Loading...
HomeMy WebLinkAboutNCG140031_DMR_Wastewater_20200720PROCESS WASTEWATER — Semi -Annual Discharge Monitoring Report GENERAL PERMIT NO. NCGI40000 CERTIFICATE OF COVERAGE NO. NCG14 D Q L L FACILITY NAME: )WA[00tb X ea4 a 7F0,7 Inc SAMPLE COLLECTOR: ' CERTIFIED LABORATORY: Lab # Lab # LIMIT VIOLATIONS? YES ❑ NO M 11 Part A: Wastewater Monitorina Requirements SAMPLE. COLLECTION YEAR: 'ai0 SAMPLE PERIOD: OJuly-December []January -June^- COUNTY: 94f1d0 PHONE NO.: (331i -QW1 ADD TO USTSERVE? E]YES []NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA Trout []Other OPTIONAL INFO: " AJSC#"j5 1 If wastewater systems have riot discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. s if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a' case -by -case basis. MAIL ORIGINAL AND ONE COPY OF TJIIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW) TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN 7HIS CERTIFICATION FOR ANY INFORMA77ON REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to fissure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering thiNnformation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifi ut pe nalt ies for m g faise i rmation, including the possibility of fines and imprisonment for knowing violations." ---�' — ---- _7 ) 7 (Signature Permtteee) (Date Permit Date:8/1/2017-06/30/2022 Last Revised 07/27/17 Page 2of2