Loading...
HomeMy WebLinkAboutNCG210433_Inspection Report_20210329ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Woodgrain Millworks Inc Attention: Johnny Sanders 820 Complex Street SW Lenoir, North Carolina 28645 NORTH CAROLINA Environmental Quality March 29, 2021 Subject: Compliance Evaluation Inspection Woodgrain Millworks, Inc. Permit:NCG210000 Certificate of Coverage: NCG210433 Caldwell County, North Carolina Dear Mr. Sanders: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 23, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincefely,� Isaiah Reed, El, CPSWQ, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ,/ Asheville Regional Office 12090 U.S. Hlghway 70 I Swannanoa, North Carolina 28778 9EMP ��` / 828.296.4500 Compliance Inspection Report Permit: NCG210433 Effective: 08/01/18 Expiration: 07/31/23 Owner : Woodgrain Millworks Inc SOC: Effective: Expiration: Facility: Woodgrain Millworks, Inc. - Lenoir County: Caldwell 820 Complex St Nw Region: Asheville Lenoir NC 28645 Contact Person: Johnny Sanders Title: Phone:828-754-2089 Directions to Facility: Take US Hwy 18 south from Hwy 321 intersection in Lenoir. Travel approximately 2 miles to Complex Street on the left. System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/23/2021 Entry Time 02:30PM Exit Time: 03:OOPM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge CDC Facility Status: ❑ Compliant 0 Not Compliant - Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210433 Owner - Facility: Woodgrain Millworks Inc Inspection Date: 03/23/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary On March 23, 2021 this facility was visited for a compliance inspection. Staff at the facility were not made available at the time of the inspection. Be advised that the training requirements of the permit should include enough staff at the facility so that availability is not an issue. This facility will be re -inspected on or after April 14, 2021. If staff are unable to provide documentation necessary to determine compliance with the permit, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210433 Owner- Facility: Woodgrain Millworks Inc Inspection Date: 03/23/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ N ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: No Stormwater Pollution Prevention Plan was made available at the time of the inspection. f Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Documentation of Qualitative monitoring was made available at the time of the inspection, Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: No documentation of Analytical monitoring was made available at the time of the inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ 0 ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 1-11:10 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3