Loading...
HomeMy WebLinkAboutSW8031055_HISTORICAL FILE_20040723STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 O 3 t b 55 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zoo'-j o7z3 YYYYMM DD tyiz�3t" V. North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor July 23, 2004 Mr. Joseph H. Goodman, President Lanvale Corporation, Inc. PO Box 4292 Wilmington, NC 28406 Subject: Stormwater Permit No. SW8 031055 Lanvale Farms High Density Subdivision Project Brunswick County Dear Mr. Goodman: William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director The Wilmington Regional Office received a complete Stormwater Management Permit Application for Lanvale Farms on July 22, 2004. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 031055, dated July 23, 2004, for the construction of the subject project. This permit shall be effective from the date of issuance until July 23, 2014, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the.form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSSlarl: S:1WQSISTORMWATIPERMIT1031055.ju104 cc: Danis Fennell, P.E., Cape Fear Engineering Delaney Aycock, Brunswick County Inspections Linda Lewis Wilmington Regional Office Central Files Wilmington Regional Office One 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 NorthCarolina Phone; 910-395-39001 FAX 910-350-20041 Internet: h2o.enr.state.nc.us Natural4il An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 031055 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Joseph H. Goodman, Lanvale Corporation, Inc. Lanvale Farms Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 23, 2014 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The subdivision is permitted for 82 lots, each allowed 3,200 square feet of built -upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2of9 State Stormwater Management Systems Permit No. SW8 031055 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, acres: 29.60 Onsite, ft2: 1,289,376 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 385,385 82 Lots at 3,200 ft2.: 262,400 Roads/Parking, ft2: 112,200 SW, ft2: 1,955 Pool Amenity, ft2: 8,830 C. Pond Depth, feet: 7.5 d. TSS removal efficiency: 90% e. Design Storm: 1" f. Permanent Pool Elevation, FMSL: 24.0 g. Permitted Surface Area @PP, ft2: 56,595 h. Permitted Storage Volume, ft3: 92,084 i. Storage Elevation, FMSL: 25.5 j. Controlling Orifice: 3.0"0 pipe k. Permanent Pool Volume, ft3: 198,070 I. Forebay Volume, ft3: 54,999 m. Maximum Fountain Horsepower: 314 n. Receiving Stream 1 River Basin: Jackey's Creek 1 Cape Fear o. Stream Index Number: CPF17 18-77-3 p. Classification of Water Body: "C Sw" ll. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. I Page 3 of 9 State Stormwater Management Systems Permit No. SW8 031055 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning -and Design Manual. t Page.4 of 9 State Stormwater Management Systems Permit No. SW8 031055 12. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 031055, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built -upon area per lot is 3,200 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate,. coquina and. parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Built -upon area in excess of the permitted amount will require a permit modification. 13. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 14. Decorative spray fountains will be allowed 1n the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is 314 horsepower. 15. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required., Page 5 of 9 State Stormwater Management Systems Permit No. SW8 031055 16. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 17. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS s This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 031055 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 23rd day of July, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A,_e Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 031055 Page 7 of 9 CAPE FEAR Engineering, Inc. 151 Poole Road, Suite 100 Belville, NC 26451 TR (910) 383-1044 FAX (910) 383-1045 www, copefearengineering. com To: NCDENR —Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Attn: -linda_Lewis-3 ❑ As Requested ❑ For Your Files ❑ Sent via Mail ❑ Sent via Courier RECEIVED J U L 2 2 2004 BY. a T Transmittal Date: 7/22/04 File: 807-01 Subject: Lanvale Farms Stormwater ❑ For Distribution ® For your Review 1 Action 1 Approval 11 Quantity I Drawing No. I Description II 1 1 1 Sample Stormwater Deed Restrictive Covenants, signed by Joe Goodman REMARKS Linda, if you have any questions, or need further information, don't hesitate to call. Thank you, Todd CC: Caper ngineeri g 'c. File Signed T nager NCDENR-trans-J uly_22_04.doc Lanvale Farrns SW8 031055 •t Subject: Lanvale Farms SW8 031055 From: Linda Lewis <Linda.Lewis@ncmail.net> Date: Wed, 21 Jul 2004 18:22:06 -0400 To: davis.fennell@capefeareng.com Davis: T have reviewed the additional information submitted on May 7, 2004. Please have Mr. Goodman sign and date the proposed section of covenants pertaining to stormwater, or submit a copy of the entire covenant document. Please submit this information prior to August 22, 2004, Thanks, Linda 1 of 1 7/21/2004 6:22 PM T CAPE FEAR Engineering, Inc. May 7, 2004 Linda Lewis NCDENR Water Quality 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: Lanvale Farms (SW8 031055) Dear Ms. Lewis. 0 l i'034 IBY:- Please find the enclosed response to your request for additional information for the above referenced project: 1. There is no offsite drainage entering the pond. The information listed in the application was utilized to determine that no offsite drainage enters the pond. 2. All access and drainage easements have been located, labeled, and dimensioned on the attached plan. 3. Sample deed restrictions containing the required verbiage are attached. 4. Articles -of incorporation documenting Mr. Goodman's signatory authority for -Lanvale Corporation are attached. 5. A cul-de-sac detail has been added to the attached plan. 6. The rebar spacing for the proposed trash rack has been reduced to 4 inches. 7. The Wet Detention Basin supplement has been revised and is attached. S. The "Pond with Forebay Section" detail has been revised on the attached plan. 9. The "other" and "parking" proposed BUA's are included for the construction of a future amenity area to include a swimming pool, bathhouse, and parking area. This area is labeled on the attached plan and the sample deed restrictions include the BUA allocation for this area. 10. See item 9. 11. No offsite drainage enters this project, including Lanvale Road. There is an existing roadside ditch along Lanvale Road, and there is a proposed driveway 151 Poole Road, Suite 100 • 6elville, NC 28451 • TEL: (910)383-1044 • FAX: (910)383-1045 www.ca pefeareng ineering.com 1 pipe to bypass the existing drainage from our project. Spot elevations are included on the attached plan. I trust this information to be sufficient for your review and approval. If you have any questions or require additional information, please contact this office. Thank yo K. Davis Fennell, PE cc: file [Ewd: La.�vale Farms] Subject: [Fwd: Lanvale Farms] From: Linda Lewis <Linda.Lewis@ncmail.net> Date: Fri, 23 Apr 2004 16:27:37 -0400 To: Todd King <todd.king@capefearengineering.com> Todd In addition to the items in my previous email, there are still 11 outstanding items from my April 12, 2004, letter yet to be addressed. Linda Subject: Lanvale Farms From: Linda Lewis <Linda.Lewis@ncmail.net> Date: Fri, 23 Apr 2004 16:21:30 -0400 To: Todd King <todd.king@capefearengineering.com> Todd: The low density supplement you submitted on April 12, 2004, has not been initialled, and the deed restrictions need to be in legal format. Please initial page 2 of the.supplement. All you've done on the deed restrictions is fill in the blanks on what I sent you. The document I sent you is meant to be a guide in developing the covenants for all projects. As was indicated in my letter of April 12, 2004, not all of the sections in that document will apply to this project. Please use only statements I.1-I.5, II.1, II.3 and 11.4, and delete those sections that do not apply. The applicant needs to have a lawyer draw up the proposed document (or use a legal shell from a previous subdivision) and have the owner submit a copy of the proposed restrictive covenants for the subdivision in legal format which contain the appropriate statements. Please submit this information by May 23, 2004. Linda Lanvale Farms Content -Type: message/rfc822 Content -Encoding: 7bit IofI 4/23/2004 4:27 PM L'anvale }rarms Subject: Lanvale Farms From: Linda Lewis <Linda.Lewis @ncmai1.net> Date: Fri, 23 Apr 2004 16:21:30 -0400 To: Todd King <todd.king@capefearengineering.com> Todd: The low density supplement you submitted on April 12, 2004, has not been initialled, and the deed restrictions need to be in legal format. Please initial page 2 of the supplement. All you've done on the deed restrictions is fill in the blanks on what I sent you. The document I sent you is meant to be a guide in developing the covenants for all projects. As was indicated in my letter of April 12, 2004, not all of the sections in that document will apply to this project. Please use only statements 1.1-I.5, 11.1, 11.3 and I1.4, and delete those sections that do not apply. The applicant needs to have a lawyer draw up the proposed document (or use a legal shell from a previous subdivision) and have the owner submit a copy of the proposed restrictive covenants for the subdivision in legal format which contain the appropriate statements. Please submit this information by May 23, 2004. Linda 1 of 1 4/23/2004 4:21 PM Calculation: SAxDF) - RA -OA = BUA -- No. Lots _ Lots 29.6 ac. x 0.30) — 2.58 ac. — 0.25 ac. = 0.0735 ac./lot = 3200 sfllot 82 lots 11I. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary.' If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. Applicants Initials a. A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse River basin may require additional buffers. b. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided by DWQ within 30 days of platting and prior to sale of any lots. C. Built upon area calculations are provided for the overall project and all lots. d. Project conforms to low density requirements within the ORW AEC (if applicable). [15A NCAC 2H .1007(2)(b)] I otw: SWU-104 Rev 3.99 Page 2 of 2 S, INFORMATION PERTAINING TO DEED RESTRICTIONS AND PROTECTIVE COVENANTS In accordance with Title 15 NCAC 2H.1000 the Coastal Stormwater Mariagemeht Regulations, deed restrictions and .. protective covenants are required for certain developments where lots will be subdivided and sold. Deed restrictions and protective covenants are'necessary to ensure that the development maintains a "built -upon" surface area consistent with ,rthe applicable regulation limiting built -upon area. The following deed restrictions and covenants must be recorded prior to s' issuing the Stormwater Management Permit: :.. !. For AEI Projects: 1. q The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8031055 as issued by the Division of Water Quality under NCAC 2H.1000. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3..', These covenants are to run with the land and be binding on all persons and parties claiming under them. s 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. ''5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. Il,t. Low Density Residential Subdivisions (In addition to 1.1-1.5 and all others that apply) The maximum allowable built -upon area per lot is 3200 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the water surface of swimming pools. if the BUA per lot varies, record as follows and provide a complete lot listing with proposed BUA: The maximum allowable built -upon area per lot is as follows: Lot # BUA Lot # BUA Lot # BUA These allotted amounts include any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 2 Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings, is strictly prohibited by any persons. C,3) Each lot will maintain a 30' wide vegetated buffer between all impervious areas and surface waters. - 4 ? All roof drains shall terminate at least 30' from the mean high water mark of surface waters. III Low Density' Subdivision with Curbs and;Gutters: (In'addition to 1.1-1.5, i1.1-11.4 and all others that apply) 1. Fil/Ag in,"piping or altering any designated 5:1 curb outlet swale associated with the development is prohibited by any persons. 2. ThlsIproject proposes a curb outlet system. Each designated curb outlet swale shown on the approved plan must be 'maintained at a minimum of 100' long with 5:1 (H: V) side slopes or flatter, have a longitudinal slope no steeper than 5%, carry th'e flow from b 10 year storm in a non -erosive manner, and maintain a dense vegetated cover. IV Project lies within CAMA's AEC: (In addition to 1.1-1.5 and all others that apply) 1. "Lots within CAMA's Area of Environmental Concem may have the permitted maximum built -upon area reduced due to CA MA jurisdiction within the AEC." V. For Low Density Commercial Subdivisions: (in addition to 1.1-1.5, 11.1-11.4 and all others that apply) 1. Each lot whose ownership is not retained by the permittee, shall submit a separate low density stormwater permit application to the Division of Water Quality and receive a permit prior to construction. Lots retained by the permittee shall be submitted as modifications to the original permit. 2. If one lot exceeds the allowable built -upon area, the entire subdivision is subject to the high density design criteria. V1 ' For High Density Commercial Subdivisions: (in addition to all others that apply) 1. The maximum allowable built -upon area per lot is square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. x If the BUA per lot varies, please record as follows and provide a complete lot listing with proposed BUA: The maximum allowable built -upon area per lot is as follows: V Lot # BUA Y Lot # BUA Lot # BUA These allotted amounts include any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 2. All runoff from the built -upon areas on the lot must drain into the permitted system. This maybe accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street or grading perimeter swales to collect lot runoff and directing them into the stormwater system or into the street. Lots that will naturally drain into the system are not required to provide these additional measures. 3. Each lot whose ownership is not retained by the permittee, shall submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction. Vll. For High Density Residential Subdivisions: (in addition to L 145 and all others that apply) •3 1. The maximum allowable built -upon area per lot is square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. If the BUA per lot varies, please record as follows and provide a complete lot listing with proposed BUA: The maximum allowable built -upon area per lot is as follows: Lot # BUA Lot # BUA Lot # BUA These allotted amounts include any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 2. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect lot runoff and directing them into the stormwater system or into the street. Lots that will naturally drain into the system are not required to provide these additional measures. 2 VIII For Shopping Centers with Outparcels or a Future Development allotment: (in addition to 1-1 through 1-5 and all others that apply) The maximum built -upon area for outparcel(s) and future areas shown on the approved plans is as follows: a� Outparcel # BUA Future Development These allotted amounts include any built -upon area constructed within the property boundaries, and that portion of the right-of-way between the 16t lines and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 2. The runoff from all built -upon area on the outparcel or future area must be directed into the permitted stormwater control system.we 3. Built -upon area in excess of the permitted amount will require a permit modification. 4. The connection from the outparcel s collection system into the stormwater control shall be made such that short- circuiting of the system does not occur. 5. Each outparcel or future development tract whose ownership is not retained by the permittee, shall submit a separate 'offsite storm water permit application to the Division of Water Quality and receive a permit prior to construction. y CAPE FEAR Engineering, Inc, 151 Poole Aoad, Suite i00 BoMffe, NC 26451 TEL (910) 383-1044 FAX (910) 383-7045 www.capefearengineering.com To: NCDENR — Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Attn: Linda Lewis ❑ As Requested ❑ For Your Files ❑ Sent via Mail ❑ Sent via Courier Transmittal Date: 4/12/04 File: 807-01 Subject: Lanvale Farms Stormwater Submittal -Supplements ❑ For Distribution ® For your Review 1 Action 1 Approval Quantity Drawing No. Description 1 Low Density Supplement Application 1 Deed Restrictions and Protective Covenants Information — Not Recorded REMARKS Linda, If you have any questions, or need further information, don't hesitate to call. Thank you, Todd CC: Cage. r gin g, Inc. File ' Signed Todd King — ProX ct Manager AQA I k2004 NCDENR-trans-APR1204.doc Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may he photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in 15A NCAC 2H .1005 through .1007. I. PROJECT INFORMATION Project Name : Lanvale Farms Subdivision Contact Person: Todd King Phone Number: ( 910) 383-1044 Number of Lots: 82 Allowable Built Upon Area Per Lot*: 3200 sf *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. I1. BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions. For uniform lot sizes, complete the following calculations in the space provided below where: • SA Site Area - the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor - the appropriate percent built upon area dived by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots - the total number of lots in the subdivision. • BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. Porni: SWIJ-104 Rev 3.99 Page 1 of 2 Permit No. sw (�31�55 (to be proti,ided bi' DJVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review_ A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: Lanvale Farms i Contact Person: Joe Goodman Phone Number: (910) 294-1015 For project with multiple basins, specify which basin this worksheet applies to: Pond #1 } elevations Basin Bottom Elevation 16.5 ft. (floor of the basin) € Permanent Pool Elevation 24.0 ft. (elevation of the orifice) ITemporary Pool Elevation 25.5 ft. (elevation of the discharge structure overflow) I areas i Permanent Pool Surface Area 56,595 sq. ft. (water surface area at the orifice elevation) Drainage Area 29.6 ac. (on -site and off -site drainage to the basin) Impervious Area 8.85 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 198,070 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 125,964 cu. ft. (volume detained above the permanent pool) a Forebay Volume s 54,999 cu. ft. (approximately 20% of total volume) Other parameters SA/DA' 0.80 (sui face area to drainage area ratio from DWQ table) Diameter of Orifice 3.0 in. (2 to S day temporary pool draw -down required) Design Rainfall I in. Design TSS Removal z 90 % (minimum 85% required) iForm: SNVU-102 Rev 3.99 rage I of 4 Entity Names Page 1 of 1 North Carolina Elaine F Marshall DEPAR^f' 1ENT °F TIDE Secretary SECRETARY OF STATE Corporations *Corporations Home *Important Notice *Corporate Forms/Fees *Corporations FAQ *Tobacco Manufacturers •Verify Certification *Online Annual Reports Links "Secretary Of State Home *Business License ORegister for E-Procuremeni •Dept. of Revenue Legislation *1999 Senate Bills *2001 Bill Summaries *Annual Reports 1997 *Corporations 1997 °Other Legislation Search *By Corporate Name *For New Corporation *By Registered Agent Online Orders *Start An Order *New Payment Procedures PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date: 4/12/2004 Click here to: View Document Filings i Print a pre -populated Annual Report Form I File an Annual Report i Corporation Names Name Name Type NC Lanvale Corporation Legal Business Corporation Information SOSID: Status: Date Formed Citizenship: State of Inc.: Duration: Registered Agent Agent Name: Registered Office Address Registered Mailing Address: Principal Office Address: Principal Mailing Address: 0691571 Current -Active 9/19/2003 Domestic NC Perpetual McLendon, John A., Jr. 230 North Elm St., Ste. 1500 Greensboro NC 27401 230 North Elm St., Ste. 1500 Greensboro NC 27401 No Address No Address For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. For questions or comments concerning the Corporations Division, please send e-mail to Corporations Administrator Click here for help downloading forms. http://www.secretary.state.nc.us/Corporations/soskb/Corp.asp?5692180 4/12/2004 SOSID: 691571 Date riled: 9/19/2003 8:45:00 AM Elaine F. Marshall North Carolina Secretary of State C200326200040 ARTICLES OF INCORPORATION OF LANVALE CORPORATION The undersigned hereby submits these Articles of Incorporation for the purpose of fonning a business corporation under the laws of the State of North Carolina. I. The name of the corporation is: Lanvale Corporation 2. The number of shares the corporation, is authorized to issue is One Hundred Thousand (100,000) shares of common stock. 3. The street and mailing address and county of the initial registered office of the corporation are 230 North Elm Street, Suite I500, Greensboro, North Carolina 27401, Guilford County, and the name of the initial registered agent at such address is John A. McLendon, Jr. 4. The name and address of the incorporator is John A, McLendon, Jr., 230 North Elm Street, Suite 1500, Greensboro, North Carolina 27401. 5. To the fullest extent permitted by the North Carolina Business Corporation Act as it exists -or may hereafter be amended, no person who is serving or who has served as a director of the corporation shall be personally liable to the corporation or any of its shareholders for monetary damages for breach of duty as a director. No amendment or repeal of this article, nor the addition of any provision to these Articles of Incorporation inconsistent with this article, shall eliminate or reduce the protection granted herein with respect to any matter that occurred prior to such amendment, repeal, or addition. 6. These articles shall become effective when filed. This the 17`h day of September, 2003. (A' RECEIVEDJohn A. McLendon, Jr., Inco rator MAY 0 7 2004 PxoJ # SW � 3 l U 55 130953-1 intity Names Page I of I North Carolina Flame F. Marshall DEPARTMENT ol" THE' Secretary )ECRE TARY car STATEE Corporations °Corporations Home "Important Notice °Corporate Forms *Corporations FAQ *Tobacco Manufacturers °Verity Certification *Online Annual Reports Links °Secretary Of State Home *Business License Register for E-Procureme °Dept• of Revenue Legislation 01999 Senate Bills 02001 Bill Summaries Annual Reports 1997 °Corporations 1997 °Other Legislation Search "By Corporate Name "For New Corporation 08y Registered Agent Online Orders "Start An Order °New Payment Procedures PO Box 29622 RBleiUh, NC 27626-0 2r 1191 )007-2 00 Date: 11 /5/2003 Click here to: View Document Filings I I File an Annual Report I Print a prepopulated Annual Report i Corporation Names Name Name Type NC Lanvale Corporation Legal Business Corporation Information SOSID: Status: Date Formed: Citizenship: State of Inc.: Duration: Registered Agent Agent Name: Registered Office Address: Registered Mailing Address: Principal Office Address: Principal Mailing Address: 0691571 Current -Active 9/19/2003 Domestic NC Perpetual McLendon, John A., Jr. 230 North Elm St., Ste. Greensboro NC 27401 230 North Elm St., Ste. Greensboro INC 27401 No Address No Address 1500 1500 -------------- For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. For questions or comments concerning the Corporations Division, please send e-mail to Corporations Administrator Click here for help downloading forms. Minutes of Action of the Board Of Directors of Lanvale Corporation September 22, 2003 The undersigned, being all of the directors of Lanvale Corporation, a North Carolina corporation, do hereby adopt the following resolutions by this written consent thereto, to complete the organization of the corporation in accordance with the North Carolina Business Corporation Act, Chapter 55 of the General Statutes: Adoption of Bylaws RESOLVED, that the Bylaws in the form made available for examination by the undersigned directors of the corporation hereby are adopted as the Bylaws of the corporation and shall be inserted in the minute book of the corporation following the Articles of Incorporation and preceding these minutes. Approval of Stock Certificate RESOLVED, that the form of certificate for the common stock of the corporation made available for examination by the undersigned directors hereby is approved and adopted and that a specimen thereof shall be inserted in the minute book of the corporation. Approval of Corporate Seal RESOLVED, that the following seal hereby is approved and adopted as the seal of the corporation: Fixing Number of Directors WHEREAS, the Bylaws of the corporation allow the number of directors to be fixed at any number between a minimum of one and a maximum of three; now, therefore, it is RESOLVED, that the number of directors of the corporation be fixed at two (2) until such other number of directors is established by the Board of Directors or the shareholders in accordance with the Bylaws of the corporation. 131241_1 Adoption of Banking Resolutions RESOLVED, that banking resolutions appointing Central Carolina Bank as a depository for the corporation's funds, in the form made available for examination by the undersigned directors and atl.ached to these minutes, are approved and adopted, and the Secretary of the corporation is authorized to certify the adoption of said resolutions. Appointment of Officers RESOLVED, that the following persons hereby are appointed to serve as officers of the corporation until their successors shall have been duly appointed: President Joseph H. Goodman Treasurer Joseph H. Goodman Secretary Margaret Goodman Shelton Assistant Secretary Patricia Goodman Issuance of Common Stock WHEREAS, Joseph H. Goodman has offered to the corporation $550.00 in cash in exchange for shares of its common stock valued at such amount, and Margaret Goodman Shelton has offered to the corporation $450.00 in cash in exchange for shares of its common stock valued at such amount; and WHEREAS, the Board of Directors has considered all factors relevant to a determination of the value of such stock and the fairness of the offer; now, therefore, it is RESOLVED, that the officers of the corporation hereby are authorized and directed to accept such offers and to issue and deliver to: Joseph H. Goodman 550 shares of the corporation's common stock for $550.00 in cash, which consideration the Board of Directors hereby determines to be adequate for the shares to be issued; and Margaret Goodman Shelton 450 shares of the corporation's common for $450.00 in cash by, which consideration the Board of Directors hereby determines to be adequate for the shares to be issued; and FURTHER RESOLVED, that, upon receipt by the corporation of such consideration, the officers of the corporation hereby are authorized to cause to be issued and delivered to each of Joseph 14. Goodman and Margaret Goodman Shelton a stock: certificate representing the shares purchased. U 1241 1 - 2 - Shareholder Agreement WHEREAS, the shareholders of the corporation desire to enter into a Shareholder Agreement dated as of September 22, 2003, and the directors deem it to be in the best interest of the corporation to enter into such Shareholder Agreement; now, therefore, it is RESOLVED, that the Shareholder Agreement dated September 22, 2003 by and among the corporation, Joseph 1-1. Goodman and Margaret Goodman Shelton, in the form made available for examination by the undersigned directors and attached to these minutes, be and hereby is adopted and approved; and FURTHER RESOLVED, that the officers of the corporation be and they hereby are authorized and directed to execute the Shareholder Agreement in the name of and on behalf of the corporation, and to take such other actions as are necessary to effectuate the intent of such Shareholder Agreement and of these resolutions. S Corporation Election RESOLVED, that the corporation elects to be treated as a small business corporation under Subchapter S of the Internal Revenue Code of 1986, as amended, for federal and state income tax purposes, and the President of the corporation hereby is authorized and directed to take such actions as are necessary to comply with all of the requirements of the Internal Revenue Service in making such election. These actions are effective as of September 22, 2003. Jos . Goodman Malt a r t G dman Shelton 1312411 - 3 - OF WAT, � Michael F. Easley, Governor �a P William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director 0 Division of Water Quality Coleen M. Sullins, Deputy Director Division of Water Quality April 12, 2004 Mr. Joe Goodman, Member/Manager Lanvale Corporation, Inc. PO Box 4292 Wilmington, NC 28406 Subject: Request for Additional information Stormwater Project No. SW8 031056 Lanvale Farms Brunswick County Dear Mr. Goodman: The Wilmington Regional Office received a Stormwater Management Permit Application for Lanvale Farms on February 3, 2004. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The top of page 3 of the application indicates that the offsite drainage areas were derived via USGS Topographic information and zoning, however, the project area and the drainage listed on page 2 of the application are the - same. If there is true offsite drainage entering this pond, the drainage area would tend to be larger than project area. If there is offsite drainage, please label and delineate the offsite drainage area and either account for the drainage in sizing the pond or show how the drainage will be routed around the pond. 2. Please locate, label and dimension the recorded access and drainage easements. 3. Please provide a copy of the proposed restrictive covenants to include the language as found in the attached document: Statements 1.1-1.5, 11.1, 11.3, and 11.4. 4. Please provide documentation of your status as Manager. 5. Please label the cul-de-sac pavement radius on the plans or provide a detail on the plans. 6. Please reduce the trash rack rebar spacing to 4". 7. The temporary pool elevation is noted as 25.5 on the supplement and in the calculations but the temporary pool volume reported on the supplement appears to be based on elevation 26. If 25.5 is the storage elevation, then please recalculate the temporary pool volume and N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service A*M Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NCOEN3i Mr. Goodman April 12, 2004 Stormwater Application No. SW8 031055 8. The "Pond with Forebay Section" detail also shows the temporary pool elevation as 26.0. Please review and revise the plans or application as needed, based on item #7. 9. Please identify and delineate the "Other' and "Parking" proposed BUA's. 10. Please identify the open space between Lots 41 and 49. Is this common area? Has any BUA been allotted for this space? If yes, don't forget to include the BUA limit for the common area in the restrictive covenants. 11. Does any of the runoff from Lanvale Road enter this project? Please provide existing grades on Lanvale Road and label all drainage features with their inverts. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to May 12, 2004, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension -to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSSlad: S:1WQSlSTORMWATIADDINFO120041031055.apr04 cc:. Todd King, Cape Fear Engineering Linda Lewis Page 2 of 2 Stormwater Design Narrative and Calculations Subject: Lanvale Farms Brunswick County, North Carolina Prepared for Lanvale Corporation Inc. P.O. Box 4292 Wilmington, North Carolina 28406 (910) 294-1015 Date: January, 2004'�, r SEAL_ 20563 s Prepared by ICN, G Cape Rear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 (910) 383-1044 �1�`t�����.orse' �ti 4y rFi►r � f� is i'� tL�' ���µ• a •�' �. r��� .�� t.�. .3.fv�`lyf DESIGN NARRATIVE L GENERAL: The project site is located in the Town Creek Township in Brunswick County, North Carolina. This is a Low density project with a proposed 82 lots and one amenity center on approximately 30 acres. 2. EXISTING SITE: Site topography in the area is relatively flat with slopes grades typically between one half and four percent (0.5% - 4%). The existing drainage pattern follows the natural draws to existing ditches and creeks. The site is primarily wooded with an existing gravel driveway and no existing structures. 3. PROPOSED IMPROVEMENTS: A stormwater collection system utilizing curb and guttering is to be used in this project. Stormwater that is collected in the roadways will be treated in the proposed stormwater treatment ponds. After treatment, the pond discharges into a existing ditch located on the property, and eventually to Jackeys' Creek. The stormwater collection system will be constructed first and the ponds are to be used as sediment basins until site stabilization. Once stabilized, the pond risers will be modified to allow the ponds to perform as stormwater ponds. 4. MAINTENANCE CONSIDERATIONS: Accumulated sediment is to be removed from the ponds when pond capacity is reduced to 75% of its original volume. A portable pump will be used to drain the ponds when maintenance is required. DRAINAGE AREA (Ad) _ IMPERVIOUS AREA (A,): WET POND DATA SKEET LAN VALE PARM 5 STORMWATER POND # I BUILDINGS: ROAD5: PARKING: SIDEWALKS: OTHER: TOTAL: PERCENT IMPERVIOUS (0.- I = Ad/Ai = 29.5% 4- 29. G ACRES G.02 ACRES 2.58 ACRES 0.09 ACRES 0.05 ACRES 0. 1 1 ACRE5 8.85 ACRES �{ V S '? � 004 STORMWATER POND # I SHALL BE 7.5' DEEP AND DESIGNED TO REMOVE 90 TSS. SA/DA= 0.79791 REQUIRED SURPACE AREA AT PERMANENT POOL: SAREQ = 0.23G 1 8 1 AC. = 10288.OG SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 24)= 5G595 SF 5A PROV'D= 5G595 > 1 0288.OG =5A REQ'D OK ............................................................................................................................: MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.009'(1) Rv= 0.319059 VOLUME= I "*Pv*Ad = 0.78701 AC -FT = 34282.3 CI= PAGff I OF 3 214104 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL El - 5A E VOL. (CE) VOL. (CP) 24 5G595 0 0 25 G29G8 59781.5 59781.5 2G G9397 GG182.5 1259G4 SET TEMP. POOL ELEVATION: REQ'D EL. = 24. G 147 1 �- U5E EL. = 25.5 VOL. PROV'D = 92872.75 CP VOL. PROV'D= 92572.75 > 34282.29 =VOL. REQ'D OK EOREBAY 51ZING: PERMANENT POOL VOLUME: INCREM. TOTAL A P VOL.(CP) VOL.(CP) I G.5 33GO 0 0 17 4271 3815.5 3815.5 18 G8G5 55G8 9383.5 19 193G9 13117 22500.5 20 25150 22274.5 44775 21 31202 25191 729GG 22 37419 343 i 0.5 10727G.5 23 4378G 40002.5 147879 24 5G595 50190.5 198OG9.5 REQ'D VOLUME = 20% Of TOTAL PERMANENT BA51N VOLUME = 39G 13.9 CF PAGE 2 OF 3 2/4/04 CHECK FOREBAY VOLUME: INCREM. TOTAL SA (SF) VOL. (CE) VOL. (CE) 19 9392 0 0 20 1 1 5 1 5 10453.5 104 53.5 21 13703 12GO9 230G2.5 22 15952 14527.5 37890 23 182G5 17108.5 54998.5 PROV'D VOLUME = 54908.5 CF ............................................................................................................................. VOL. PROV'D= 54999 > 39G 14 =VOL. REQ'D OK ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0. 198393 CI'S (FOR 2 DAY DRAWDOWN) Q5= 0.079357 CFS (FOR 5 DAY DRAWDOWN) SELECT A 3.0 INCH CIRCULAR ORIFICE, (PERM. POOL EL. = 24 Q PROV'D= Cd"A'(2gh) ^ 112 Q PROV'D= 0. 195975 WHERE: Cd= O.G A= 0,04909 SF g= 32.2 FPS/S h= avcg head: = O.G875 02> 0.195975 >Q5 OK DRAWDOWN TIME = VOLUME / Q PROV'D = 2.02 DAYS PAGE 3 OF 3 214104 51ZE PRINCIPAL SPILLWAY AND EMERGENCY SPILLWAY TO PASS 10 YEAR - 24 HOUR STORM EVENT DRAINAGE AREA = 29.G AC IMPERVIOUS = 29.9% Cc = 5UM(CA)/5UM(A) 0.30525 WHERE C IMPERVIOU5 = 0.9 C PERVIOU5 = 0.2 DESIGN STORM EVENT = I 0-year, 10 minute duration RAINFALL INTENSITY = 6.3 IN/HR TOP OF OUTLET STRUCTURE= 25.5 M51- INVERT OF OUTLET STRUCTURE= 22 M51- TOP OF POND ELEVATION = 27.25 M51L DIMEN510NS OF OUTLET 5TRUCTU 8' TOP OF POND = 27.25 TOP OF SPILLWAY = RISER EL. 25.5 h INVERT = 22 WIDTH OF EMERGENCY 5PILLWAY 126.01 , TOP OF POND = 27.25 TOP OF 5PILLWAY = 2G.5 0 req = Cc I A = 73.7 I cf5 4- PRINCIPAL 5PILLWAY TO PA55 REQUIRffD 10 YEAR STORM EVENT PAGE 1 OF 2 214/04 A A h = 4.50 Dra. Of outlet pipe = 3.0' taw/DIA. = 1.5 Q=CA(2gh) ^ .SxNb 15G.432 cfs Where C=0.G5 (Groove -end with headwall) Nb=number of barrels= 2 barrels CMECK FOR FLOW CAPACITY OF RISER Orrin = Cw L �1 ^ 3/2 = 2 1 G.51 3 CF5 Where Cw=3.3 (Sharp -crested weir) ........................................................................................................................... Q prir= 21 G.51 cf5 > 73.71 cf5 =0 req OK: ........................................................................................................................... CHECK FOR FLOW CAPACITY Of EMERGENCY SPILLWAY FOR 25 YEAR STORM RAINFALL INTENSITY = 7. 1 3 INMR. Q req = Cc I A = 83.42 ef5 s— EMERGENCY SPILLWAY TO PA55 REQUIRED 25 YEAR STORM EVENT Q emergency = Cw L H ^ 3/2 = 245.52 cf5 Where Cw=3.0 (Broad -crested weir) Q emer= 245.52 cf5 > 83.42 cf5 =Q req OK: PAGE 2 OF 2 2/4/04 Hydraflow Plan View Project fife: 807-01-storm.stm I No. Lines: 20 102-03-2004 1 - Hydratow Storm Sewers 2003 Storm Sewer Profile Proj. file: 807-01-storm.stm Elev. (ft) 47.00 41.00 35.00 29.00 23.00 17.00 0 . .. ..... ..... . ............... .... . ....... . ...... ............. Ln:-1 6-----'­'—j­­--'---- -----36 (in)----'L---'--- - --- ------------ (in) - .... . .... .. .... .... .. ....... —48 Ln: 2 -(in) Ln: 3 48 (in) Ln:-14— ---Ln:-15-- .......... i Ln:1 .............. ................ Ln:-18— 4 (in)_ ....... .... ..... . .. . . ........... . ......... ..... . ------ ------ ------------- ........ .. ........ . - - - - - -- - - - 50 100 150 200 250 300 350 400 450 500 550 600 650 700 Reach (ft) Hydraflow Storm Sewers 2003 Storm Sewer Profile Proj. file: 807-01-storm.stm Elev. (ft) HydraFlow Storm Sewers 2003 Storm Sewer Profile Proj. file: 807-01 -storm.stm Elev. (ft) 46,00 40.00 34.00 28.00 22.00 16.00 0 .. . . . ..... . ...... . ..... . .... ........... .. .... ............ . .. ... .... ..... ........... . ..... ............... ....... .... . ...... ....... . . .. ..... ....... ... . ........... .......... . ..... . . --- __- ---- —Ln: 2 46 �kj_ -Ln:-12—.- '24-(in)-- Ln:.13 __24 (in)-, ... __ 1 L n_. jin) Ln: 10 24 24 (in) .. .......... .... .............. ... . ... . . . . . . . . ........ . .. ... . ...... H, 50 100 150 200 250 300 350 400 450 500 550 600 650 Reach (ft) Hydraftow Storm Sewers 2003 Storm Sewer Profile Proj. file: 807-01-storm .stm HydrafEow Storm Sewers 2003 Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vet EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sgft) (ft!s) (ft) (ft) {%) (ft) (ft) (ft) (ft) (sgft) (ftls) (ft) (ft) (%) (%) (ft) (K) (ft) 1 48 72.29 21.00 24.00 3,00 10,11 7.15 0.80 24,80 0.305 101 22.50 25.01 2,51" 8.32 8.69 1.17 26.19 0.488 0.396 n/a 1,50 1.76 2 48 71.49 22.50 26.78 4.00 12.56 5.69 0.50 27.28 0.248 138 24.53 27.03 2.50" 8.27 8.65 1.16 28.19 0.485 0.366 n/a 1,50 1.74 3 48 55.29 24.53 28.78 4.00 12.56 4.40 0.30 29.08 0.148 33.0 24.70 28.82 4.00 12.57 4.40 0.30 29.13 0.148 0.148 0.049 1.50 0.45 4 36 23.57 25.70 29,28 3.00 7.07 3,34 0.17 29.45 0.125 222 26.81 29.52 2.71 6.72 3.51 0.19 29.71 0.110 0.117 0.260 0.45 0.09 5 36 24,31 26.81 29.60 2.79 6.86 3.54 0-20 29,80 0.115 250 27.49 29.86 2,37 6.00 4.05 0.26 30.12 0.142 0.128 0.321 0.50 0.13 6 30 23.29 27.99 30.49 2.50' 4.91 4.75 0.35 30.84 0.323 34,0 28.05 30.55 2.50 4.91 4.74 0.35 30.90 0,320 0.322 0.109 1.50 0.53 7 30 20.83 28,05 31.07 2.50 4.91 4.24 0.28 31.35 0.258 48.0 28.15 31.20 2.50 4.91 4.24 0.28 31.48 0.258 0.258 0.124 0.50 0.14 8 30 20.17 28.15 31.34 2.50 4.91 4.11 0.26 31.60 0.242 150 28.45 31.70 2.50 4.91 4.11 0.26 31.96 0.242 0.242 0.363 1.50 0.39 9 24 8.76 28.95 32,10 2.00 3.14 2,79 0.12 32.22 0.150 24.0 29.00 32.13 2.00 3,14 2.79 0.12 32.25 0.150 0.150 0.036 1.00 0.12 10 24 16.12 26.70 28.78 2.00 3.14 5.13 0.41 29,18 0.508 41.0 26.91 28.98 2.00 3.14 5,13 0.41 29.39 0.508 0.508 0.208 1.50 0.61 11 24 10A3 26.91 29.60 2,00 3.14 3.48 0.19 29,79 0,233 132 27.57 29.91 2.00 3.14 3.48 0.19 30.09 0.233 0.233 0.308 0,70 0.13 12 24 10.32 27.57 30.04 2.00 3.14 3.29 0.17 30.21 0.208 186 29.00 30,38 1.38 2.31 4.47 0.31 30.59 0,309 0.259 0.481 1.25 0.39 13 24 7.46 29.00 30.77 1.77 2.94 2.54 0.10 30.87 0.097 24.0 29.25 30.76 1.51 2.55 2.93 0.13 30.90 0.128 0.113 0.027 1.00 0.13 14 36 26.13 25,70 29.28 3.00 7-07 3.70 0.21 29.49 0.154 163 26.52 29.52 3.00 7.07 3.70 0.21 29.73 0,151 0.152 0,249 0.70 0.15 15 36 20.66 26.52 29.67 3.00 7,07 2.92 0.13 29.80 0.096 32.0 26.68 29.68 3.00 7.07 2.92 0.13 29.81 0.096 0.096 0.031 0.50 0.07 16 36 17.47 26.68 29.75 3.00 7.07 2.47 0.10 29.84 0.069 113 26.91 29.82 2.91 7.00 2.49 0.10 29.91 0,060 0.065 0.073 0.45 0.04 17 30 17.63 27.41 29.86 2.45 4.89 3.61 0.20 30.06 0.166 69.0 27.55 29.97 2.42 4.86 3.63 0.20 30.18 0.163 0.164 0.113 1.25 0.26 18 24 11.14 28.05 30.23 2.00 3,14 3.55 0.20 30.42 0.243 24.0 28.10 30.29 2.00 3.14 3.55 0.20 30.48 0.243 0.243 0.058 1.00 0.20 19 24 0.78 25.27 26.78 1.51 2.54 0.31 0,00 26.78 0.001 28.0 25.33 26,78 1.45 2.43 0.32 0,00 26.78 0.002 0.001 0.000 1,00 0.00 20 24 4.77 26.91 29.60 2.00 3.14 1.52 0.04 29.63 0.045 35.0 27,09 29,61 2.00 3.14 1.52 0,04 29.65 0,044 0.044 0.016 1.00 0.04 Project File: 807-01-storm.stm Number of lines: 24 Run Date: 01-29-2004 NOTES: ' Normal depth assumed., "' Critical depth assumed. hyaranow storm aewers zwj Storm Sewer Inventory Report Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-loss Inlet/ line length angle type Q area coeff time El Dn slope El Up size type value coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M) (ft) (in) (n) (K) (ft) 1 End 101.0 111.4 Curb 0.00 0.18 0.60 5.0 21.00 1.49 22.50 48 Cir 0.013 1.50 28.65 CB#2 - FES#1 2 1 138.0 86.7 Curb 0.00 0.26 0.60 5.0 22.50 1.47 24.53 48 Cir 0.013 1.50 31.00 CB#3 - CB#2 3 2 33.0 -31.1 Curb 0.00 1.91 0.60 5.0 24.53 0.52 24.70 48 Cir 0.013 1.50 31.00 CB#4 - CB#3 4 3 222.0 -11.9 MH 0.00 0.00 0.00 0.0 25.70 0.50 26.81 36 Cir 0.013 0.45 33.00 JB#5 - CB#4 5 4 250.0 23.3 Curb 0.00 0.26 0.60 5.0 26.81 0.27 27.49 36 Cir 0.013 0.50 34.38 CB#6 - JB#5 6 5 34.0 6.9 Curb 0.00 0.61 0.60 5.0 27.99 0.18 28.05 30 Cir 0.013 1.50 34.30 CB#7 - CB#6 7 6 48.0 -97.7 Curb 0.00 0.24 0.60 5.0 28.05 0.21 28.15 30 Cir 0.013 0.50 34.20 CB#8 - CB#7 8 7 150.0 -1.0 Curb 0.00 2.65 0.60 5.0 28.15 0.20 28.45 30 Cir 0.013 1.50 32.27 CB#9 - CB#8 9 8 24.0 -86.5 Curb 0.00 2.02 0.60 5.0 28.95 0.21 29.00 24 Cir 0.013 1.00 32.37 CB#10 - CB#9 10 2 41.0 -107.8 Curb 0.00 0.20 0.60 5.0 26.70 0.51 26.91 24 Cir 0.013 1.50 31.00 CB#11 - CB#3 11 10 132.0 12.7 Curb 0.00 0.20 0.60 5.0 26.91 0.50 27.57 24 Cir 0.013 0.70 31.82 CB#12 - CB#11 12 11 186.0 32.2 Curb 0.00 0.67 0.60 5.0 27.57 0.77 29.00 24 Cir 0.013 1.25 32.77 CB#13 - CB#12 13 12 24.0 71.8 Curb 0.00 1.72 0.60 5.0 29.00 1.04 29.25 24 Cir 0.013 1.00 32.77 CB#14 - CB#13 14 3 163.0 109.1 Curb 0.00 1.34 0.60 5.0 25.70 0.50 26.52 36 Cir 0.013 0.70 31.64 CB#15 - CB#4 15 14 32.0 18.2 Curb 0.00 0.85 0.60 5.0 26.52 0.50 26.68 36 Cir 0.013 0.50 31.64 CB#16 - CB#15 16 15 113.0 -3.2 MH 0.00 0.00 0.00 0.0 26.68 0.20 26.91 36 Cir 0.013 0.45 32.50 JB#17 - CB#16 17 16 69.0 -26.5 Curb 0.00 1.51 0.60 5.0 27.41 0.20 27.55 30 Cir 0.013 1.25 30.93 CB#18 - CB#17 18 17 24.0 65.3 Curb 0.00 2.57 0.60 5.0 28.05 0.21 28.10 24 Cir 0.013 1.00 30.93 CB#19 - CB#18 19 1 28.0 0.0 Curb 0.00 0.18 0.60 5.0 25.27 0.21 25.33 24 Cir 0.013 1.00 28.65 CB#20 - CB#2 20 10 35.0 90.9 Curb 0.00 1.10 0.60 5.0 26.91 0.51 27.09 24 Cir 0.013 1.00 31.00 CB#21 - CB#11 Project File: 807-01-storm.stm Number of lines: 20 Date: 01-29-2004 - - -- - - Hydr2Flow Storm Sewers 2UO3 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No, rate size length EL Dn EL Up slope down up loss line (cis) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) No. 1 CB#2 - FES#1 72.29 48 c 101.0 21.00 22.50 1.485 24.00 25.01 1.76 End 2 CB#3 - CB#2 71.49 48 c 138.0 22.50 24.53 1.471 26.78 27.03 1.74 1 3 CB#4 - CB#3 55.29 48 c 33.0 24.53 24.70 0.515 28.78* 28.82* 0.45 2 4 JB#5 - CB#4 23.57 36 c 222.0 25.70 26.81 0.500 29.28 29.52 0.09 3 5 CB#6 - JB#5 24.31 36 c 250.0 26.81 27.49 0.272 29.60 29.86 0.13 4 6 CB#7 - CB#6 23.29 30 c 34.0 27.99 28,05 0.176 30,49 30.55 0.53 5 7 C13#8 - CB#7 20.83 30 c 48.0 28.05 28.15 0.208 31.07* 31.20' 0.14 6 8 CB#9 - CB#8 20.17 30 c 150.0 28.15 28.45 0.200 31.34* 31,70* 0.39 7 9 CB#10 - CB#9 8.76 24 c 24.0 28.95 29.00 0.208 32.10* 32.13* 0.12 8 10 CB#11 - CB#3 16.12 24 c 41.0 26.70 26.91 0.512 28.78* 28.98* 0.61 2 11 CB#12 - CB#11 10.93 24 c 132.0 26.91 27.57 0.500 29.60* 29.91* 0.13 10 12 CB#13 - CB#12 10.32 24 c 186.0 27.57 29.00 0.769 30.04 30.38 0.39 11 13 CB#14 - CB#13 7.46 24 c 24.0 29.00 29.25 1.042 30.77 30.76 0.13 12 14 CB#15 - CB#4 26.13 36 c 163.0 25.70 26.52 0.503 29.28 29.52 0.15 3 15 C13916 - CB#15 20.66 36 c 32.0 26.52 26.68 0.500 29.67 29.68 0.07 14 16 JB#17 - CB#16 17.47 36 c 113.0 26.68 26.91 0.204 29.75 29.82 0.04 15 17 CB#18 - CB#17 17.63 30 c 69.0 27.41 27.55 0.203 29.86 29,97 0.26 16 18 CB#19 - CB#18 11.14 24 c 24.0 28.05 28.10 0.208 30.23* 30.29* 0.20 17 19 CB#20 - CB#2 0.78 24 c 28.0 25.27 25.33 0.214 26.78 26.78 0.00 1 20 CB#21 - CB#11 4.77 24 c 35.0 26.91 27.09 0.514 29.60* 29.61* 0.04 10 Project File: 807-01-storm.stm Number of tines: 20 Run Date: 01-29-2004 NOTES: c = circular; e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. Hydraflow Slorm Sewers 2003 MyReport Page 1 Line Line Line Line Invert Invert Line HGL HGL No. ID Size Length Dn Up Slope Dn Up (III) A (ft) (ft) M (ft) (ft) 1 CB#2 - FES#1 48 101.00 21.00 22.50 1.49 24.00 25.01 2 CB#3 - CB#2 48 138.00 22.50 24.53 1.47 26.78 27.03 3 CB#4 - CB#3 48 33.00 24.53 24.70 0.52 28.78 28.82 4 JB#5 - CB#4 36 222.00 25.70 26.81 0.50 29.28 29.52 5 CB#6 - JB#5 36 250.00 26.81 27.49 0.27 29.60 29.86 6 CB#7 - CB#6 30 34.00 27.99 28.05 0.18 30.49 30.55 7 CB#8 - CB#7 30 48.00 28.05 28.15 0.21 31.07 31.20 8 CB#9 - CB#8 30 150.00 28.15 28.45 0.20 31.34 31.70 9 CB#10 - CB#9 24 24.00 28.95 29.00 0.21 32.10 32.13 10 CB#11 - CB#3 24 41.00 26.70 26.91 0.51 28.78 28.98 11 CB#12 - CB#11 24 132.00 26.91 27.57 0.50 29.60 29.91 12 CB#13 - CB#12 24 186.00 27.57 29.00 0.77 30.04 30.38 13 CB#14 - CB#13 24 24.00 29.00 29.25 1.04 30.77 30.76 14 CB#15 - CB#4 36 163.00 25.70 26.52 0.50 29.28 29.52 15 CB#16 - CB#15 36 32.00 26.52 26.68 0.50 29.67 29.68 16 JB#17 - CB#16 36 113.00 26.68 26.91 0.20 29.75 29.82 17 CB#18 - CB#17 30 69.00 27.41 27.55 0.20 29.86 29.97 18 CB#19 - CB#18 24 24.00 28.05 28.10 0.21 30.23 30.29 19 CB#20 - CB#2 24 28.00 25.27 25.33 0.21 26.78 26.78 20 CB#21 - CB#11 24 35.00 26.91 27.09 0.51 29.60 29.61 Project File: 807-01-storm.stm Number of lines: 20 Date: 02-03-2004 NOTES: ** At critical depth Hydra Flow Storm Sewers 2003 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line Ht L area L W So W Sw Sz n depth spread depth spread Dep No (cfs) (cfs) (cfs) (cfs) (in) {ft) {sgft} (ft) (ft) (tuft) (ft) (ft)ft) (ftlft) (ft) (ft) (ft) {ft} (in) 1 0.78 0.00 0.78 0.00 Curb 6.0 31.35 0.00 OM 0.00 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.08 5.80 0.00 Off 2 1.13 0.00 1.13 0.00 Curb 6.0 35.04 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 MO 6.60 0.10 6.55 0.00 1 3 8.28 0.00 8.28 0.00 Curb 6.0 67.86 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.24 13.60 0.23 13.20 0.00 2 4 0.00 OM 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 3 5 1.13 0.00 1.13 0.00 Curb 6.0 35.04 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.10 6.60 0.10 6.55 0.00 4 6 2.65 0.00 2.65 0.00 Curb 6.0 45.81 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.15 9.10 0.14 8.75 0.00 5 7 1.04 0.00 1.04 0.00 Curb 6.0 34.02 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.10 6.60 0.10 6.35 0.00 6 8 11.49 0.00 11.49 0.00 Curb 6.0 76.27 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.27 15.10 0.27 14.85 0.00 7 9 8.76 0.00 8.76 0.00 Curb 6.0 69.18 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.24 13.60 0.24 13.45 0.00 8 10 0.87 0.00 0.87 0.00 Curb 6.0 32.33 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.09 6.00 0.00 2 11 0.87 0.00 0.87 0.00 Curb 6.0 32.33 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.09 6.00 0.00 10 12 2.91 0.00 2.91 0.00 Curb 6.0 47.28 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.15 9.10 0.15 9.05 0.00 11 13 7.46 0.00 7.46 0.00 Curb 6.0 65.37 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.23 13.10 0.22 12.70 0.00 12 14 5.81 0.00 5.81 0.00 Curb 6.0 59.88 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.20 41.60 0.20 11.60 0.00 3 15 3.69 0.00 3.69 0.00 Curb 6.0 51.22 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.17 10.10 0.17 9.85 0.00 14 16 0.00 0.00 MO 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 15 17 6.55 0.00 6.55 O.00 Curb 6.0 62.41 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.21 12.10 0.21 12.10 0.00 16 18 11.14 0.00 11.14 0.00 Curb 6.0 75.46 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.27 15.10 0.26 14.70 0.00 17 19 0.78 0.00 0.78 0.00 Curb 6.0 31.35 0.00 0.00 U0 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.08 5.80 0.00 1 20 4.77 0.00 4.77 0.00 Curb 6.0 55.92 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.19 11.10 0.18 10.80 0.00 10 Project File: 807-01-storm.stm I-D-F File: Brco_ver8.IDF -T Number of lines: 20 Run Date: 01-29-2004 NOTES: Inlet N-Values = 0.016 ; Intensity = 121.80 1 (Inlet time + 23.50) ^ 0.84; Return period = 10 Yrs. ; *Indicates Known Q added Hytlratlow storm sewers [=J 1 CALCULATIONS PROJECT: Arr1j141 �(�rzl�'S _ _ _ DATE: CLIENT: CnMPaZAMrAf PROJ. NO.: SUBJECT: �Z� r�ln�A�f Cl3WF�.�" ti(_L� _ _._. DESIGNED BY: 11-K Q= CCI A A t- 2.5 tic_ Lam= �ulUDl'1= ��1�1=P��T - Q. p 1 uTE.,Lc61 T-( - Q- Lo,-OCI,ZZ�(2.5) = I`A.�+-[ cry -Pi aE- I rozr�l c L - LF-&u*t+Y- ` I C.D tS a S LdPE - C) , S �� 1 m v r Z.T 1 tit = 33.OQ ,uT 00 r - 3Z.5c> 151 Poole Road, Suite 100 8elville, NC 28451 TEL. (910) 383-1044 FAX: (910) 383-1045 www.capefeareng.com CAPE FEAR Engineering, Inc. t a o 10 000 ra.. 168 8,000 EXAMPLE (1) (2) (3j f 156 - - 6 000 D•42 inches (3.5 Issl) 6. 6. 144 5,000 Q. lzo US 5. 4,000 I2vr• Hw 6. S. 152 p feet 4. 3,000 (1) Z.5 8.8 5' —4, - 120 (2) 2.1 7.4 _ 2,000 131 4. _ 3 l0a — - 3' "p in fret 96 — 1,000 3' — 600 84 - 600 _ 2. —2. - 500 // / 72 400 / ` 2. tn Uj 300 4E 3 U z (n / aNr 60 v 200 / w 1.5 z z - /_ j o F-a: 54 c7 G LJ too 0C,{ w 48 0- / a c=i / 2 60 CL 1.0 1.0 0 N 50 HW ENTRANCE O � o 40 SCA D TYPE CC w I.0 36 30 F- } Square sdg• with Q 9 .9 w 33 headwall 0 •9 a Q 2O a {2j Groove end with w 30 h.ad.atl S a 8 (3) Groove end .9 ~27 projecting 10 C 24 8 7 . 7 7 6 To use scale (2) or (3) project 21. 5 horizontally to seals (1),than 4 use rtralght Inclined line through D and 0 scales, or reverse as 3 Illurtrat.d. 6 .6 .6 E. 18 2 15 ' 5 .5 .5 1.0 12 HEADWATER DEPTH FOR CONCRETE PIPE CULVERTS FHWA WITH INLET CONTROL NCHOGWH 1 BRIDGE DIVISION HYDRAULIC MANUAL 12-85 4 - 35 Worksheet for Circular Channel Project Description Project File p;18071807-011adminlstormwater1807-01-c.fm2 Worksheet Driveway Culvert Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.005000 ftlft Discharge 14.44 cfs Results Depth 23.1 in Diameter 23.10 in Flow Area 2.91 ftz Wetted Perimeter 6.05 ft Top Width 0.00 ft Critical Depth 1.38 ft Percent Full 100.00 Critical Slope 0.006666 ft/ft Velocity 4.96 ftls Velocity Head 0.38 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 15.53 cfs Full Flow Capacity 14.44 cfs Full Flow Slope 0.005000 ft/ft 01l22/04 Cape Fear Engineering FYowMaster v5.08 08:31:14 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) No. 1 CB#2 - FES#1 72.29 48 C 101.0 21.00 22.50 1,485 24.00 25.01 1.76 End 2 CB#3 - CB#2 71.49 48 c 138.0 22,50 24.53 1.471 26.78 27.03 1.74 1 3 CB#4 - CB#3 55.29 48 c 33.0 24.53 24.70 0.515 28.78* 28,82* 0.45 2 4 JB#5 - CB#4 23.57 36 c 222.0 25.70 26.81 0,500 29.28 29.52 0.09 3 5 CB#6 - J8#5 24.31 36 c 250.0 26.81 27.49 0,272 29.60 29.86 0.13 4 6 CB#7 - CB#6 23.29 30 c 34.0 27.99 28.05 0.176 30.49 30.55 0.53 5 7 CB#8 - CB#7 20.83 30 c 48.0 28.05 28.15 0.208 31.07* 31.20* 0,14 6 8 CB#9 - CB#8 20.17 30 c 150.0 28.15 28.45 0.200 31.34* 31.70' 0.39 7 9 CB#10 - CB#9 8.76 24 c 24.0 28.95 29.00 0.208 32.10* 32,13* 0.12 8 10 CB#11 - CB#3 16.12 24 c 41.0 26,70 26.91 0.512 28.78* 28,98* 0.61 2 11 CB#12 - CB#11 10.93 24 c 132.0 26.91 27.57 0.500 29.60* 29,91* 0.13 10 12 CB#13 - CB#12 10.32 24 c 186.0 27,57 29.00 0.769 30.04 30.38 0.39 11 13 C13#14 - CB#13 7.46 24 c 24.0 29.00 29.25 1.042 30.77 30.76 0.13 12 14 CB#15 - CB#4 26.13 36 c 163.0 25.70 26,52 0.503 29.28 29.52 0.15 3 15 CB#16 - CB#15 20.66 36 c 32.0 26.52 26.68 0.500 29.67 29.68 0.07 14 16 JB#17 - CB#16 17.47 36 c 113.0 26,68 26.91 0.204 29.75 29.82 0.04 15 17 CB#18 - CB#17 17.63 30 C 69.0 27.41 27,55 0.203 29.86 29.97 0.26 16 18 CB#19 - CB#18 11,14 24 c 24.0 28,05 28.10 0.208 30.23* 30.29* 0.20 17 19 CB#20 - CB#2 0.78 24 c 28.0 25.27 25.33 0,214 26,78 26.78 0.00 1 20 CB#21 -CB#11 4.77 24 c 35.0 26.91 27.09 0.514 29.60* 29,61* 0.04 10 Project File: 807-01-storm.stm Number of lines: 20 Run Date: 01-29-2004 NOTES: c = circular; e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. HydraFlow Storm Sewers 2003 MyReport Page Line Line Line Line Invert Invert Line HGL HGL No. ID Size Length On Up Slope On Up (in) (ft) (ft) (ft) M) (ft) lk! 1 CB#2 - FES#1 48 101.00 21,00 22.50 1.49 24.00 25.01 2 CB#3 - CB#2 48 138.00 22.50 24.53 1.47 26.78 27.03 3 CB#4 - CB#3 48 33.00 24.53 24.70 0.52 28.78 28.82 4 JB#5 - CB#4 36 222.00 25.70 26.81 0.50 29.28 29,52 5 CB#6 - JB#5 36 250.00 26.81 27.49 0.27 29.60 29.86 6 CB#7 - CB#6 30 34.00 27.99 28.05 0.18 30.49 30.55 7 CB#8 - CB#7 30 48.00 28.05 28.15 0.21 31.07 31.20 8 CB#9 - CB#8 30 150.00 28.15 28.45 0.20 31.34 31.70 9 CB#10 - CB#9 24 24.00 28.95 29.00 0.21 32.10 32.13 10 CB#11 - CB#3 24 41.00 26.70 26.91 0.51 28.78 28.98 11 CB#12 - CB#11 24 132.00 26.91 27.57 0.50 29.60 29.91 12 CB#13 - CB#12 24 186.00 27,57 29.00 0.77 30.04 30.38 13 CB#14 - CB#13 24 24.00 29.00 29.25 1.04 30.77 30.76 14 CB#15 - CB#4 36 163.00 25.70 26.52 0.50 29.28 29.52 15 CB#16 - CB#15 36 32.00 26.52 26.68 0.50 29.67 29.68 16 JB#17 - CB#16 36 113.00 26.68 26.91 0.20 29.75 29.82 17 CB#18 - CB#17 30 69.00 27.41 27.55 0.20 29.86 29.97 18 CB#19 - CB#18 24 24.00 28.05 28.10 0.21 30.23 30.29 19 CB#20 - CB#2 24 28.00 25.27 25.33 0.21 26.78 26.78 20 C13#21 - CB#11 24 35,00 26.91 I 27.09 0.51 29.60 29.61 Project File: 807-01-storm.stm Number of lines: 20 Date: 02-03-2004 !VOTES: -At critical depth Hydraflow Storm Sewers 2002 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line Ht (in) L (ft) area (sgft) L (tt) W (ft) F02 W (ftj SW (ft/ft) Sx (ftlft) n depth (ft) spread (ft) depth (ft) spread (ft) Dep (in) (cfs) (cfs) (cfs) (cfs) No 1 0.78 0.00 0.78 0.00 Curb 6.0 31.35 0.00 0.00 0.00 2.00 0.004 0.020 0.013 0.09 6.10 0.08 5.80 0.00 Off 2 1.13 0.00 1.13 0.00 Curb 6.0 35.04 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.10 6.60 0.10 6.55 0.00 1 3 8.28 0.00 8.28 0.00 Curb 6.0 67.86 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.24 13.60 0.23 13.20 0.00 2 4 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 3 5 1.13 0.00 1.13 0.00 Curb 6.0 35.04 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.10 6.60 0.10 6.55 0.00 4 6 2.65 0.00 2.65 0.00 Curb 6.0 45.81 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.15 9.10 0.14 8.75 0.00 5 7 1.04 0.00 1.04 0.00 Curb 6.0 34.02 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.10 6.60 0.10 6.35 0.00 6 8 11.49 0.00 11.49 0.00 Curb 6.0 76.27 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.27 15.10 0.27 14.85 0.00 7 9 8.76 0.00 8.76 0.00 Curb 6.0 69.18 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.24 13.60 0.24 13.45 0.00 8 10 0.87 0.00 0.87 0.00 Curb 6.0 32.33 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.09 6.00 0.00 2 11 0.87 OM 0.87 0.00 Curb 6.0 32.33 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.09 6.00 0.00 10 12 2.91 0.00 2.91 0.00 Curb 6.0 47.28 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.15 9.10 0.15 9.05 0.00 11 13 7.46 0.00 7.46 0.00 Curb 6.0 65.37 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.23 13.10 0.22 12.70 0.00 12 14 5.81 0.00 5.81 0.00 Curb 6.0 59.88 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.20 11.60 0.20 11.60 0.00 3 15 3.69 0.00 3.69 0.00 Curb 6.0 51.22 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.17 10.10 0.17 9.85 0.00 14 16 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 15 17 6.55 0.00 6.55 0.00 Curb 6.0 62.41 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.21 12.10 0.21 12.10 0.00 16 18 11.14 0.00 11.14 0.00 Curb 6.0 75.46 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.27 15.10 0.26 14.70 0.00 17 19 0.78 0.00 0.78 0.00 Curb 6.0 31.35 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.09 6.10 0.08 5.80 0.00 1 20 4.77 0.00 4.77 0.00 Curb 6.0 55.92 0.00 0.00 0.00 0.020 2.00 0.004 0.020 0.013 0.19 11.10 0.18 10.80 0.00 10 Project File: 807-01-storm.stm I-D-F File: Brco_ver8.IDF Number of lines: 20 Run Date_ 01-29-2004 NOTES: Inlet N-Values = 0.016 ; Intensity = 121.801 (Inlet time + 23.50) ^ 0.84; Return period = 10 Yrs.: " Indicates Known 0 added Hydraflow Storm Sewers 200c CALCULATIONS PROJECT, L Ad- ( LL FAzl^tom DATE: C)q CLIENT: _ i A�[�Ira --nnet PROJ. NO.: -eZ,01-7 -o SUBJECT: ` iC'r DESIGNED BY: STK, Yk At 'Z.5 14C- I - TC A 1tir ,"ArrL- l MTE tiA61 T`( - '1, ZZ L - L zA-(c-tt--r i CO I Kivr.—Z--T { ti = 33. 00 151 Poole Road, Suite 100 Belville, NC 25451 TEL (910) 353-1044 FAX. (910) 353-1045 www.capefeareng.com Li L-{ e r� t 45�1 CAPE FEAR # Engineering, Inc. A 16 0 10,000 168 8,000 EXAMPLE (1) (2) (3) 6. 156 6,000 D-42 inches (3,5 feel) 6. '14 4 5,000 Q. Izo cre 5. 4,000 —ww" Hw 5. 5. 132 D feet 4, 3,0O0 (1) 2.5 a.e 5' 4. 120 (2) 2.1 7.4 2,000 S3► 2.2 7.7 4. 3, 108 "D in 14e1 96 1,000 3. 800 84 600 2' 2- 1-J 500 / 72 ' 400 / 3 2. N U 300 N 1.5 1.5 z_ / a 60 U- v 200 / w 1.5 z .� 54 q /� 100 w � 48 / w 80 D U /2 v 60 CL 1.0 1'0 0 0 50 Hw ENTRANCE w 0 (r 40 SCA p TYPE Cr I.d 36 30 ] 5auare edge with La < 9 9 w 1E 33 headwall Q .9 Q 2 0 1z) Groove end with Q w 3d headwall = .13 8 13) Groors •nd 8 — 27 pratecrinq 10 C 24 8 .7 7— 7- 6 To use scale (2) or (3) protect 2 I. 5 horiiontolq to scale it). then 4 use slralghl Inclined line through o and 0 scales, or reverse as 6 3 illustrated. 6 .6 IB 2 15 5- .5 5 1.0 - - - — ,2 HEADWATER DEPTH FOR UwJ�Gs CONCRETE PIPE CULVERTS FHWA WITH INLET CONTROL T10FIDC�Z�f'H I ' BRIDGE DIVISION HYDRAULIC MANUAL 12-85 4 - 35 Worksheet for Circular Channel Project Description Project File p:18071807-01ladminlstormwater1807-01-c.fm2 Worksheet Driveway Culvert Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.005000 fuft Discharge 14,44 cfs Results Depth 23.1 in Diameter 23.10 in Flow Area 2.91 ft7 Wetted Perimeter 6.05 ft Top Width 0.00 ft Critical Depth 1.38 ft Percent Full 100,00 Critical Slope 0.006666 ft/ft Velocity 4.96 ft/s Velocity Head 0.38 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 15,53 cfs Full Flow Capacity 14.44 cfs Full Flow Slope 0.005000 ft/ft 01/22/04 Cape Fear Engineering FlowMaster v5.08 08:31:14 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Re: Lanvale Famis Subject: Re: Lanvale Fanns S� From: "Todd King" <todd.king@capefearengineering.com> d?, Date: Mon, 29 Mar 2004 10:12:21 -0500 i To: "Linda Lewis" <Linda.Lewis@ncmail.net> Linda, Sorry to respond so late, but your email was placed into someone elses box. I will be sending you the requested suppliments ASAP. Thank you for your patients. Todd ----- Original Message ----- From: "Linda Lewis" <Linda.Lewis@ncmail.net> To: "Todd King" <todd.kin @ca efearen ineerin .com> Sent: Wednesday, February 11, 2004 9:53 AM Subject: Lanvale Farms Todd: Please provide a completed low density supplement- the application does not indicate how much BUA is alloted to each lot; and provide a copy of the proposed covenants and deed restrictions, including the language found in Sections I and VII of the attached form. Thanks. Linda El zi-04 olem ell tV bW CMG iilrered A f S 2 ice ?ain . d 1 of 1 3r29/2004 11:36 AM ,` CAPE FEAR Engineering, Inc. 151 Poole Road, Suf[e 100 BelTEL (9, ) 2845 44 TEL (910) 383-104.5 FAX (910) 383-1045 www. ca pe feare ngin eerrng. co9,0� b m Transmittal To: NCDENR —Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Att n : F E B 3 2004 BY:z�� ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review 1 Action 1 Approval ❑ Sent via Mail ❑ Sent via Courier w I Quantity Drawing No. Description 1 $420 Application Fee 2 Original and Copy of Application 1 Copy of Supplements 2 Sets of Plans 2 Design Narrative and Calculations REMARKS If you have any questions, or need further information, don't hesitate to call. i 1i i i CC: Cape Fear E Weer c. File Signed I T9dd King — Proj t Manager ` i �I 1 NCD EN R-trans-jan2104.doc BRANCH BANRINO AND TRUST COMPANY WILMINGTON. NORTH CAROLINA 10226 CAPE FEAR ENGINEERING, INC. 68-115 02;01t P.O. BOX 988 A a2 WILMINGTON, NC 28402 . 1/21/2004 PAY TO THE ORDER OF NCDENR $ **420.00 Four Hundred Twenty and OO/100****s*r*::::*.:.:*:.: ***«*.*+:*:::.s:.s*s**.s* :.*** **** ******** **:** ****«*. DOLLARS NCDENR 56,,S 03 ro 55 MEMO Stormwater Submittal NCDENR Stormwater Submittal 1 /21 /2004 10226 420.00 Cape Fear Engineering Inc Stormwater Submittal 420.00 Lanvale Farms Subject: Lanvale Farms From: Linda Lewis <Linda.Lewis@)ncmail.net> Date: Wed, 11 Feb 2004 09:53:56 -0500 To: Todd King <todd.king@capefearengineering.com> Todd. Please provide a completed low density supplement- the application does not indicate how much BUA is alloted to each lot; and provide a copy of the proposed covenants and deed restrictions, including the language found in Sections I and VII of the attached form. Thanks. Linda 1 of 1 - - - - - - - - - - - - - -- - --_ -- . _ - - - -- - --- - 2/11/2004 9:54 AM °F W A PFq 7 r_ y Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources December 1, 2003 Mr. Joe Goodman, Member/Manager Lanvale Properties, LLC 304 W. West Street Southport, NC 28461 Dear Mr. Goodman: Alan W. Klimek, P.E., Director Division of Water Quality Coleen N. Sullins, Deputy Director Division of Water Quality Wilmington Regional Office Subject: REQUEST FOR STORMWATER MANAGEMENT PERMIT APPLICATION Lanvale Farms Stormwater Project No. SW8 031055 Brunswick County On October 13, 2003, the Wilmington Regional Office received a copy of a Notice of Receipt of Erosion & Sedimentation Control Plan for Lanvale Farms. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets'of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than January 2, 2004. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-395-3900. Sincerely, &C�� Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWATISTORMSUB1031055.Oct cc: Delaney Aycock, Brunswick County Building Inspections Cape Fear Engineering Caro line.Belli1) ,Linda Lewis` Central Files N.C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service NCDENR Wilmington Regional Office Wilmington, N.C. 28405 (910) 350-2004 Fax 1- 800-623-7748 Ovate of Ivortn uarolina DepArtment of Environment end `�.laturai Resources Wilmington Regional Office + Division of Land Resources 2v Land Quality Section J H&M�®ENDR Michael F. Easley, Governor NORTH CARO4INA DEPARTMENT OF ENVIRONMENT AND NATl1R/l RESOURCES William G. Ross Jr., Secretary October 13, 2003 NOTICE OF RECEIPT OF EROSION & SEDIMENTATION CONTROL PLAN Lanvale Properties, LLC. Mr. Joe Goodman, Member I Manager 304 W. West Street Southport, N.C. 28461 Dear Mr. Goodman: This office has received a soil erosion and sedimentation control plan for the project listed below which was submitted as required by the North Carolina Sedimentation Pollution Control Act (NCGS 113A-57(4)). Please be advised that this Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of said land -disturbing activity (NCGS 113A-54(d)(4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30 day period will be deemed approval of the plan if the submitted plan is complete. Commencement or continuation of a land -disturbing activity underthe jurisdiction of this Act prior to the approval of an erosion & sediment control plan is a violation of the Act. A copy of any erosion and sediment control plan which could involve the utilization of ditches for the purpose of dewatering or lowering the water table is forwarded by this office to the Division of Water Quality (DWQ). It is suggested that you contact the Division of Water Quality at (910) 395-3900 if the ditches shown on your plan will lower the water table. We have performed a preliminary review of yoursubmitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can complete the review process. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions or need additional information, please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, &4�1� Kevin R. Rowland Environmental Technician KRR:jsc cc: Todd King; Cape Fear Engineering PROJECT NAME: Lanvale Farms PROJECT NO.: Br-04100 LOCATION: SR 1438 - Brunswick County RIVER BASIN: Cape Fear SUBMITTED BY: Cape Fear Engineering DATE RECEIVED BY L.Q.S.: October 9, 2003 127 North Cardinal Drive, Wilmington, N.C. 28405-3845 + Telephone 910-395-3900 .e Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer k. NORTH CAROLINA DEPARTMENT of ENVIRONMENT & NATURAL RESOURCES r� LAND QUALITY SECTION 1 WILMINGTON REGIONAL OFFICE PROJECT NAME: Lanvale Farms DATE: 1019/03 PROJECT NUMBER. Br-04100 COUNTY: Brunswick EROSION & SEDIMENT CONTROL PLAN'PRELIMINARY REVIEW CHECKLIST To expedite the approval process, a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below. To meet our review schedule, any additional information should be received by this Regional Office no later than . Failure to meet this schedule may result in disapproval of your plan. LOCATION OF PROJECT SITE DRAINAGE FEATURES & CALCULATIONS OF DESIGN -Project location - ---Existing & planned drainage patterns (including thru drainage) -� Roads, streets _ Size and location of culverts and sewers _ North arrow & scale - - — Soil information'. type, special characteristics _ Adjoining lakes, streams or water bodies _ Name and classification of receiving watercourse For Riparian Buffers, include Site located on USGS Preconstruction runoff calculations for each outlet from site topo and USDA Soil Survey Maps _ Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients of site) GENERAL SITE FEATURES (Plan Elements) Design calculations of culverts and storm sowers Design calculations of cross sections & method of Number of atonal copies of the plan needed stabilization of existing & planned channels (include North _ Legend; Norrth arrow, scale, etc. temporary linings) Property lines Design calculationsandconstruction detailsofenergy dissipators Existing and proposed contours (topographic lines) below culvert & storm seweroutlets (diameter& apron dimensions) ` Limits of disturbed area (amount of acreage; label limits) Design calculations and details tocontrol groundwater(seeps,etc.) Planned and existing buildings locations and elevations Planned and existing road locations and elevations FINANCIAL RESPONSIBILITYIOWNERSHIP (FRIG) FORM Lot and/or building numbers Land use of surrounding areas _ Completed, notarized FR/O Form Geologic features; rock outcrops, seeps, springs, — Accurate application fee ($50.00 per acre; no ceiling) wetlands, streams, lakes, dams, etc. — Certificate of assumed name, if the owner is a partnership Easements and drainagen+ays _ Name of Registered Agent (if applicable) Profiles of streets, utilities, lateral ditchlines, etc. x Other missing data:_Property Deed Stockpile topsoil and/or subsoil locations VEGETATIVE STABILIZATION if the same person conducts the land -disturbing activity and any related borrow or waste activity, the related borrow or waste activity shall — Area and acreage to be vegetatively stabilized constitute part of the land -disturbing activity, unless the borrow or waste Method of soil preparation activity is regulated under the Mining Act of 1971, or is a landtiil regulated Seed type and rates (both temporary and permanent) by the Division of Solid Waste Management. Ifthe land -disturbing activity — Fertilizer type and rates and the related borrow or waste activity are not conducted by the same — Mulch type and rates financially responsible party, they shall be considered separate land- — disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through Note: Plan should include provision for groundcover on exposed slopes the Mining Act. within 15 working days but not more than 30 calendar days, following completion of any phase of grading. Permanent ground - if the Plan proposes 150 feet or more stream disturbance401 cover for all disturbed areas within 15 workings days or no more Water Quaiity certification may be necessary. than 90 calendar days following completion of construction. EROSION CONTROL MEASURES Legend Location of temporary and permanent (t&p) measures Construction drawings & details for both t&p measures Maintenance requirements of measures Contact person responsible for maintenance Person responsible for overseeing permanent measures NARRATIVE AND CONSTRUCTION SEQUENCE 4 Narrative describing the construction sequence Narrative describing nature & purpose of the development Bid specification; only as it regards erosion control Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & the removal of measures after the areas they serve have been permanently stabilized) OTHER INFORMATION: Please provide a copy of the most current deed for this project. This is a necessary requirement because recent enforcement actions have been complicated by changes in LLC names and other actions that prevent this office from malting actuai.written contact with'the entity legally responsible for the land disturbing activity. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 e Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer