Loading...
HomeMy WebLinkAboutSW8030809_HISTORICAL FILE_20030912STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Entity Names hitp://www.secretary.state.nc. us/Corporations/soskb/Corp.asp'?53150 Elaine F. Marshall Secretary 64Corporations; Home !Important Notice - ,Corporate Forms ,Corporations; FAQ ,&,Tobacco Manufacturers ,Verify Certification !Online Annual"'Reports *,Secretary Of, State Home .business License' `,Register for E-Pro !Dept: of Revenue *1999 Senate:Bills _ 2001 BiII Surrimaries 'yr, _!Annual!Reports, 1997 . Z oCorporations' 1997 ' 00therLegislation ,!By Corporate Name For Neyir:Corporation�= North Carolina DEPARTMENT OF THE SECRETARY OF STATE PO Box 29622 Raleigh, NC 2762fi-t7622 {919j807-2000 Date: 911212003 Document Filings mTlPrint Entity Report Corporation Names I Name Name Type Devin Health Group LLC Legal Limited Liability Company Information-- i SOSI D: 0583745 Status: Current -Active Dale Formed: 3/9/2001 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Registered office Address: Registered Mailing Address: Principal Office Address: Principal Mailing Address: File Your Online Annual Report Butler, Owen Autry 603 Williwood Road Fayetteville NC 28311 603 Williwood Road Fayetteville NC 28311 603 Williwood Road Fayetteville NC 28311 No Address For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. For questions or comments concerning the Corporations Division, please send e-mail to Corporations Administrator Click here for help downloading forms. of 1 9/12/2003 9:15 AM t5 04M41'W3 8:43 AM LIMITED LIABILITY COMPANY (LLC) ANNUAL REPORT (42) NAME OF LIMITED LIABILITY COMPANY: DEVIN HEALTH GROUP LLC STATE OF FORMATION: NC SECRETARY OF STATE L.L.C. ID NUMBER: 0583745 FEDERAL EMPLOYER ID NUMBER: 03— 0 3 992 92 S OS i D: 0583745 Date Filed: 4/24/2003 11:44:00 AM Elaine F. Marshall North Carolina Secretary of State 231140314 23 114 0314 FISCAL YEAR ENDING: 12131/02 MONTH/DAY/YEAR IF THIS IS THE INITIAL ANNUAL REPORT FILING, YOU MUST COMPLETE THE ENTIRE FORM, IF YOUR LLC'S INFORMATION HAS NOT CHANGED SINCE THE PREVIOUS REPORT, PLEASE CHECK THE BOX AND COMPLETE LINE 8. 0 1. REGISTERED AGENT 8 REGISTERED OFFICE MAILING ADDRESS: 2. STREET ADDRESS AND COUNTY OF REGISTERED OFFICE: 3. IF THE REGISTERED AGENT CHANGED, SIGNATURE OF THE NEW AGENT: OWEN AUTRY BUTLER 603 WILLIWOOD ROAD FAYETTEVILLE NC 28311 603 WILLIWOOD ROAD FAYETTEVILLE NC 28311 CUMBERLAND SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. ENTER PRINCIPAL OFFICE ADDRESS HERE: ADDRESS- 603 WILLIWOOD ROAD CITY- FAYETTEVILLE ST- NC zip- 28311 5. ENTER PRINCIPAL OFFICE TELEPHONE NUMBER HERE: 910-488-0435 PLEASE INCLUDE AREA CODE 6. ENTER NAME, TITLE, AND BUSINESS ADDRESS OF MANAGER(S) OR IF THE LLC HAS NEVER HAD MEMBERS, ITS ORGANIZERS: NAME- OWEN AUTRY BUTLER TITLE- MANAGING PARTNER NAME- TITLE- NAME- TITLE- ADDRESS- 603 WILLIWOOD ROAD CITY- FAYETTEVILLE ADDRESS- CITY- ADDRESS- CITY- ST- NC ZIP- 27311 ST- ZIP- ST- ZIP- 7. BRIEFLY DESCRIBE THE NATURE OF BUSINESS: DEVELOPMENT & MANAGEMENT OF LT HEALTH FACILITY 8. CERTIFICATIO NUAL REPORT MUST BE COMPLETED BY ALL LIMITED LIABILITY COMPANIES. FO MUST BE SIGNED 8Y AGER OF THE L.L.C. - DATE . TYPE R PRINT NAME TYrE OR PRINT TITLE ANNUAL REPORT FEE: $200.00 MAIL TO: Secretary of State 0 Corporations Division 0 Post Office Box 29525 0 Raleigh, NC 27628-0525 q• State Stormwater Management Systems _ Permit No. SW8 030809 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION 1S HEREBY GRANTED TO Devin Health Group, LLC Nursing Facility for Devin Flealth Group New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 12, 2013, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This pennit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stonnwater runoff as described on page 3 of this pennit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 161,170 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 48,635 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded casements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 030809 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: Drainage Area, acres: Onsite, sq. ft.: Offsite, sq. ft.: Total Impervious Surfaces, sq. ft.: Buildings, sq. ft: Streets and Parking, sq. ft: Sidewalks, sq. ft: Future, sq. ft: Pond Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMSL: Permitted Surface Area, sq. ft.: Permitted Storage Volume, cubic ft.: Temporary Storage Elevation, FMSL: Controlling Orifice: Permitted Forebay Volume, cubic ft.: Nursing Facility for Devin Health Group SW8 030809 New Hanover County Mr. Owen Autry Butler Devin Health Group, LLC 603 Williwood Road Fayetteville, NC 28311 August 11, 2003 Greenfield Lake / Cape Fear CPF17 18-76-1 "C Sw" 4.7 161,172 43,560 161,170 60,860 47,700 3,975 48,635 7.5 90% (no filter is required) 14.0 11,000@Permanent Pool 14,350 15.0 1.5" � (drawdown in 2-5 days) 6,000 3 State Stormwater Management Systems Permit No. SW8 030809 11. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. £ Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittec shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the pennittee, for which Sedimentation and Erosion Control Plan approval or a LAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. El State Stormwater Management Systems Permit No. SW8 030809 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. if the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee slialI submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of owership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as maybe appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Penmittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Pennittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittce grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. State Stormwater Management Systems Permit No. SW8 030809 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the I2th day of September, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 1,4 -4 'P 13" Alan W. Klimek, P.E., Director 4-e) Division of Water Quality By Authority of the Environmental Management Commission 6 State Stormwater Management Systems Permit No. SW8 030809 Nursing Facility for Devin Health Group Stormwater Permit No. SW8 030809 New Hanover County Designer's Certification 1, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 7 State Stormwater Management Systems Permit No. SW8 030809 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. it. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections STATE OF NORTH CAROLINA, Department of Environmental Quality, 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (9110) 796-72I5 FILE ACCESS RECORD DEQ SECTION: PIEMLR REVIEW TIME / DATE: 4 06i/10/20ZD NAME: Robert 13,Amvld EMAIL: _ _ rballavld �poraimo�tvtte-evlc�colm REPRESENTING: 'Paravnornw-te 1 waiweeriwa PHONE: Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the _files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3: .�<H..CAMA'Ma�Eermits ffie.issi:e� aut afthe:Nl,Cit�Dis�riix df�ice �'f7ec EOMPi.;E'1'E-lfilelis in thc{ Dff ce and"�`: cii�[ain� ,mfort�ixt or•��mmenfs .uthtci► m : �i;lze ttt tb�>�1ViR©i�e� 4. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is $.05 cents. Payment may be made by check, money order,, or cash at the reception desk. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases, large totes, etc. are permitted in the file review area. ecessary large plan copies can be scheduled with Cameron.Weaver r?ncdenr.,,ov 919-796-7265 for a later date/time at our expense. Large plan copies needed should an offsite location at e y p g p attached ontopof the file. Allways Graphics �1' can be contacted to set up payment options. iei tea;u>ds1'�ay;Eie - ctetai tprai;:aa�,.a`sta� 7. In accordance with General Statue 25-3-512, a $25,00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY AvI �•�� ►=4113041111 Signature and Name of Firm/Business Date MM/DD/YY COPIES MADE '!� � PAID GJADM/Shared/File Review Access Form rev 2018 2-pm Time In INVOICE 1 ime Uut i Hanover Design Services, P.A. Land Surveyors, Engineers, Land Planners August 6, 2003 Ms. Linda Lewis, Environmental Engineer Department of Environment and Natural ResourcesQ Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 R E C IVf Re: Devin Nursing Facility, new submittal AUG 1 l iuu3 Dear Linda: BY:-D� �y v L—J Enclosed please find 3 copies of the Plans for the construction of the above project. Also please find: ❑ A check for $420.00 ❑ A signed Application and "Wet Detention Basin Supplement" and one copy. ❑ 3 copies of the SW Calculations, including your sealed summary sheet ❑ 1 copy of the ESC narrative (FYI) As always, if you have any questions or comments, please feel free to call me. Thanks for your consideration in this matter. Sincerely, David S. Hollis, PE, PLS attachments xc: Mr. Autry Butler, Devin Health Group 2660-7-LL 7 .doc L. tKcta. er Mv-. -5u-4 (ev-S 319 Walnut Street Wilmington, NC 28401 (910) 343-8002 STORMWATER and DRAINAGE CALCULATIONS for Devin Nursing Facility PREPARED FOR Devin Health Group 603 Williwood Road Fayetteville, NC 28311 910-488-0435 N CRROt; r�'rCC1n:.�'9 St AL 2000T ilNE 40 "'..= David S. Hollis, PE, PLS Hanover Design Services, PA 319 Walnut Street Wilmington, NC 28401 v 0, DEVIN HEALTH GROUP - Wet detention / retention pond Calculation Summary for NCDENR / DWQ WATER QUALITY CONSIDERATIONS - Impervious area calculations: See Project Data Sheet TOTAL IMPERVIOUS = 3.7 acres TOTAL AREA DRAINING TO POND = 4.7 acres 4.7 acres total - 3.7 acres impervious = 1.0 acre green area SA REQUIRED: 3.7 X 0.95 + 1.0 x 0.20 / 4.7 = 0.79, or 80% At 7.5' depth, 90% TSS removal, from chart - SA/DA factor = 2.8 4.7 x 0.01 x 2.8 - 5,735 sf SA REQUIRED At Elev. = 14.0 = 11,000 sf SA PROVIDED VOLUME REQUIRED: R= [ (P) (Pj) (Rv) /12] (A) SEE PAGES A.1 and A.2, "Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs" (P) = 1" (Pj) = 0.9 (Rv)= 0.05 + 0.9(3.7/4.7) = 0.759 (A) = 4.7 R= [(1)(0.759)/12](4.7) = 0.297 acre-feet = 12,950 cf REQUIRED STORAGE At Elev. = 15.0 = 14,350 cf PROVIDED STORAGE DRAWDOWN: Average head from storage elevation to orifice - 15.0 - 14.0 / 2 = 0.5' 1-1/2" PVC drain to draw -down pond: Orifice equation: Q = CA(2gh)"1/2 Q = 0.6(.0123)(64.4 X 0.5)"1/2 = 0.0419 cfs T = 342,660 sec. = 4 days OKAY FOREBAY REQUIREMENTS - Approximate capacity = 11000 X 0.4 X 7 = 30,000 cf X 20t = 6,000 cf Provided capacity = 6,000 cf 'o'stI II111,E e.•'''�1� CARp�'#" 2660-7WQ.txt r` 0N99 10 _ $ SEAL r 20007 • �+ w ONOVER DEMON SERVICES, PA $19 WALNUT STREET WILNIMTON NO 28401 / 1 alth Group Be DFtpINpGE AREA MAP pL6: 1 "60, $.0 I S: l � • I �� 2 . _ (\ c' � � I DfiAINpG� ARFAof Vrlifmin9tonl h4tGd�O POND 1 4 ; r J I g/�'� _) vn JS d a ►x d �w i w ! I i [ GRAiP�15 0.8 ,;, � •I � ;� I l J p � � c.a . � �� - tici „,<, 7 � � 1 ; � ¢.1 acre 1 p,l acre >7/ I • ! ' > ", f a 2 acre / / a I • t - I 1 v �C4 a Q.i acre acre • � bbb 8' 44 i3j 7 p,5 acre acre 1 • I as wno e ears 10 0.$ acre 1 ' / _ram • f I wR09s »••_Fk ` tolfsite drains to 0.2 acre 43 acre$ 91 In I n• F � �__—r- th-l1 I ' a, `�' � • 1} o• j • ,! 8i�}YVAt.f1t}Y S{�628d0i .. �j' • if _ _. - •r 'lA fil 19 - � : � � � r ' S1+`i. '�, "R r� • .• fit €L O `- \ �. ��... � • I \y, � o, { � � � :R � � 'ait:`i � '-,,� \ yam. � '�.� o r a s i �, r ,.�] i' `•.. ...„�. .. qw all , 10 mil' i+' • w�-" ��.oe :1 . g� ,D �..... ��,,,`• �,�� CIO ,.� \V • � � � �,� , ,•� �� yam; , �� � N � 1 Reservoir Report Reservoir No. 1 - Devin Pond Pond Data Pond storage is based on known contour areas Stage 1 Storage Table Stage Elevation ft ft 0.00 1.00 2.00 3.00 4.00 5.00 5.50 14.00 15.00 16.00 17.00 18.00 19.00 19.50 Contour area Incr. Storage Total storage sqft cult cuft 11,000 0 0 17,700 14,350 14,350 19,750 18,725 33,075 21,750 20,750 53,825 28,500 25,125 78,950 32,800 30,650 109,600 50,000 20,700 130,300 Culvert 1 Orifice Structures [A] Rise in = 18.0 Span in t = 18.0 No. Barrels = 1 Invert El. ft = 13.50 Length ft = 75.0 Slope % = 0.50 N-Value = .013 Orif. Coeff. = 0.60 Multi -Stage = ----- [B] [C] [D] 1.5 12.0 0.0 1.5 12.0 0.0 1 1 0 14.00 15.00 0.00 10.0 1.0 0.0 0.01 0.01 0.00 .013 .013 .000 0.60 0.60 0.00 Yes Yes No Stage 1 Storage 1 Discharge Table Weir Structures [A] Crest Len ft = 0.0 Crest El. ft = 0.00 Weir Coeff. = 3.00 Eqn. Exp. = 1.50 Multi -Stage = No Page 1 English IB] [C] [D] 4.0 40.0 0.0 17.00 18.00 0.00 3.00 3.00 3.00 1.50 1.50 1.50 Yes Yes No Tailwater Elevation = 10.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 ' 14.00 1.30 0.00 0.00 --- --- 0.00 0.00 --- 0.00 1.00 14,350 15.00 5.14 0.04 0.00 --- --- 0.00 0.00 --- 0.04 2.00 33,075 16.00 9.84 0.05 0.05 --- --- 0.00 0.00 --- 0.10 3.00 53,825 17.00 12.93 0.06 4.63 --- --- 0.00 0.00 --- 4.69 4.00 78,950 18.00 15.42 0.03 2.96 --- --- 12.00 0,00 --- 14.99 5.00 109,600 19.00 17.56 0.00 0.00 --- --- 33.94 120.00 --- 17.56 5.50 130,300 19.50 18.53 0.00 0.00 --- --- 47.43 220.45 --- 18.53 IRANOVEl4 DESIGN SERVICES, PA 319 WALNUT STREET WILMINGTON NG 28401 a T � r Hydrograph Summary Report Page i Hyd. No. Hydrograph type (origin) Peak now (cfs) Time interval (min) Time to peak (min) Volume (tuft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 4.93 6 738 43,726 10 -- ----- --- - Davin 10-pre 2 SCS Runoff 8.14 6 738 68,870 50 --- — - - Davin 50-pre 3 SCS Runoff 9.85 6 738 82,268 100 --- — - -- Davin 100-pre 4 SCS Runoff 18.19 6 726 92,415 10 ---- - — — Davin 10-post 5 SCS Runoff 24.60 6 726 126,352 50 — — - Davin 50-post 6 SCS Runoff 27.79 6 726 143,485 100 ---- -- --- Davin 100-post 7 Reservoir 4.47 6 774 82.572 10 4 16.86 50,988 Routed 10-year 8 Reservoir 9.10 6 762 116,499 50 5 17.47 65,533 Routed 50-year 9 Reservoir 11.61 6 762 133,628 100 6 17.69 71.213 Routed 100-year �—Proj. file: 2660-7.GPW IDF file: wilmington.IDF Run date: 07-28-2003 HANOVER DESIGN SERVICES, PA Sig WALNUT STREET wit U11drW)N Alf: 2Rd01i _�J r Hydrograph Plot Hyd. No. 1 Devin 10-pre Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 4.70 ac = 0.5 % = USER = 7.00 in = 24 h rs English Peak discharge = 4.93 cfs Time interval = 6 min Curve number = 60 Hydraulic length = 750 ft Time of conc. (TO = 30 min Distribution = Type II Shape factor = 242 Total Volume = 43,726 cull 1-SCSRunoff -10Yr-Qp4.93ds 5 N t� a 0 5 10 15 20 25 30 Time (hrs) + Hyd. 1 4 3 [i1WOVER DESIGN SERVICES, PA 319 WALNUT STREET woo AMrir;Tr-)N Alf: 9A4131 . -a r , Hydrograph Plot Hyd. No. 2 Devin 50-pre Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 50 yrs = 4.70 ac = 0. 5 % = USER = 9.00 in = 24 h rs English Peak discharge = 8.14 cfs Time interval = 6 min Curve number = 60 Hydraulic length = 750 ft Time of conc. (Tc) = 30 min Distribution = Type II Shape factor = 242 Total Volume = 68,870 cuft 2-SCS Runoff -50Yr-Qp=8.14ds 10 u 0 5 20 25 30 Time (hrs) + Hyd. 2 8 - 6 -- 4 2 0 , u.uw,w„, xxx,x w,'w.,,,x, �n u i uttxlnx,ntlnttu.xix uIII � 0 5 10 1 M OVER DESIGN SERVICES, PA Sag WALNUT STREET WIiMllNGTON NC 28401 � OVER DESIGN SERVICES, PA Sag WALNUT STREET WIiMllNGTON NC 28401 � Hydrograph Plot Hyd. No. 3 Devin 100-pre Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 4.70 ac = 0.5% = USER = 10.00 in = 24 hrs English Peak discharge = 9.85 cfs Time interval = 6 min Curve number = 60 Hydraulic length = 750 ft Time of conc. (Tc) = 30 min Distribution = Type 11 Shape factor = 242 Total Volume = 82,268 cult 3 SCS Runoff - 100 Yr - Qp = 9.85 ds 10- 6- CY 4- 2- 0 0 5 10 15 20 25 30 Time (hrs) + Hyd. 3 MOVER DESIGN SEMcEs. PA 319 WALNUT STREET WLMiNGTON NC 29401 flydrograph Plot Hyd. No. 4 Devin 10-post Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs 4.70 ac = 0.5 % = USER = 7.00 in = 24 hrs English Peak discharge = 18.19 cfs Time interval = 6 min Curve number = 85 Hydraulic length = 750 ft Time of cone. (Tc) = 15 min Distribution = Type II Shape factor = 242 Total Volume = 92,415 tuft 4-SCSRunoff -10Yr-Qp=18.19cfs 20 1 5 w. 0 1 0 CY 5 0 0 5 10 15 20 25 Time (hrs) + Hyd. 4 HANOVEA DESIGN SERVICES, PA 319 WALNUT STREET WIININGTON NC 28401 HANOVEA DESIGN SERVICES, PA 319 WALNUT STREET WIININGTON NC 28401 Hydrograph Plot Hyd. No. 5 Devin 50-post Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 50 yrs = 4.70 ac = 0.5 % = USER = 9.00 in = 24 hrs English Peak discharge = 24.60 cfs Time interval = 6 min Curve number = 85 Hydraulic length = 750 ft Time of cons. (Tc) = 15 min Distribution = Type 11 Shape factor = 242 Total Volume = 126,352 cult 5 - SCS Runoff - 50 Yr - Qp = 24.60 cfs 25 2 0 DESIGN SERVICESr pA. 319 WALNUT STREET WIi.MENGTQN NC 28401 Hydrograph Plot Hyd. No. 6 DeVin 100-post Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 4.70 ac Basin Slope = 0.5 % Tc method = USER Total precip. = 10.00 in Storm duration = 24 hrs English Peak discharge = 27.79 cfs Time interval = 6 min Curve number = 85 Hydraulic length = 750 ft Time of conc. (Tc) = 15 min Distribution = Type II Shape factor = 242 Total Volume = 143,485 cult 6 - SCS Runoff -100 Yr - Qp = 27.79 cfs 30 25 20 v 15 C'1 10 5 0 5 10 15 20 25 Time (hrs) + Hyd. 6 HANOVER DESIGN SERVICES. PA 319 WALNUT STREET WILMINGTON NC 25401 _�.� Hydrograph Plot Hyd. No. 7 Routed 10-year Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 4 Max. Elevation = 16.86 ft Storage tndication method used. Peak discharge Time interval Reservoir name Max. Storage English = 4.47 cfs = 6 min = Devin Pond = 50,988 cult Total Volume = 82,572 tuft 7 - Reservoir -10 Yr - Qp = 4.47 cis 20 15 w � 10 a 5 0 0 50 100 150 Time (hrs) + Hyd. 4 + Hyd. 7 MOVER DESIGN SERVICES, PA 319 WALNUT STREET WiWHNGTON NC 28401 Hydrograph Plot Hyd. No. 8 Routed 50-year Hydrograph type = Reservoir Storm frequency = 50 yrs Inflow hyd. No. = 5 Max. Elevation = 17.47 ft Slorage Indication method used. aY Peak discharge Time interval Reservoir name Max. Storage 8 - Reservoir - 50 Yr - Qp = 9.10 cfs 25 2a 15 10 5- 0- English = 9.10 cfs = 6 min = Devin Pond = 65,533 cuft I ot81 vaurne = 116,4'dy CUtt 0 20 40 60 80 100 Time (hrs) + Hyd. 5 + Hyd. 8 HWVER DESIGN SERVICES. PA 319 WALNUT STREET WI MINGTON NC 2ml , 1i 1 1 Hydrograph Plot English Hyd. No. 9 Routed 100-year Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 6 Max. Elevation = 17.69 ft Storage Indication method used. Peak discharge Time interval Reservoir name Max. Storage = 11.61 cfs = 6 min = Devin Pond = 71,213 cuft Total Volume = 133,628 cult 9 - Reservoir -100 Yr - Qp =11.61 ds 30 25 20 N w 15 CY 10 5 0 0 20 40 60 80 Time (hrs) + Hyd. 6 + Hyd. 9 HANOVER DESIGN SERVICES. PA 319 WALNUT STREET WILMINGTON NC 2WI Hydraflow Plan View Project file: 2660-7A.stm J OF file: WILMlNGTONADF I No. Lines: 11 1 07-28-2003 Hydraflow Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (H) M) (ft) (ft) (ft) No. 1 1 TO 2 19.44 36 c 30.0 14.00 14.20 0.667 16.90 16.91 0.01 End 2 2 TO 3 19.13 36 c 79.0 14.20 14.40 0.253 16.92 16.96 0.01 1 3 3 TO 4 18.68 30 c 29.0 14.40 14.50 0.345 16.97 17.00 0.02 2 4 4 TO 5 10.36 24 c 147.0 14.50 14.70 0.136 17.02* 17.29* 0.02 3 5 5 TO 6 9.43 24 c 113.0 14.70 14.90 0.177 17.30* 17.47* 0.01 4 6 6 TO 7 7.32 18 c 97.0 14.90 15.00 0.103 17.48* 17.88* 0.03 5 7 7 TO 8 4.57 18 c 91.0 15.00 15.20 0.220 17.91 * 18.03* 0.01 6 8 8 TO 9 1.73 18 c 84.0 15.70 15.90 0.238 18.05* 18.06* 0.00 7 9 4TO10 8.28 24 c 91.0 14.50 14.70 0.220 17.02* 17.13* 0.01 3 10 10-11 4.63 18 C 194.0 14.70 14.90 0.103 17.14* 17.46* 0.01 9 11 10-12 0.43 12 c 45.0 14.80 15.00 0.444 17.14* 17.14* 0.00 9 Project File: 2660-7A.stm I-D-F File: WILMiINGTON.ID Total No. Lines: 11 Run Date: 07-30-2003 NOTES: c = circular; e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. RANOVER DESIGN SERVICES, P,A. AtA IAl A I ill !T OTnCCT Hydraflow Storm Sewer Tabulation Page- 1 Z nm 0 0 �x m Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd 1 Rim Elev Line ID coeff (1) flow full Line To Incr Total lncr Tota! Inlet Syst Size Slope Up Dn Up Dn Up Dn Line (ft) (ac) [ac) (C) (min) (min) (inlhr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 30.0 0.10 3.90 0.80 0.08 2.96 5.0 8.6 6.6 19.44 58.99 2.84 36 0.67 14.20 14.00 16.91 16,90 19.20 17.00 1 TO 2 2 1 79.0 0.10 3.80 0.80 0.08 2.88 5.0 8.1 6.6 19.13 36.35 2.91 36 0.25 14.40 14.20 16.96 16.92 19.50 19.20 2 TO 3 3 2 29.0 0.20 3.70 0.50 0.10 2.80 5.0 8.0 6.7 18.68 26.09 3.80 30 0.34 14.50 14.40 17.00 16.97 17.70 19.50 3 TO 4 4 3 147.0 0.20 1.90 0.80 0.16 1.52 5.0 7.1 6,8 10.36 9.04 3.30 24 0.14 14.70 14,50 17.29 17.02 18.50 17.70 4 TO 5 5 4 113.0 0.40 1.70 0.80 0.32 1.36 5.0 6.5 6.9 9.43 10.31 3.00 24 0.18 14.90 14.70 17.47 17.30 18.50 18.50 5 TO 6 6 5 97.0 0.50 1.30 0.80 0.40 1.04 5.0 6.0 7.0 7.32 3.65 4.14 18 0.10 15.00 14.90 11.88 17.48 18.50 18.50 6 TO 7 7 6 91.0 0.50 0.80 0.80 0.40 0.64 5.0 5.5 7.1 4.57 5.82 2.58 18 0.22 15.20 15.00 18.03 17.91 18,50 18.50 7 TO 8 8 7 84.0 0.30 0.30 0.80 0.24 0.24 5.0 5.0 7.2 1.73 5.55 0.98 18 0.24 15.90 15.70 18.06 18.05 18.50 18.50 8 TO 9 9 3 91.0 0.60 1.60 0.80 0.48 1.18 5.0 6.1 7.0 8.2B 11.49 2.63 24 0.22 14.70 14.50 17.13 17.02 17.70 17.70 4TO10 10 9 194.0 0.80 0,80 0.80 0.64 0.64 5.0 5.0 7.2 4.63 3.65 2.62 18 0.10 14.90 14.70 17.46 17.14 17.70 17.70 10-11 11 9 45.0 0.20 0.20 0.30 0.06 0.06 5.0 5.0 7.2 0.43 2.57 0.55 12 0.44 15.00 14.80 17.14 17.14 17.50 17.70 10-12 Project File: 2660-7A.stm I-D-F File: WILMINGTON.IDF Total number of lines: 11 Run Date: 07-30-2003 NOTES: Intensity =161.201(Tc + 26.60) " 0.90; Return period = 10 Yrs. ; Initial tailwater elevation = 16.90 (ft) Hydraflow Inlet Report Page 1 - Line No Line ID A Inlet time I C Q CIA Q carry Q capt Q byp Junc type Curb Inlet Grate Inlet Gutter Flow Byp =_ line Ht L area I. W So W Sw Sx depth spread _ No (ac) (min) (inthr) (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (Rift) (ft) (tuft) I Mitt) (ft) (ft) 1 1 TO 2 0.10 5.0 7.23 0.80 0.58 0.00 0.58 0.00 Comb 0.0 2.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.11 22.00 Offsite 2 2 TO 3 0.10 5.0 7.23 0.80 0.58 0.00 0.58 0.00 Comb 6.0 2.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 4.09 18.00 1 3 3 TO 4 0.20 5.0 7.23 0.50 0.72 0.00 0.72 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.12 38.05 Offsite 4 4 TO 5 0.20 5.0 7.23 0.80 1.16 0.00 1.16 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.16 52.42 3 5 5 TO 6 0.40 5.0 7.23 0.80 2.31 0.00 2.31 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.25 83.82 4 6 6 TO 7 0.50 5.0 7.23 0.80 2.89 0.00 2.89 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.30 97.44 5 7 7 TO 8 0.50 5.0 7.23 0.80 2.89 0.00 2.89 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.30 97.44 6 8 8 TO 9 0.30 5.0 7.23 0.80 1.73 0.00 1.73 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.21 69.01 7 9 4TO10 0.60 5.0 7.23 0.80 3.47 0.00 3.47 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.33 110.17 3 10 10-11 0.80 5.0 7.23 0.80 4.63 0.00 4.63 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag 1.50 0.005 0.003 0.40 133.68 9 11 10-12 0.20 5.0 7.23 0.30 0.43 0.00 0.43 0.00 Grate 0.0 0.00 2.00 2.00 2.00 Sag i.50 0.005 0.003 0.08 26.77 9 Project File: 2660-7A.stm I-D-F File: WILMINGTON.IDF Total number of lines: 11 Run Date: 47-30-2003 NOTES: Inlet N-Values = 0.016 ; Design depth for grate(s) = 0.3 (ft); Intensity = 161.201 (Inlet time + 26.60) ^ 0.90; Return period = 10 Yrs. ; ' Indicates Known Q added Hydraflow Hydraulic Grade Line Computations Page 1 ESIZ cn =�0 7rm z'IM z� -i A Z co Line Size Q Downstream Len Upstream Check JL Min6t coeff loss Invert elev HGL elev Depth Area Vel Vel head I EGL elev Sf Invert HGL Depth Area Vel Vel EGL Sf elev elev head elev Ave Enrgy Sf loss (in) (cfs) (ft) (ft) (ft) (soft) (fvs) (ft) (ft) M (ft) (ft) (ft) (ft) (syft) (ftls) (ft) (ft) M M (ft) (K) (ft) 1 36 19.44 14.00 16.90 2.90 7.00 2.78 0.12 17.02 0.063 30.0 14.20 16.91 2.71 6.72 2.89 0.13 17.04 0.064 0.064 0.019 0.10 0.01 2 36 19.13 14.20 16.92 2.72 6.74 2.84 0.13 17.05 0.061 79.0 14.40 16.96 2.56 6.42 2.98 0.14 17.10 0.066 0,063 0.050 0A0 0.01 3 30 18.68 14.40 16.97 2.50 4.91 3.81 0.23 17.20 0.177 29.0 14.50 17.00 2.50 4.91 3.80 0.23 17.22 0.176 0.176 0.051 0A0 0.02 4 24 10.36 14.50 17.02 2.00 3A4 3.30 0.17 17.19 0.179 147 14.70 17.29 2.00 3.14 3.30 0.17 17.45 0.179 0.179 0.263 0.10 0.02 5 24 9.43 14.70 17.30 2.00 3.14 3.00 0.14 17.44 0.148 113 14.90 17.47 2.00 3.14 3.00 0.14 17.61 0.148 0.148 0.167 0A0 0.01 6 18 7.32 14.90 17.48 1.50 1.77 4.14 0.27 17.75 0.414 97.0 15.00 17.88 1.50 1.77 4.14 0.27 18.15 0.414 0.414 0.401 0.10 0.03 7 18 4.57 15.00 17.91 1.50 1.77 2,58 0.10 16.02 0.135 91.0 15.20 18.03 1.50 1.77 2.58 0.10 18.14 0.135 0.135 0.123 0.10 0.01 8 18 1.73 15.70 18.05 1.50 1.77 0,98 0.01 18.06 0.023 84.0 15.90 18.06 1,50 1.77 0.98 0.01 18.08 0.023 0.023 0.020 0.10 0.00 9 24 8.28 14.50 17.02 2.00 3.14 2.63 0.11 17.13 0.114 91.0 14.70 17.13 2,00 3.14 2.63 0.11 17.23 0.114 0.114 0.104 0.10 0.01 10 18 4.63 14.70 17.14 1.50 1.77 2.62 0.11 17.24 0.165 194 14.90 17.46 1.50 1.77 2.62 0.11 17.56 0.165 0.165 0.321 0.10 0.01 11 12 0.43 14.80 17.14 1.00 0.79 0.55 0,00 17.14 0.013 45.0 15.00 17.14 1.00 0.79 0,55 0.00 17.15 0.013 0.013 0.006 0.10 0.00 Project File: 2660-7A.stm I-D-F File: WILMINGTON.IDF Total number of lines: 11 Run bate: 07-30-2003 NOTES: Initial tailwater elevation = 16.9 (ft) , " Normal depth assumed., '" Critical depth assumed. Storm Sewer Profile Proj. file: 2660-7A.stm - Elev. (ft) 31.0 27.0 23.0 19.0 15.0 11.0 0 Line:1 Line: Size: 36 (in Sim 36 (in) Line:3 Size: 30 (in) Line:4 Size: 24 (in) Line:5 Size: 24 (in) Line: Size: 6 18 (in) Line: Size: 7 18 (in) Line: Size: 8 18 (in) 50 100 150 200 250 300 350 400 450 500 550 600 650 700 Reach (ft) Storm Sewer Profile Proj. file: 2660-7A.stm Elev. (ft) 27.0 24.0 21.0 18.0 15.0 120 Line: 9 Size: 24 (in) Line: 10 Size: 18 (in) 0 25 50 75 100 125 150 175 200 Reach (ft) 225 250 275 300 Storm Sewer Profile Proj. file: 2660-7A.stm' Elev. (ft) 28.0 25.0 22.0 Line: 11 19.0 Size: 12 (in) 16.0 13.0 0 10 20 30 40 50 60 70 80 90 100 Reach (ft) EROSION and SEDIMENT CONTROL NARRATIVE for DEVIN NURSING FACILITY prepared for DEVIN HEALTH GROUP LLC %L t•`�(zi.•D'E5SI ae SEAL i 2000T �y °05 Hanover Design Services, PA 319 Walnut Street Wilmington, NC 28401 EROSION AND SEDIMENT CONTROL PLAN DEVIN NURSING FACILITY for DEVIN HEALTH GROUP LLC August, 2003 NARRATIVE NOTE: To be reviewed in conjunction with "Erosion and Sediment Control Plan for Nursing Facility for Devin Health Group", Hanover Design Services, P.C., Drawings No. 2660-7, Sheets 3 and 4 of 5. PROJECT DESCRIPTION - The purpose of this project is to construct a commercial retirement residence at the terminus of Silver Stream Lane off Medical Center Drive. The. Erosion and Sediment Control Plan is to identify measures to be implemented to control erosion during construction of the parking, utilities, and land grading associated with this development. The site is located south of Lake Shore Drive off Silver Stream Lane. The project is 1 1.9 acres in size, 5.5 of which are proposed to be disturbed, with 4.7 acres draining to the proposed water quality detention 1 retention pond. The developable site is gently rolling and wooded. It is bordered on the West by Lake Shore Drive, the South by office development and on all other sides by regulated wetlands. SOILS - The soils in the project area are primarily Kenansville complexes; well drained, moderately permeable soils, with an erosion "K" factor of .10 and a hydrologic classification of "A". The primary means of stormwater transport in all areas around the site, all proposed site improvements, and impervious areas will be a storm sewer system directed to the proposed pond/ basin. (Soils Map attached) RMOVEA DESIGN SERVICES, PA 319 WALNUT STREET WILMINGTON NC 28401 J PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - 1 . TEMPORARY GRAVEL CONSTRUCTION ENTRANCE Practice 6.06 Shall be installed at the entrance to the proposed parking area from Silver Stream Lane. Drainage is away from the road and sedimentation will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at this location. 2. LAND GRADING Practice 6.02 Grading should be limited to areas as shown on the plans. Cut and fill slopes shall be 3:1 or flatter except where specifically indicated. 3. SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Plan, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent areas. 4. OUTLET STABILIZATION Practice 6.41 Rip -rap aprons will be located at the downstream end of all discharge pipes to prevent scour. 5. CONSTRUCTION ROAD STABILIZATION Practice 6.80 Upon reaching final grade and after utilities have been installed, parking areas are to be stabilized by placing sub -base course of approved stone, to reduce erosion and dust during the remainder of building construction. 6. INLET PROTECTION Practice 6.52 Storm sewer inlet barriers of block and gravel or filter fabric inlet protection are to be constructed to help prevent sediment from entering the storm sewer system. After permanent stabilization of the entire contributing watershed area, the storm sewer system is to be flushed to remove accumulated sediment and ensure design flows. H11AlOVE'R DESIGN SERVICES, PA, 319 WALNUT STREET WILMINGTON NC 28401 , 7. SEDIMENT BASIN Practice 6.61 The Sediment Basin is to be constructed first (see Construction Schedule) and is the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the CALCULATIONS section following. CONSTRUCTION SCHEDULE - Indicated on Plan 1. Obtain approval of Plan and any necessary permits, and hold a pre -construction conference prior to commencing any work. 2. Flag work limits and stake -out measures and Sediment Basin for preliminary grading. 3. Install Gravel Construction Entrances. 4. Install Sediment Basin and silt fencing around all wetlands perimeters as shown on Plan prior to clearing and grubbing site. 5. Construct any sediment control Practices shown, prior to rough grading site, stockpiling topsoil as necessary. Construct utilities. 6. Establish final grades and stabilize parking areas with stone base course. 7. Final grade building site, install non -municipal utilities as needed, and vegetatively stabilize areas where building construction is not imminent. 8. All erosion and sediment control Practices are to be inspected weekly and after any rainfall, and repaired as necessary. 9. Upon completion of building construction, the roadway and parking areas are to be paved and all areas permanently vegetatively stabilized. After site stabilization, temporary measures are to be removed and the Sediment Basin cleaned to its original design contours, if necessary, and riser structures orifices opened, so as to function as a stormwater management 1 water quality retention pond. RMVER DESIGN! SET ICES, PA 319 WALNUT STREET WILMINGTON NC 2M01 MAINTENANCE PLAN - Indicated on Plan 1. All measures to be inspected weekly and after any rainfall event and needed repairs made immediately. 2. Sediment Basin to be cleaned out when the level of sediment reaches 5.6' below water surface level. Riser structure to be cleaned if excess water above design surface no longer drains properly. 3. Sediment to be removed from behind the Silt Fence when it becomes 0.5' deep. Fencing to be repaired as needed to maintain a barrier. 4. All seeded areas shall be fertilized, mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. VEGETATIVE PLAN - 1 . Permanent vegetation to be established in accordance with "North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.1 1, latest version. See Plan for specifications. RANOVER DESIGN SERMES, PA 919 WALNUT STREET WILIAINGTON NC >?M I k 4,� rv� ­4 V-lA 1A ,11, - t.,U'Pit W"r sF� 'INA t MM4. 717 ms al, st w" VT-441 �71130v. ;h �'4:r IV, Ry r ,,Cr ;? .� �wx ;t�, --'• r s. 5'y'` r:•em�.�r ":ELF' a M>{. d" ,K •;,�.. .,.. ,j\\. _� �i .�k. �%"' �'I t, 1-ti-I �WV go kn 4 14 "IV rR 'I'V 1. uv� -W i I... 011kk ON AIIV�.., e7 Fri I G; ClT;¢• � H� `Y rr • ` r . ,'r.b.;r T 1 3,1111, Ly Fit m, kV 13( w. Temporary Gravel Construction EntrancelExit Specification # 6 46 Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4 Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad m a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed,. or tracked onto public roadways. : ' - 3ER 11DE8'GN SEWCM PA '. "" R STREEr rb.. r.... �.. �-'.J.kc -280 Fabric Drop Inlet Protection (Temporary) Specification # 6.51 Construction Specifications 1. As synthetic fabric, use a pervious sheet of nylon, polyester, or ethylene yarn --extra strength (50 lb/1 inch minimum) that contains ultraviolet ray inhibitors and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pool. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For stakes, use 2 x 4 inch wood (preferred) or equivalent metal with a minimum length of 3ft. 4. Space stakes evenly around the perimeter of the islet a maximum of 3ft. apart, and securely drive them into the ground, approximately 13 inches deep. 5. To provide needed stability to the installation, frame with 2 x 4-inch wood strips around the crest of the overflow area at a maximum of 1.5 ft above the drop inlet crest. 6. Place the bottom 12 inches of the fabric in a trench and bacldill the trench with at least 4 inches of crushed stone or 12 inches of compacted soil. 7. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stake. S. The top of the frame and fabric must be well below the ground elevation downslope from the ..� drop inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary dike on the down slope side of the structure to prevent bypass flow. Material from within the sediment pool may be used for diking,. Maintenance Inspect the fabric barrier after each rain and make repairs at needed Remove sediment from the pool area as necessary to provide adequate storage volume for the next rain. Take care not to damage or undercut the fabric during sediment removal. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable sediment and dispose of them properly. Being the disturbed area to the grade of the drop inlet and smooth and compact it. Appropriately stabilize all bare areas around the inlet. WNOVER DESIGN SERVICES, pA 319 WALNUT STREET WIiMINGTON NG 2sM _ Construction Road Stabilization Specification # 6.80 Construction Specifications 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material 2. Ensure that road construction follows the natural contours of the terrain if it is possible. 3. Locate parking areas on naturally flat areas if they are available. Keep grades sufficient for drainage but generally not more than 2 to 3%. 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References: Rwwff Control Measures). S. Keep cuts and fills at 2:1 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-inch course of "ABC" crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain). 8. Vegetate all roadside ditches, cuts, Ols and other disturbed areas or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Topdress with new gravel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff -producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment - producing areas should be treated immediately. HANOVER DESIGN SERVICES, PA. 319 WALNUT STREET WILMWGTON NC 2 M1 U Outlet Stabilization Structure Specifrcaffon # 6 41 Construction Specifications i Ensure that the subgrade for the filter and riprap follows the required lines and grades shown in the plan. Compact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the nprap thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the nprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap a minimum of L ft. Ifthe damage is extensive, replace the entire filter cloth. 4. Rpprap may be placed by equipment, but take can to avoid damaging the filter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather - resistant and well graded. 7. Construct the apron on zero grade with no overfall at the end Make the top of the riprap at —� the downstream end level with the receiving are or slightly below it. 8. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. If a curve is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation (Practice 6.10, Temporary Seeding, and 6.11, Permanent Seeding). Maintenance Inspect riprap outlet structures after heavy rains to see if any erosion around or below the riprap has taken place or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. HARC R DESIGN SI:FNI= PA 319 WALNUT STREET WIIMINGTON Nc 2MI , Land Grading Specification # 6 02 Construction Specifications 1. Construct and maintain all erosion and sedimentation control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2. Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of all critical areas. 3. Scarify area to be topsoiled to a minimum depth of 2 inches before placing topsoil (Practice 6.04, Topsoiling). 4. Clear and grub areas to be filled to remove trees, vegetation, roots, or other objectionable material that would affect the planned stability of the fill. 5. Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, building debris, and other materials inappropriate for constructing stable fills. 6. Place all fill in layers not to exceed 9 inches in thickness, and compact the layers as required to reduce erosion, slippage, settlement, or other related problems. 7. Do not incorporate frozen material or soft, mucky, or highly compressible materials into fill U slopes. 8. Do not place fill on a frozen foundation. due to possible subsidence and slippage. 9. Keep diversions and other water conveyance measures free of sediment during all phases of development. 10. Handle seeps or springs encountered during construction in accordance with approved methods (Practice 6.81, Subsurface Drain). 11. Permanently stabilize all graded areas immediately after final grading is completed on each area in the grading plan. Apply temporary stabilization measures on all graded area when work is to be interrupted or delayed for 30 working days or longer. 12. Show topsoil stockpiles, borrow areas, and spoil areas on the plans, and make sure they are adequately protected from erosion. Include final stabilization of these areas in the plan. Maintenance Periodically check all graded areas and the supporting erosion and sedimentation control practices, especially after heavy rainfalls. Promptly remove all sediment from diversions and other water4sposal practices. If washouts or breaks occur, repair them immediately. Prompt maintenance of small eroded area before they become significant gullies is an essential part of an effective erosion and sedimentation control plan. RANOVER DESIGN SERVICES, PA 319 WALNUT STREET WILMINGTON NC 20401 Sediment Fence (Silt Fence) Specification 6.62 Construction Specifications MATERIALS 1. Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, which is certified by the manufichurer or supplier as conforming to the requirements shown in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide minimum of 6 months of expected usable construction life at a temperature range of 0 to 120°F. 2. Ensure that posts for sediment fences are either 4-inch diameter pine, 2-inch diameter oak, or 1.33lb/linear ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening the fabric. 3. For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62b Specifications For Sediment Fence Fabric Physical Property Filtering Efficiency Tensile Strength at 20% (max.) Elongation Slurry Flow Rate CONSTRUCTION Requirements 85% (mm) Standard Strength- 30 lb/lin in (mim) Extra Strength- 50 lb/lin in (min) 0.3 pYsq ft/min (min) 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 18 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the fitter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post. ROOM DESIGN SERMES, pA. 819 WALNUT STREET KLMINGTQN file 2MI 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts using heavy duty wire staples at least 1 inch long, or tie wires. Extend the wire mesh support to the bottom of the trench. 5. When a wire mesh support fence is used, space posts a maximum of 8 $ apart. Support posts should be driven securely into the ground to a minimum of 18 inches. 6. Extra strength filter fabric with 6S post spacing does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (figure 6.62a). 8. Backfill the trench with compacted soil or gravel placed over the filter fabric. 9. Do not attach filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Replace burlap every 60 days. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. R WOVER DESIGN SERVtCM PA 3191r1ALNUT STREET W-,.,„iGTON NC 28401 Temporary Seeding Spectjication # 6.10 Specifications Complete grading before preparing seedbeds and install all necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose and uniform. Where hydroseeding methods are used, the surface may be lift with a more irregular surface of large clods and stones. Liming - Apply lime according to soil test recommendations. If the pH(acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1 to 1 'h tons/acre on coarse -textured soils and 2-3 tons/acres on fine -textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer- Base application rates on soil tests. When these are not possible, apply a 10- 10-10 grade fertilizer at 700-1,000 lb./acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations have resulted in a loose surface, additional roughening may not be required except to break up large clods. If rainfall cuses the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods, Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection Select an appropriate species or species mixture from Table 6.10a, for seeding in late winter and early spring, Table 6.10b for summer, and Table 6.1Oc for fall.. HANOVER DESIGN SEWCE% PA. 319 WALNUT STREET WILM NGTON NC 28441 Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hdroseeder. Use seeding rates given in Table 6.10a-6.10c. Broadcast seeding and hyroseeding are appropriate for steep slopes wher equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than'h inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. Mulching The use of an appropriate mulch will help ensure establishment under normal conditions and is essential to seeding success under harsh site condition (Practice 6.14, Mulching). Harsh site conditions include: -seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 3:1, -excessively hot or dry weather, -adverse soils(shallow, rocky, or high in clay or sans!), and .� -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). Table 6. 1Oc Temporary Seeding Recommendation for Fall Seeding mixture Species-Rye(grain) Rate(lb/acre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Soil amendments - Follow soil tests or apply 2,000 lb./acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch- Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance- Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March, if it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) RkWVER DEMON SEFMCES, PA 319 WALNUT STREET WILMiNGTQN NC 2WJ Table 6. 10a Temporary Seeding Recommendation for Late Winter and Early Spring Seeding mixture Species- Rye(grain), Annual lespedeza (Kobe in Piedmont and Coastal Plain Rate (ib/acre)-120 Omit annual lespedeza when duration of temporary cover is not to extend beyond June Seeding dates -Coastal Plain — Dec. 1 — Apr. 15. Soil amendments- Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000lb/acre straw. Anchor straw by tacldng with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Rfferttilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.1Ob Temporary Seeding Recommendations for Summer Seeding mixture Species -German millet Rate(lb/acre)- 40 .� Seeding dates -Coastal Plain- Apr. 15-Aug. 15 Soil amendments -Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch —Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a much anchoring tool. Maintenance-Refertilize if growth is not fully adequate. Reseed, refertilize and much immediately following erosion or other damage. HANOVER DESIGN SERVICES, PA 319 WALNUT STREET t M iGT ]0N ,WC . 2W Permanent Seeding Specifications # d 11 Specifications Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to inappropriate soil texture (Table 6.11a), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have time criteria: - Enough fine-grained (silt and clay) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 inches water to 1 inch of soil). - Sufficient pore space to permit root penetration. - Sufficient depth of soil to provide an adequate root zone. The depth to rock or impermeable layers such as hardpans should be 12 inches or more, except on slopes steeper than 2:1 where the addition of soil is not feasible. - A favorable pH range for plant growth, usually 6.0-6.5. - Freedom from large roots, branches, stones, large clods of earth, or trash of any land. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydroseeded. If any of the above criteria are not met-i.e., if the existing soil is too coarse, dense, shallow or acidic to foster vegetation —special amendments are required. The soil conditioners described below may be beneficial or, preferably, topsoil nay be applied in accordance with Practice 6.04, �--i Topsoiling. Soil Conditioners In order to improve the structure or drainage characteristics of a soil, the following material may be added. These amendments should only be necessary where soils have limitations that snake them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat -Appropriate types are sphagnum moss peat, hypnum moss peat, reedsedge peat, or peat humus, all from fresh -water sources. Peat should be shredded and conditioned in storage piles for at least 6 months after excavation. Sand -clean and free of toxic materials Vermiculite -horticultural grade and free of toxic substances. Ratted manure -stable or cattle manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust- free of stones and debris. Add 6 lb. Of nitrogen to each cubic yard. Sludge -Treated sewage and industrial sludges are available in various forms: these should be used only in accordance with local, State and Federal regulations. RMIOVER DESIGN $EAMES, PA. 319 WALNUT STREET WI MiNGTON NC 28mai Species Selection Use the key to Permanent Seeding Mixtures (Table 6.1 lb) to select the most appropriate seeding mixture based on the general site and maintenance factors. A listing of species, including scientific names and characteristics, is given in Appendix 8.02. Seedbed Preparation Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing is performed free of charge by the North Carolina Department of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are available through county. Agricultural extension offices or from NCDA . Because the NCDA soil testing lab requires 1-6 weeks for sample turn- around, sampling must be planned well in advance of final grading. Testing is also done by commercial laboratories. When soil test are not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.1 is through 6.1 Iv). Applications rates usually fall into the following ranges: - Ground agricultural limestone LighmexfturA sandy soils; 1-1 % tons/acre Heavy textured, clayey soils 2-3 tons/acre Fertilizer: Grasses 800-1200 lb/acre of 10-10-10 (or the equivalent) Grass -legume mixtures: 800-12001b/acre of 5-10-10 (or the equivalent) Apple lime and fertilizer evenly and incorporate into the top 4-6 inches of soil by dislang or other suitable means. Operate machinery on the contour. When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking into a smooth, uniform surface (slope less than 3:1) Fill in or level depressions than can collect water. Broadcast seed into a freshly loosened seedbed that has not been sealed by rainfall. K MOVE» DESIGN SERVICES, PA 319 WALNUT WILLMtNGTOIr NG Eby M Table 6.11s Seeding No. 4CP for: Well -Drained Sandy loams to Dry Sands, Coastal Plain and Eastern Edge of Piedmont; Low to Medium -Care Lawns Seeding mixture Species - Centipedegrass Rate - 10-20 lb/acre (seed) or 33 bu/acre (sprigs) Seeding dates - Mar. - June (Sprigging can be done through July where water is available for irrigation.) Soil amendments - Apply lime and fertilizer according to soil test, or apply 300 lb/acre 10-10-10. Sprigging - Plant sprigs in furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 inches deep and 2ft apart. Place sprigs about 2 & apart in the row with one end at or above ground level (Figure 6.1 ld). Broadcast at rates shown above, and press sprigs into the top 1 Y: inches of soil with a disk set straight so that sprigs are not brought back toward the surface. Mulch - Do not mulch Maintenance - Fertilize very sparingly-20 lb/acre nitrogen in spring with no phosphorus. Centipedegrass cannot tolerate high pH or excess fertilizer. `Refer to Appendix 8.02 for botanical names HWVER DESIGN SE"CiM pp $19 WALNUT STREET XLMiNGTQjd, NC 2MI Table 6.1 It .� Seeding No. 5CP for: Well -Drained Sandy Loam to Dry Sands;Low Maintenance Seeding midure Species Pensacola Bahiagrass Sericea lespedeza Common Bermudagrass German millet Rate (lb/acre) 50 30 10 10 Seeding notes 1. Where a neat appearance is desire, omit sericea 2. Use common Bermudagrass only on isolated sites where it cannot become a pest. Bermudagrass may be replaced with 5 lb/acre centipedgrass. Seeding dates - Apr. 1- July IS Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch Apply 4,0001b/acre grain straw or equivalent cover of another suitable mulch. Anchor by tacking with asphalt, roving and netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertilize the following Apr. with 50 lb/acre nitrogen. Repeat as growth requires. May be moved only once a year. Where a neat appearance is desired, omit sericea and now as often as needed. MOVER DESIGN SERVICES, PA 319 WALNUT STREET 4VI MINGTON Nc 2MI Table 6.1ly Seeding No. 7CP for: Grass -lined Channels; Coastal Plain, Lower Piedmont and Dry Soils in the Central Piedmont Seeding Mixture Species - Common Bermudagrass Rate - 40-80 (1/2 lb11,000 ft ) Seeding dates - Coastal Plain; Apr - July Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch - Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they can clog drainage devices. Maintenance -A minimum of 3 weeks is required for establishment. Inspect and repair mulch frequently. Refertilize the following Apr. with 50 lb/acre nitrogen. HANOVER DESIGN SERVECEB, PA 319 WALNUT STREET WILMiNGTON NC 2&4ot Sediment Basin Specifications # 6 61 Construction Specifications Site preparations --Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees and other objectionable materials to facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2. Cut-off trench --Excavate a cut-off trench along the centerline of the earth fill embaniQnent. Cut the trench to stable soil material, but in no case make it less than 2 S. deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 & Make side slopes of the trench no steeper than 1:1. Compaction requirements are the same as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3. Embankment —Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rucks and other objectionable material. Scarify areas on which fill is be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8-inch �-' continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. 4. Conduit spillways —Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as baclfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. Care Hurst be taken no to raise the pipe from firm coact with its foundation when compacting under the pipe haunches. Place a minimum depth of 28. of hamd-compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. S. Emergency spillway —Install the emergency spillway in undis#urbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of emergency spillway. HA OVE � STREET SIGN �' pA WILMINGTONt NC 2aAn1 L. 6. Inlets—Discbarge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7. Erosion control —Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stabilization). 8. Safeq —Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-halfthe design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. RAMMR DE81GN SEAVICfSy PA V9 WALNUT STREET , WILMINGTON NC 26401