HomeMy WebLinkAboutSW8970855_CURRENT PERMIT_20001010STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW Q!77DS"SS
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Butte (.it GI'tlt Carolina
Deiia;rtment of Environment
and Natural Resources
Wilmington Regional Office
Jaynes B. Hunt, Jr.. Covernor
Bill Holman, Secretary
I)i6sion of, Water- Quality
October 10. 2000
Mr. Bill Boulia, President
Bill Boulia Enterprises, Inc.
PO Box 1765
Newport. .NC 28570
Subject: Permit No. SW8 970855
Newport River Shoppes
High Density Stormwater Project
Carteret County
Dear Mr. Boulia:
The Wilmington Regional Office received a complete Stormwater Management Permit Application for Newport
River Shoppes on September 8.2000. Staff review of the plans and specifications has determined that the project,
as proposed. will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are
iorwardin�g, Perinit No. SW8 970855 dated October IO. 2000, for the construction of Newport River Shoppes.
This permit shall bee effective from the date of issuance until October 10. 2010.. and shall be subject to the conditions
and limitations as specified therein. Please pad- special attention to the Operation and Maintenance requirements
iii this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management
systen) ,vill result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicator), hearing upon written request within thirty (30) days following; receipt of this permit. This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Heariiws, P.O. Drawer 27447. Raleigh_ NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Linda Lewis. or
nie at (910) 395-3900.
Sincerely,
Rich Shiver
Water Quality Regional Supervisor
1'\SSAiH: S:1VIQSISTORMV%ATIPERM1T1970855.00T
cc: Joe Dlinnehoo, P.E.
Katrina Marshall, Carteret County Inspections
Linda Lewis
V1%ilmingTton Regional Office
Central Files
127 Cardinal Dr. Ext.. Wilmington, North Carolina 25405 Teiephone 910-395-3900 FAX 910-3-50-200x
An Equal Opportunity Affirmative Action Employer 5fl' o rec}cied/10%', post -consumer paper
H
State Stormwater Management Systems
Permit No. SWR 970855
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes ofNorth Carolina as amended, and
other applicable Laws, Rules_ and Regulations
PER. 1SSlON IS IIEREBY GRANTED TO
Bill Boulia Enterprises, Inc.
NcisTor7 River- Shoppes
Carteret County
FOR THE -
construction, operation and maintenanee'of a wet detention pond in compliance with the provisions of 15A NCAC
2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit.
This permit shall be effective frorn the date of issuance until October 10, 2010 and shall be subject to the following
specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in the
application and other supporting data.
2.. This stormwater system has been approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet. The stor nwater control has been designed to handle the runoff from
151,671 square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts
of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per
approved plans.
5. The offsite runoff from the neloliboring property must be collected and redirected per the approved plans.
G_ The runoff from all onsite built -upon area permitted with this project must be directed into the permitted
stormwater control system.
U
State Stormwater Management Systems
Permit No. SW8 970855
Proiect Name:
Permit Number:
Location:
Applicant:
Mailing Address:
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Newport River Shoppes
SW8 970855
Carteret County
Mr. Bill Boulia, President
Bill Boulia Enterprises, Inc.
PO Box 1765
Newport, NC 28570
Application Date: September 8, 2000
Name of Receiving Stream/Index : Newport River / (WHO 21-1)
Classification of Water Body: °C"
11'Class SA, chloride sampling results: n/a
Pond Depth; feet: 6
Permanent Pool Elevation. FMSL: ?
Drainage Area, acres:
6.4
Total Impervious Surfaces, ft
151,671
Offsite Area entering Pond, ft':
rerouted, per Engineer
Required Surface Area, ft2:
8.386
Provided Surface Area, ft':
14,924
Required Storage Volume; ft3:
12,538
Provided Storage Volume, ft':
15,172
Temporary Storage Elevation, FMSL:
2.92
Controlling Orifice:
1.5"(� pipe
3
State Stormwater Management Systems
Permit No. SW8 970855
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in it's entirety, vegetated and operational for its
intended use prior to the construction of any built upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired
immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must
be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited
to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans'and specifications.
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel
of DWQ. The records will indicate the date, activity, name of person performing the work and what actions
were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless
the facilities are constructed in accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of
thi s permitted facility, a certification must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification.
If the stormwater system was used as an Erosion Control device, it must be restored to'design condition prior
to operation as a stormwater treatment device, and prior to occupancy of the facility.
9. A modification must be permitted priorto any construction. The -following items will require a modification
to the permit:
a. Any revision to the approved plans, regardless of size.
b. Project naive change.
C. Transfer of ownership. `
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of the project area. The proj ect area is defined as all property
owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
10. The Director may determine that other revisions to the project should require a modification to the permit.
11, A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum
of ten years from the date of the completion of construction.
4
State Stormwater N4anaaement Systems
Permit No. SWS 970855
12. Prior to the sale of an), portion of the property, an access/maintenance easement to the stormwater facilities
shall be granted in favor of the Permittee if access to the stormwater facilities will be restricted by the sale
of any portion of the property.
13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable
built -upon area.
14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
15. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days.
Ill. GENERAL CONDITIONS
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division of Water
Quality accompanied by an application fee, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be considered on its merits and may or
may not be approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute
143-215.6A to 14 3-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinancesm _ which may be imposed by other government agencies {local, state, and federal)
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those as may be required by this Division,
such as the construction of additional or replacement stormwater management systems.
The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all
components of the permitted stormwater management facility.
6. The permit may be modified, revolted and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the
guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual.
Permit issued this the 10th day of October, 2000.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SWS 970855
State Stormwater Management Systems
Permit No. SW8 970855
Newport River Shoppes
Siorinwater Permit No. SW8 970855
Carteret County
Designer's Certification
as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of
the project,
(Project)
for (Project Owner) hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the project construction such that the construction was observed to be
built within substantial compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification
Noted deviations from approved plans and specification:
Signature
Re+vistration Number
Date
SEAL
0
State Stormwater Management Systems
Permit No. SW8 970855
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains to the system.
4. The outlet/bypass structure elevations are per the approved plan.
S. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
S. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of the system.
10. The permitted amounts of surface area and/or volume have been provided.
11. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
All required parts of the system are provided, such as a vegetated shelf, and a forebay.
14. The overall dimensions of the system, as shown on the approved plans, are provided.
cc: NCDENR-DWQ Regional Office
Katrina Marshall, Carteret County Building Inspector
N
r
M
State of North Carolina. '
Department of Environment and Natural Resources
Division of Water Quality '
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for' use as an 'original
1. GENERAL INFORMATION
1. AppIicants name (s ecify the Warne of'the corporation, individual, etc. who owns the project):
L d u 1A 611 Alt %I .S G ,
2. 4'-Print,OvMer/Signing Official's name and- title (the person who is legally responsible for the facib y and
fits compliance):
3. Mailing Address for person.listed in iten'i 2 above: ,
Z 5, "
Telephone Number: ( ash 1
4. Project Name (subdivision, facility, or establishment'name - sfi culd'66-consistent with project nazis - >ri
plans, s ecifi=ations, letters, operation and maintenance a�aeents;.etc.}:f
;�lu C1vTEi��re�3�s. New r�IVQr* ��:
5. Location of Facility (street address):
"Goarti��'RFTT :...:
6. Directions to facility (from nearest major inteis
irp
F!\bi� &46& Gor'
.,46- jaed, .���� `/7a/TD �./7 /y !97NI "-rtW / ..d N
�T 1 a'wv "c PLv aA7n:Eaok FoF" C stiv %!� i�T�" iS. d�S.I�tifes d.R1 �►a�T
T ArTE S'pc?%0"'
7. Latitude: 3y-Y'Vt-O'/ e 76� • of facility
8. Contact person who c f answer questions about the facility:
Mjjr �� Io `�'"' Telephone Number
II. PERMTT INFORMATION:
1. Specify whether project is (check one): � Modificat in
2. If this application is being submitted as the result of a renewal or modification to an existing permit list
tine existing permit ru=**r N and its issue date (if known
Form SWU-101 April 1998
Pagc'.1' of-4
3. Specify the type of project (check one):
i.ow'Density 1!gh Density Redevelop . General Permit Other
C. Additional Project Requirements (check applicable blanks).
• CAMA Major Sedimentation/Erosion Control '� 404 Permit
III. PROJECT INFORMATION ;
1. In the space,provided below, summarize how stormwater will be treated. Also attach a"detailed narrative
, (one to two pages) describing stormwater management for the project-.' '
_S_ToiCJh wIFTc-C iv,llt (
C KL Eq T if to77,GNG AIUD. 'DISc1�i r w;/1 . � r NT
r'C �1iC�h is AI Tu(l� �t}r uF Aee p rt eoarslKvc.7aA1•
,S
2. Stormwater runoff Pram this project drains to the Rive r basin.
3. Total Project Area , 3�- acres 4. Project Built Upori Area:' i'S 8 J
5. How many drainage basins does the project have?
5. Complete the following information for each drainage basin If there are more than. two drainage' asins in
the project, attach an additional sheet with the information for each basin provided in the same f rmat as
below.
Receiv Stream Name
N&WE91ET % v t; YL ' "
RecE!Xjn Stream' Class
Drainan Basin Area. ,
2 63 = _ � ;5F
Existing 1m ervibus' Area
0. 5, 9 . 4 c - ;L5; 7 p °
Prosed Im ervious`Area
Q. 91196 A c , "I A 5, 1 S `r
% Impervious* Area (total)
IOUs
�Bai`l!�����it A t
'a,Dffirgn'�' y x
On -site Buildings
J- o o (, 933 A(
On -site Streets
1_- 5 $ o Y 74
On -site Parkin
dk Y y $'{ 8 =; 3 G a 3 J=
On -site Sidewalks
014MA211C =Jyz 37
Other on -site
s
t.
Off -site,
... , Total:
�= 3..�}$1 Y$'
'Im`veruivus�area is defined
as- the'built uvori area including• but not limited to, buildbiQs.' roads. r
areas, sidewalks, gravel areas, etc. `"..•' : •:
7. How was the off -site impervious area listed above derived?
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
irking
Deed restrictions and protective covenants are required to be recorded for all low density projects and a I
subdivisions prior to the sale of any 16t. Please see Attachment A for the specific items that must be rep :)rded.
Form SWU-141 April 1998
Page.Z of.d, .
0
By your signature below, you certify that the recorded deed restrictions and protective covenants for tl is project
shall include all the items required by the permit, that the covenants will be binding on all parties an . persons
claiming under them, that they will nin with the land, that the required covenants.cannot be changed :)r
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot
V. AGENT AUTHORIZATION
If you wish to designate submittal authority to another individual or firm so that they may provide
information on your behalf, please complete this section:
Designated agent (individual or firm} d 4Qi nI S iy tN �1�/ a1 G
ifAln L S„L E State.
Phone 5 3s - �7 741 Fax 2S'�77
VI. SUBMITTALREQUIREMENiS
This application package will not be accepted by the Division of Water Quality unless all of the apl .icable
items are included with the submittal
i. Please indicate that you have provided the following required information by.signing your initia 5 in the
space provided next to each item.
Avnlicanft Initials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP (see Attachment A)
• Permit application processing fee (see Attachment A),,
• Two copies of plans and specifications including:
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
r Development/Project nine
- Engineer and firm'
• Legend ,
- North arrow
- Scale
- Revision number do date
-'Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations_, finished floor elevations
- Details of roads, parking, cul-de-sacs, sidewalks, and curb and gutter.
- WetW%& delineated, or a note on plans that'none exist.
- Existing drainage (including off-site),,drainage easements, pipe sizes, runoff calcula ions
- Drainage basins delineated .. _
Vegetated buffers (where required)
VIL' APPLICANTS CERTIFICATION
I, (print or type name of person listed in General bifnrrnation, item Z) !� i%� 3a v,Gi�
certify that the information included on this permit application form is correct, that the project will f e•
constructed 'in conformance with the approved plans, that the deed restrictions in accordance with Al achment
A of this form will be recorded with all required permit conditions, and that to the best of my knowle kge the
proposed project complies the requirements of 15A NCAC 2H .1000.
r
r '
Dates-
Title:�l�,�/
Form SWU-101 April 1999
Page 3 of 4
• , . � • . • ATTACHMENT A.. - , {. - "
1. Deed Restriction Language
The following statements must be recorded for all low density projects and for all projects that involve f e
subdivision and selling of lots or outparcels-.
I. No more than square feet of any lot, including that portion of the right -of --way betwee t the
edge,of pavement 'and the front lot line, shall be covered by impervious, stiuctures .including
asphalt, gravel, concrete, brick, stone, slate or similar, material but not including wood decki :g'-or
the surface of swimming ,pools. This covenant is intended to insure continued compliance wi y the
stormwater permit, issued by the'•State • of North Carolina. ILThe covenant. may not be changed or .
deleted without the consent of the State.. '
2. No "orie: inay fill in, pipe, • or' alter any. roadside swale except as 'necessary 'to provide a' minim :m
driveway_crossing.
NOTE: if lot sizes vary significantly, the owner/developer must provide an attachment Iisting each to :
number, size and the allowable built -upon area for each lot.
For commercial projects that have outpareels or future development the following statements must also ' e
recorded:
3. The connection from the outparcel or future area into the stormwater system must be made ii to the
forebay such that's)iort-Circuiting of the system does not occur.
4. 'Ail built -upon area from the outparcel or future development must be directed into the pen pitted
stormt6ater control systein.
5. Built upon area in excess of the permitted 'ai4ou6•ivill .require a •permii modification prior 7•
construction.
For curb outlet systems, the following statement in addition to items 1'and 2 above must be recorded:
6. No 0& may pipe, fill in or alter any designated I00 foot long grassed suwale used to med th.
requirements of NCAC 2H .I008(g).
2. Supplement Fors
The applicable supplement form(s) listed below must be submitted for each BUT specified for this prof+ :t:
Form SWU-102 Wet Detention Basin Supplement
meen,t
Form SWU-103 Infiltration Basin Supple
Form SWU-104 Law Density Supplement
Form SWU-105 Curb Outlet System Supplement
Form SWU-106 Off -Site System Supplement
Form SWU-107 Underground Infiltration Trench Supplement
Form SWU-108 Neuse River Basin Nutrient Management Strategy Supplement
3. Permit Application Fees (check made payable to NCDENR and submitted to, the appropriate Reg mal
Office)
Type of Permit z. New, Modification, 'or Timely' Renewal Withot t
Late Renewal . Modification
Low Density S`n/a
High Density $38 $225
Other . n/a '
Directors Certification $350 n/a '
General Permit $50 n/a • '
Form S WU-101 April 1998 Page 4 of 4 1 1 .
Permit No. S ✓f r7o85S
(to be provided b% DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This farm may be photocopied for use as an original
DWQ_Stormwater Management Plan Review:
A complete. stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name: _, oulia Enterprises
Contact Person: Joseph F. Dunnehoo Phone Number: ( 252 ) -554-7761
For projects with multiple basins, specify which basin this worksheet applies to: Vewoort Bashi
elevations
Basin Bottom Elevation (--4) ft. (floor of the basin) -
Permanent Pool Elevation 2 ft. (elevation of the orifice)
Temporary Pool Elevation (elevation of the discharge structure overflow)
a real
Permanent Pool Surface Area 1 924 sq. ft. (water surface area at the orifice elevation)
Drainage Area 6.. 4263 ac. (on -size and off -site drainage to the basin)
Impervious Area 3' 461'9 ac. (on -site and off -site drainage to the basin)
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SAIDA t
Diameter of Orifice
Desiun Rainfall
Desit,n TSS Removal '-
21 ?3 cu. ft. (combined volume of main basin and forebay)
r 16'P- 43T cu. ft. (volume detained above the permanent pool)
4, 360 cu. ft. (approximately 20% of total volume)
: 6f 3.4 !0 (surface area to drainage area ratio from DWQ table)
in. {2 to 5 day temporan, pool draw -down required)
1 in.
�,90, % (mininnum 85% required)
Form SWU-102 Rev 3.99
Paae 1 of 4
Footnotes:
' When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal.
H. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
.a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
b. Th&forebay volume is approximately equal to 20% of the basin volume.
c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days.
e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
f. The basin length to width ratio is greater than-3:1
9.
h.
1.
k.
The basin side slopes above the permanent pool are no steeper than 3: 1.
A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
Vegetative cover above the permanent pool elevation is specified.
L d' . U
A trash rack or similar device is provided for b6th the overflow and orifice.
A recorded drainage easement is provided for each basin including access to nearest right-
of-way. `
1. if the basin is used for sediment and erosion control during corstr-tiction, clean out of the
basin is specified prior to use as a wet detention basin`
72 m. A mechanism is specified which will drain the basiln'for maintenance or an emergency.
JI
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does Wdoes not incorporate a vegetated"'fi'iter at the outlet.
This system (check one) 0 does 1does not incorporate pretreatment other than a forebay.
Form SWU-102 Rey- 3.99 Page 2 of 4 -
a
III
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed. I k.• • t � 1 C I- . i
2.. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash.as needed.
Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to
maintain proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed
of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality
(i.e. stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
4.S AfzC_
When the permanent pool depth reads '�0.feet in the main pond, the sediment shall be removed.
2:25: A?, --
When the permanent pool depth rdads ' 9- feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
2.00 Permanent Pool Elevation } 2 _ 00
Sediment Re oval El. --0. 25 75 0
-------------- -- Sediment Removal Elevation —2' �0 75%
Bottom
Ele anon —
--------------------------------- �125% ----------------
Bottom Elevation-4 00
FOREBAY
MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Pape 3 of 4
ma -'I rf
7. All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party:
Printname: Bill Boulia
Title: President
Address: F.O. Box 1765 , Newport , N.C. 28570
Phone: 252-223-2122
;'-Signature: � �AL�2,
Date: July 16, 1999
Note: The legally resp rsible pa.^y should not be a hemeowrers association unless more than 50% a: the sots have been sold ar:,4.
a resident of the subdivision has been named the president.
I,', Gretchen E. Davis , a Notary Public for the State of North Carolina
County of Onslow , do hereby certify that Bill Boulia
personally appeared before me this 16 th day of July ,1999 , and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
• Lis
.P 0
s �
•........a•
pfW'CO�N`.�`°tee
SEAL
My commission expires July 27, 1999
Form SWU-102 Rev 3.99 Pape 4 of 4