ) �� OF W A T�c9 ^�`�T� ���A"`` NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name FTCC EmergenncyServices Campus Contact person Richard Lee Phone number Date 5/12/2021 Drainage area number 2 II. DESIGN INFORMATION Site Characteristics Drainage area 126,274 ftz Impervious area, post -development 67,446 ftz % impervious 53.41 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required 4,445 ft3 Volume provided 4,750 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 1.0 in Rational C, pre -development 0.61 (unitless) Rational C, post -development 0.40 (unitless) Rainfall intensity: 1-yr, 24-hr storm 1.36 in/hr OK Pre -development 1-yr, 24-hr peak flow 7.86 ft3/sec Post -development 1-yr, 24-hr peak flow 6.20 ft3/sec Pre/Post 1-yr, 24-hr peak flow control -1.66 ft3/sec Elevations Temporary pool elevation 90.50 fmsl Permanent pool elevation 93.24 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 1 Oft vegetated shelf elevation 91.50 fmsl Bottom of 1 Oft vegetated shelf elevation 90.50 fmsl Sediment cleanout, top elevation (bottom of pond) 85.00 fmsl Sediment cleanout, bottom elevation 84.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, Aps n_pW Area, bottom of 1 Oft vegetated shelf, Aba shelf Area, sediment cleanout, top elevation (bottom of pond), Abot_pood Volumes Volume, temporary pool Volume, permanent pool, Vpertn_pool Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpertn_pool Area provided, permanent pool, Aperml,00l Average depth calculated Average depth used in SA/DA, d_ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Aperml,00l Area, bottom of 1 Oft vegetated shelf, Aba shelf Area, sediment cleanout, top elevation (bottom of pond), Abot_pond "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, de,,, (Round to down to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 4,336 ft' 2,121 ft' 1.68 (unitless) 2,401 ft` OK 2,401 ft' 96 ft, 4,750 ft' OK 6,409 ft' 1,282 ft' 20.0% % OK 90 % N (Y or N) N (Y or N) 1.68 (unitless) N (Y or N) 6,409 ft' 2,401 ft' ft Need 3 ft min. ft Y (Y or N) 2,401 ft' 2,401 ft' 96 ft' 5.50 ft 3.71 ft OK 3.5ft OK Y (Y or N) 4.00 in In z 0.60 (unitless) 2.74 ft N (Y or N) RISER (unitless) 3.33 (unitless) 12.56 ft 1 ft 7.86 ft3/sec 6.19 ft3/sec 0.02 ft3/sec 2.96 days OK, draws down in 2-5 days. 10 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK N (Y or N) Trash rack or similar device recommended. 1.0 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2