Loading...
HomeMy WebLinkAboutSW8991241_COMPLIANCE_20000203STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT. NO. SW9wLv_/ DOC TYPE I ❑ CURRENT PERMIT ❑ T APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 1l28100 CDC ::> IV Y "I t t ,cam r t LINCOLN INDUSTRIAL Stormwater Calculations 99140 Total D►aina a Area sq. ft. - acres 83 200 1.91 Impervious Area Land Use s ,ft. acres buildings 10,842 0,25 arkin las haft 14.845 0.34 Future/Offsite 2,146 0.05 Total 27,833 0.64 a]vormwater Calculations: Time of Concentration: Hydraulic Length (L) = 750 ft. change in Height (H) = 2 ft. Tc = (L3 M)"B* 1 128 12.52 min. Flow for 10 year, 6 hour Storm (Qrs): QPRE _ (CPRE) x (I10) x (Area) 3.01 cfs QPOST = (CPosT) x (Ila) x (Area) 5.90 cfs oou ozora a -apacrEy ror iu year ororm: CN = (98)(% imp.) + (60)(1-% imp.) = 73 P = 4.82 in. for 1Cyr, 6 hr storm So 10001CN - 10 = 3.70 Depth (D)= [P-(0.2)(S)]21 [P+(0.8)(S)j = 2.14 in. Time to Peak Flow: TP = [(43.5)(0)(Area)] I 02.PosT 30.16 min. Detention Pond Design: .. -Pond Size: Elevation ft. Surface Area (sq. ft. Normal Pool 22.00 4,879 Flood Pool 23.00 5,853 Top of Bank 24.00 6,884 Bottom of Pool 16.00 437 Provided Storage Volume: Vol. _ [(Normal pool SA + Flood Pool SA) 121 x (F.P. alev. - N.P. elev.) 5,366 cu.ft. % impervious = 0,335 = 33.5% say 34.0% CARE = 0.25 CPosT = (% imp.)(.95)+(1-°% imp-)(.25) 0.49 Ila = 6.30 in/hr 125 = 7,13 in/hr Flow for 25 year, 6 hour Storm (025): OPRE _ (CPRE) x (125) x (Area) 3.40 cfs QPosT = (CaosT) x (125) x (Area) 6.67 cfs oou oiora a kapauay ror co yew omrm, CN = (98)(°% imp.) + (60)(1-°% imp_) = 73 P = 5.71 in. for 25 yr, 6 hr storm S = 1000ICN - 10 3.70 Depth (D)= [P-(0.2)(S)]2I 1P+(0.8)(S)1 = 2.85 in. Time to Peak Flow: TP = [(43.5)(D)(Area)) 1 01o.POST - 35.48 min. State Surface Area Requirement at normal poot: Pond side slopes = 3 :1 Depth below N.P. = 6 ft. SAMA = 0.0180 (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Required SA = (SAIDA) x (Total Drainage Area) 1,498 sq. ft. State Volume Required for Storage of first 1" of runoff: Vot. = 1(1/12) x (CA) x (°% imp.)] + [(1112) x (DA) x (1-0% imp.) x C] C = 0.2 3,242 eu.ft, owl l 111011/1", ,,•�� ,its CARO�%!- �QO ER r; T 0NVI i f 17374 r n ECE[VE F F B 0 3 2000 PROS 4' , -41 99140POND.xIs 1 of 2 1/28/00 LINCOLN INDUSTRIAL CDC Stormwater Calculations Pond Volume: Bottom SA = 437 sq. ft. Normal Pool SA = 4,879 sq, ft, Vol. = [(N.P. SA + Bottom SA) 1 2] x (N.P. el. - Bottom el.) 15,948 cu.ft. Forebay: Required Volume Vol. = 20% of storage volume 3,190 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for 1st 1" of stormwater, Q = Required Vol. 1172,800 sec. (2-days) 0.019 cfs Required Area of Pipe for 2-da drawdown: A= Q 1 [Cd x SQRT(2 x g x h)] Cd = 0.6 9 = 32.2 ft.Is2 h = (F.P. elev.- N.P. elev.) 12 0.5 ft. A = 0.0055 sq. ft. Diameter of Pi o for 2-day drawdown: DIA. = SQRT((A x 4)1 pi] = 0.0838 ft. = 1.01 in. 'Uso: 1.0 in diameter pipe Outlet Structure Check: Using a 3' x 3' Basin, Perimeter L) = 12 ft. Q = CIA C = (% imp.)(.95) + (1-% imp)(25) 0,49 1 = 7.13 in. for a 25 yr. Storm A = 1.91 Acres — 6.67 cfs Q= CwxLxH''S H = (Q 1 (Cw x L)]213 Cw = 3 — 0.33 ft. Peak elevation = flood pool elevation + H 23.33 ft. Provided Volume Bottom SA = 480 sq. ft. Normal Pool SA = 1,700 sq. ft. Vol. _ [(N.P. SA + Bottom SA) 12] x (N.P. el, - Bottom el.) = 3,270 cu.ft. depth = 3 ft. 7ro.008 drawdown: stormwater, uired Vol. 1432,000 sec. (5-days) cfs Required Area of Pie for 5-day drawdown: A= Q! [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 322 ft.ls2 h = (F.P. elev. - N.P. elov.)1 2 0.5 ft. A = 0.0022 sq. ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) 1 pi] = 0.0530 ft. 0•64 in. 99140 99140POND.xis 2 of 2 O1/21/00 TE 99140 Stormwater Narrative LINCOLN INDUSTRIAL PARK Brunswick County, NC The total drainage area of this project is 2.99 acres. A 10,842 sf building will be constructed with an asphalt access and parking area of 14,845 sf and 2,146 sf of concrete sidewalk. Total impervious area is 27,833 sf for a total built upon area of 21.4% impervious. Stormwater runoff will be handled by a wet detention pond designed to exceed the state's requirement of the first one inch of runoff. This pond will drain to Jackey's Creek with a classification of C-SW. A vegetated filter is not required due to the 90% TSS removal used in the wet detention design. �7; ^� Ff M r p p E C E I V E JA N 2 4 200 U 0 PR{-)j n�G,u tl Z4/ Compliance Inspection Report Permit: SW8991241 Effective: 02/22/00 Expiration: 02/22/10 Owner: G William Dobo Project: Lincoln Industrial Park County: Brunswick Ploof Rd Region: Wilmington Contact Person: G William Dobo Title: Owner Directions to Project: Approx. 750' south from intersection of SR 1566 and SR 1524 Type of Project: State Stormwater - HD - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 1213012010 Entry Time: 10:05 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E State Stormwater (See attachment summary) Leland NC 28451 Phone: 910-262-6669 Exit Time: 10:10 AM Phone: 910-796-7215 Inspection Type: Transfer Renewal Page: 1 Permit: SW8991241 Inspection Date: 12/30/2010 Owner - Project: G William Dobo Inspection Type: Transfer Renewal Inspection Summary: Site is considered compliant received P.E. on 12/28/2010. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Reason for Visit: Follow-up Yes No NA NE D❑❑❑ Q ❑ Q ❑ ❑ ❑ D ❑ ❑ ❑ ❑ ❑ Page: 2 YF NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary December 2, 2010 Mr. G. William Dobo, Owner P.O. Box 424 Wrightsville Beach, NC 28480 Subject: NOTICE OF VIOLATION, NOV-2010-PC-1188 Lincoln Industrial Park Stormwater Permit No. SW8 991241 New Hanover County Dear Mr. Dobo: On November 29, 2010, Wilmington Regional Office personnel performed a Compliance Inspection and file review of the subject project, located at Ploof Road in Belville, Brunswick County; North Carolina. The inspection was performed to determine the status of compliance with Stormwater Permit Number SW8 991241, issued to you on February 22, 2000. The project has been found in violation of Stormwater Permit Number SW8 991241 , issued pursuant to the requirements of 15A NCAC 21-1.1000. The violations found are: 1. Failure to certify the stormwater system. A file review revealed that this office has not received a Designers Certificate. Permit condition states that upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. To correct these violations you must: Provide a written "Plan of Action" which outlines the actions you will take to correct the violation(s) and a time frame for completion of those actions, on or before January 8, 2011. 2. Submit the required Designers Certificate. Remove the cattails from the storage basin. Failure to provide the 'Plan of Action" by January 8, 2011, or to correct the violations by the date designated in the "Plan of Action", are considered violations of 15A NCAC 2H.1000, and may result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215.6A. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910.350-20041 Customer service: 1-877-623-6748 Internet: www,ncwaterquality.org One NorthCarolina An Equal Opportunity 1 Aff rmaUve Action Employer December #2, 2010 Lincoln Industrial Park Stormwater Permit No. SW8 991241 By copy of this letter to the Brunswick County Building Inspector, this Office is requesting that the Building Inspector consider withholding building permits and Certificates of Occupancy for this project until this matter is satisfactorily resolved. If you have any questions concerning this matter, please call David Cox at (910) 796-7318. Since rely, Georgette Scott Stormwater Supervisor Division of Water Quality GDSldwc: S:IWQSISTORMWATERINOTICE11241 cc: Phill Tripp Brunswick County Building Inspections John Hennessey Georgette Scott Central Files WiRO Page 2 of 4 ti December 12, 2010 Lincoln Industrial Park Stormwater Permit No. SW8 991241 Page 1 of 2 Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically 1 weekly I full time) the construction of the project, ( Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the constriction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 3 of 4 December 12, 2010 Lincoln Industrial Park Stormwater Permit No. SW8 991241 Certification Requirements: k Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. - The outlet structure is located per the approved plans. 6. - Trash rack is provided on- the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3.1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ New Hanover County Building Inspections Page 4 of 4 I V Compliance Inspection Report Permit: SW8991241 Effective: 02/22/00 Expiration County: Brunswick Region: Wilmington Contact Person: Gabriel Wiliam Dobo Title: Owner Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 11/29/2010 Entry Time: 02:00 PM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ® Not Compliant Question Areas: ® State Stormwater (See attachment summary) Owner: Unknown Wiro Project: Lincoln Industrial Park Exit Time: 02:30 PM Phone: 910-262-6669 Phone:910-796-7215 Inspection Type: Transfer Renewal Page: 1 } k Permit: SW8991241 Owner - Project: Unknown Wiro Inspection Date: 11/29/2010 Inspection Type: Transfer Renewal Reason for Visit: Routine Inspection Summary: In order for this State Stormwater Collection System into compliance you must perform the following: 1. Submit the required Engineer's Certificate. 2. Remove cattails from pond. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? Q Are the SW 6MP inspection and maintenance records complete and available for review or provided to DWO ❑ 0 0 upon request? Comment: Cattail growth has exceeded the 50% requirement. File Review Yes No NA NE Is the permit active? ■ 0 0 11 Signed copy of the Engineer's certification is in the.file? ®� Q Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ 0 Copy of the recorded deed restrictions is in the file? 0 ❑ in Comment: This office has not received a copy of the Engineer's Certificate. Page: 2 1128100 CDC s'1<v 8 9 9 t 2-ql LINCOLN INDUSTRIAL Stormwater Calculations �'Z:iCI�1 Total Drainage Area N. ft. acres 83,200 1.91 Impervious Area Land Use s .ft. acres buildings 10,842 0.25 arkin !as haft 14,845 0.34 Future/ OffsAa 2,146 0.05 Total 27,833 0.64 Stormwater Calculations: Time of Concentration: Hydraulic Length (L) - 750 ft. change in Height (H) = 2 ft. Tc = (L' IH)'a5 / 128 12.52 min. Flowfor 10 year, 6 hour Storm (Q10): QPRe = (Cpge) x (tjo) x (Area) 3,01 cfs QPosr = (CPosT) x (lio) x (Area) 5.90 efs oou oturage,,apacay ror i u year owrm: CN = (98)(°% imp.) + (60)(1-0% imp.) 73 P = 4.82 in. forl0yr, 6 hr storm S= 10001CN-10 = 3.70 Depth (D)= jP-(0.2)(S)j' / (P+(0.8)(S)] 2.14 in. Time to Peak Flow: Tp = [(43.5)(0)(Area)] 1 02,pos7 30.16 min. Detention Pond Desian: Elevation R. Surface Area s . ft.) Normal Pool 22.00 4.879 Flood Pool 23.00 5,853 Top of Bank 24.00 6.684 Bottom of Pool 16.00 437 Provided Storage Volume: Vol. _ [(Normal pool SA + Flood Pool SA) / 21 x (F.P. elev. - N.P. etev.) 5,366 cu. ft. `\\\�,�1a11111111 !!JJlJ �ARo����i�� ..QOFSS%y�9 ;Q SEAT, y 17374 � 4 99140POND.xIs 1 of 2 °% impervious = 0.335 = 33.5% say 34.0% CPRE = 0.25 C'PosT = (% imp.)(,95)+(1-0% 0.49 Ito = 6.30 inlhr 123 = 7.13 inlhr Flow for 25 year, 6 hour Storm (Q25) QPRe = (C'PRF) x (125) x (Area) 3.40 cfs QPosT = (CPosr) x (125) x (Area) 6.67 cfs CN = (98)(°% imp.) + (60)(1-°% imp.) = 73 P = 5.71 in, for 25 yr, 6 hr storm S= 10001CN-10 3.70 Depth (D)= [P-(0.2)(S)f 1 [P+(0.8)(S)j 2.85 in. Time to Peak Flow: Tp = [(43.5)(D)(Area)] 1 Q10posT 35.48 min. orate sunace Area mo wremenr at normal Rooc Pond side slopes = 3 :1 Depth below N.P. = 6 ft. SAIDA = 0.0180 (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Required SA = (SAIDA) x (Total Drainage Area) - 1,498 s . ft. State Volume Required for Storage of first 1" of runoff: Vol._ [(1112) x (DA) x (% imp.)[ + [(1112) x (DA) x (1-°% imp.) x C] C = 0.2 - 3.242 cu. ft. i "TORMWATER 0 D E C E I V E FEB Q 3 2001 PRO.1 # osw I Z4i 1/28/00 LINCOLN INDUSTRIAL CDC Stormwater Calculations Pond Volume; Bottom SA = 437 sq. ft. Normal Pool SA = 4.879 sq. ft. Vol, = M.P. SA + Bottom SA) 1 2] x (N.P. el. - Bottom ei.) 15,948 cu. ft. Forebav: Required Volume Vol. = 20% of storage volume 3,190 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for 1st V of stormwater, Q = Required Vol. 1172,800 sec. (2-days) = 0.019 cfs Required Area of Pipe for 2 -day drawdown: A= Q! [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft./sZ h = (F.P, elev.- N.P. elev,) 12 0.5 ft. A = 0.0055 sq, ft. Diameter of Pi a for 2-day drawdown: DIA. = SQRT{(A x 4) / pi] = 0.0838 ft. 1.01 in. 'Use: 1.0 in diameter pipe Outlet Structure Check: Using a 3' x 3' Basin, Perimeter L) = 12 ft. Q = CIA C = (% imp.)(.95) + (1-% imp)(25) 0.49 1 = 7.13 in. for a 25 yr. Storm A = 1.91 Acres 6.67 cfs Q= CwxLxHi'5 H = [Q / (Cw x L)]2J3 Cw = 3 0.33 ft. Peak elevation n flood pool elevation + H 23.33 ft. Provided Volume Bottom SA = 480 sq, ft. Normal Pool SA = 1,700 sq, ft_ Vol. = [(N.P. SA + Bottom $A) 1 2] x (N.P. el. - Bottom el.) 3,270 cu. ft. depth = 3 ft. Flow for 5-day drawdown: for 1 st 1" of stormwator, Q = Required Vol, 1432,000 sec. (5-days) — 0.008 cfs Required Area of Pipe for 5-day drawdown: A- Q I [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft.1s' h = (F.P. elev. - N.P. elev.) / 2 0.5 ft. A = 0.0022 sq, ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] = 0.0530 ft. 0.64 in. 99140POND.xts 2 of 2 99140 01/21/00 TE 99140 Stormwater Narrative LINCOLN INDUSTRIAL PARK Brunswick County, NC The total drainage area of this project is 2.99 acres. A 10,842 sf building will be constructed with an asphalt access and parking area of 14,845 sf and 2,146 sf of concrete sidewalk. Total impervious area is 27,833 sf for a total built upon area of 21.4% impervious. Stormwater runoff will be handled by a wet detention pond designed to exceed the state's requirement of the first one inch of runoff. This pond will drain to Jackey's Creek with a classification of C-SW. A vegetated filter is not required due to the 90% TSS removal used in the wet detention design. E C E I V E J A N 2 4 2000 PRQJ riS / Z4� 0