Loading...
HomeMy WebLinkAboutSW8081010_COMPLIANCE_20120430STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 UQj 10 I D DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE C' COMPLIANCE EVALUATION INSPECTION DOC DATE Zoe 2 o�3 J YYYYM M D D NOV-25-2009 WED 02;26 Phi NODENR FAX N0, 910 350 2004 P. 07 State Stormwater Management Systems Permit No. SWg 081010 Mod Progress Energy-rBrunswick Plant --independent Spent Fuel Storage Installation (ISFSI) Modification for the Stabilization Pond Stormwater Permit No. SW8 081010 Modification @rgpswick Coenty Page 1 of 2 Designer's Certlfica Ian G 11k , as a duly registered g"L .(;P*dWein the State of North Carolina, having been authorized to observe (period"callyi wee) the construction of the project, i (P p44:00 forP+ Wr%tli rfA G, (Project Owner) hereby state that, to the best of my abilities, due ca and diligence waf used in the observation of the project construction rich that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: 12 Signature zj/-� Registration Num er ` G - 19IM15 Date 30 12014 1--•�e6of 7 ,',�4111fi111/! ��•�¢'� CA iaE 0. -74 BY: NOV-25-2009 WED 02:26 PM NODENR FAX % 910 350 2004 P. 08 State: Stormwater Management Systems Permit. No. SW8 081010 Mod Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 14k63. All the bullt-upon area associated with the project Is graded such hat the runoff drains to the system. 2440'.4. All roof drains are located such that the runoff is directed into the system. W5. The outlet/bypass structure elevations are per the approved plan. /6. The outlet structure is located per the approvedplans. Trash rack is provided on the outlet/bypass structure. W,,8. All slopes are grassed with permanent vegetation. et J. Vegetated slopes are no steeper than 3:1. j-rTM� 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. FN�12. Required draw dowry devices are correctly sized per the approved plans. i 13. All required design depths are provided. �14. All required parts of the system are provided 4a;sa in accordance with the permit. 15. The required system dimensions are provided per the approved plans. cc: NCDE=NR-DWQ Regional Office ; Brunswick County Building Inspections I �. t Page 7 of 7 Self -Assessment Program Post Construction Stormwater Systems Compliance Checklist Form Completed By: Donald L Safrit, P.E. Facility/Area: Brunswick Nuclear — ISFSI Pad Stormwater System EHS Professional Date: June 1, 2020 Chuck Nelson Action Plan Owner: Chuck Nelson Note: Bolded answers require action. All corrective actions must be documented on the action plan, including actions completed at the time of the assessment. 1. Is there an identified person or organizational work unit who is responsible for NIA FX YES = NO maintaining the Post Construction Stormwater System? (Sw.02.01.SA) Name & Title: Mark DeWire, Work Control Center 2. Are the Post Construction Stormwater System permit and/or approval 0 NIA 0 YES = NO documents on -site (including system design drawing slschem atics)? (SW.02.02.SA) 3. Do the Post Construction Stormwater System permit and/or approval have an 0 NIA X� YES 0 NO expiration date? (SW,02.03.SA) If so, what is the expiration date? Note: Some permits and approvals may be issued "until rescinded" or are based upon city/county ordinances or regulations. Expiration Date: December 12, 2020 4. Are there any components of the Post Construction Stormwater System which 0 NIA F_� YES FX] NO need to be repaired or replaced? (SW.02.04.SA) Note: Significant findings or concerns may need to be evaluated by a stormwater specialist and may require regulatory review and approval prior to implementation. Such situations should be discussed with a support Water SME. 5, Is Post Construction Stormwater System vegetation being properly maintained 0 NIA [g] YES E::] NO (no excessive or intrusive vegetative growth)? (Sw.02,05.sA) 6. Are there any potential environmental risks (transformers, chemicals, waste oil 0 NIA 0 YES XO NO containers, etc.) adjacent to the Post Construction Stormwater System? (SW.02.06.SA) 7. Are Post Construction Stormwater System inspections being conducted on a 0 NIA X� YES 0 NO semi-annual basis or other frequency as specified in the permit? (SW.02.07.SA) 8. Have past Post Construction Stormwater System inspection 0 NIA FX YES 0 NO recommendations/requirements been corrected and/or implemented? (SW.02.08.SA) 9. Is there evidence of accumulated silt or sediment within the Post Construction NIA 0 YES XD NO Stormwater System? (SW.02.09.SA) 10. Is there evidence of silt or sediment leaving or being discharged from the Post 0 NIA 0 YES 0 NO Construction Stormwater System (inspect outfall(s) and perimeter)? (SW.02.10.SA) 11, Do the Post Construction Stormwater System permit and/or approval require F-1 NIA 0 YES 0 NO semi-annual or annual reports to be submitted to the governing agency? (SW.02.11.SA) 12, If required, are copies of such semi-annual or annual reports submitted to the FX NIA 0 YES 0 NO governing agency maintained on -site? (SWMA2.SA) Note: Copies should be maintained on -site for a minimum of five (5) years 13, Do the Post Construction Stormwater System permit and/or approval require an 0 N/A [�:] YES 0 NO annual compliance, monitoring or inspection fee to be submitted to the governing agency? (Sw.02.13.SA) Notes ISFSi Pad Stormwater System observed to be in good shape and well maintained. No need for repairs or improvements identified. Action Plan: (Q# - this should be the question number from above that the corresponding action addresses; Fact Description — details about the deficiency that was found; Owner — responsible person at the location; Date — target completion date; Corrective Action — planned or completed action to correct the deficiency.) Q#' ";Fact.Descri tion :Owrief`. ._Date:_ Corrective Action: ' ROLj t 16400 �•••=cyGINtEQ: ���� �aU t 1 �6/ter Donald L. Safrit, P.E. Senior Environmental Specialist Carolinas Permitting & Compliance Environmental Services Self -Assessment Program Post Construction Stormwater Systems Compliance Checklist Form Completed By: Donald L Safrit, P.E. Date: June 1, 2020 Facility/Area: Brunswick Nuclear - ISFSI Pad Stormwater System EHS Professional: Chuck Nelson Action Plan Owner: Chuck Nelson Note: Bolded answers require action. All corrective actions must be documented on the action plan, including actions completed at the time of the assessment. 1. Is there an identified person or organizational work unit who is responsible for 0 NIA OX YES F-] NO maintaining the Post Construction Stormwater System? (Sw.02.01.SA) Name & Title: Mark DeWire. Work Control Center 2. Are the Post Construction Stormwater System permit and/or approval 0 NIA FX—] YES 0 NO documents on -site (including system design drawings/schematics)? (SVV.02.02.SA) 3. Do the Post Construction Stormwater System permit and/or approval have an 0 NIA F_X] YES 0 NO expiration date? (Sw.02.03.SA) If so, what is the expiration date? Note: Some permits and approvals may be issued "until rescinded" or are based upon city/county ordinances or regulations. Expiration Date: December 12, 2020 4. Are there any components of the Post Construction Stormwater System which 0 N/A YES FX NO need to be repaired or replaced? (SW.02.04.SA) Note: 'Significant findings or concerns may need to be evaluated by a stormwater specialist and may require regulatory review and approval prior to implementation. Such situations should be discussed with a support Water SME. 5. Is Post Construction Stormwater System vegetation being properly maintained NIA aX YES E�] NO (no excessive or intrusive vegetative growth)? (SVV.02.05.SA) 6. Are there any potential environmental risks (transformers, chemicals, waste oil 0 N/A F—] YES XO NO containers, etc.) adjacent to the Post Construction Stormwater System? (SVV.02.06.SA) 7. Are Post Construction Stormwater System inspections being conducted on a 0 N/A OX YES NO semi-annual basis or other frequency as specified in the permit? (Sw.02.07.sA) 8. Have past Post Construction Stormwater System inspection N/A FX YES 0 NO recommendations/requirements been corrected and/or implemented? (SW.02.08.SA) 9, Is there evidence of accumulated silt or sediment within the Post Construction N/A YES FX NO Stormwater System? (Sw.02.09.SA) 10. Is there evidence of silt or sediment leaving or being discharged from the Post N/A 0 YES �X NO Construction Stormwater System (inspect outfall(s) and perimeter)? (Sw.02.10.sA) 11. Do the Post Construction Stormwater System permit and/or approval require N/A 71 YES OX NO semi-annual or annual reports to be submitted to the governing agency? (Sw.02.11.SA) 12. If required, are copies of such semi-annual or annual reports submitted to the OX NIA 0 YES F_� NO governing agency maintained on -site? (Sw.02.12.SA) Note: Copies should be maintained on -site for a minimum of five (5) years 13. Do the Post Construction Stormwater System permit and/or approval require an F-1 NIA F] YES n NO annual compliance, monitoring or inspection fee to be submitted to the governing agency? (SW.02.13.SA) Notes ISFSI Pad Stormwater System observed to be in good shape and well maintained. No need for repairs or improvements identified. ' Action Plan: (Q# - this should be the question number from above that the corresponding action addresses; Fact Description -- details about the deficiency that was found; Owner — responsible person at the location; Date — target completion date; Corrective Action -- planned or completed action to correct the deficiency.) Q# ".Fact'Descriptian Owner :Days Corrective Action � Q y • r •s 16400 — rrr l � �6Ja! Donald L. Safrit, P.E. Senior Environmental Specialist Carolinas Permitting & Compliance Environmental Services