HomeMy WebLinkAboutNCC211366_ESC Approval Submitted_20210329ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
February 23, 2021
LETTER OF APPROVAL. WITH MODIFICATIONS
DR Horton, Inc.
A`ITN: Jessica Meyer, NPDES Technical Compliance Administrator
2000 Aerial Center Pkwy, Suite 110A
Morrisville, NC 27560
RE: Project Name: Cambridge Park Ph2A Lot Erosion Control Plans
Acres Approved: 4.6
Project ID: ALAMA-2021-040
County: Alamance
City: Melville
Address: Jones Dr.
River Basin: Cape Fear
Stream Classification: WS-V ; NSW - Jordan Lake Watershed
Submitted By: Evans Engineering, Inc.
Date Received by LQS: February 16, 2021
Plan Type: New -Express
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 1 SA NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please
direct questions about the eN01 form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul
Clark at Pau l.clarkCa)ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
/J�_� y� Firth Cafdn,.0etnvtvrm nl Envkaratendl Quaky Dcvwon of Energy.. ha.wal aim l+nd Reu�urcev
V — — E Q�/ W-1— Sakm Reg o 1 Of1we ' 4W Hanel )All Road. SUMe )00 I Mmtor.S -m Nw1M Car(ft. 2TK))
1167169800
Letter of Approval with Modifications
DR Horton, Inc.
February 23, 2021
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
achy yy Lentz, El
Assistant Regional Engineer -
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
cc: Dave Southard of Evans Engineering, Inc. (via e-mail)
WSRO file
Letter of Approval with Modifications
DR Morton, Inc.
February 23, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Cambridge Park Ph2A Lot Erosion Control Plans
Project ID: ALAMA-2021-040
County: Alamance
Modifications pursuant to applicable North Carolina General Statutes and f or Regulations:
1. Land -disturbing activity beyond that which is needed to install erosion control measures
may not commence on any lot prior to installation of all measures shown for that lot
[G.S. 113A-57(3)]
2. Silt fence must be maintained in accordance with Section 6.62 of the North Carolina
Erosion and Sediment Control Planning and Design Manual. At a minimum:
a. Inspect sediment fences at least once a week and after each rainfall. Make any
required repairs immediately.
b. Should the fabric of a sediment fence collapse, tear, decompose or become
ineffective, replace it promptly.
c. Remove sediment deposits as necessary to provide adequate storage volume for
the next rain and to reduce pressure on the fence. Take care to avoid undermining
the fence during cleanout.
[G.S. 113A-57(3)]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment
from leaving this site. 115A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S.113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities