Loading...
HomeMy WebLinkAboutSW6210205_1644-Stormwater Narrative_20210310Spring Lake Ray Road Dollar General Storm Water (Narrative The site is currently wooded. The site is being developed as a new Dollar General store. The site drains from the north to the south. The proposed development includes a 9,100 sf store with the associated parking. Storm water will be collected in a drop inlet within the parking lot and through a roof drainage system. Storm water will then be conveyed through an underground drainage system into a new on -site wet pond located at the southern end of the site. The wet pond is designed to mitigate the peak runoff for the 1 yr and 10 yr storm events. This basin has been designed in accordance with the latest NCDEQ Stormwater Design Manual. 409 Chicago Drive, Suite 112, rayettevi I le. NC 28306 office 1 910-426-6777 fax 1 910-426-5777 On time, every time. I www.4Dsitesolut!ons.com