Loading...
HomeMy WebLinkAboutSW8090630_HISTORICAL FILE_20110322NORTH CAROLINA .� Departnent of Environmental Qual STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 oq oia 3 a DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zo i I o 3Z-2- YYYYM M D D RA NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor March 22, 2011 Cdr- Ronald Kramps, Public Works Officer USMCB Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28547 Division of Water Quality Coleen H. Sullins Director Subject: State Stormwater Management Permit No. SW8 090630 Mott. New Base Entry Road P-1382, P-1383 and P-1384 High Density Permit - Overall Low Density Linear Road Project with BMP's for the Collected Areas and Areas of Higher Density Onslow County Dear Cdr. Kramps: Dee Freeman Secretary The Wilmington Regional Office of the Division of Water Quality received a complete modification to the previously issued Stormwater Management Permit for the New Base Entry Road P-1382, P-1383 and P- 1384, on March 21, 2011. Staff review of the plans and specifications has determined that the modified project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 090630, dated March 22, 2011, for the construction of the BUA and BMP's for the subject project. The modifications covered by this permit include the following: 1. Expanded the overall project area from 19,154,579 sf to 19,816,223 sf, to include the NC 241 Brewster Road interchange. 2. Increased the maximum allowed built -upon area for 24% low density from 4,579,099 sf to 4,755,893 sf. 3. Provided detailed. development plans for the new gate area. 4. Added a new wet detention basin (A3) to treat the collected runoff from a portion of the gate area. This permit shall be effective from the date of issuance until February 8, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215. Sincerely, Georgette Scott Stormwater Supervisor Division of Water Quality GDSlarl: S:tWQSiStormwater\Permits & Projectsl20091090630 HD12011 03 permit 090630 cc: Louise Slate, P.E., MacTec Engineering David Towler, USMCB Camp Lejeune Wilmington Regional Office Stormwater File SM1lilmi y1�n Do�ly. �l nrr. 127 Cardinal Drive Extension, Wilmington. North Carolina 28405 011C Phona: 910-796-7215 i FAX: 9ilD-350-M, l Customer Service: 1-877-623-5748 t V ortl i Car o f 11i a Internet: www.ncwalerqualily.org � �J - `]�, An Equal Opiw€ wity 1 AEtirimWc Action EmrilDvar air �/ j! L State Stormwater Management Systems Permit No. SW8 090630 Mod. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY DEVELOPMENT WITH BMP's FOR THE COLLECTED AREAS AND AREAS OF HIGHER DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune New Base Entry Road P-1382, P-1383 and P-1384 Route 24 between Ellis Road and Bell Fork Road, MCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of an overall 24% low density development and three (3) wet detention ponds to treat the collected areas and the areas with a higher density, in compliance with the provisions of Session Law 2008-211 and Title 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 8, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The overall tract built -upon area percentage for the project must be maintained at 24%. This project is permitted for a maximum of 4,755,893 square feet of BUA. A total of 4,500,302 square feet is currently proposed and covered by this permit. A plan revision or modification to this permit is required for any additional BUA beyond 4,500,302 square feet. 3. The stormwater systems proposed to treat the runoff generated by the designated collection systems have been approved for the management of stormwater runoff as described in Section 1.9 of this permit. 4. The low density portion of this project utilizes a linear road project with roadside swales to treat runoff. Swales must be designed to pass the peak flow from the 10 year storm at a non -erosive velocity and be maintained with a dense vegetated cover. Stormwater runoff that is directed to flow through wetlands shall flow into and through these wetlands at a non -erosive velocity of 2 fps or less. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 090630 Mod. 5. The road construction is broken up into three phases, A, B and C. The maximum BUA of 4,755,893 square fleet covers all three phases. This permit also covers the 3 wet detention ponds, A-1, A-2, and A-3, that will serve the collected portions of Phase A. The detailed road plans and the engineered systems for the collected portions of Phases B and C will be submitted as modifications and added to this permit in the future. 6. A 50-foot-wide vegetated buffer shall be provided adjacent surface waters, measured perpendicular to and horizontally from the normal pool of impounded structures, the top of bank of both sides of rivers and streams and the mean high waterline of tidal waters. Except for water dependent uses, no built -upon area shall be located within the buffer. 7. Within the low density portions of the permitted project, the only runoff conveyance systems allowed will be vegetated conveyances. The minimum side slope for non -curb outlet swales is 3:1 (H:V) as defined in the stormwater rules and as shown on the approved plan. 8. No piping shall be allowed except those amounts shown on the approved plan. 9. The runoff from the collected portions within this overall low density project is being treated in 3 wet detention ponds. The following design elements have been permitted for the wet detention pond stormwater facilities, and must be provided in the system at all times. I C. d. e. f. 9: i. j� k. 1. n o. P. q. r. Pond Number Drainage Area, acres: Onsite, ft2: Offsite, ft. Total Impervious Surfaces, ft2: Road, ft2: Buildings, ft2: Parking, ft2.. Sidewalk ft2: Offsite, ft�: Average Pond Design Depth, feet: TSS removal_ efficiency: Design Storm, inches: Permanent Pool Elevation, FMSL: Permitted Surface Area @PP ft2: Permitted Storage Volume, ftJ: Storage Elevation, FMSL: Controlling Orifice: Controlling Orifice flowrate. cfs: 1 yr 24 hr pre-dev. flowrate. cfs: Permanent Pool Volume, ft3 : Forebay Volume, ft3: Maximum Fountain Horsepower: Receiving Stream 1 River Basin: Stream Index Number. - Classification of Water Body: II. SCHEDULE OF COMPLIANCE A-1 A-2 A-3 2.77 2.79 10.96 120,575 121,731 477,373 0 0 0 92,623 92,929 226,917 92,623 92,929 161,738 0 0 10,695 0 0 49,846 0 0 4,638 0 0 0 3.5 3.5 3.5 90% 90% 90% 1.5 1.5 1.5 7.50 16.50 17.0 12,406 13,346 25,785 13,966 14,916 28,583 8.50 17.50 18.0 2"0 pipe 2" O pipe 3.0" O pipe 0,058 0.058 0.128 0.107 0.108 0.422 33,888 39,365 80,652 6,099 7,715 15,041 1/8 118 1/4 Northeast Creek 1 WOK02 19-16-(3.5) "SC HQW NSW" 1. No one shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 090630 Mod. 2. The permittee is responsible for verifying that the proposed built -upon area for the project does not exceed the maximum allowed by this permit. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated,and operational for its intended use prior to the construction of any built -upon surface. 5. The runoff from all built -upon area within the drainage area of the high density collected portions of the project must be directed into the appropriate permitted stormwater control system. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. G. Transfer of ownership. d. Redesign or construction of additional built -upon area in excess of 4,500,302 square feet. e. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. All stormwater collection systems, swales and BMP's must be located in either public rights -of -way or dedicated common areas or recorded easements. The final plats for the project must be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Unless otherwise shown, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 4of8 State Stormwater Management Systems Permit No. SW8 090630 Mod. 13. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is described in Section 1.9 (o) of this permit.. 14. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of side slopes. d. immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. a. Access to all components of the system must be available at all times. 15. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 16. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the Permittee or of the project, or a mailing address change, the permittee shall submit a completed and signed "Name/Ownership Change Form" to the Division of Water Quality, along with the documents as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the conveyance of common area to a third party, constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 090630 Mod, 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 5. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 22nd day of March 2011 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 090630 Mod. New Base Entry Road P-1382, P-1383 and P-1384 Page 1 of 2 StormwaterPermit No. SW8 090630 Mod. Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (period icallylweeklylfull time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 090630 Mod. ' Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The. outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided.. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Page 8of8 MEMORY TRANSMISSION REPORT FILE NO. 330 DATE 03.23 08:35 TO : 8919104512927 DOCUMENT PAGES 9 START TIME 03,23 08:35 END TIME 03,23 08:38 PAGES SENT 9 STATUS ©K *** 'SUCCESSFUL TX NOTICE TIME :03-23-'11 08:38 FAX NO.1 :910-350-2004 NAME :DENR Wilmington *** Stale of North Carolina r?cpal,t—ont of $nv, R'tlI marls and Nutur"I I2csourccs Wilnnington Regional Office B vtrly $'Hues Fcrduc, Governor Dcc Frccmun, s eercrrary FAX 4cO1*%v1F& SIAM"ET An (i9.. w] Gn(w�(u..11y AM. n.n 11v. wF.Ma. �ml�1a)i+r MEMORY TRANSMISSION REPORT TIME :03-23-111 08:46 FAX NO.1 .910-350-2004 NAME :DENR Wilmington . FILE NO. 332 DATE 03.23 08:40 TO : R 919198318136 DOCUMENT PAGES 9 START TIME 03.23 08:42 END TIME 03.23 08:46 PAGES SENT 9 STATUS Oi **" SUCCESSFUL TX NOTICE *** State o!'Norrt. CftrQlin� 17epartrnent of JEnVircmrnant and 1VntUral 12esources W:Im:fxgtort Rcgianal Office �iwv4rfy Enves 1-'erdue, Governor 1'�er� � Qe+�ncxrx, Saai'sYary 1+AX C[zrVER S1-11p-ET T7�1 �`623 NO. CPC rages: (ezctuAln¢ cfrvar) From- CaY: Phone: FAX FAX#: 910_3SO_2004 �* : 1 ' 1 ►.1 .' b 20403'Iw.p[aun.[410]'I4G-'!2[S Nar(Yi0),sJO_�p0� An Rgn�l f)t. p..11u wiry A Rf. n[..[1.-. —.1— �.nnlolur Permit Number SW8090630 Central Files: APS_ SWP_ 03/23/11 Permit Tracking Slip Program Category Status Project Type State SW Active Major modification Permit Type Version Permit Classification State Stormwater 1.20 Individual. Primary Reviewer linda.lewis Coastal SW Rule Coastal Stormwater - 2008 Permitted Flow Facilit Permit Contact Affiliation Facility Name Major/Minor Region New Base Entry Point and Road P1382 P1383 Minor Wilmington and P1384 Camp Lejeune Location Address County New Base Entry Rd Onslow Camp Lejeune NC 28547 Facility Contact Affiliation Owner Owner Name Owner Type Commanding Officer US Marine Corps - Camp Lejeune Government - Federal Owner Affiliation Carl H. Baker P S C 20004 Camp Lejeune NC 285420004 Dates/Events Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 02/08/10 02/23/11 03/22/11 03/22/11 02/08/20 Regulated Activities Reauested/Received Events State Stormwater - HD - Detention Pond Deed restriction requested State Stormwater - Low Density Deed restriction received Additional information requested 02/25/11 Additional information received 03/10/11 Additional information requested 03/14/11 Additional information received 03/21/11 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin ArMACTEC MACTEC Engineering and Consulting R.I. Atlantic Avenue Raleigh. NC 27604 Phone: (919) 876-0416 Fax: (919) 831-8136 LETTER OF TRANSMITTAL TO: Linda Lewis DATE: 3-18-2011 NCDENR/DWQ Express Permitting PROJECT NO.: 6225 09 4999 127.N. Cardinal Drive Ext, PROD. NAME: Camp Lejeune New Base Entry Point & Road Wilmington, NC 28405 SUBJECT: Revised drawings and table for stormwater permit modification for the Base Entry Point and Road WE TRANSMIT TO YOU: HEREWITH UNDER SEPARATE COVER SUBJECT: ®DRAWINGS [—]SPECIFICATIONS ❑CALCULATIONS ❑ REPORT ❑COST ESTIMATE ®AS NOTED ACTION: ®FOR YOUR INFORMATION ❑FOR YOUR COMMENT OR APPROVAL []RETURNED FOR CORRECTION: RESUBMIT []APPROVED AS NOTED - ❑AS REQUESTED SENT BY: ❑MAIL []CERTIFIED MAIL ®EXPRESS FedEx (7945 4841 6490) ❑COURIER ❑HAND DELIVERED ❑FACSIMILE: pages (including transmittal sheet) COPIES DATE DESCRIPTION 1 3-17-11 Page 3 of application with updated table (Part IV 10) 2 3-7-1 1 Gate civil plans — Sheets C-133 and C-136 1 3-7-1 1 Post Developed Watershed Drainage Map REMARKS: Enclosed are the revised plan sheets reflecting to correct pond name (A-3) and application page 3 based on the express review comments. CC: Orathai Bulfer, MCB Camp Lejeune Jesse Barker, MACTEC Pete Wright, NAVFAC Jeff Meador, MACTEC/RK&K Joint Venture File (1) wise Slag C�+ lVIE loslate@mactec.com I Direct Phone: 919-831-8006 MAR 2 1 2011 CONFIDENTIALITY NOTICE: This message is intended only for the use of the individual or entity to which it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable law, If the reader of this message is not the intended recipient, or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited, If you have received this communication in error, please notify us immediately by telephone and return the original message to us at the above address via the U.S. Postal Service. Thank you. If transmission is not received in good order, please call Louise Slate at 919-831-8006. Ar a n olrs F-m R—sed 10118, 02 BARINE CORPS BASE a A P LEJ \/ Naval ac;Gties EnFA ginee,,n Command DUNE Stormwater Management Design RFC EIV MAR 1 0 2011 DWQ Permit SW8-090630 New Base Entry Road Marine Corps Base, Camp Lejeune Onslow County, North Carolina JAP9 &K MACTEC I RK&K JV Design By Rummel, Klepper & Kahl, LLP 900 Ridgefield Drive -- Suite 350 Raleigh, NC 27609 (919) 878-9560 NC Firm License No. F-1185 February 2011 •�''�1H OARQf�''•. � •oFESSIQtiq SEAL 33184 w i v Water Quality Volume Calculations Wet Detention Basin A3 Drainage Area Parameters Units Formulas Drainage Area 477373 Ft See Drainage Area Map Impervious Area 226917 Ft See Drainage Area Map Impervious % 47.5 IA Impervious Area/Drainage Area Runoff Volume (Simple Method) R„ 0.48 IncheSr.n,,f/lnchesr,inf,tj R„=0.05+0.9*IA Rainfall 1.50 Inches Water Quality Design Storm - Coastal County Runoff 0.72 Inches Runoff = R *Rainfall Runoff 28512 Ft Runoff (Ft) = Runoff (in)/12 * DA (Ftz) VEED MAR 10 2011 LAY: Area and Volume Calculations Wet Detention Basin A3 Elevation Main Pool Forebay Total Vol Ft3) Total Vol (Ac-Ft) Comments Area (Ft) A Vol (Ft') Sum Vol (Ft;) Area (Ft") A Vol (Ft') Sum Vol (Ft) 12.00 8765.7 - 0 0 Bottom of Pond, 5ediment Clean Out Top Elevation 13.00 10401.1 9583 9583 2395.1 - 0 9,583 0.220 Bottom of Forebay, Sediment Clean Out Top Elevation 14.00 12093.1 11247 20831 3027.2 2711 2711 23,542 0.540 15.00 13841.6 12967 33798 3718.3 3373 6084 39,882 0.916 16.00 15646.7 14744 48542 4466.1 1 4092 10176 59,718 1,348 16.50 16570A 8054 56596 4861.1 2332 12509 69,104 1.586 Inside Edge of Vegetated Shelf 17.00 19489.1 9015 65611 5270.3 2533 15041 80,652 1,852 Permanent Pool Elevation 17.00 25785.2 0 65611 15041 80,652 1.852 Permanent Pool Elevation • Area Includes Forebay Berm at PPE 17.50 29097.8 13721 79332 15041 94,373 2.166 Outside Edge of Vegetated Shelf 18.00 30351.7 14862 94194 15041 109,235 2.508 Overflow Elevation (Top of WQ Pool) 19.00 32962.2 31657 125851 1 15041 140,892 3,234 20Z0 35772.9 34368 160219 15041 175,260 4.023 21.00 38172.8 36973 197192 15041 212,232 4.872 Top of Dam Surface Area of Main Pool at PPE (Ft2) 19489.1 334 Basin Length (ft) Surface Area of Forebay at PPE (Ft 2} 5270.3 75 Average Basin Width (ft) Total Surface Area at PPE (Ft') 25785.2 Includes Forebay Berm at PPE 4.5 L:W Ratio Total Volume at PPE (Fts) 80652 21431.5 Abet shelf Includes Main Pool and Forebay Total Volume at Overflow Elev (Ft) 109235 25785.2 Aae-_voo i Includes Main Pool, Forebay and Forebay Berm Total WQv Provided (Ft3} 28583 8765.7 Abae_po„d Main Pool Only 4.50 Depth Main Pool Volume Forbay 18.65 % of Total at PPE 3.13 dam, Option 1 3.63 d,,, Option 2 AVcrsgc ticpth of Ix.rm.kncnt pt,ol tc) use in the SAIDA lables (ft) i pee _'MNIf (71�tion l: clR, A pem hoof A,,,, L +isr,,,,,;r iuu ?: rl=D.2Sxi a 2x MAR 1 0 !�'i Draw Down Calculations Wet Detention Basin A3 Water Quality Volume (Ft3) 28583 Total WQv Provided Top Elevation of Temp Pool (Ft) 18.00 Overflow Elevation Orifice Invert Elevation (Ft) 17.00 Maximum Head (Ft) 0.88 At Centroid of Orifice Driving Head Ha (Ft) 0.29 1/3 Maximum Head Orifice Diameter (in) 3.00 Orifice Diameter (Ft) 0.25 Orifice Area (Ft z) 0.049 Orifice Coefficient 0.60 Orifice Discharge Q (Ft3/s) 0.13 Days to Complete Drawdown 2.60 Between 2 and 5 Days Q = CAA Wluvre: Discharge: (cfs) Gn = Coefficient of discharge (dirnensionless) - see Table 3-8 ,-1 = Cross -sectional area of flow at the orifice entrance. (sq ft) g = Acceleration of gravity (32.2 ft/sec2) 110 = Driving head (ft), nieasureLi frout the ce:ntroid of the orifice area to the water surface - Noie: Usually use Hn/3 to Compute drawdown through an orifice to ritfleet the fact that head is decreasing as the drawdown occurs. Figure 3.3 Schematic: section through an orifice: ="ZR2 Table 3-8 Values of Coefficient of Discharge, G7 (Malcout, 1989) Entrance Condition C„ Typical default value 0.60 Squire -edged entrance 0.59 Concrete pipe, grooved end O.65 Corrugated metal Ripe, mitred to slope 0.52 Corragaled metal pipe, proler:tink from fill 1.00 MAR 1 0 2011 BY Curve Number Calculations Wet Detention Basin A3 Existing Conditions Area # Description Area (Fe) Area Ac CN CN x A 1 Pavement 9,261 021 98 20,8 2 Grass (HSG A 86,986 2.00 39 77,9 3 Grass (HSG B) 48,818 1.12 61 68A 4 Woods (HSG 13 332,308 7.63 60 457.7 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 477,373 10.96 57 Imi' 0.0171 y '-i lk ,- r.i v x:. MAR 1 0 2011 3/8/2011 R:\Hydraulics\CALCULATIONS\Pond A-3\Supporting Calculations A3.xls Curve Number Calculations Wet Detention Basin A3 Area # Description Area (Fe) Area Ac CN CN x A 1 Pavement 226,917 5.21 98 510.5 2 Grass - HSG B 225,718 5.18 61 316.1 3 Water 24,738 0.57 98 55.7 4 0.00 0.0 5 0.00 0.0 6 0.00 0.0 7 0.00 0.0 8 0.00 0.0 9 0.00 0.0 10 0.00 0.0 11 0.00 0.0 12 0.00 0.0 13 0.00 0.0 14 0.00 0.0 15 0.00 0.0 16 0.00 0.0 Total 477,373 10.96 81 0.0171 Imi, RECEIVED MAR 1 0 2011 BY: 3/8/2011 R:\HydraulicSICALCULA710NS\Pond A-3\Supporting Calculations A3.xls Discharge Summary Wet Detention Basin A3 Pre Development 1 yr 24 hour Discharge (cfs) 3.25 Post Development 1 yr 24 hour Discharge (cfs) 19.15 Flow Into Pond Post Development 1 yr 24 hour Discharge (cfs) 1.54 Flow Out of Pond All Values calculated using PondPack computer program Using SCS 7pye Ill rainfall distribution MAR 1 0 2011 Buoyancy Calculations Wet Detention Basin A3 Weight of Riser Structure Walls 4 identical Toe El 19-00 Bottom El 14.35 Height 4.65 ft Width 6.50 ft Thickness 0.50 ft Volume 15.11 ft3 One Wall Volume 60.45 ft3 (4 Walls) Bottom Slab Length 7.00 ft Width 7.00 ft Thickness 2.25 ft Volume 110.25 ft3 Total Volume 170.70 ft3 Density 150 Iblft3 Total Weight 25605 lb �CEIVED MAR I 0 ZO11 BBC: Weight of Displaced Water Height 6.90 ft Width 7.00 ft Length 7.00 ft Volume 338.10 ft3 Density 62.4 IbVP Total Wei ht 21097 lb Factor of Safety Conc. Weight 25605 lb Water Weight 21097 Ib FS 1.21 Min FS = 1.2 PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 Element Oetails ID 42 Label Worksheet (PO-1) - 1 Select Pond to Design PO-1 Flow Allowed Below Target 25.0 Flow Allowed Above Target 10.0 Flow Allowed Below Target 25.0 Flow Allowed Above Target 0,0 Volume Allowed Below Target 25.0 Volume Allowed Above Target 50.0 Tolerance Display Display PASS for values within specified tolerance Notes Volume Pond Type Elevation- Use Void Space? False Volume Elevation -Volume Pond Elevation Pond Volume (ft) (ac-ft) 12.00 0.000 13.00 0.220 14.00 0.540 15.00 0.916 16.00 1.348 16,50 1.586 17.00 1.852 17.50 2.166 18.00 2.508 19.00 3.234 20.00 4.023 21.00 4.872 Infiltration Infiltration Method No Infiltration Output Detention Time None Initial Conditions Is Outflow Averaging On? Define Starting Water Surface Elevation False Elevation (Starting Water 17.00 ft Surface) User Defined Initial Elevation Bentley Systems, Inc. Haestad Methods Soluticn Bentley PondPack V8i POndA3. ppc Center (08.11.01.51] 31812011 27 Siemon Company Drive SuAe 200 W Page 1 of 4 Watertown, CT 06795 USA +1-203-755-1666 MAR 1 0 2011 13Y PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 PondMaker Worksheet (Outlet Design) besign Scenario ' Design Target Peak Target Peak Pond Total Inflow Return Outflow Outflow inflow Volume Event (ft3/s) Volume (ft3/s) (ac-ft) (ac-ft) Post -Development I Year 1 3.25 0,442 19.15 1.691 Past -Development 10 Year 10 22.41 2.053 47.73 4.305 Post -Development 25 Year 25 34.76 3.105 62.54 5.720 Post -Development 50 Year 50 46.11 4.084 75.26 6.958 Post -Development 100 Year 100 59.27 5,234 89.35 8.350 Estimated Estimated Estimated Design Outlet Structure Estimated Estimated Storage Max Water Freeboard Peak Outflow Peak Outflow (ac-ft) Surface Depth (ft3/s) vs. Target , Elevation 0.811 18.21 Pass Composite Outlet 0.77 Fail Structure - 1 1.349 18.95 Pass Composite Outlet 2.55 Fail Structure - 1 1.540 19.20 pass Composite Outlet 10.12 Fail Structure - 1 1.667 19.36 Pass Composite Outlet 19.41 Fail Structure - 1 1.798 19.53 Pass Composite Outlet 31.00 Fail Structure - 1 Bentley Systems, Inc. Haestad Methods Solution PondA3.ppc Center 316/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 UC-ij W 9� MAR 1 0 1.011 Bentley PondPack V8i 108,11,01-511 Page 2 of 4 PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 21.00 ,-, 20.00 v 19.00 $ 16.00 w LO 17.00 00 16.00 15.00 14.00 a. 13.00 Pondl faker Outlet Design I I --------. PondA3 ppc 318/2011 p` MAR 1 0 2a11 8.00 16.00 24.00 32.00 40.00 48.00 56,00 64.00 72.00 Flow (f V/s) Composite Outlet Structure -I f Target Rating Curve »- Post- Development I Year Post-Development10 Year Post- Development 25Year ••• Post- Development 50Year --• Post-Development100 Year Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.51] Page 3 of 4 PondMaker Worksheet Detailed Report: Worksheet (PO-1) - 1 PondMaker Worksheet (Routing Design) Design Scenario Design Target Peak Computed Computed Target Return Outflow Peak Outflow Peak Outflow Outflow Event (ft3/5) (ft3/s) vs. Target Volume (ac-ft) Post -Development 1 Year 1 3.25 1.54 Fail 0.442 Post -Development 10 Year 10 22.41 26.87 Fail 2.053 Post -Development 25 Year 25 34.76 48.15 Fail 3.105 Post -Development 50 Year 50 46.11 61.19 Fail 4.084 Post -Development 100 Year 100 59.27 68.96 Fail 5.234 Computed Computed Routing Outlet Computed Freeboard Maximum Volume Outflow Structure Max Water Depth Storage Outflow Volume vs. Elevation (ac-ft) (ac-ft) Target (ft) 0.965 Fail Composite Outlet 18.45 Pass 2.833 Structure - 1 3.446 Fail Composite Outlet 19.97 Pass 3.607 Structure - 1 4.806 Fail Composite Outlet 19.73 Pass 3.809 Structure - 1 5.994 Pass Composite Outlet 19.91 Pass 3.950 Structure - 1 7.325 Pass Composite Outlet 20.12 Fail 4.121 Structure - 1 PondMaker Routing Design 21.00 20.00 c 19.00 .a A > 1e,aa w 17.00 to It Z' 16.00 15.00 a 14.00 0 a 13.00 12.00 sss rraaa sss 1 aa••a >G-ae STT__ , -Xl "" � -aar rarra N•• ••• •• I� •aaa !a!! �•• • • !N 0.O0 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 Flow (ft3/s) PondA3.ppc 3/8/2011 --fT7 I I. j MAR1�Z011 - Composite Outlet Structure -I -W Target Rating Curve •-• Past-Development1 Year •a• Post -Development 10 Year Post- Development 25Year Post -Development 50 Year •-• Post -Development 100 Year Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8l [08,11.01.51) Page 4 of 4 Contract B -FY12 Contract A - FY10 New Gate Facilities Bougainville Dr./Camp Knox Rd, Intersection Northeast Creek Bridges ANorth Serving Brewster Blvd. Interchange Ramps Brewster Blvd, Widening, and Ring Rd. �a eras 81" d) O'NO M+ u PARADISE POINT Contract B'- FY12 Grade Separated Interchange with NC 24 N Contract C - FY13 Brewster Blvd, Interchange Bridges South Serving Brewster Blvd. Interchange Ramps. Stone Street Bridges Wallace Creek Bridge Proposed Wallace Creek Interchange Bridges Northern Wallace Creek Interchange Ramps 84V SeM WftNamS Stvd New River NOT TO SCALE Contract B - FY12 Southern Ramps of the Proposed Wallace Creek Rd. Interchange Bearhead Creek Bridges Holcomb Blvd. Interchange A'. p yCI� 66�,0' 10 q,d �m Bearhe m�� Qm` McHugh Btvd Birch Street HADNOT POINT New Base Entry Point Project Marine Corps Base, Camp Lejeune, NC CONTRACT PACKAGES J,,, ENWFAC, �V Team r1fItET DETENTION POND ANALYSIS FILE NAME: S:1WQS1Stormwaterlpermits & projects120091090630 HD12011 03 excel _WP 090630 PROJECT #: SW8 090630 REVIEWER: L. Lewis PROJECT NAME: Base Entry Road P-1382, 1383 & 1384 Original Run Date: February 28, 2011 ,Note - User input boxes are shaded in blue. Last Modified: 22-Mar-11 Modification to add pond A3. Ponds Al and A2 are unchanged. Pond A-1 _ _ Pond A-2 Pond A-3 Receiving Stream: Northeast Creel�Jortheast Cre_6_ortheast Creek Classification: Index Number, Onsite DA, sf= Offsite DA. sf = Total Drainage Area,sf: Total Drainage Area,ac Built -Upon Area Buildings, sf = New Road, sf = Parking, sf = Sidewalk, sf = Offsite, sf Total Built -upon Area: SC HOW SC HOW SC HOW 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) 120575.00 121731-00 477373,00 0.00 0.00 0.00 120575,00 121731.00 477373,00 0.00 2.77 2.79 10.96 0,00 `I11 ill 111 111 10695.00 92623.00 92929.00 161738.00 49846,00 4638.00 926 33.00 92929.00 226917.00 0.00 0.00 0.00 Built -Upon Area I Volume at a Different Design Storm BUA. sf DA, sf Design Storm, inches Rv #DIV/O! #DIVIO! #DIV/0! #DIV/O! #DIV10! #DIV/O! Volume required, cf 0 0 0 1 0 1 0 1 0 Minimum Surface Area % impervious Avg. Design Depth. ft: TSS (85% or 90%): SAIDA ratio PP Surface Area req. 76.82% 76.34% 47.53% #DIV/O! #DIV/O! #DIVIO! 3.5 90 3.5 90 3.5 90 7,68% 7.63% 4.75% #DIVIO! #DIV/0! #DIVIO! 9262 9293 22692 #DIVIO! #DIV/0! #DIV101 Pond 1 Pond 2 Pond 3 Pond 4 Pond 5 Pond 6 Within 1/2 mile SR? Y or I n n n 1yr 24hr Rainfall Depth, SR Pre/ Rv 0.050 _ 0.050 0.050_ 0.050 0,050 0,478 _ #DIV/O! #DIV/O! _0.050 #DIV/O! Post/ Rv 0.741 0.737 1 yr 24 hr Pre/ Volume, cl 0 0 0 0 0 0 1 yr 24 hr Post/ Volume, t 0 0 1 0 1 #DIV/0! #DIVIO! #DIV/O! 11215 1 28512 1 #DIVIO! #DIVIO! #DIVIQI Volume Required 11174 Top of Sediment Elev, Fn Top of Sediment Area, sf Bottom of shelf Elev, Fm: Bottom of shelf Area, sf: Permanent Pool Elev= Perm Pool Area= Top of shelf elev= Top of shelf area= Temp. Pool Elevation= Temp.Pool Area= Temp Vol. Prov, cf Average Depth = SHWT Forebav Volume Permanent Pool Vol.= Req. Forebay Volume= Prov. Forebay Volume= Percent= (22>%>18) Max. Pump HP 3.00 11.00 12,00 4114.00 3045.00 8766.00 7.00 16.00 16.50 10026.00 10333.00 21432.00 7.50 16.50 17,00 12406 13346 25785 8.00 17.00 17.50 14194 15189 29098 8.50 17.50 18,00 15068 15941 30352 13966 14916 1 28583 0 0 0 3.5 3.5 1 3.5 #DIV/01 #DIVIOI #DIVIO! 7.33 16.83 17.5 33888 39365 79750 0 0 0 6778 7873 15950 0 0 0 6� 999 7715 15041 18% 20% 19% #DIV/O! #DIV/O! #DIV/0! 1/8 1/8 1/4 NIA NIA NIA Pond A-1 Pond A-2 ❑rawdown OrificeNVeir Avg. Head, ft = 0.31 0.31 Average Flow Q2, cfs 0.065 0.065 Average Flow Q5, cfs 0.026 0.026 02 Area, sq. in. = 3.498 3.511 Q5 Area, sq. in. = 1.399 1.405 No. of Orifices Orifice Diameter, in.= Orifice Area, sq. in. = 3.142 3.142 Weir Height, inches= Weir Length, inches= Pond A-3 0.29 0.00 0.00 0.00 0.165 #DIVIO! #DIVIO! #DIV/O! 0.066 #DIVIO! #DIWO! #DIV/O! 9.137 #DIVIO! #DIVIO! #DIV/O! 3.655 #DIV/O! #DIVIO! #DIV/O! 2 00 2 00 3.00 Weir C = #DIV/O! #DIV/O! ' #DIVIO! #DIV/O! Weir U, eff. length= -0.061 -0.061 -0.058 0.000 Avg. Orifice Flowrate, Q, 0.058 0.058 0.128 0.000 Runoff Coefficient Cc 0.250 0.250 0.250 0.250 1 yr 24 hr rainfall depth, h _ 3.70 _ 3.70 3.70 1 yr 24 hr Intensity, I, in/h 0.154 0.154 0.154 0.000 1 yr 24 hr Prep Q, cfs 0.107 0.108 0.422 0.000 Avg. Orifice flaw<Pre Q? OK OK OK N 2.24 2.59 #DIV/01 Drawdown, days = 2.23 ,overwrite the pre Rv value for sites with existing BUA. overwrite the pre -development runoff Cc value for sites with existing BUA. .-if the project drains to non -SR waters, look up the rainfall depth in the NOAA charts. 0.000 0.000 #DIVIO! #DIV/01 0.000 0.000 0,000 0.000 0,250 0,250 0.000 0.000 0.000 0.000 N N #DIV10! #DIVIO! Lewis,Linda From: Lewis,Linda Sent: Monday, March 14, 2011 5:28 PM To: 'Slate, Louise' Cc: Russell, Janet Subject: SW8 090630 BER Louise I'd like to change the reporting format of the overall low density column to include the BUA from the individual high density areas. The low density column is not just to report the BUA that is not being treated. Essentially, you will end up with a total BUA number for the "on -site streets" in the overall low density column that includes the entire proposed street area, both treated and untreated. Similarly, the total BUA numbers for the on -site building area in the overall low density column would include the proposed BUA being treated in a BMP and the proposed BUA that is not being treated in a BMP. Future BUA would necessarily not be placed into a high density column. Once the plans for any future BUA are permitted, the application will reflect an appropriate reduction in future BUA, and an increase in the buildings and streets BUA in the overall column. If the future BUA is in a high density area, there will also be a corresponding increase in the buildings and streets total in one or more of the existing BMP columns, or in a separate column for a completely new BMP. There is an allocation of 11,299 sf of building from the June 2010 permit. Where is that building located? None of the previous basins, Al or A2, had any buildings in their BUA total, so the 11,299 sf should be a new building that is untreated. The new application contains an allocation of 10,695 sf of building for Basin A3 (the new Highway 24 gate area), and changes the previous overall low density building area from 11,299 to 11,516. I'm just not sure what the low density "building" covers. If there is 11,516 sf of building not being treated and another 10,695 sf being treated in Basin A3, then the total building to report in the overall low density column is 22,211 sf. Has the pond designation changed from A3 to 133? The revised plans now say Pond B3, but the application maintains a designation as Pond A3. Please provide the requested information prior to Monday, March 21, 2011. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 Education is the progressive discovery of our own ignorance. -Will Durant F-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. t / -- 3 ac:�a �. -a. cxawrtsa TOTAL AREA- 1.11 ACRES TOTAL ARFA- aa9 ACRES i0�f>ti IITEA- 1-67 AGRES� °� �. •,•�, +� .15axI _ _ BVERr10ll5 AREA- 0.63 ACRES hWVMDS AREA, 0.23 /�LRES MP4IMOUS AREA- IM ACAS nna.+u r: LENGTH OF FLOW- 297 FT. lE)10�1 OF FLOW- 232 fT- -,Tb4 TW.OF. FLOW- 360 FT. SCOPE. IA4x ,SLOPE- 0.6x LOK Oex- TOE OF CONCENTRATION- 6 TIIE OF WFICF7TTRA310N- 24AT =�TxE-O�CONCEATTRAT10Fr•_D'1mL c.• or S6- l i' J��_ r-zre� 0.17 ACRES ° .cass.�.�.�.-�---6•l�r s r r �1.% f R ,� !� `�`\`\ mwnx7-1. 00 \\ "\\. 6BERN0l15 AREA- 0.12 ACRES OF FLOW- t l6 Fr. 4.24x Eaw Err. cl /A .ti+ t ` 'zx er.gn7-11e airSz- f / �y"I��\\ a `•\ \ q TLC OF COfICEMR1110A1- D.ariz.7-1e •s �•�y. r \ sw..lfzo-)-,e.s • """`'""' " ,'. ?�• •\ !1 / \� \\ �- �x.-I=,a+e ij, � A�'ls xr � � / ' `•\_ '� t;rsa r„ ww IBC �• j} jj \'\ \.\ � % L•�[R &4 NM1..CT .W al!!21 I I I 1 ^ � r �,�1 s f /- �- � 4l e�annols aaoa-� .cr ocrert,on 1 l' orc. .r~n wr.n.l� r \ \ •\\.v n f j / ./•� / 6� , - :r u.5 �jtYPJI0l5�ARFM 330 RES// `' ° / / /�� \ \ �% ACRES LENGTH OF FLOW- 210 FF:X// SLOPE- 2.17% )) /`' "� .---.-." / e000 -`i.•{ a.rl �l`` y \\\ ••\ / nuE aF CONCENTRATmm 1oN- 6 YIi. TOTAL AREA- 1.69 ACRES N"= \ ■PE7LVXWS AREA. Oat ACRES ;\ r / I 1 ! laa a irE A(, A7-nrC\ \ \\\. V / •'' .. C C Low-TH of FLOW- 309 Fl. SLOPE- 1.511 \ ,� �4./ i wrvMun euna ,mm I Irr nl \ TOE OF CONCENTRATION- 6 Y .\ I ' i " \``,\\\ / f��!�\\�, \I�OfAal ORES- 2.113 OGRES \�� wlzr el I E xw ! I 1 ,M1/ a�raa / 1• \�� .. \ FLOW- 191 V W UDCrH OF tawa [mw- 1z I {{ I . ,' 1l, .( \\SLOPE- .olx YI51 / / rr iP1Ap w}1 (CI r6e1rt71'91 i I I I �` �, ,� 1�, \IiYE'OF COIKEMRATION- 23 YII M 70UL NXA- 1.16 ACIDS i ^ f ra L 7 \\ I V ■PERNOIS AREA- 0.72 ACRES/%/j• o I ' w I %aearoia1 N+n z1x-'y711�® / LOOM OF1.ROW-453 Fr. TIME OF CONLxNTAA710N- 6 -_--- .-- --- =•l 'i. � e�eewnaw oxff./ % 4mo I I I ` I � I li ! Ii:Os* 1 /, .. ' �t � ea wrl,°7-m.°s �� �•. % � .ate cr...l PERAAGRF5 I I ..ia� �I /� .10 / rAVRwco WOUS AREA- 0.56EACRES mag i♦ e[ I - •- \�• '•\ \.\ ¢. ~�•. J LFUUM OF -FLOW- �6`� _ _ I ACPE� 0.8HS �1 I € �'�' �` e�onale/ •\ \"r { �7 ". /' ron cdrr.ce. w - \ ` TIME OF Y6i '�� ; F W�rss "\9_ •\\\ \ / �sr'yr i�/ !cm*n i;/ %',=1 vrrsncsoa. la --.,.-..-....... -.- .�.�. .r.mm-; �� wal it 1 'a \ r E 49W \ �\ j/�/ i/ nnrx+l+e9=ISn oes E� Ei �`.. YMS! \ \ \;\vrir ji/ �Inv.eNl°7-, 5, 11 nxr �f curt r.u.�al: a °nwcn wvucw ��j kK-x1.W <I� spr �•�. y11fa� sAIFKx +rwrrx inc. : a5.-.��-xeAroncuwr .� 1 sA►.� d E = yE Q \.\ -t U ¢�¢ L x. - �ALr7K�_u - it o''ss r -� 1. o,. �- \ \ a'r037-Lew 4eaws w_ o 6. _� V - a�3 �.r feA►Ali Z W CImD flVlEl G1� °�''SS 1 ' Q �. Q -.--------------- >� TOTAL AREA- 0,24 ACRES xaao IIPFRNOUS AREA-'0.24'ACS E w+.aI11T157- ,°3 •`-`' - rAOnars ! r I' \\ ° I cwsean m -+� 3 tJ d O / CV1B MR r1 \\\ _ TOTAL AREA- 0.21 MAPS !'-z.353 LFYICTH OF FLOW- 196'FT. I . srAS1371a } _ vs+�¢ _ 31.53 1 IPE tVlOCM AREA- 0.21 ACRES / ,,Sle 57xa.ao �\ waaL n T11If'OF-O(�FICFNIRATION- D YIN I - wli,s7-x°.Sa _� \., W \ ! LEIIUIH OF FLOW- 207 FT. i / /%\:\ \ \\ ! O L=.I Z C - ` I j SCOPE- 0.93x Z Wow w ffi `I.tr+Osl:+.4 °rl+u rwl c - 1 ' TOE OF oONCW WT10N- 6 16N J \ i/ ti • \ `\ �� zp ¢ J TOTAL AREA- 0.23 ACRES 1 / /; \`• ♦. TOTAL AREA, 0.44 ACRES W U m Q 9APETiJg175 AREA- 02s ACltFS \ i��� / •� / \ _\ \\• UD4GtH OF AREA- 295 ACIDS _ W � -zo as' TOTAL AREA- READ OGRES �� -~- _ LENGTH OF FLOW- 205 FT. /. \\, LE740TH OF FLOW 295 FT. �� z g LC TIME O 0.93%CONC // / / IBERYIOOF AREA- 0.00 `ACRE C' ♦\ SLOPE- 0.50%CONC ti.� ��� U LQ TIME OF CONCQCLTUTION- D ` - •� /i LETLGTT4 Di Fi.OAY- 437 Fi` 94yA \.\ TOE OF COIILEMMiION- 8 YW -�� _ f x a r CL SLOPE -- I.34OF ooNCE)MtADOFI+ IS- /fy ~\�� \ -- yam_ �� . Iwl1 m o p'1' \\` TOTAL AREA- 2-02 ACRES 4 �-�.UJ mFMPERVIOUS AREA- 26 ACRES Z j L04M OF FLOW- 673FO- \.� `\ `•�\� ` -- o•aCTOTAL ARE4- F3EL TWMIYPER!eO SM- 0,01 Q of UI •\\ \�\. Ua4UIH OF Flow- 215 Fr. LL 0. d A \ TILE of OOI TKN- lI � w MAR 2 1 Z011 >*�+� As VOTER fr°°S[I ro.: POST DEVELOPED WATERSHED DRAINAGE MAP 60' 0 60' 120' 1 ` - 60'-0' SCALE: 1 " = 60' GRAPHIC SCALE Re�ace vvi aKrt s!� -f;v GE ms Sec( . > ryas i �� Cove ccacs . 4VMACTEC MACTEC Engineering and Consulting R k Atlantic 7604 Raleigh, NC 27604 Phone: (919) 876-0416 Fax: (919) 831-8136 LETTER OF TRANSMITTAL TO: Linda Lewis DATE: 3-9-2011 NCDENR/DWQ Express Permitting PROJECT NO.: 6225 09 4999 127 N. Cardinal Drive Ext. PROD. NAME: Camp Lejeune New Base Entry Point & Road Wilmington, NC 28405 SUBJECT: Revised drawings and calculations for stormwater permit modification for the Base Entry Point and Road WE TRANSMIT TO YOU: R HEREWITH FUNDER SEPARATE COVER SUBJECT: ®DRAWINGS ❑SPECIFICATIONS ®CALCULATIONS ❑REPORT ❑COST ESTIMATE ❑AS NOTED ACTION: ®FOR YOUR INFORMATION ❑FOR YOUR COMMENT OR APPROVAL ❑RETURNED FOR CORRECTION: RESUBMIT ❑APPROVED AS NOTED ❑AS REQUESTED SENT BY: ❑MAIL ❑CERTIFIED MAIL ®EXPRESS FedEx (7945 1040 9164) ❑COURIER ❑HAND DELIVERED ❑FACSIMILE: pages (including transmittal sheet) COPIES DATE DESCRIPTION 2 3-9-1 1 Page 3 of application with updated table (Part IV 10) 2 3-9-1 1 Responses to comments received in email from Linda Lewis on 2-28-201 1 2 3-7-1 1 Revised Stormwater Management Design calculations and drawing for stormwater pond at fate 2 3-7-1 1 Revised stormwater calculations and drawings (CEMS) 2 3-7-1 1 Gate civil plans — Sheets C-131 to C-136 and C-138 2 3-7-1 1 Wet detention Basin A-3 plans — Sheets CG564 to CG568 2 3-7-1 1 Bioretention plans (for information only) — Sheets CG551 and CG554 REMARKS: Enclosed are the comment responses, revised plan sheets, calculations and application page 3 needed based on the express review comments. CC: Orathai Bulfer, MCB Camp Lejeune C Jesse Barker, MACTEC ui, Siat Pete Wright, NAVFAC losiate@tnactee.com tnactee.com 4PjF Jeff Meador, MACTECIRK&IC Joint Venture CEIVIE Direct Phone: 919-831-8006 —File (1) I MAR I 0 2011 CONFIDh:NfIALITY NOTICE: This message is intended only for the use of the individual or entity to which it is addressed, aridL�mav:contain-iniormation_that_is privileged, confidential, and exempt from disclosure under applicable lain, If the reader of this message is not the intended recipient, or the employee or agent responsible liir delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone and return the original message to us at the above address via the U.S, Postal Service. Thank you. If transmission is not received in good order, please call Louise Slate at 919-831-8006. I xnalenl5 Form Rerisrd 10?Nd ] New Base Entry Point FY10 MCON P 1382 NCDWO Stormwater Permit 090630 The following comments were received via e-mail regarding the February 22, 2011 stormwater meeting for the subject project. Responses to the comments and actions taken to remedy the comment are shown in bold red text. You've partitioned the plans for the gate area into "low density" and "high density". You really can't draw a line through the project and designate one side as low density and the other side as high density. I think you only need to show overall low density and the drainage area of this particular BMP. Low densitylhigh density designation removed from plans. Drainage area and overall low density boundary remain on drainage area map and color boundary drawings. Speaking of low density, there is a pretty significant piped collection system in the "low density" area that discharges directly into the borrow pit. This is not allowed under low density. Some of the piping appears to be acting as a means to deal with the overflow from a few bioretention basins that were not included in the permit application for review. If you want to keep that much collection pipe in an overall low density project, you'll need to add BMP(s) to treat that collected runoff. The two manholes, E1 and K2 share the same outlet invert, 16.42, so it's conceivable that a second wet pond could be created. Per subsequent e-mail discussions the area of low density with extensive piping that drains to the borrow pit has been directed to pond A-3. Pond A-3 has been redesigned to accommodate the additional drainage area. The average depth is not correct. For some unknown reason, this calculation is not automatically performed on the wet pond supplement form, although all the numbers needed for it are right there. The "Depth" between the bottom of the shelf and the bottom of the pond (top of sediment) is correctly reported on the supplement form as 4.5 feet, which should yield an average depth of 3.6 feet, rounded to 3.5 feet. But the "Depth" used in the actual calculations is 5.0, yielding the incorrect average depth of 3.93 feet, which was rounded to 4.0 feet. The supporting calculations have been updated to show the correct depth of 4.5'. The correct average depth is now reported in the supporting calculations and the supplement. F T FZ MP J " I_ cu13 B4 � �o�OCo3c� The orifice routing should start at the selected temporary pool elevation of 18.1, not the calculated minimum elevation of 17.93. The drawdown calculations have been revised to show the temporary pool elevation of 18.1. 4. The overall drainage area has increased by 661,644 sf from the June 2010 permit. The increase appears to only come from the addition of the NC 24 ramp area adjacent the new gate, however, when I scale the added area, I come up with less than 500,000 sf. There's about 4 acres of missing project area. Has project area been added somewhere else? The project area was updated from NC24 through the gate to the intersection with Bougainville Drive and Camp Knox Road as well as within the Brewster Boulevard Interchange. Additional boundary was required to ensure that the BUA would be less than or equal to 24% along the project corridor even if subsequent contracts were not built. For future submittals, please use the first column of the application to list the overall low density data, then use the remaining columns for the individual permitted/added BMP's, Table has been revised listing low density data in the first column and updated info for pond A-3. All future submittals will utilize the requested format. As mentioned in the meeting, the calculations should not be a simple listing of the "required" and the "provided" design minimums. That information is already on the supplement form. It should be a written derivation of the formulas and numbers reported on the supplement, including drainage area, BUA, SAMA ratio, average depth, minimum volume, forebay volume, elevations, areas, and orifice drawdown time. Routing spreadsheets such as HydroCAD or PondPak are useful as supporting documents for the numbers, and should be referenced in the calculations, but do not supplant the calculations themselves. The supporting calculations have been updated to provide additional background information. I'm not OK with the overflow pipe from cell A-5, unless you add that bioretention cell A-5 as a permitted BMP. Another alternative is to shorten up the pipe so it's just long enough to get under the road with a 3:1 slope, and use vegetated conveyances from there. The pipe from cell A-5 has been shortened to the minimum needed to pass under the roadway. �.ViHt� 1 0 2011 Lewis,Linda From: Lewis, Linda Sent: Monday, February 28, 2011 4:49 PM To: Louise Slate Cc: Russell, Janet Subject: SW8 090630 BER Louise I've finished the majority of the review and have the following questions and comments: 1. The average depth is not correct. For some unknown reason, this calculation is not automatically performed on the wet pond supplement form, although all the numbers needed for it are right there. The "Depth" between the bottom of the shelf and the bottom of the pond (top of sediment) is correctly reported on the supplement form as 4.5 feet, which should yield an average depth of 3.6 feet, rounded to 3.5 feet. But the "Depth" used in the actual calculations is 5.0, yielding the incorrect average depth of 3.93 feet, which was rounded to 4.0 feet. 2. The orifice routing should start at the selected temporary pool elevation of 18.1, not the calculated minimum elevation of 17.93. 3. The piping issue in the low density portion will be further discussed tomorrow. As you are aware, extensive collection piping in low density is not allowed, 4. The overall drainage area has increased by 661,644 sf from the June 2010 permit. The increase appears to only come from the addition of the NC 24 ramp area adjacent the new gate, however, when i scale the added area, I come up with less than 500,000 sf. There's about 4 acres of missing project area. Has project area been added somewhere else? 5. For future submittals, please use the first column of the application to list the overall low density data, then use the remaining columns for the individual permitted/added BMP's. 6. As mentioned in the meeting, the calculations should not be a simple listing of the "required" and the "provided" design minimums. That information is already on the supplement form. It should be a written derivation of the formulas and numbers reported on the supplement, including drainage area, BUA, SAIDA ratio, average depth, minimum volume, €orebay volume, elevations, areas, and orifice drawdown time. Routing spreadsheets such as HydroCAD or PondPak are useful as supporting documents for the numbers, and should be referenced in the calculations, but do not supplant the calculations themselves. Thanks, Linda Please note my new email address is Linda.Lewis@nedenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Lewis,Linda From: Lewis,Linda Sent. Wednesday, January 19, 2011 9:57 AM To: 'Slate, Louise' Subject: RE: Quick question about permit mod. for Base Entry Road at Camp Lejeune (Contract A) Louise - Thanks for that clarification. Permeable pavement is only for use in low traffic areas, i.e., less than 100 vehicles per day. Unless this gate is located in a remote area of Camp Lejeune, I would expect to see well in excess of 100 vehicles per day, meaning the Division could not give you a lowered "effective" BUA amount for the use of permeable pavement. If you don't want or need the BUA credit to stay under the maximum density limit, then it's OK to use the permeable pavement. Keep in mind that at higher traffic volumes, the pavement may not last and will require frequent maintenance. Also, if you are using bioretention basins in a "low density" area, you still can't have a conveyance system of piping to get the runoff into the basin. Low density precludes having a piped conveyance system. If you have a piped conveyance system, then that area will be considered high density and the basin would have to be permitted. If you only have a grassed swale conveyance system, then we can look at low density permitting. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal drive Ext. Wilmington, NC 28405 910-796-7215 IE-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Slate, Louise [mailto:LOSLATECa@mactec.com] Sent: Wednesday, January 19, 2011 9:21 AM To: Lewis, Linda Cc: Russell, Janet Subject: RE: Quick question about permit mod. for Base Entry Road at Camp Lejeune (Contract A) Linda, Ok. We will arrange a meeting for a permit mod. Just to be clear, the bioretention areas and permeable pavement are not for credit, they are incorporated into the low density section. The pond size is based on the portion of the gate area in the high density section. I did not make this clear in the previous email. If you have questions or concerns about the approach, please let me know. Hopefully we can address them through email or a phone call. I want to make sure that we are all on the same page before the meeting so there are no surprises and we can make the best use of our face time in Wilmington. Louise Louise O. State, PE, LEED AP I Senior Engineer I Environmental Department MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue I Raleigh, North Carolina Office 919.876.04161 Direct 919.831.8006 1 Fax 919.831.8136 Email losiate@mactec.com I Web www.mactec.com From: Lewis,Lindafmaiito:tinda.lewis(ancdenr.govj Sent: Tuesday, January 18, 2011 9:19 AM To: Slate, Louise Cc: Russell, Janet Subject: RE: Quick question about permit mod. for Base Entry Road at Camp Lejeune (Contract A) Louise: A scoping meeting is only necessary if either one of us feels the need to discuss the project. Unless you have some questions/concerns that would prevent you from making a complete submittal on the scheduled Express review date, then a scoping meeting is not necessary. You've proven yourself to be competent in getting the calculations, applications and plans correct. If you have any minorlsimple design or procedural questions, we can handle them via email. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Slate, Louise mall o:LOSLATE mactec.com Sent: Monday, January 17, 2011 5:09 PM To: Lewis,Unda Subject: Quick question about permit mod. for Base Entry Road at Camp Lejeune (Contract A) Hello Linda, I hope 2011 is starting off well for you. We are preparing to submit a permit modification for Contract A focusing primarily on the gate area where some curb and gutter was removed and bioretention and permeable pavement were incorporated into the design in order to reduce the size of the WQ pond. In order to make the best use of everyone's time, do you think we need to have a brief scoping meeting first or do you think it will be ok to bring in the design to be permitted? I will be in the office this week if you need more detail than this. Please let me know and I will contact the team for dates to get this scheduled through Janet. Thanks. Louise Louise O. Slate, PE, LEED AP I Senior Engineer I Environmental Department MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue I Raleigh, North Carolina Office 919.876.04161 Direct 919.831.8006 1 Fax 919.831.8136 Email loslate@mactec.com I Web www.mactec.com :f ^` DWQ USE ONLY Date Received Fee Paid Permit Number 2 23 ZU1r 7 2-2s-Zal 000 -W (o43DoCo I SW F U`)063 O1-fool Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form niay be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): New Base Entry Point and Road (P1382,1.383, and 1384), U.S. Marine Corps, Camp Lejeune (includes Hospital Corps Road) 2. Location of Project (street address): U.S. Marine Corps Base, Camp Lejeune City: Camp Lejeune County: Onslow Zip: 28547 3. Directions to project (from nearest major intersection): Heading north into Jacksonville on US 17, turn onto NC 24 toward Camp Lejeune. The new base entry road is located to the right before the pedestrian bridge over Rte 24 between Ellis Road and Bell Fork Road. Hospital Corps Road is located on base off Brewster Blvd. across from Stone Street. Use the main entry agate to Camp Leieune off Rte 24 onto Holcomb Blvd, turn right on Brewster Blvd. and go approx. 0.8 mi. 4. Latitude: 34' 44' 40" N Longitude:77° 23' 30" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing. permit, list the existing permit numberSW8 090630 , its issue date (if known)February 8, 2010 , and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 138 Contract A/TBD Contract B & C ac of Disturbed Area ❑NPDES Industrial Stormwater ®404/401 Permit: Proposed Impacts 5.98 ac. wetlands, 2228 If streams b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Erosion & Sedimentation Control Permit ONSLO_2010-104, issued Form SWU-101 Version 07July2009 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: U.S. Marine Corps, Camp Lejeune Signing Official & Title: Commander Ronald Kram s Public Works Officer b.Contact information for person listed in item la above: Street Address: Public Works Division, 1005 Michael Road City: Camp Lejeune State: NC Zip: 28547 Mailing Address (if applicable): PSC Box 20005 City: Camp Lejeune State: NC Zip: 28542 Phone: (910 ) 451-2213 Fax: (910- } 451-2927 Email: ronald.kramps©usmc.mil Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2:a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: U.S. Marine Corps, Camp Lejeune Signing Official & Title: Commander Ronald Kramps, Public Works Officer - b. Contact information for person listed in item 2a above: Street Address: Public Works Division, 1005 Michael Road City: Camp Lejeune State: NC Zip: 28547 Mailing Address (if applicable):PSC Box 20005 City: Camp Lejeune State: NC Zip: 28542 Phone: ( 910 ) 451-2213 Fax: ( 910 ) 451-2927 T Email:ronald.kramps@usmc.mil 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer Questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( } Fax: ( ) Email: 4. Local jurisdiction for building permits: MCB Camp Lejeune T ^ Point of Contact: Phone #: �Eg292011 Form SWU-101 Version 07July2009 Page 2 of 7 BY:- - - - IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Low density sections of the roadway will use sheet flow, roadside swales and re-formed scour holes. High density areas will include, in addition to the above, some12i12ing, that will. discharge to a structural BMP such as wet detention basin pond, prior to discharge. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the roject has been designed in accordance with: ❑ Coastal SW -1995 �] Ph I1 - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 469.16 acres 5. Total Coastal Wetlands Area: 1.96 acres 6. Total Surface Water Area: 12.29 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area*:454.92 acres Total project area shall be calculated to exclude tlne followin the nortnai pool of impounded structures, the area between the banks of streams and rivers, tlne area below the Nornnal High Water (NHW) line or Mearr High Water (MHW) Iine, and coastal wetlands landward from the NHW (or MHW) line. Tlne resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NH11V (or MHW) line niay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 22.71 % 9. How many drainage areas does the project have?_4 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. 'Basin Information , Drainage Area 1 D. Drainage Area AZ Drainage Area; A2`V Drainage Area A3 ReceivingStream Name New River Northeast Creek Northeast Creek Northeast Creek Stream Class * SB, HQW, NSW SC, HQW, NSW SC, HQW, NSW SC, HQW, NSW Stream Index Number* 19-(10.5) 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) Total Drainage Area (so 19,816,223 120,575 121,731 477,373 On -site Drainage Area (sf) 19,816,223 120,575 121,731 477,373 Off -site Draina e Area (so 0 0 0 0 Proposed Impervious Area*" (so 4,500,302 92,623 92,929 226,917 Impervious Area* total 22.71 76.8 76.3 47.5 lm ervious 'Surface 'Area" -Draina e,Area 'Dr aina e.Area'' '',Drairia e Area Draina e'Area On -site Buildings/Lots (so 11,516 10,695 On -site Streets (SO 1,932,194 92,623 92,929 161,738 On -site Parkin (so 49,846 49,846 On -site Sidewalks (so 137,290 4,638 Other on -site (so Future(so 2,341,853 Off -site (so Existing BUA*** (so 27,603 Total (so: 4,500,302 92,623 92,929 226,917 * Stream Class and Index Nuniber can be determined at: lit r2o.enr.state.ric.us inns re orts r ortsWB.lntur! rZr.,s'C P_,A VED Form SWU-10i Version 07July2009 Page 3 of MAR 2 1 2011 Iinperoious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. " Report only that amount of existing BUA that will remain after deuelo rent. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Offsite impervious area is not calculated because there is no offsite drainage into the water ualiponds and the low densi corridor with i2ockets of high density measures the corridor only. Proieets in Union County: Contact D&PQ Central p)re staffto check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project The latest versions of the forms can be downloaded from h h2o.enr.state.nc.us su bm forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below, A detailed application instruction sheet and BMP checklists are available from h=/ / h2a,enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by Iocating project on the interactive online map at htip:/ /h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.stite.nc.us/su/bmp_forms,htrn. 1. Original and one copy of the Stormwater Management Permit Application Form, 2. OriginaI and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) sealed signed and dated and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to Hitt+://www.etivhelp.or�/pages/onestopexpress.htmi for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator fo additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. �? b. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/7 mile of the site boundary, include the 1/ mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates, h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the ]a11-1W or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. RECv�D k. Existing contours, proposed contours, spot elevations, finished floor elevations. Form SWU-101 Version 073uly2009 Page 4 of 7 FEB 2 8 2011 BY: 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9_ Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with project area clearly delineated. For projects with infiltration BNiPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (9I0) 796-7378.) 10. A copy of the most current property deed. Deed book: n/a Page No: n/a 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hqR:/ /www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htti2:/(h2o.enr.state.nc.us/su/bmp forms.htm9deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and Iisted on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Louise Slate Consulting Firm: ,v1 ACTEC Mailing Address:3301 Atlantic Avenue City:Raleigh Phone: (919__ ) 831-8006 Ema il:Ioslate®mactec.com State:NC Zip:27604 Fax: (919 __ -_l _831-8136_ FFEB �`E'VED Form SWU-101 Version 07July2009 Page 5 of S ���1 : IX. PROPERTY OWNER ALTEIORIZATION (if Contact Information, itent 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item Ia) with (print or type name of organization listed in Contact Information, item Tb) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I wilt be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date.: I, a Notary Public for the State of County of do hereby certify that personally appeared before me this _-_, day of . _ and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Fora, SWIJ-101 Version 07July2009 Page 6 of 7 RF, CEIVED F E B 2 8 2011 BY: X. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in Contact Information, item 2) Commander Ronald Kram s Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormier rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Date: Z.!, F" /l [,T IY I cam. lVOf 1- 4 S , , a Notary Public for the State of _�V Dr'1 ht,� v�, County of Oft SAow do hereby certify that c d d F. 4- C Q rY1P_$ _ personally appeared before me thiscZb ay of F-C.Dfl�l0.lf" V 011 and ackn wledge the due execution of the application for a stormwater permit. Witness my hand and official seal, [SYLVIA NDRRIS NOTARY PUBLIC ONSLOW COUNTY, MYCOMMISSION EXPIRES SEAL My commission expires Farm SWU-101 Version 071uly2009 1'a�e 7 of 7 RECEIVED FEB 28Z0» BY: �r *;7 MCB Camp Lejeune SoilEvaluation Onslow County, North Carolina SEASONAL HIGH WATER TABLE EVALUATION MCB CAMP LEJEUNE BER STORMWATER ONSLOW COUNTY, NORTH CAROLINA MACTEC PROJECT 6225-09-4999 MACTEC Project No.: 6225-09-4999 April 12, 2010 Page 1 Methodology A MACTEC soil scientist conducted a preliminary evaluation of the soils within areas considered for stormwater best management practices (BMPs) on April 9, 2010. Hand -auger borings were advanced at ten pre -determined locations. This evaluation included field descriptions for soil texture; color; structure; and depth to seasonal high water table (SHWT) if possible. The SHWT depth was based on field observations of soil characteristics through identification of low chroma redoximorphic features (mottles). All depths presented are below the land surface (BLS). Findings The approximate SHWT depth was based on field observations of soil characteristics .through identification of low chroma mottles. The low chroma mottles suggest past conditions of saturation and reducing soil conditions. Evidence of a SHWT was observed at the depths indicated in the table below. Boring Number Depth To Season High Water Table inches BLS SWB-A 90 SWB-B s0 SWB-C 40 SWB-D <12 SWB-E 40 SWB-H 29 SWB-I <12 SWB-J 32 SWB-K 30 SWB-L <12 Notes 1. The soils present at boring locations SWB-D, I and L were hydric soils. Evidence of a SWHT was observed within 12 inches of the soil surface. T � 'w �..' d a• NC®ENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review For DENR Use ONLY I C - Submit: Z~'�ZY.I 1 Time: confirm. FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan PDF file and vicinity ma same items expected in the application Package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296-4698;alison.davidson(cbncmail.net • Fayetteville or Raleigh Regfon•DavfdLee 919.791-4203; david.tee(a)ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or Patrick. ra an ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lYn.hardison(r-ncmait.net • Wilmington Region -Janet Russell 910-350-2004 or janetrusseltna.ncmaitnet NOTE: Project application received alter 12 noon will be stamped in the following work day Enter Related SW Permits of request SW SW SW SW SW C)ce_PVn Project Name: NEW BASE ENTRY POINT AND ROAD County: ONSLOW Applicant: CARL BAKER Company: US MARINE CORPS BASE C LEJEUNE Address: PUBLIC WORKS DIVISION, 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.ba er@usmc.mil Physical Location:MCB CAMP LEJEUNE Project Drains into waters - Water classification SC (tor classification see-http:f/h2o.enr.state.nc.uslbimstreyorts/reDortsWB.htmll Project Located in WHITE OAK River Basin. is project draining to class ORW waters? N , within A mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? Y Engineer/Consultant: LOUISE SLATE Company: MACTEC RAF C FTVED Address; 3301 ATLANTIC AVENUE City: RALEIGH, State: NC Zip: 27604 I JAN 1 2011 Phone: 919-U1-8006, Fax: 919-831-8136, Email: loslate@macteo.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWO, ❑ DCM, ❑ DLR, ❑ OTHER: BY: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: — # of stream calls - Please attach TOPO map marking the areas it? questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility, ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Ouiiet Swales ❑ Off -site (SW (Provide permit #)j ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ® MOD;® Major ❑ M+nor ❑ Plan Revision ❑ Redev. Exclusion SW 090630 (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan vnth — acres to be disturbed.(CK # (for DENR use)), SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooina and express meetina reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ® YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ® Yes ❑ No US ACOE Approval of Delineation completed: 0 Yes ❑ No 404 Application in Process wl US ACOE: ® Yes ❑ No Permit Received from US ACOE [A Yes ❑ No +«•»«rs«»r»•»ss»»»*s**»***»«*»:»»»*»»ssr«******•*t**»s*slot DENR use only:*r»•*«***»***»*»*rss**»ss«««rr♦ss*ssss*ss*s**ss»s»•*s»«r*s Fee Split for multiplepermits: Check N Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance I❑ Mai; ❑ Min) $ SW (0 HD, El LD, ❑ Gen) , $ 401: 1 $ LQS $ Stream Deter,_ / $ t NCDENR EXPRESS March 2009 Russell, Janet From: Slate, Louise [LOSLATE@mactec.com] Sent: Monday, January 31, 2011 12:14 PM To: Russell, Janet Cc: Lewis,Linda; Barker, Jesse Subject: Permit mod request - Camp Leleune Base Entry Road Attachments: Express Request Narrative - 1-31-11.pdf; EXPRESS Request 1-31-11.pdf Janet, Attached is the express permit review request for a permit modification for changes to the Rase Entry Road at Camp Lejeune. The focus of the changes are in the detailed design section for Contract A. We would like to schedule a meeting with you and Linda Lewis on February 23. An alternate date is February 22. Please let me know if this is suitable and I will notify the rest of the team. The express request is filled out as a major modification based on the design changes at the gate that include a water quality pond. The Brewster Boulevard interchange is designed as low density. Please let me know what the fee will be as this project is overall low density with pockets of high density. Call -or email if you have any questions or need additional information. Thanks for your help coordinating this meeting. Louise Louise O. Slate, PE, LEED AP I Senior Engineer I Environmental Department MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue I Raleigh, North Carolina Office 919.876.0416 1 Direct 919.831.8006 1 Fax 919.831.8136 Email Ioslate(&mactec.com I Web www.mactec.com Request for Express Permit Review Stormwater Narrative FY10 MCON Project 1382, New Base Entry Point Camp Lejeune, NC January 31, 2011 This narrative describes the changes in the design to New Base Entry Point since stormwater permit SW8 090630 was issued on February 8, 2010 and modified on June 15, 2010. This modification focuses on the gate area of the Base Entry Road (BER) and the Brewster Boulevard interchange which are included in Contract A, the first of three phases. The overall permitting strategy continues to be low density with pockets of high density. The gate area includes a high density pocket draining to a water quality pond. Low density areas in the gate area include stormwater treatment in support of the Federal government's green initiative. No credit is sought for the Stormwater measures in the low density areas. The Brewster Boulevard interchange is designed to comply with low density requirements. The project site is located in Onslow County, North Carolina and is in the White Oak River Basin. The roadway drains to three main receiving waters: Northeast Creek, Wallace Creek, and Bearhead Creek. The following table lists each stream with its DWQ Classification. Stream Name DWQ Classification DWQ Index Northeast Creek SC NSW 19-16-(0.5) Wallace Creek SB NSW 19-20 Bearhead Creek SB NSW 19-20-1 The project permit boundary is established to achieve the Low Density stormwater permitting option and has pockets of High Density. Consistent with Low Density stormwater strategy described in requirements set forth in the Session Law 2008-211 Section 2.(b)3b, sheet flow and flow through vegetated conveyances (grassed swales) will be maximized along the project corridor. Generally, the roadway will have a 46 ft depressed median cross section. The roadway will generally have three (3) distinct typical cross sections: Section Description Proposed Typical Section Stormwater Strategy Permitting Strategy Tangent and Depressed median, Utilize shoulder sheet flow and Low Curve Sections open shoulder, grass roadside swales. Occasional median Density swales discharge points will be discharged to preformed scour holes. No other structural BMPs are proposed in these roadway sections. Tangent and Depressed median, Utilize shoulder sheet flow and Low Curve Sections raised median with roadside swales. Occasional median Density curb and gutter and discharge points will be discharged to with open shoulder, grass preformed scour holes. No other Occasional swales structural BMPs are proposed in Pockets of these roadway sections. Collect High stormwater in pipe systems and Density convey to structural BMP prior to discharge Stormwater Narrative VD Page 1 JAN 3 1 Z01t 1J .w1 1 Bridge/Culvert Curb and gutter Collect stormwater in pipe systems Pockets of approaches and and convey to structural BMP prior to High other sections discharge Density requiring curb and gutter Gate n/a Utilize sheet flow and swales or Pocket of collect stormwater in pipe systems High and convey to structural BMP prior to Density discharge Proposed structural stormwater BMPs will be designed in accordance with the 2007 NCDENR Stormwater Best Management Practices Manual and will be designed in compliance with requirements set forth in the Session Law 2008-211 Section 2.(b)3b. The total proposed impervious area and placement of structural stormwater BMPs will be determined as the project progresses. To comply with the low density option, built upon area (BUA) will be 24% or less. The stormwater BMPs will be located outside the vegetated buffer for each stream. The new base entry road will pass close to some existing and proposed developments served by appropriately sized best management practices; however, it is strongly desired to treat stormwater from this project independently from other development on the base and with the project corridor. The roadway will typically be constructed in fill elevated above existing terrain. Off -site drainage will pass through the roadway via culverts in locations of natural drainage conveyance. Existing streams will be conveyed under the roadway in appropriately sized culverts following typical NCDOT criteria. These culvert crossings will provide a combination of low and high flow conveyances to maintain natural conditions along the jurisdictional corridor passing under the road. The three significant watercourses (Northeast Creek, Wallace Creels and Bearhead Creels) will be spanned by bridges. Coordination with FEMA has been conducted to ensure compliance with floodplain regulations. The project site is located in an area that is mostly previously undeveloped land. There are some localized areas of development that the roadway corridor will impact, some of which might be pre-1988 built upon area. Stormwater Narrative Page 2 f•k3., '� �:.;>•,� f.-., t�----;• -. i::.�`E�>-y:�-i..; �', 1-.r: �vo; ,3 •,. P.S ,. L an ��.j'�1•+ `�''' .a 1�.1.. ` $ 1.� `,! �'z�-.: � .v.-,••_,� `'�,..''"��/�,.e, J •1} t4 J':� � �"i '� - ^ ti5. +i�C. "sId ' '.- f.`•. jj4- . "- ..�.�'� `- - ,S-R:J�L/ � l i,}p r!/ ...•;:�w-1�,'-•--.., s�'J-- _ :7}"�r�.r.. �^ iY •� /r •w. � � f' 1V' ••:a�.V-.'•. ! ! :y �,., mot' _ �y a i it _ �1 I+'sti' 1 �'+ �•��EJ� , e •', .e '� •s.RAI NW� �}-, f.✓j���• ��; S r'F "itz}too� °,�''�q E•j� � ,, U 4 /r , _ � � I,,�_ ::•f'� \ Pik„r \.� '1,++�`-r�.�~ fR/'.'° �•�J,}::�`' /,�' .y`i�/ ~d. � \`- ,�.'`,.• -;,ire ��v : _�• .l`,lr.-�"�: .L !} ' s` �'L''r`!..i� L ' z � T�''�t _ r � I. Ab r1i':�'f 4 ✓'. ^ � r.•'� `[� ki a 1=j4til ` a j`!� �! ►}� �1k '' ? 9� , w T•S+ i y~ a 1 5 ��'{" �'hi � �`�^' ay, .ia-'1 ��-s `��.1i'• ," ^ - '#9't �� r} 1 l4� y�' �'•. r �,'� r n 'Yi ( ` so' � �; her}• ���k...r*y,'�'Y /! C�� � ,'� � 7 ,�' '� r%"`'��� n'a cv t,:l ��,�, . n,, r task is �� �\.. • I �7, . �^• Yt •i ' •: r �•..f'Y`6o-"4'rdZ � .RL'-�-r � f�1 4 e�`LG �, I. f . � L.,� } f '\ �t+ L ! '�' S Ste! F.,y.iy - 1�'k 1'X f 'rS'�" •• � '; 1 i � a. . , f� I ' -� �. �.�.ir',�7", ��i�.t: ��'• i L xy .�,-C�6C�y �w •j i �•`vF�Y S� ,ry`tf� F.�jr \; x?Tsiiry'C^+i''s,r,� -3`�� =ti y +�'� '•o ��.3,. ��' { `� 'l 'l ';• r �tC ;4. tf; ,i�_,�: fy .10`tM r;, �� , 15yi 5 .. . urn •1 /+' 3� i y1�t✓ ^dyt"+ti r;r i rl•. ' �' N .±� .., q��' - •�••� �1��, � ji'r � l :`1 J 's �L=� <�.lw'!�\ff•'K.==r"Sr",.`:wr, .-iLi''}?���Xi�. .` �t� .Y fn�...�/ ii •`•_..`}-k TL:�? `� {��_.-• _ ;� * ���Ca' 1" i -- �,', � ,11s � �" I' .'�1, u ..+. y Z ,f-�J c � .�, � - •—" �11���sS'�.4�'\T:l��� C,,+r7� �"� .•t,��.}.:�.r �i,l:'y�Sjf,r j„� �J%�..� i��N,�+lr{ iZ,11�'k � � vjZ_+��. \ pAa s\"�1 •ry'�5 �y�r r�� i\\�Fi�ry �`j� t,•xx�t�i� T �_�,� .��;, �J ,•r �,,\..'1-.l ��'!f !j �� s1�� 11ii} .` `, �� I�`•`.%•��3'�,• � ry1 � �� •c•r�l, S �: � I . ! f. ry +. �'N, /�/1 '�,'.,.,«y��}$„' �+1i�]1`"' (1'�i''r''a 1.T3 L,�fy '�ijt q �,I •?.. 'r ` h f yy L '� e� }.� _ _ 1 ' ) i 1f1, J\ •.,1 :.`� hr� ! r v P.,gsue\ F�•r��y r�r"j �y�'lS�h�1i�ry�[. r4;f J'r•c1.+� _`��r�\��!':I�•+�G'+' ,,, '�1'�;..G !i!• "fir 7M1.l �+!/�.•} it_••rE-?_� ^!`y�' wr,1 r'l( �+ v� •yr r. r, �..n' �,' . «� ,� i , [fit/ N ti� r • 4 T e r 7, I,, J ✓ ';e� �r �, .. } `« �4�� Si 14Y C L,i'�!*R �JYOAIIANti._y r'� +_ �� Lit ti ,x.�\^Yf�J4� ..� \���'r'�`'• � ._` t;,"w!� ��'. � -,, I:V iW ti� - �3 . i < «• ,C ir! � 4ti y yJ1A r:.-33••, ;.�a 7 �..�t• �f `^ �f ��_�•i.. �,�/ ' t r i I r, p n--�fl; C•• S��F. !i f • i..r.� •'�[ji• tit `- +. . }_�.., --t .:-�ti •« ,+': -J' J i Y • }} / �'F_ r' ty .% IS7- !'" 0i.:•-r-; .k �..._r*..,�.: 1- _• ` �br4 +.. '� >ti �.i _ .._ la yy^ .�i` r:'�'•,�, :' ; r �Z: �. l•' T.• } s r \ ` T w f ltl.•r r i•:('Y �. q C r -_fir {, r}�. - ° ! r t. R- -'/ a�"•. ,,,i • , •'� .i h+. 1:•.` !1�.+�1 5 C �S :' z . i:, t... c f• a+r F�f�'• ay,t•. -t. +r 3�i '�� ;• 1�v�4�t+`•r'•� � ,�''�-�ir-�'•- �, ::':Cr r:� 'b j' -,iif :�,t',,�s�i-'�.b 'tKl;°1aa"L. - •Uti .{1'�`-.. hL`'r�rtYty;� �1. r 1'4y'-rFti..:' _ .Y.: t_ :4p4_ £�_•;}ti},}�1.��s� r �-r�=-�tlir` rtwt+ �—•-.d ., i i- ,c ��.:'a"�' • •K•_ :^�' �S�I�,r•✓•• [k'r S �-�, '=+''• it r - S'�� a °;� �� '- e � � it - . �.i.t a .��, ..,y � j.,4 r-sl � ,lti'-:C,�lif � `'• ::. 7 ' •jl:.., �. i �_.ii ,,p+� j t �. t o / :`� :. /7r1 �4 �. �`1.3''i"> J'�, r-..,,xa k .1 •'Y_ r }r� !'t, :v r �• \�'i�'-.a t .+vw�x A„ C Al '"'',11 13^ f'i;.T f� r �w tc} * , s,,. }jl� ,ee. r-f, •'•s_f�� �S�•��., 1 !� '' y-'•�k 'w ` psi" Y ,nrL-r, \ .+• ar.t I'+j.'�1�.. ]�i { Jf, ' rJ' r.�� + :r� •_;W,, < - �,.r' l• t11Y'L�7,0.�1 ems. �`''�_ t r �' �t `� ��. f •" _ �^'�r,R ,• FANYICLL •r Yty._ _ •�f1� S l r'� � � J� jf, ,• lit Y��If_` I/ t .:� 1 e• Y, +,� i--. �i•y to,� ,,�� "• <� eA Y lid . Zd F � i1';<i17�3aF ` y'< `!' • a���r, ;-, '.' .`... "'...4a• � '' �• ,,yyam v r y �\ •'v r .'� ,�'�i,''. � � w�. r 1 - r i i y..,. :_•f-T,r,ryr -♦< '�`-�..'ti�, ,'^'+ '^s +�:•� s.+� •' V Ir- _ < �� j2 - *?) � ,�„#-!s�".s;•u %' .^ ..<••�. � 'ti,r ! a l i+y 1 7_ !." t` ', ��'.�rr n '�_ ,,tt�� ..lug;,.;.+-�-_ ,-�i .s �.••..r{ �;\ ew • i -. �� �'' t'�f-`��✓ �;jf'{ q. 01 1 .d~• 4. ::a; r`:'.n. • , fi�•f ji _ 1f '.. + . ,G'��fy 1 -� t -�` ( - _ ��v"y I1 •,/,Ile ".Tl • ;p '/+ �` • iq1� �l+��.,+�>.-- _ice+ ��: a �#�1.1 Y''`iS *•rti�,}_r/ !`��_r Source NR art, >w f! f4 ��,f•Y t I :`-. .,'.'.: r •.,-�.�_ ; •Z •�" i�.. f r ��, CS•S„ofl Dafrya `r" .�yri i .? z•':r ! *� [ .1 - r' _ 0 2,250 a,5tl0 �• �r \`�•. r S� ��.! '•.!4 'Hy '{ Y __ � J� f `� �7 • f� #7 �.� I �,f FNI 'l}}• �� \. -SS 4.ry 1 i6 1� :�� ! p� , � f 3 ' F,> •• ..y.p -i <I . . y1�.i,��.!1,`s �� f �, `�1 % : � y t`\L_•-,.5,• ,;i„ ., ;�� I. . _�'� .• NAVAL FACILITIES ENGINEERING COMMANC? • MIOATLANTiC 'Sr•.,rgl �j r . -,;==- �. ti �•�) �, o a":'''� f -�: ,1 FY10 MOON PROJECT 1382 BASE ENTRY ROAD �.4' USGS 7.5 MINUTE Legend`' TOPOGRAPHIC QUADRANGLE Od"'p���'•'��ei1tle1+' !' '.�';' - CAMPLEJELINE- JACKSONVILLE, ONSLOW COUNTY. NORTH CAROLINA ° — �•++� s, •4i°` 4;`. ry'! a • ;({ FIGURE 1 DECEMBER 2009 Permit Modification Request for SW8 090630 Stormwater Narrative FY10 MCON Project 1382, New Base Entry Point Camp Lejeune, NC February 22, 2011 This narrative describes the changes in the design to New Base Entry Point since stormwater permit SW8 090630 was issued on February 8, 2010 and modified on June 15, 2010. This modification focuses on the gate area of the Base Entry Road (BER) and the Brewster Boulevard interchange which are included in Contract A, the first of three phases. The overall permitting strategy continues to be low density with pockets of high density. The SER project boundary has expanded from the entry gate to the NC Department of Transportation right-of-way at Route 24. The gate area includes a high density pocket draining to a water quality pond. Low density areas abutting the gate area include stormwater treatment in support of the Federal government's green initiative. No credit is sought for the stormwater measures in the low density areas. The Brewster Boulevard interchange is also designed to comply with low density requirements. As a result of the changes described above, percent impervious of Contract A is now 23.95 percent. Overall percent impervious is 22.71 for the entire project corridor, which is slightly less than 23.74 percent, which was the percent impervious area total for the first permit modification. The project site is located in Onslow County, North Carolina and is in the White Oak River Basin. The roadway drains to three main receiving waters: Northeast Creek, Wallace Creek, and Bearhead Creek. The project permit boundary is designed to achieve the Low Density stormwater permitting option which includes pockets of High Density. Consistent with Low Density stormwater strategy described in requirements set forth in the Session Law 2008-211 Section 2.(b)3b, sheet flow and flow through vegetated conveyances (grassed swales) will be maximized along the project corridor. Generally, the roadway will have a 46 ft depressed median cross section. The roadway will generally have three (3) distinct typical cross sections: Section Description Proposed Typical Section Stormwater Strategy Permitting Strategy Tangent and Depressed median, Utilize shoulder sheet flow and Low Curve Sections open shoulder, grass roadside swales. Occasional median Density swales discharge points will be discharged to preformed scour holes. No other structural BMPs are proposed in these roadway sections. Tangent and Depressed median, Utilize shoulder sheet flow and Low Curve Sections raised median with roadside swales. Occasional median Density curb and gutter and discharge points will be discharged to with open shoulder, grass preformed scour holes. No other Occasional swales structural BMPs are proposed in Pockets of these roadway sections. Collect High stormwater in pipe systems and Density convey to structural BMP prior to discharge Stormwater Narrative Page 1 Bridge/Culvert Curb and gutter Collect stormwater in pipe systems Pockets of approaches and and convey to structural BMP prior to High other sections discharge Density requiring curb and gutter Gate n/a Utilize sheet flow and swales or Pocket of collect stormwater in pipe systems High and convey to structural BMP prior to Density discharge Proposed structural stormwater BMPs will be designed in accordance with the 20D7 NCDENR Stormwater Best Management Practices Manual and will be designed in compliance with requirements set forth in the Session Law 2008-211 Section 2.(b)3b. The total proposed impervious area and placement of structural stormwater BMPs will be determined as the project progresses. To comply with the low density option, built upon area (BUA) will be 24% or less. Stormwater BMPs will be located outside the vegetated buffers for each stream. The new base entry road will pass close to some existing and proposed developments served by appropriately sized best management practices; however, it is strongly desired to treat stormwater from this project independently from other development on the base and with the project corridor. The roadway will typically be constructed in fill elevated above existing terrain. Off -site drainage will pass through the roadway via culverts in locations of natural drainage conveyance. Existing streams will be conveyed under the roadway in appropriately sized culverts following typical NCDOT criteria. These culvert crossings will provide a combination of low and high flow conveyances to maintain natural conditions along the jurisdictional corridor passing under the road. The three significant watercourses (Northeast Creek, Wallace Creek and Bearhead Creek) will be spanned by bridges. Coordination with FEMA ensures compliance with fioodplain regulations. The project site is located in an area that is mostly previously undeveloped land. There are some localized areas of development that the roadway corridor will impact, some of which might be pre-1988 built upon area. Stormwater Narrative Page 2 Soil Map—Onsiow County. North Carolina 34' 44' 41" CNEEIVIII N N 7` Map Scale: 1 8,660 it prated an A size (85" M 11 ") sheet N Meters ^� 0 100 200 400 600 ti Feel [I 450 900 1800 2.700 34' 44' 47' 34" 44' 3' USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/13/2010 Page 1 of 3 1,11YAW1Xr74`I91 Area of Interest (A01) C Area of Interest (AOI) Solis Soil Map Units Special Point Features vi Blowout ® Borrow Pit X Clay Spot Closed Depression y Gravel Pit Gravelty Spot ® Landfill f� Lava Fiow Marsh or swamp R Mine or Quarry ® Miscellaneous Water Perennial Water V Rock Outcrop + Saline Spot Sandy Spot Severely Eroded Spot 0 Sinkhole 3) Slide or Slip pr Sodic Spot Spoil Area Q Stony Spot Soil Map—Onslow County, North Carolina (� Very Stony Spot Wet Spot Other Special Line Features Gully Short Steep Slope r , Other Political Features Cities Water Features Oceans Streams and Canals Transportation Rails ry Interstate Highways US Routes Major Roads Local Roads MAP INFORMATION Map Scale: 178,660 if printed on A size (8.5" x 11") sheet. The soil surveys that comprise your AOI were mapped at 124,000 Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nres.usda.gov Coordinate System: UTM Zone 18N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Onslow County, North Carolina Survey Area Data: Version 11, Jun 5, 2009 Date(s) aerial images were photographed: 6/19/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probab#y differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 6/13/2010 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map--Onslove County, North Carolina Map Unit Legend Onslow County, North Carolina (NC133) Map Unit Symbol Map Unit Name Acres in AO1 Percent of AO1 SaB Baymeade fine sand, 0 to 6 percent slopes 66.6 22.0% BmB Baymeade-Urban land complex, 0 to 6 percent slopes 28.5 9.4% CrC Craven fine sandy loam, 4 to 8 percent slopes 77.4 25.6% Mk Muckalee loam 20.7 6.8% On Onslow loamy fine sand 96.9 32.1% Ur Urban land 9.5 3.1% W Water 2.6 0.9% Totals for Area of Interest 302.1 100.0% USDA Natural Resources Web Soil Survey 6/13/2010 'ram Conservation Service National Cooperative Soil Survey Page 3 of 3 5C-0ee/ For DENR Use ONLY Reviewer: LL ANorth Carolina Department of Environment and Natural Resources Timsube8— u® v NC®ENR Request for Express Permit Review Time: (�_ —� Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF filel and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. Asheville Region -Alison Davidson 828-296-4698;alison.davidson(&ncmail.net + Fayetteville or Raleigh Region -David Lee 919-791.4203; david.leena ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 orpatrick.9rogan@ncmail.net • • Washington Region -Lyn Hardison 252-946-92f5 or lyn.hardison0ncmail.net • Wilmington Region4anet Russell 910-350-2004 orianet-russell(ai)ncmail.not NOTE: Project application received after 12 noon will be stamped in the following work day Etter Related SW Permits of request SW SW SW SW SW Ce-Af-� Project Name: CAMP LEJEUNE SASE ENTRY POINT County: ONSLOW Applicant: COMMANDING OFFER, ATTN: MR. JOHN T_D_ WNSON Company: MCB CAMP LELFUNE Address: PSC BOX 20004 City: CAMP LEJEUNE, State: NC Zip: 28542.2 4 Phone: 919-451-, Fax: 919 451-5997 Email: JOHN.TOWNSON@USMC.MIL Physical Location:MCB CAMP LEJEUNE Project Drains into SS waters - Water classification NSW (for classification see-htlp:/lh2o.enr.state.nc.us/bims/repgrtslreportsWB,html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within''/z mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: LOUISE-SLATE Company: MACTEC Address: 3301 ATLANTIC AVENUE City: RALEIGH, State: NC Zip: 27604 Phone: 919-831-8006, Fax: 919-831-8136, Email: L SLATE@MACTEC.COM P,lkfi 0 4 2010 SECTION ONE: REQUESTING A SCOPING MEETING ONLY Sco in Meeting ONLY ®DWO DCM DLR, ❑ OTHER: ® p g 9 ,❑ ,❑ - SECTION TWO: CHECK ONLY THE PROGRAM_(SS) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: — # of stream calls - Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (`linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑8khd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ElHigh Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention — # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit ay ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with — acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoDina and express meetina reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No 0 YES: _acre(s) Wetlands Delineation has been completed. ® Yes ❑ No Isolated wetland on Property ® Yes ❑ No US ACOE Approval of Delineation completed; ® Yes ❑ No 404 Application in Process wl US ACOE: ® Yes ❑ No Permit Received from US ACOE ® Yes ❑ No +*«««+«#+*#t*s«+ss«ss*««+«**+*«*+«++«sr«s+«*«**+++«**«*FOfDI.NRuseOnly*ss««ss*«ss*+#+**++*ssss«*s+s+*++«*+*++sss«*++*++*++*++s+sss Fee Split for multiple permits: (Check # . _ 1 Total Fee Amount $ _. SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) J $ 401: 1 $ LQS $ Stream Deter— $ NCDENR EXPRESS March 2009 Russell, Janet From: Slate, Louise [LOSLATE@mactec.com] Sent: Wednesday, August 04, 2010 10.39 AM To: Russell, Janet Subject: Scoping meeting request Attachments: Scoping meeting request Contract B and C.pdf Janet, I would like to request a Scoping meeting to present the detailed design of stormwater treatment on the Camp Lejeune Base Entry Road (5W08- 090630) for Contracts B and C. We would like to incorporate feedback from this meeting into the design before submitting the permit modification for Contract B, which will be the next step. If possible we would like to meet on either August 18 or 19. Thursday the 19`h is preferable if that day is still available on your end. Hope all is well. Louise Louise 0. Slate, PE, LEED AP I Senior Engineer I Environmental Department MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue I Raleigh, North Carolina Office 919.876.04161 Direct 919,831.8006 1 Fax 919,831.8136 Email IoslateCa7mactec.com I Web www.mactec.com ... ' " MEMORANDUM �DTZ LISMC Camp Lejeune New Base Entry Road and Gate Storm Water Scoping Meeting with DENR at Wilmington Regional Office 10:30 —11:30 pm, August 19, 2010 Attendees DENR: Linda Lewis, Janet Russell USMC Camp Lejeune: David Towler, Steven Whited, Jonathan Raynor, Orathai Buffer, Pete Wright (NAVFAC/MIDLANT) MACTEC/RK&K Joint Venture: Jesse Barker, Jeff Meador, Brad Boggs, Louise Slate Meeting Minutes: Jeff Meador (1M) presented the drainage design for the base entry road (BER) for Contracts B and C. This includes the area from Brewster Boulevard to Sneads Ferry Road and the portion of the interchange at Hwy 24 on Base. Pre -formed scour holes (PSH) have been included in the design. Linda Lewis said they have been removed from the design manual and they can't be used to meet drainage requirements to surface waters or wetlands until they are reintroduced into the design manual. Consider using a level spreader as an alternative. Pre -formed scour moles or riprap pads may be used in areas where discharges from pipes are less than 2 fps and they don't discharge to surface waters or wetlands. It is ok to use pre -formed scour holes in areas draining to uplands. No Operations & Maintenance agreement is needed for PSH in this case. David Towler encouraged the use of PSH in upland areas. Where curb and gutter is in place, use 5:1 side slopes on swales. Raise median drain near Sta 212+00 to temporarily store stormwater and increase infiltration. Check seasonal high water table elevations against designs for ponds on both sides of Wallace Creek Bridge. Ponds have been moved to the south side of the road due to space and access requirements. Need to coordinate the permit boundary near the Wallace Creek Road interchange. Currently the permit boundary abuts edge of pavement at Wallace Creek Road. Drainage from this interchange does drain to wetlands, therefore pre -formed scour holes may not be used in this area. Jeff highlighted the fact that the ramp at Holcomb does not have enough fall to fit a BMP by the cloverleaf. Some drainage from the existing Holcomb Blvd. drains into this system, but not much. This drains to a ditch that runs —700 ft to a non -jurisdictional outfall. In the area near Holcomb, some existing pavement will be removed, which will be accounted for in the BUA calculations for the area within the permit boundary. Some curb and gutter will be added along radii at side roads such as Louis Rd. Michael Rd. etc. Some coordination of permit boundaries may be required around Piney Green Road. In the gate area, the permit boundary will be redefined. It now extends up to the DOT right of way (ROW). Linda indicated that we do not need to account for BUA in the DOT ROW on this particular project. At the same time we cannot claim DOT ROW for permit density calculations. MEMORANDUM l�k Jeff asked about reconfiguring the stormwater pond by the gate to take advantage of the proximity and size of the borrow pit. Linda said that an outlet structure is required for the pond so it may make more sense to use a cell of the borrow pit or leave the design as it is. Jesse described how the phasing may change from the initial permit mod phasing presented to DWQ. Linda is not concerned how the permit modifications are packaged as long as the entire area gets accounted for and meets the stormwater requirements.