Loading...
HomeMy WebLinkAboutSW8010628_COMPLIANCE_20011102I STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW _ _10L-- _ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M D D DETENTION POND ANALYSIS FILE NAME: S:\WQS\POND1010628.WK1 PROJECT#: SW8 010628 PROJECT NAME: Heatherton Park REVIEWER: L.Lewis DATE: 02-Nov-2001 Receiving Stream: Sandy Run Branch Class: SC NSW Drainage Basin: White Oak Index No. '119-10-1 Site Area - 4,.05 acres :Drainage Area PFM76-50Wl square feet Area in Acre 3.16 IMPERVIOUS AREAS Rational C Buildings 28055.00 square feet 1.00 Parking 38637.00 square feet 1.00 SW square feet 1.00 square feet square feet square feet TOTAL square feet Rational Cc= 0.59 SURFACE AREA CALCULATION % IMPERVIOUS 48.45% Des. Depth 3.5 TSS: 90 SA/DA Ratio 4.85% Req. SA 6669 sf .::....7.4 :�301 sf Prov. SA . VOLUME CALCULATION * place a "'I " in the box if Rational is used i Rational ?* Des. Storm X..: ....... ..... .. VIOG. inches Rv= 0.49 Bottom 38.25 msl Perm. Pool E 41;-,'.76-.jmsI Design Pool 42.5 rnsl Design SA 8300 sf Req. Volume575 cf Prov. Volume 5899<1cf ORIFICE CALCULATION Avg. Head = Flow Q2, efs. Flow 05, cfs No. of Orifices Diameter, inches Drawdown = 0.35 ft 0.032 cfs 0.013 cfs or weir H x W days YOUTWEVA Perm. Pool Volume= 17308 Req, Forebay Volume= 3461.6 Provided Volume= 3682.00 Percent= 2 3% Q2 Area = 1.64 in' Q5 Area = 0.66 in 2 Orifice Area 1.48 in' Q= 0.029 cfs Lin x .... .. .. .. .. .. .. COMMENTS Surface Area , Volume and Orifice are not within Design Guideli r, DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1010628.WK1 PROJECT #: SW8 010628 PROJECT NAME: Heatherton Park REVIEWER: L.Lewis DATE: 12-Sep-2001 Receiving Stream: Sandy Run Branch Class: SC NSW Drainage Basin: White Oak Index No. _ _ 19-10-1 Site Area 4.05 acres Drainage Area [ f176418 OO square feet Area in Acre 4.05 IMPERVIOUS AREAS Rational C Buildings 27081.00 square feet 1.00 Parking 30600.00 square feet 1.00 SW 5919.00 square feet 1.00 square feet square feet square feet TOTAL 6.360000 square feet Rational Cc= 0.49 SURFACE AREA CALCULATION % IMPERVIOUS 36.05% Des. Depth 3 TSS: 85 SAIDA Ratio 3.04% Req. SA 5371 sf Prov. SA 3362' sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm .i00' inches Rv= 0.37 Bottom 38 msl Perm. Pool 41 17> msl Design Pool 42.5 msl Design SA 4558 sf Req. Volume 5505 cf Prov. Volume ='S26T>cf ORIFICE CALCULATION FOREBAY . Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= N Avg. Head = 0.58 ft Q2 Area = 1.25 in2 Flow Q2, cfs 0.032 cfs Q5 Area = 0.50 in Flow Q5, cfs 0.013 cfs Orifice Area 12.57 in No. of Orifices Q= 0.320 cfs Diameter, inches :; 4 00 or weir H x W in x in Drawdown = 0 2 —_ days -- COMMENTS Surface Area , Volume and Orifice are not within Design Guideli