Loading...
HomeMy WebLinkAboutSW8020532_CURRENT PERMIT_20031031STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE WYYMMDD OF 1 A 1 F� Michael F. Easley, Governor p North Carolina Department William G. Ross Jr. Secretary Environment and Natural iResources �O co j of Alan W. Klimek, P.E.,Director p t Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality October 31, 2003 Cdr. Ben D. Pina, Public Works Officer Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28542-0004 Subject: Permit No. SW8 020532 HQ Armory N62470-99-R-9158 High Density Stormwater Project Onslow County Dear Cdr. Pina: The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for HQ Armory on September 29, 2003. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 020532 dated October 31, 2003, for the construction of HQ Armory. This permit shall be effective from the date of issuance until October 31, 2013, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:IWQSISTORMWATIPERMIT1020532.00T CC.' Kevin Avolis, P.E. A.G. Sholar, Asst. PWO Division of Land Resources (Ref. ON02127) Linda Lewis Wilmington Regional Office Central Files N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28406 (910) 350-2004 Fax 1 800 623-7748 A*A NCDENR State Stormwater Management Systems Permit No. SW8 020532 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Marine Corps Base HQ Armory (N62470-99-R-9958) Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 31, 2013, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 29,506 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4_ All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The project may be constructed without the permitted pond as long as the disturbed area remains less than 1 acre. If at any time the disturbance for this project exceeds 1 acre, as determined by the Division of Land Resources, the pond must be constructed as approved. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 020532 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: HO Armory (N62470-99-R-9158) Permit Number: SW8 020532 Location: Onslow County Applicant: Cdr. Ben D. Pina, Pubiic Works Officer Mailing Address: Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28542-0004 Application Date: August 21, 2002 Modified September 29, 2003 Receiving Stream/River Basin/Index #: White Oak 1 New River 1 19-(15.5) Classification of Water Body: "SC NSW" Pond Depth, feet: Permanent Pool Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ft2: Offsite Area entering Pond ft2: Provided Surface Area, ft2: Provided Storage Volume ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: 4 6.56 (2.0 M) 0.87 29,506 5,328 2,799 2,672 7.26 (2.21 M) 1" � pipe Page 3 of 8 State Stormwater Management Systems Permit No, SW8 020532 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept '-and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was'used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 10.1 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 020532 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name Change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. The permittee must maintain compliance with the proposed built -upon area and ensure that the -runoff from all the built -upon is directed into the permitted system. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum_ requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to anyone except after notice to and approval by the Director. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit transfer request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Responsibility for compliance with all permit conditions remains with the Permittee until such time as the Division approves the formal permit request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 020532 # 6. The permit may be modified, revoked and reissued or terminated for cause. The I ding of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and ' Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit modified and reissued this the 31 st day of October, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director 4� Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 020532 HQ Armory Stormwater Permit No. SW8 020532 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Certification Requirements: Page 7 of 8 State Stormwater Management Systems Permit No. SW8 020532 1. The drainage area to the system contains approximately the permitted acreage. .2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided,. such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8of8 �FFIGEAUSE gONLY " s Date Received Fee Paid Permit Number .S� `�Za `= 00i 0Sr 3 1 State of North Carolina Department of Environment and Natural Resources Division- of. Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): U.S. Marine Corps 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): CDR S.R. Scanlan, Public Works Officer 3. Mailing Address for person listed in item 2 above: 1005 Michael Road City: Camp Lejeune State: NC Zip: 28542-0004 Telephone Number: ( 910 } 4 51 - 2 5 81 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): HQ Marine Armory 5. Location of Project (street address): "H" Street City: Camp Lejeune County: Onslow 6. Directions to project (from nearest major intersection): 0.05 miles southeast of the intersection of Holcomb Blvd. and River Road and make a left on "H" Street. 7. Latitude: N 3 4° - 3 9. 6 3 2' Longitude: W 7 7° - 21 . 1 1 1' of project 8. Contact person who can answer questions about the project: Name: Kevin Avo l i s , P.E. Telephone Number: (__2 5 2 II. PERMIT INFORMATION: 1. Specify whether project is (check one): x New Renewal 633-0068 Modification Form S%U-101 Version 3.99 Page I of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number N / A and its issue date (if known) 3. Specify the type of project (check one): Low Density x High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major x Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Runoff from new pavement, gravel areas and the building will be collected by curb inlets and will be routed to the wet detention basin. See attachment No.1 for additional information. 2. Stormwater runoff from this. project drains to the New River basin, 3. Total Project Area: 0.75 acres 4. Project Built Upon Area: 77.6 % 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. �D '"Basin Information '� i.- �= rama eArea 1�� g e,....:��E � F s%S _ a �¢,.. _sf-'°-^K_ . _�d�.- z � ramage:AzeaY� Receiving Stream Name UT to New River Receiving Stream Class l"� Qs Drainage Area 38,018 SF Existing Impervious* Area 5,328 SF Proposed Impervious*Area 241178 SF % Impervious* Area (total) 7 7. 6 % Impervious°..'Surface Area €d� -- t Drainage Area 1 n 5� -. .vl.r.-6.. : � ... i-� -� _r t Drainae Area.2 •Prt � On -site Buildings 7,352 SF On -site Streets 0 SF On -site Parking 972 SF On -site Sidewalks 1 000 SF Other on -site 14,854 SF (gravel) Off -site 5,328 SF Total: 29, 506 SF Total: " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas. etc. Form SVrU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? Site Investigation IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than 2 9 , 5 0 6 square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-I07 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. ' SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of Stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and Stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Mailing Address: P.O. Box 15564 City: New Bern Phone: ( 252 ) 633-0068 VIII_ APPLICANT'S CERTIFICATION Avolis Engineering, PA State: NC Zip: 28561 Fax: ( 252 1 633-6507 I, (print or type name ofperson listed in General Information, item 2) CDR S.R. Scanlan certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. , f Signature: Date: 2")� .1qA x' CZ Form SWU-101 Version 3.99 Page 4 of 4 Permit No. 5WY O ZO 53Z (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: HQ Marine Armory Contact Person: Kevin Avo 1 i s , P.E. Phone Number: (2 5 2 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 2.59 ft. Permanent Pool Elevation 6.56 ft Temporary Pool Elevation 7.26 ft. areas Permanent Pool Surface Area 2, 799 sq. ft. Drainage Area 0.873 ac. Impervious Area 0.677 ac. volumes 4,049 Permanent Pool Volume cu. ft. Temporary Pool Volume 2,672 cu. ft. Forebay Volume 953 cu. ft. Other parameters SA/DAI 6.78% Diameter of Orifice 1 in. Design Rainfall 1 in. Design TSS Removal 2 90 % 633-0068 (floor of the basin) ( 0.79m ) (elevation of the orifice) (2. Om) (elevation of the discharge structure overflow) (2.214m) (water surface area at the orifice elevation) (2 6 0m2) . (on -site and off -site drainage to the basin) (38,018 SF) (on -site and off -site drainage to the basin) (29,506 SF) (combined volume of main basin and forebay) I 1 14. 6 6m3 } (volume detained above the permanent pool) (75.7m3 } (approximately 20% of total volume) ( 27. Ord ) (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary pool draw -down required) (minimum 85% required) Form 5WU-102 Rev 3.99 Page 1 of 4 Footnotes: 1 When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Is a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:I or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. in. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does redoes not incorporate a vegetated filter at the outlet. This system (check one) 0 does Acdoes not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 r Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth {see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3 feet in the forebay, the sediment shall be renio-ved. BASIN DIAGRAM (fill in the blank) Permanent Pool Elevation 6. 5 6 y r— Sediment Re oval EL 3 . 5 9 ' 175 o t -------------- • - Sediment Removal Elevation 3 ' S 9 7557, Bottom Eie ation 2 . 5 9 ' %--------------------------------�----- ------f_25% ------ Bottom Elevation 2 . 59 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Printname: S.R. Scanlan Title: Commander / CEC / USN; Public Worker Officer Address: _ 1005 Michael Road, Camp r.P3Pnna, NC Phone: (91 0) 4 51— Signature: Date: 2 Y 1`44Y 02 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 1E,Eu -1 �y NDy a Notary Public for the State of i eA 2c�L, yU County of _ ONSLo� , do hereby certify that er personally appeared before me this o2 day of r-t , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires �`, Form SWU-102 Rev 3.99 Page 4 of 4 Attachment Ng...I Stormwater Management Permit Application HQ Marine Armory Stormwater Management Narrative All of the 0.75 acre HQ Marine Armory site impervious area runoff will be captured by this project and will be routed to the front of a single wet detention basin. 0.124 acres of off -site impervious area runoff will be captured and treated by this project. The basin incorporates a forebay and perimeter shelf. The basin has a permanent pool depth of four feet and is designed for 90% TSS removal. The 1-inch orifice results in a 1-inch storm draw down period of 60 hours (2.5 days). The pond length to width ratio is greater than three. A permanent pool depth is specified in the application where sediment removal would be required. Permit No. ,SW 8 UZ 6S? L ' R 1 Date: 0 ZY 00 L- 4ti_ Z044 Engineer Certification I'U 4d hokeAW, as a duly registered Professional Engineer in the State of North Carolina, I)aving been authorized to observe periodically the construction of the Project H Q /9, Camp Lejeune, North Carolina for the Permittee hereby state that to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations form approved plans and specifications: ..uOOO.._ Signature: Registration No. Date: �3 s