Loading...
HomeMy WebLinkAboutSW8030503_COMPLIANCE_20030619STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Laurie Munn, 10:02 AM 6/19103 -0400, Re: Southport Commons To: Laurie Munn <Laurie.Munn@ncmail.net> From: "John A. Kuske, III 1 Andrew & Kuske" <jakuske3@andrewandkuske.com> Subject Re: Southport Commons Cc: mloughlin@andrewandkuske.com RECEIVED Bcc: Attached: JUN 19 2003 M. Laurie, The 15" invert at the box should be 21.60 and the invert at the flared end section should be 21.50. Thank you for calling this to my attention. I will drop the plans off at lunch. We look forward to receiving the permit. Thanks, JAK III Laurie, Thank you for your prompt review. I will take care of this ASAP and drop the plans off today. JAK Ill At 09:20 AM 6/19/03 -0400, you wrote: Mr. Kuske, I have reviewed the Southport Commons and only have one comment. On Sheet 1A, the detail of the special drop inlet has different elevations for the 15" RCP bypass pipe on the plan and profile views. You can just modify this sheet and send 2 copies over. I will insert them into the plans. This should wrap things up for this application. Please call me if you have any questions. Thanks, Laurie Printed for "John A. Kuske, Ill l Andrew & Kuske" <jakuske3@... 1 INFILTRATION TRENCH ANALYSIS Project # 030503 Project Name Southport Commons `' �Recvng"Stream Price Creek Drainage Basin Cape Fear Site Area 1.74 acres Impervious Area Calculation Buildings Parking/Asphalt Concrete Total VolumelStorage Calculation 14500 37000 1500 If Rational Method is used, place a 1 in this box Required Design Storm RV Provided Pipe Diameter Length Of a Single run of Pipe Number of Pipe Runs in Trench Storage In Piping Total Storage in Piping Cross -Sectional Area Of Pipe Runs Length Of Trench Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Voids Volume, 40% Trench Volume per linear foot Minimum Trench length required Total Volume Provided Elevation Of Bottom Of Trench Elevation Of SHWT Overflow Elevation Exfiltration Rate / Drawdown Reported Hydraulic Conductivity -Bottom Surface Area rawdv+n Time Filename: G:IDATAIWPDATAIWQSIINTRENCH1030503 Date 18-Jun-03 Reviewer Classification Index # Drainage Area 70131.6 SF 1.61 Acres Rational Cc (list C after each BUA) Pipe Size 1 JPipe Size 2 Comments: Required volume, storage, and drawdown guidelines are met. 20.8 Mean Sea Level 18.8 Mean Sea Level 21.6 Mean Sea Level 1.25 Cubic Feet Per Hour Per Sq Ft 7345 Square Feet 0 46<':, hours Date Design Andrew and KUSke :�Of t 012sk-7 z� CONSULTING ENGINEERS, INC. 902 Market St. Wilmington, N.C. 28401 Check Job For SplJTtljQyGT" Gc�/�J.iC/V1" Job No. �i�o-r'itan/ Can/77�oG .rr�r�7?11�a2T� �/C. �ZZ .so vT� �o� T Go,�-�r�► ovf' i9 K of4e 0,7Z-- c T ^Av 6 ZZ I / Date Design Andrew and Kuske sl, �Ofl ¢�5 902 Market 5t. CONSULTING ENGINEERS, INC. Wilmington, N,C, 28401 O Check Job . For Job No, NoT� : 7rt ---C rT OF ova C --7-' o p f✓ iTi*/ sus/-��'L T �?e/�' ✓+�s�� �iT�C--� /n/G h/ le- e- /IVG e- v,o.E TiY� Goivc f. -v C 77 0 pF .&vle _ a /�l� � �`f G L O���W-/MCI, 4iT> G , 77 ,e--" -/ ; G ifi✓ O/C/ ..r ,, T25� Oe a L. a �/ G �G vi✓!� in/FiG ?x?T74n/ S'o v -/-2:, �t �f H//!T-/C� p�C_�O/!V r✓7�1GE 7�T�C Sires r4��� /.74.9 7S, 79-S'- pa.c77av O �/ 7e J / 3 Z' S� _ fD 2/iC/F/G 77G/�T70/✓ S'�-f.T7�is'f / To Ti7L /.�-� /a�it�✓/o �.1' �iC Eif = /. Z Z of L 57-7, o 001P-r ,S,67-10:7- S-1 rZ-- �i� rlrtscE �,� rn/.�iT �E /J �f �7o i •-�/��z r/�c�.J- /jX.t/f = 7S, 78 ':7 / . 2Z )< ♦ OD = 73'. 1,61 '1 I SITE DATA TOTAL SITE AREA: DRAINAGE AREA FOR STORMWATER INFILTRATION SYSTEM: DISTURBED AREA/CONSTRUCTION LIMITS: ZONING: BUILDING SETBACKS: REQUIRED PARKING: BASED ON 21,800 SF TOTAL LEASE SPACE TOTAL PARKING: IMPERVIOUS AREAS: PROPOSED BUILDINGS: 2 ® 7250 SF EACH INCLUDING CANOPY ASPHALT PARKING LOT/DRIVES: INCLUDING CURB do GUTTER CONCRETE WALKS/PADS: TOTAL IMPERVIOUS AREA: SITE % IMPERVIOUS AREA: DRAINAGE AREA % IMPERVIOUS AREA: LANDSCAPING REQUIRED: INTERIOR LANDSCAPING AREA PROVIDED: 1.74 ACRES 1.61 ACRES 2.64 ACRES C-2 25' FRONT SETBACK 4' SIDE SETBACK 10' REAR SETBACK MAXIMUM 1 PER 160 SF = 136 MINIMUM 1 PER 300 SF = 73 77 SPACES WITH 4. HC 14,500 SF 37,000 SF 1.500 SF 53,000 SF/1.22 ACRES 70.11% 75.78% 20 SF PER 1 PARKING SPACE INTERIOR = 1,580 ,SF 2,300 SF Date Design Andrew and Kuske Sheet ��/O3 -- WX-4 E:: 7 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 3 (� Of J O Check Job For Job No. si .�r� vr�� C.1 �.r�rs-7a►�tl s-4o XV,ve: o C-T� n/G OZ Z 8 I �7"/T r"�� �S7Z��L� i✓/TT�.. crrGG✓�. ?�7c:r�f-!" .�' ..�� �O E,J' / Gam//s✓G . �� 4�� L� F /�cG�/�/�' S 77J it- �'�'J 4-'fTl'1C/� , .. //,/� ic.r?+��Tr1 cv,/ S' yrr�. v"7 �-7� S'7-a �E �T/✓t� /^IA=--/G-7'7"�- r/TTL_ 77`Y-'dE7 ,S/.T�= ,p.�`.!'"'/ Gam./ /�✓��C�37t71� 76 /61 9 88T�J Si> is Z f ; 'i i Date Design Andrew and Kuske set w 902 Mprket 5t. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 !�Of Check Job S ForJob No. ire C/7G Sov77i�/t-7 , n/c ozZ B I 72> W-- 77Wzz-- : ��� � C f L�TC� �EI�o�C.-r �.✓. �� o.l' �.1� — ¢8 �� / � � .BE Gp c✓ E 1C/.T T7i✓ G Glz�roC �J7` �sT Go c�>�r../ • G� u�7'T7 a �✓ o 2 3, o c7 'F7 u 41F:_ v�l�7o�./ O 2:3 tom/ it T7.�✓G. AC— /1`T T�J' � �o c �7d�✓ �/B , 3 E c� `�7'7 o r� o,C:7- 23, o0 /-/7 G /`/ G2ovr✓r� G�//TT�2 %%9IlL� S�rxro.✓�rL mG.� G/L-pv,,i h��rDx.� = . 80 /✓DT � Tr1'E S` T7?TC: �G G v� J1�7 �Nr.i��iti/� �J��.. G/T� Date Design Andrew and Kuske Sheet / /d3 �L�_ 9D2 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 S pf lo Check Job -V7;-� For , jbvT%>ioart-�Cd�"�on�,f Job No. �t,ryf✓ilTr/L �ilL t r.rc fov7ly �o ��J`^� /✓G 4ZZiff / �.✓�:v �rTv•.r� is vc%. -¢ w�rA = 40 vo a •��rna .OEM e/ .€ o 7; F-P�/S4 l/aG 1,.+7� ¢ X z x -5, /38 7 s 3 - 7P'?- ice' . k-0e- <o . �¢O)�S6S /K /, 6 is i3 - /387`T3 �7-3 - t 7b �'TG_r�/G// No7Z�_ : %7��s,/G/,� ✓O G.-- vi+7 � � �yC GZ GO �� ���.TT ,/ �� sTb2it-c-G_ r/oe--vr-sue or g700.��3. $ `7 F��.rl I�✓/G G._ . ©GG-vim .l�E G o �✓ Ta � ?�i-./G� H i'y7 t.�l'T /,JG�® � � �� C✓ T +7 0 � � . iJ.lrv.-�� /i✓��G-TyL1T77o,.�/ �vG-/� .aoT3��'! s6 s f X -I 1 Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of q" Check Job X7;>� ForJob No. ��a.��w c�c�✓erne S^r^z--7"; /Yz1 �/�-o c. �� /� /zo vT-�.✓G - X X, - 4-o3 7 F7-3 Xz = S3 Fr3 40 3 -7 g-700 - 403 7) f z J, 9 7 s.E T og!57G e- X, - z1• 77 yy ¢03-7 -7 -7) t go3-7 � 7co,--7-;.7 ©�-- / 02281 South portCommons Prepared by Andrew & Kuske Consulting Engineers, Inc. H droCAD® 6.20 s/n 000479 ©1986-2003 Applied Microcomputer. Sstems Hydrograph for Pond 1 P: Infiltration System Time Inflow Storage Elevation Outflow Discarded Primary hours cfs cubic -feet feet cfs cfs cfs 11.00 0.63 0 20.80 0.00 0.00 0.00 11.10 0.66 12 20.80 0.66 0.66 0.00 11.20 0.73 13 20.80 0.72 0.72 0.00 11.30 0.82 15 20.80 0.81 0.81 0.00 11.40 0.91 16 20.80 0.91 0.91 0.00 11.50 1.02 18 20.81 1.01 1.01 0.00 11.60 1.16 21 20.81 1.15 1.15 0.00 11.70 1.70 30 20.81 1.66 1.66 0.00 11.80 2.54 45 20.81 2.50 2.50 0.00 11.90 3.51 91 20.83 3.06 3.06 0.00 12.00 4.93 462 20.93 3.06 3.06 0.00 12.10 9.01 1,842 21.33 3.06 3.06 0.00 12.20 8.16 4,037 21.97 3.06 3.06 0.00 12.30 5.52 6,345 22.35 3.06 3.06 0.00 12.40 4.11 5,477 22.39 4.15 3.06 1.09 12.50 3.00 5,456 22.38 3.10 3.06 0.04 12.60 2.01 5,248 22.32 3.06 3.06 0.00 12.70 1.48 4,757 22.18 3.06 3.06 0.00 12.80 1.27 4,145 22.00 3.06 3.06 0.00 12,90 1.14 3,475 21.81 3.06 3.06 0.00 13.00 1.03 2,763 21.60 3.06 3.06 0.00 13.10 0.92 2,011 21.38 3.06 3.06 0.00 13.20 0.86 1,229 21.16 3.06 3.06 0.00 13.30 0.82 430 20.92 3.06 3.06 0.00 13.40 0.79 14 20.80 0.79 0.79 0.00 13.50 0.77 14 20.80 0.77 0.77 0.00 13.60 0.74 13 20.80 0.74 0.74 0.00 13.70 0.71 13 20.80 0.71 0.71 0.00 13.80 0.68 12 20.80 0.68 0.68 0.00 13.90 0.65 12 20.80 0.65 0.65 0.00 14.00 0.62 11 20.80 0.63 0.63 0.00 14.10 0.60 11 20.80 0.60 0.60 0.00 14.20 0.58 10 20.80 0.58 0.58 0.00 14.30 0.56 10 20.80 0.56 0.56 0.00 14.40 0.55 10 20.80 0.55 0.55 0.00 14.50 0.54 10 20.80 0.54 0.54 0.00 14.60 0.52 9 20.80 0.52 0.52 0.00 14.70 0.51 9 20.80 0.51 0.51 0.00 14.80 0.49 9 20.80 0.50 0.50 0.00 14.90 0.48 9 20.80 0.48 0.48 0.00 15.00 0.47 8 20.80 0.47 0.47 0.00 r Date Design Andrew and Kuske Sheet 4/!S/oJ 1-7� CONSULTING ENGINEERS, INC. 8 902 Market St, Wilmington, N.C. 28401 Of Check Job ForJob No. C�c cc✓�iT'� 77 /y �'J/��1d✓Gbc..�,�/ 77r-yE e- /E ../7— of �4 ���.9 ♦c . i�j /n/�/L Tt- iT77 o r✓ GZ �T� �.e. av-7 / •��iL7x•��-, �.✓ � ��-� ��r-� cam a y y 4.0 �� Ie.� Q '-`f K // - / - S6.S�x /3 ' = 73 -- I�.��"1-✓ .O ra ram✓ �/ i 7r-7� T = 4 76k:;, rrT3 /B3.63 Fr� B y��.rs L � �✓� ��� QvT�G�' ?a C am. 7 7f-e. / J YAC-jYL . S 7'>' l'Z-e-7 , 2J` '74 eftc- .�i/✓E G �TL (�c�t�/n7c,•��1' '0�2_ 77�� Na N 014 yt.�-Z- .s-7v �----� Cosa y�.r� s� •L-,-•� . s 7 4L!�— -� !/, �i 77777F L 7lC4'0Z /ri- Q Date Design Andrew and Kuske [Sheet CONSULTING ENGINEERS, INC. 902 Market St. Wilmington, N.C. 28401 Of Check Job For Job No. S7bti.•'�r..�lTt2 CAL �..Y 5O�77lY� /L-�"-Co.�.tt.r�,t!' G i O s'cvT W--T 't�"'r4'✓ ✓L C/JLe- t,, e- S yS"T�✓�i J' �E G���G %✓ a fob i7Y� /o '7CrJy[_ 7�/f-T'T Th`�.. �aTT" ,per✓�L�o����f,� i✓ /`c' � G So G rf,E c•�%�7� r"7 �7� ��Pi�J.y�/lEG9- �✓�%' T� i c� yt , _r- �.� •--� ' �-�v,o .�, n� per- y,e . STD2 /t7. /vc` w/tC Ca�•7 /�!`�F ���Cr.+'�1�TX-� . Q,a,�,� �c2 T7tE s� •�-.-r-r' r� TJr� �i-zar� r/ Z e ,:Z, AV.V err L i.0 /n/ C 4-v oE" AV A-Z ;r7y-,o hoc r 770%1"e- T7'07 r op _ — .d .e. Sri .✓•t-c.� �1+�-�/� -- /. _6 � �t-e . 9.-74-79 t a, zo C 9, z¢zz) a 77 I: I Date Design Andrew and Kuske Sheet 902 Market 5t. CONSULTING ENGINEERS, INC. Wilmington, N.C. 2$401 p1000 pf qU Check Job G/ T'y ol-- For f�x.7ra L�Cor•..._+J"' Job No. i u? iL Cifz �uGiT77�...+ 1"oc.777Y�o zT/ ^/G dZZ 8 l [O. 7- 87)e /, 6 7 7),( 7, 9 7)(-,', C C.y6ie�tSTio 7, 4�iporf — O. Od CC S r•�o..-� /t`>.p� o c �l—G� lav Tljv �s r : /V4 4 /lC i`%TX_rG� 7iL► � -7 /G �IL�T''L .S7D.�.�'•'!. Gory/J�-/�.T h//77y G-/T'7 .�Qv/�G•+sGr../,�..)` ZS-- Q.a.eE7s moo. Zo)C7,a6 jL/.� �� Q � 60,-77�C Qeoee zs PaST��,r 2. 9 Z C�.T L�tGGx�rsxQ Q,.f� C //. Z3 G�J' s4- �.... D v,7-.v ci �r-- 2 , /S G FS 2. 9 z cF -r"' SJ��-y7 /-r G4r J—j- 71;� d 'r vE 4 Are T7t� 2 S" yEiT�2 S'Tait,..A►1 ,. Ca�7/�G /Lf meo/iC� 77rr Q'-l.vijkrr Lin.iL s.�iLc /'Jr'1�v� LL i� aoiarT ,OC i+/o 1-2r ��r�,c�c-r�.7r� 2-�•✓G �-� i7f, �`o �l2 �rr.�o . /o� y2 . sT8-c .wr it �.✓c co.s-G4, �t� ..s" y,..r ram..-� gioaT7 D 1rC /)A T C-AC f.C. M 77741,,- . I Date Design Andrew and Kuske Lheel�902 Market 5t. CONSULTING ENGINEERS, INC.1+Viimington, N.C. 28401 Of U Check Job Giil-i vo--.roFor _5-cw �e—Co�+y,•ti.,.v1- Job No, �.c..-,c.�rT�' c.s��..ic ��77lYo l`, a je- OZ?—a Afa c-- T'i Fay- Utz S� yc . s,,�•�.�, �s S. 09 cF.l' err✓� GolL 7»� /ten y�e. STo2rr /T �.1'�J, � ciS, C�9lr C t/G /TTz o.-...J.I' �r✓C C QS,�'I� ,777�'y-I'/�"1� ��� 771-K-. / do -�Tl�v�7Z�� � /✓ /.�C G /l-L G� � �7 e�---�1' �Tn-+� --5� G»occ5a = 37, zc cor-:.r /00 -7'06-'jiL zzz tf- M q _ 3, 3o 41'-ro- /Z.33e�.r CHART E-6* L. Intensity - Duration - Frequency 4pp^g, %Q .� Southport, North Carolina RETURN PERIOD 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year Duration (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) 5 Min 7.10 8.66 10.21 11.77 12.92 13.20 "911' 10 Min 5.47 6.67 7.$7 9.Ob 9.95 10.26 15 Min 4.61 5.62 6.62 7.63 8.38 8.64 30 Min 3.20 3.90 4.60 5.30 5.82 6.00 1 Fir 2.00 2.50 2.90 3.33 3.71 4.00 2 Fir 1.22 1.60 1.78 2.07 2.28 2.59 3 Fir 0.91 1.13 1.31 1.50 1.67 1.85 6 Fir 0.52 0.67 0.77 0.90 1.00 1.13 12 Fir 0.31 0.40 0.47 0.54 0.60 0.67 24 Hr 0.17 0.23 0.28 0.32 0.35 0.40 'Source: Rainfall Frequency Atlas of the United States, Technical Paper 40, U.S. Weather Bureau, May, 1961. Stormwater Management Technical Manual Southport, North Carolina 17 When the values of the peak, Qp, and the time to peak, Tp, have been set, the discharge at any time T may be determined by the pattern function (a step function). For time T from zero to 1.25 * Tp: Q = (Qp / 2)(1 - cos((TT * t) / Tp) For times greater than 1.25 * Tp: Q = 4.34 Qp exp(-1.3(t / Tp)) In the step function, Q is the hydrograph discharge at the time of interest, t, in minutes. Qp is the estimated peak discharge in cfs, and Tp is the calculated time to peak in minutes. It is important to note that the argument of the cosine is in radians. If the calculations are carried out on a manual calculator, it shall be set to calculate in radians mode. CHART H-1 * Depth - Duration - Frequency Southport, North Carolina RETURN PERIOD 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year Duration (in) (in) (in) (in) (in) (in) 5 Min 0.59 0.72 0.85 1.98 1.08 1.11 10 Min 0.91 1.11 1.31 1.51 1.66 1.71 15 Min 1.15 1.40 1.66 1.91 2.10 2.16 30 Min 1.60 1.95 2.30 2.65 2.91 3.00 1 Hr 2.00 2.50 2.90 3.33 3.71 4.00 2 Hr 2.43 3.20 3.55 4J 3 4.55 5.17 3 Hr 2.73 3.39 3.94 4.50 5.00 5.56 6 Hr 3.09 4.00 4.63 5.38 6.00 6.76 12 Hr 3.67 4.80 5.63 6.45 7.14 8.07 24 Hr 4.10 5.50 6.61 8.33 9.50 Stormwater Management Technical Manual 54 Southport, North Carolina INAIVIM-r""COV010 1.rvx12jw^Of )"AMOC-400 R-OU77 ,9fte Drainage Area A Bypass Infiltration System (Byp.;sFR..t,ng Po nd 01a 1PA-4 7 J Subca Reach on Z. Ai 02281 SouthportCommons Type 11124-hr 10-YR RainfaA=6.61 Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 2 HydroCAD® 6.20 sln 000479 ©1986-2003 Applied Microcomputer Systems 4129/03 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Site Drainage Area Runoff Area=1.610 ac Runoff Depth=3.49" Tc=10.0 min CN=86 Runoff=8.01 cfs 0.469 of Reach 1 R: Bypass Peak Depth=0.00' Max Vet=0.0 fps Inflow=0.00 cfs 0.000 of D=12.0" n=0.010 L=400.0' S=0.0030 ? Capacity=2.54 cfs Outflow=0.00 cfs 0.000 of Pond 1P: Infiltration System Peak Elev=21.99' Storage=4,111 cf Inflow=8.01 cfs 0.469 of Discarded=3.06 cfs 0.468 of Primary=0.00 cfs 0.000 of Outflow=3.06 cfs 0.468 of Pond 2P: Bypass Routing Pond Peak Elev=22.40' Storage=0 cf Inflow=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Total Runoff Area = 1.610 ac Runoff Volume = 0.469 of Average Runoff Depth = 3.49" 02281 South portCommons Type /// 24-hr 10-YR Rainfall=6.61" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 3 HydroCAD® 6.20 s/n 000479 0 1986-2003 Applied Microcomputer Systems _ _ _ 4/29/03 Subcatchment 1S: Site Drainage Area Runoff - 8.01 cfs @ 12.14 hrs, Volume= 0.469 A Depth= 3.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 10-YR Rainfall=6.61" _ Area (ac) CN Description 1.220 98 Impervious Area 0.390 50 Green Area 1.610 86 Weighted Average Tc Length Slope Velocity Capacity Description _(min) {feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Site Drainage Area Subcatchment 1S: Site Drainage Area Hydrog ra ph ._ 8.0 _' � ®Runoff ------ ------ 1 cfs -------------•------------------------- ------------------•- Type III 24-hr 10-YR ------------------- Rainfall=6.61" 6 ---------------------- ----------------- - Runoff-Area=1-:610-ac-- ---------------------- RunofF _Volume.=0.46.9.-af _. 57 Runoff Pepth= 3.49" 3 - --- ---- ci 4 'Tc=10.0 min -... - •-------•-------- ...--- 3 - CN=86 2 1 11 12 13 14 is Time (hours) .. 3 02281 SouthportCommons Type l/l 24-hr 10-YR Rainfall=6.61" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 4 HydroCADO 6.20 s/n 000479 OO 1986-2003 Applied Microcomputer Systems _ _ _ 4/29/03 Reach 1 R: Bypass [52] Hint: Inlet conditions not evaluated [79] Warning: Submerged Pond 2P Primary device # 1 by 0.20' Inflow Area = 1.610 ac, Inflow Depth = 0.00" Inflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 11.00 hrs Capacity at bank full= 2.54 cfs Inlet Invert= 22.40', Outlet Invert= 21.20' 12.0" Diameter Pipe n= 0.010 Length= 400.0' Slope= 0.0030'1' Reach 1R:Bypass Hydrogra ph 1 a Inflow ® Outflow Inflow Area=1.610 ac Peak Depth= 0.00' Max �Vel=0.0 fps W D=12.0" n=0.010 LL L=400.0' S=0.0030 T Capacity=2.54 cfs 0 00.E 0.00 cfs, 11 12 13 14 15 Time (hours) 02281 SouthportCommons Type 11124-hr 10-YR Rainfall=6.6171 Prepared by Andrew & Kuske Consulting Engineers, Inc. Hydro CAD® 6.20 sln 000479 © 1986-2003 Applied Microcomputer Systems 4/29/03 Pond 1P: Infiltration System [821 Warning: Early inflow requires earlier time span Inflow Area = 1.610 ac, Inflow Depth = 3.49" Inflow — 8.01 cfs @ 12.14 hrs, Volume= Outflow — 3.06 cfs @ 11.93 hrs, Volume= — 3.06 cfs 11.93 hrs, Volume= Prima = .0: - s 11.00 hrs, Volume= In/O POST" 0.469 of 0.468 af, Atten= 62%, Lag= 0.0 min 0.468 of 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 21.99' @ 12.44 hrs Surf.Area= 7,345 sf Storage= 4,111 cf Plug -Flow detention time= 8.5 min calculated for 0.467 of (100% of inflow) Center -of -Mass det. time= 8.4 min ( 757.1 - 748.8 } Storage determined by Prismatic sections Elevation Surf.Area Open Inc.Store Cum.Store (feet) (sq-ft) {%) cubic -feet) (cubic -feet) 20.80 7,345 47.0 0 0 22.40 7,345 47.0 5,523 5,523 Discarded OutFlow Max=3.06 cfs @ 11.93 hrs HW=20.82' (Free Discharge) L1=Exfiltration (Exfiltration Controls 3.06 cfs) Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=20.80' (Free Discharge) L2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 22.38' 500.0' long x 1.0' high Sharp -Crested Rectangular Weir 2 End Contractions) g �0 02281 SouthportCommons Type lU 24-hr 10-YR Rainfall=6.61" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 6 HydroCAD® 6.20 sln 000479 OO 1986-2003 Applied Microcomputer Systems 4/29/03 Pond 1 P: Infiltration System Hydrograph 8'01'cts==--------- ■Inflow ------------ ---- ------._.._...._.-----------°------------------- -- p Outflow Inflow Area=1.610 ac ®Discarded ..__......_........ - _-.......,---- Primary Peak Elegy=21.99' -- ----------------------------------------------------- --- 7' Storage=4,111 cf s s 1Z 4 3.06 cfs 3 2 1 0,00 cfs O 11 12 13 14 15 Time (hours) 02281 SouthportCommons I Type I// 24-hr 10-YR =6.61 " Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 7 HydroCAM 6.20 s/n 000479 O 1986-2003 Applied Microcomputer Systems ,- 4/29/03 Pond 2P: Bypass Routing Pond [801 Warning: Exceeded Pond 1 P by 1.60' @ 11.00 hrs (4.64 cfs) Inflow Area = 1.610 ac, Inflow Depth = 0.00" Inflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Ou = 0 00 cf @ 11.00 hrs, Volume= 0.000 af, Atten= O%, Lag= 0.0 min Primary = 0.00 cf @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.40' @ 11.00 hrs Surf.Area= 96 sf Storage= 0 cf Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) Storage determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft} (cubic -feet) (cubic -feet) 22.40 96 0 0 24.00 96 154 154 Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=22.40' (Free Discharge) �1=Orifice/Grate (Passes 0.00 cfs of 0.67 cfs capacity) 2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) # Routing_ Invert Outlet Devices 1 Primary 2220' _ 6.0" Vert. Orifice/Grate X 6.00 C= 0.600 2 Primary 22.60' 4.0' long x 2.0' high Sharp -Crested Rectangular Weir 2 End Contractions) 02281 SouthportCommons Type 11! 24-hr 10-YR Rainfall=6.61" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 8 HydroCAD® 6.20 sln 000479 © 1986-2003 Applied Microcomputer Systems 4/29/03 Pond 2P: Bypass Routing Pond Hyd rog ra ph 1 Inflow Primary 11 12 13 14 15 Time (hours) I I 71z/qo 02281 SouthportCommons Type Ill 24-hr 25 YR Rainfall=7.67" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 9 H dry oCAD® 6.20 s/n 000479 01986-2003 Applied Microcomputer Systems 4/29/03 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind}Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Site Drainage Area Runoff Area=1.610 ac Runoff Depth=4.17" Tc=10.0 min CN=86 Runoff=9.56 cfs 0.560 of Reach 1 R: Bypass Peak Depth=0.54' Max Vet=3.3 fps Inflow=2.02 cfs 0.016 of D=12.0" n=0.010 L=400.0' S=0.0030 'P Capacity=2.54 cfs Outflow=1.42 cfs 0.016 of Pond 1 P: Infiltration System Peak Elev=22.39' Storage=5,491 cf Inflow=9.56 cfs 0.560 of Discarded=3.06 cfs 0.543 of Primary=2.15 cfs 0.016 of Outflow=5.21 cfs 0.559 of Pond 2P: Bypass Routing Pond Peak Elev=22.58' Storage=17 cf Inflow=2.15 cfs 0.016 of Primary=2.02 cfs 0.016 of Outflow=2A2 cfs 0.016 of Total Runoff Area = 1.610 ac Runoff Volume = 0.560 of Average Runoff Depth = 4.17" Z31 q 0 02281 SouthportCommons Type 11124-hr 25 YR Rainfall=7.67" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 10 HydroCAD® 6.20 sln 000479 ©19W2003 Applied Microcomputer Systems 4129103 Subcatchment 1S: Site Drainage Area Runoff = 9.56 cfs @ 12.14 hrs, Volume= 0.560 af, Depth= 4.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 25 YR Rainfall=7.67" Area (ac) CN Description 1.220 98 impervious Area 0.390 50 Green Area 1.610 86 Weighted Average Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec cfs 10.0 Direct Entry, Site Drainage Area Subcatchment 1S: Site Drainage Area Hyd rogra ph / Runoti 9.56 cis Y 0 U. M. ------------- ------- ------- Type - III- 24-hr-25 YR-- Rainfall=7.67" __.__.._..-------- --Runoff-Area=1.6'10.ac-- _.__ ' _-Runoff_Volume=.0.560.af__ --..._._. Ru-noffDepth=4_.1-7"-- 7c=10.0 min -- - - -- CN=86------------------------- 11 12 13 14 Time (hours) 15 02281 South portCommons Type 11124-hr25 YR Rainfaft7.67" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 11 HydroCADV 6.20 s/n 000479 ©1986-2003 Applied Microcomputer Systems 4/29/03 Reach 1 R: Bypass [52] Hint: Inlet conditions not evaluated [801 Warning: Exceeded Pond 2P by 0.45' @ 12.40 hrs (6.08 cfs) Inflow Area 1.610 ac, Inflow Depth = 0-12" Inflow = 2.02 cfs @ 12.34 hrs, Volume= 0.016 of Outflow = 1.42 cfs @ 12.41 hrs, Volume= 0,016 af, Atten= 30%, Lag= 4.5 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity-- 3.3 fps, Min. Travel Time= 2.0 min Avg. Velocity = 0.7 fps, Avg. Travel Time= 9.5 min Peak Depth= 0.54' @ 12.38 hrs Capacity at bank full= 2.54 cfs Inlet Invert= 22.40', Outlet Invert= 21.20' 12.0" Diameter Pipe n= 0.010 Length= 400.0' Slope= 0.0030 'f Reach 1 R: Bypass Hydrograph Inflow --- ------------ --2.0-------- ------ -- ---------- ------------ Outflow 2- Inflow Area=1.610 ac Peak Depth=0.54' MaxVel=3.3 fps 1.42 cfs D=12.0" 3------------- ........... .--n=0.010 - LL 1 L=400.0' S=0.0030 '1' Capacity=2.54 cfs 11 12 13 14 15 Time (hours) zs-/qD 02281 South portCommons I Type 11124-hr 25 YR Rainfall-7.67" Prepared by Andrew & Kuske Consulting Engineers, Inc. age 12 HydroCAD®fi.20 sin 000479 © 1986-2003 Applied Microcomputer Systems _ 4/29/03 Pond 1P: Infiltration System [821 Warning: Early inflow requires earlier time span Inflow Area = 1.610 ac, Inflow Depth = 4.17" Inflow = 9.56 cfs @ 12.14 hrs, Volume= 0.560 of Outflow - 5.21 cfs @ 12.33 hrs, Volume= 0.559 af, Atten= 46%, Lag= 11.8 min Discarded = 3.06 cfs 00 11.86 hrs, Volume= 0.543 of rima - c s 12.33 hrs, Volume= 0.016 of 4 .sr is Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.39' @ 12.33 hrs Surf.Area= 7,345 sf Storage= 5,491 cf Plug -Flow detention time= 11.7 min calculated for 0.559 of (100% of inflow) Center -of -Mass det. time= 11.6 min ( 759.8 - 748.3 ) Storage determined by Prismatic sections Elevation Surf.Area Open Inc.Store Cum.Store (feet) (sq-ft) (%) �47.0 (cubic -feet) (cubic -feet) 20.80 7,345 0 0 22.40 7,345 47.0 5,523 5,523 Discarded OutFlow Max=3.06 cfs @ 11.86 hrs HW=20.82' (Free Discharge) t-1=Exfi1tration (Exfiltration Controls 3.06 cfs) Primary OutFlow Max=1.71 cfs @ 12.33 hrs HW=22.39' (Free Discharge) t--2=Sharp-Crested Rectangular Weir (Weir Controls 1.71 cfs @ 0.3 fps) # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm EAltration over entire Surface area 2 Primary 22.38' 500.0' long x 1.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) r 02281 South portCommons Type I// 24-hr25 YR RainfalF7.67' Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 13 HydroCADO 6.20 s/n 000479 ) t 986-2003 Applied Microcomputer Systems 4129/03 Pond 1 P. Infiltration System Hydrograph • Pia • . _ • f s. • . cw yr 11 12 13 14 15 Time (hours) 02281 SouthportCommons Type 11124-hr 25 YR Rainfall=7.67' Prepared by Andrew & Kuske Consulting Engineers, Inc. HydroCAD® 6.20 s/n 000479 ©1986-2003 Applied Microcomputer Systems 4/29103 Pond 2P: Bypass Routing Pond 1801 Warning: Exceeded Pond 1 P by 1.60' @ 11.00 hrs (4.64 cfs) Inflow Area = 1.610 ac, Inflow Depth = 0.12" Inflow = 2.15 cfs @ 12.33 hrs, Volume= 0.016 of Outflnw— 12.34 hrs, Volume= 0.016 af, Atten= 6%, Lag= 0.3 min Primary = 2-02.tfs.@ 12.34 hrs, Volume= 0.016 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.58' @ 12.34 hrs Surf.Area= 96 sf Storage= 17 cf Plug -Flow detention time= 0.1 min calculated for 0.016 of (100% of inflow) Center -of -Mass det. time= 0.1 min ( 742.7 - 742.6) Storage determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) s -ft cubic -feet cubic -feet 22.40 96 0 0 24.00 96 154 154 Pr:r-ary OutF!ow Max=1.99 cfs @ 12.34 hrs HW=22.58' (Free Discharge) P, 1=Orifice/Grate (Orifice Controls 1.99 cfs @ 2.1 fps) 2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Iff Routina invert Outlet Devices 1 Primary 22.20' 6.0" Vert. OrificelGrate X 6.00 C= 0.600 2 Primary 22.60' 4.0' tong x 2.0' high Sharp -Crested Rectangular Weir 2 End Contractions) 1qO 02281 South portCommons Type fff 24-hr 25 YR Rainfaff=7.67" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 15 HydroCAD® 6.20 sln 000479 ©1986-2003 Applied Microcomputer Systems 4129103 u 3 0 LL Pond 2P: Bypass Routing Pond H yd rog ra ph Time (hours) ■ Inflow 0 Primary 02281 SouthportCommons Type RI 24-hr 50 YR Rainfall=8.33" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 17 HydroCAD® 6.20 sln 000479 ©1986-2003 Applied Microcomputer Systems 4/29/03 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Star -Ind method Subcatchment IS: Site Drainage Area Runoff Area=1.610 ac Runoff Depth=4.59" Tc=10.0 min CN=86 Runoff=10.53 cfs 0.616 of Reach 1 R: Bypass Peak Depth=1.00' Max Vet=3.7 fps Inflow=5.05 cfs 0.047 of D=12.0" n=0.010 L=400.0' S=0.0030 'r Capacity=2.54 cfs Outflow=2.73 cfs 0.047 of Pond 1 P: Infiltration System Peak Elev=22.40' Storage=5,523 cf Inflow --I 0.53 cfs 0.616 of Discarded=3.06 cfs 0.569 of Primary=5.09 cfs 0.047 of Outflow=8.15 cfs 0.615 of Pond 2P: Bypass Routing Pond Peak Elev=22.84' Storage=42 cf Inflow=5.09 cfs 0.047 of Primary=5.05 cfs 0.047 of Outflow=5.05 cfs 0.047 of Total Runoff Area = 1.610 ac Runoff Volume = 0.616 of Average Runoff Depth = 4.59" 3c)/ nD 02281 SouthportCommons Type 11124-hr 50 YR Rainfall=8.33" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 18 HydroCAD® 6.20 sln 000479 01986-2003 Applied Microcomputer Systerns 4129103 Subcatchment 1S: Site Drainage Area Runoff - 10.53 cfs @ 12.14 hrs, Volume= 0.616 af, Depth= 4.59" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 50 YR Rainfall=8.33" _ Area ac_ CN Description 1.220 98 _ Impervious Area 0.390 50 Green Area 1.610 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ftlsec) (cfs) 10.0 Direct Entry, Site Drainage Area Subcatchment 1S: Site Drainage Area Hyd rogra ph 10.53 cfs f rri� ' i munorr i r S •• • r � • 1 ! ii w. . . r1E ..... 11 12 13 14 Time (hours) 15 02281 SouthportCommons Type 11124-hr 50 YR Rainfall=8.33" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 19 HydroCAD® 6.20 sin 000479 01986-2003 Applied Microcomputer Systems 4129103 Reach 1 R: Bypass [521 Hint: Inlet conditions not evaluated [55] Hint: Peak inflow is 199% of Manning's capacity [76] Warning: Detained 0.003 of (Pond w/culvert advised) [80] Warning: Exceeded Pond 2P by 0.85' @ 12.38 hrs (14.64 cfs) Inflow Area = 1.610 ac, Inflow Depth = 0.35" Inflow = 5.05 cfs @ 12.25 hrs, Volume= 0.047 of Outflow = 2.73 cfs @ 12.30 hrs, Volume= 0.047 af, Atten= 46%, Lag= 3.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity-- 3.7 fps, Min. Travel Time= 1.8 min Avg. Velocity = 0.9 fps, Avg. Travel Time= 7.8 min Peak Depth= 1.00' @ 12.28 hrs Capacity at bank full= 2.54 cfs Inlet Invert= 22.40', Outlet Invert= 21.20' 12.0" Diameter Pipe n= 0.010 Length= 400.0' Slope= 0.0030 7 Reach 1 R: Bypass Hyd rog ra ph ------------ InBow ------------------ 5.05 ds------------------------------------------------------------- ® outflow Inflow Area=1.610 ac Peak. DepthF I_.00' 4 Max Vel=3.7 fps --------------------- ----------------- ;------------------------ i------D=1-2.0"--- 3 2.73 cts n=0.010 2 - S=0.0030 7' p ity=2.54--cfs--_ 1 = 11 12 13 14 15 Time (hours) 02281 SouthportCommons Type /// 24-hr 50 YR Rainfall=8.33" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page HydroCADO 6.20 s/n 000479 ©1986-2003 Applied Microcomputer Systems 4/29/03 Pond 1P: Infiltration System [82] Warning: Early inflow requires earlier time span Inflow Area = 1.610 ac, Inflow Depth = 4.59" Inflow = 10.53 cfs @ 12.14 hrs, Volume= 0.616 of Outflow - 8.15 cfs @ 12.24 hrs, Volume= 0.615 af, Atten= 23%, Lag= 6.5 min Discarded = 3.06 cfs 11.83 hrs, Volume= 0.569 of nmary = 5.09 cfs @ 12.24 hrs, Volume= 0.047 of Routng�y tor�nd method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.40' @ 12.24 hrs Surf.Area= 7,345 sf Storage= 5,523 cf Plug -Flow detention time= 11.5 min calculated for 0.614 of (100% of inflow) Center -of -Mass det. time= 11.4 min ( 759.4 - 748.0 } Storage determined by Prismatic sections Elevation Surf.Area Open Inc.Store Cum.Store (feet)` (sq-ft) (%) (cubic -feet) (cubic -feet) 20.80 7,345 r 47.0 0 0 22.40 7,345 47.0 5,523 5,523 Discarded OutFlow Max=3.06 cfs @ 11.83 hrs HW=20.82' (Free Discharge) L1=Exfiltration (Exfltration Controls 3.06 cfs) Primary Outflow Max=4.43 cfs @ 12.24 hrs HW=22.40' (Free Discharge) L2=Sharp-Crested Rectangular Weir (Weir Controls 4.43 cfs @ 0.5 fps) # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 22.38' 500.0' long x 1.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 33/ q0 02281 SouthportCommons Type 11! 24-hr 50 YR Rainfall=8.33" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 21 HydroCAD® 6.20 s!n 000479 © 1986-2003 Applied Microcomputer Systems 4/29/03 Pond 1 P: Infiltration System Hydrograph r • r ` _ F:�. p,f h< ------------------- --------------- i.yT>�u.._._:__.. 11 12 13 14 15 Time (hours) 02281 SouthportCommons ype U/ 24-hr 50 YR - " Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 22 HydroCADO 6.20 s/n 000479 © 1986-2003 Applied Microcomputer Systems _ 4129/03 Pond 2P: Bypass Routing Pond [801 Waming: Exceeded Pond 1 P by 1.60' @ 11.00 hrs (4.64 cfs) Inflow Area = 1.610 ac, Inflow Depth = 0.35" Inflow = 5.09 cfs @ 12.24 hrs, Volume= 0.047 of 04029. = 12.25 hrs, Volume= 0.047 af, Atten= 1%, Lag= 0.4 min Primary = _5.05 cfs @ 12.25 hrs, Volume= 0.047 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.84' @ 12.25 hrs Surf.Area= 96 sf Storage= 42 cf Plug -Flow detention time= 0.1 min calculated for 0.047 of (100% of inflow) Center -of -Mass det. time= 0.1 min ( 739.6 - 739.5 ) Storage determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 22.40 96 0 0 24.00 96 154 154 Primary OutFlow Max=4.88 cfs @ 12.25 hrs HW=22.83' (Free Discharge) 1=Orifiice/Grate (Orifice Controls,3.48'cfs @ 3.0 fps) 2=Sharp-Crested Rectangular Weir (Weir Controls 1.41 cfs @ 1.6 fps) # Routing Invert _Outlet Devices _ 1 Primary 2-2.20' 6.0" Vert. Orifice/Grate X 6.00 C= 0.600 2 Primary 22.60' 4.0' long x 2.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 3 s--/- q 0 02281 SouthportCommons Type 11124-hr 50 YR Rainfafl=8.33" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 23 HydroCAD® 6.20 s/n 000479 O 1986-2003 Applied Microcomputer Systems 4129/03 7 3 0 U. Pond 2P: Bypass Routing Pond H yd rogra ph 11 12 13 14 15 Time (hours) � InBow 8 Primary 361 q0 02281 SouthportCommons Type H/ 24-hr 100 YR Rainfall=9.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 24 H droCAD® 6.20 s/n 000479 © 1986-2003 Applied Microcomputer Systems 4/29/03 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Site Drainage Area Runoff Area=1.610 ac Runoff Depth=5.33" Tc-10.0 min CN=86 Runoff=12.22 cfs 0.716 of Reach 1 R: Bypass Peak Depth=1.00' Max Vet=3.6 fps Inflow=9.15 cfs 0.104 of D=12.0" n=0.010 L=400.0' S=0.0030 '1' Capaci4=2.54 cfs Outflow=2.54 cfs 0.104 of Pond 1P: Infiltration System Peak Elev=22.42' Storage=5,591 cf Inflow --I 2.22 cfs 0.716 of Discarded=3.06 cfs 0.610 of Primary=9.79 cfs 0.104 of Outflow=12.85 cfs 0.715 of Pond 2P: Bypass Routing Pond Peak Elev=23.10' Storage=67 cf Inflow=9.79 cfs 0.104 of Primary=9.15 cfs 0.104 of Outflow=9.15 cfs 0.104 of Total Runoff Area = 1.610 ac Runoff Volume = 0.716 of Average Runoff Depth = 5.33" 02281 SouthportCommons Type 11124-hr 100 YR Rainfall=9.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 25 HydroCAD® 6.20 sin 000479 ©1986-2003 Applied Microcomputer Systems 4/29/03 Subcatchment 1S: Site Drainage Area Runoff - 12.22 cfs @ 12.14 hrs, Volume= 0.716 af, Depth= 5.33" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt- 0.01 hrs Type III 24-hr 100 YR Rainfall=9.50" Area (ac) CN Description 1.220 98 Impervious Area 0.390 50 Green Area 1.610 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) _ (fUft) t;ft/sec} (cfs) 10.0 Direct Entry, Site Drainage Area Subcatchment 1S: Site Drainage Area H yd rog ra ph 12-' .• 11 • 1 • --. y,. .. 47 11 12 13 14 15 Time (hours) 02281 SouthportCommons Type 11124-hr 100 YR RainfaU=9.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 26 HydroCADO 6.20 s/n 000479 © 1986-2003 Applied Microcomputer Systems 4/29/03 Reach 1R: Bypass [52] Hint: Inlet conditions not evaluated [55] Hint: Peak inflow is 361% of Manning's capacity [76] Warning: Detained 0.038 of (Pond wlculvert advised) [801 Warning: Exceeded Pond 2P by 1.00' @ 12.58 hrs (14.95 cfs) Inflow Area = 1.610 ac, Inflow Depth = 0.78" Inflow — 9.15 cfs @ 12.19 hrs, Volume= 0.104 of Outflow = 2.54 cfs @ 12.23 hrs, Volume= 0.104 af, Atten= 72%, Lag= 2.4 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 3.6 fps, Min. Travel Time= 1.8 min Avg. Velocity = 1.1 fps, Avg. Travel Time= 6.0 min Peak Depth= 1,00' @ 12.19 hrs Capacity at bank full= 2.54 cfs Inlet Invert= 22.40', Outlet Invert= 21.20' 12.0" Diameter Pipe n= 0.010 Length= 400.0' Slope= 0.0030 T Reach 1 R: Bypass H yd rog ra ph 10----------- --- 15 cfs •------------' Inflow Area=1.610 ac ----------------------- � -------------�-�---- ---- _- --Peak Depth=1.00'-- g------------------ -------------- ------------ - Ma0e1=16 fps 7----------------------------------------- ----- - D=12.Q" 0 n=0.10 LL .-----.-------.------.---- -.--�= 400:0--- 4 ----------------------- - =0.0030'1' 2.54 cfs . - Capac 02:54 cfs 2 ---•------------------ _ -.._.. ;.----------_......._---_,. 11 12 13 14 15 Time (hours) Inflow 5 outflow 39/ 10 02281 SouthportCommons Type 11124-hr 100 YR Rainfall=9.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 27 HydroCADO 6.20 s1n 000479 OO 1986-2003 Applied Microcomputer Systems 4/29/03 Pond 1 P: Infiltration System [82] Warning: Early inflow requires earlier time span [91] Waming: Storage range exceeded by 0.02' [88] Warning: Qout>Qin may require Finer Routing>1 Inflow Area = 1.610 ac, Inflow Depth = 5.33" Inflow = 12.22 cfs @ 12.14 hrs, Volume= Outflow = 12.85 cfs @ 12.18 hrs, Volume= c =06 gis a 11.79 hrs, Volume= Prima Ill2.18 hrs, Volume= 0.716 of 0.715 af, Atten= 0%, t_ag = 2.9 min 0.610 of 0.104 of Routing by Stor--Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.42' @ 12.18 hrs Surf.Area= 7,345 sf Storage= 5,591 cf Plug -Flow detention time= 11.1 min calculated for 0.713 of (100% of inflow) Center -of -Mass det. time= 10.9 min ( 758.5 - 747.6 ) Storage determined by Prismatic sections Elevation Surf.Area Open Inc.Store Cum.Store (feet) _ (sq-ft) , (%) (cubic -feet) _ _(cubic -feet) 20.80 7,345 47.0 0 0 22.40 7,345 47.0 5,523 5,523 Discarded OutFlow Max=3.06 cfs @ 11.79 hrs HW=20.82' (Free Discharge) t-1=Exfiltration (Exfiltration Controls 3.06 cfs) Primary OutFlow Max=11.16 cfs @ 12.18 hrs HW=22.42' (Free Discharge) t--2=Sharp-Crested Rectangular Weir (Weir Controls 11.16 cfs @ 0.6 fps) # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 22.38' 500.0' long x 1.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 02281 SouthportCommons Type !ll 24-hr 100 YR Rainfall=9.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 28 HydroCADO 6.20 sln 000479 01986-2003 Applied Microcomputer Systems _ _ 4/29/03 Pond 1 P: Infiltration System s . Q. • r n ` i ---------------- t_ w .x 11 12 13 14 15 Time Ihoursj 02281 South portCommons Type III 24-hr 100 YR Rainfa11=9.50° Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 29 HydroCAD® 6.20 sln 000479 01986-2003 Applied Microcomputer Systems _ 4/29/03 Pond 2P: Bypass Routing Pond (801 Warning: Exceeded Pond 1 P by 1.60' @ 11.00 hrs (4.64 cfs) Inflow Area = 1.610 ac, Inflow Depth = 0.78" Inflow - 9.79 cfs @ 12.18 hrs, Volume= 0.W4 of Qutflomg.= 12.19 hrs, Volume= 0.104 af, Atten= 7%, Lag= 0.4 min Primary = : 9�12.19 hrs, Volume= 0.104 of Routing by Star -Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 23.10' @ 12.19 hrs Surf.Area= 96 sf Storage= 67 cf Plug -Flow detention time= 0.1 min calculated for 0.104 of (100% of inflow) Center -of -Mass det. time= 0.1 min (737.3 - 737.2) Storage determined by Prismatic sections Elevation Surf.Area inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 22.40 96 0 0 24.00 96 154 154 Primary Outflow Max=9.02 cfs @ 12.19 hrs HW=23.09' (Free Discharge) —00 12=Sharp-Crested 4=Orifice/Grate (Orifice Controls4`53"cfs @ 3.8 fps) �W Rectangular Weir (Weir Controls 4:49 cfs-@ 2.4 fps) # Routing Invert Outlet Devices 1 Primary 22.20' 6.0" Vert. Orifice/Grate X 6.06 C= 0.600 2 Primary 22.60' 4.0' long x 2.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) 02281 South portCommons Type !ll 24-hr 100 YR Rainfall=9.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 30 HydroCAD® 6.20 s/n 000479 ©1986-2003 Applied Microcomputer Systems �. 4/29/03 Pond 2P: Bypass Routing Pond Hydrograph ------------•------ Inflow 9: 9 cfs ----------------- �] Primary 10 --------------------- ----Inflow--Area=1-.610-ac-- 9.15 cfs ------ Peak- Elegy=23.10'- ----------------------- ----- ---------- Sto;rage=67 cf--- -----.._-------- ---- -------------- 3 .------------------ --- ----....--------------- .2 ------------- 4-------•------------- - --- ..---- --------------... --•---------------- 2 ---------------- ------------------------- ------- 11 12 13 14 1s Time (hours) Date Deslgr, Andrew and Kuske Sheet Q/ZS�iT CONSULTING ENGINEERS, INC. �3 902 Market St. Wilmington, N.C. 28401 Of Check Job For Job No. I�/IoE. CC..GVGr'rT1o..Ci_loc�Tlt�o�-T`� �/c fjZZB/ Cu- -T3'7 0 —,Aj iycr� : /�ivE c�rr- G �c ern �.�,...• Fay- ,7r�� /o yrc z s- y R- ��✓� -tea y2 sr�.G .---� /�'�-+� E.-✓� � �..rL�o c_ .77'G-il7"i F.U/,mE _ I /ter T7yZ r�- oe- /G- a '0� A'-' -- -4-f Date Design ���� Andrew and Kuske She n 41 9�3 .74,,,��� 902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Ofi IQ Check Job For Job No. �# 011PIF:' Sa�TJ�' fir, ^/G b Zz8 f CA WEST PA(ZI<(NG, TOTAL fkcKr--S 0.2-1 1Mf, Acf-es DJ '3 (, kf-bv ACKE-S 0,11 C= O,(,7 Q10 0 2c, ( b. I c) Z 9) QzS = ) 5 8 c.F S asp - Ca, 1�7)(g,Z-7) (o, z9) Aso = ! ,7 Z c,Fs CENTF.P-- 7 AKKIOG 3F307, Ge.EEIJ "ro i A L A A A E-S o. 2- a imp, A ce-&� o. 18 C,e-Ef l Ac-,eGs 0. I o o,.l � 4- d%p 1 M�ERvrot�S �b�o G, 2EEJJ n.ZB �- c%A G b tp8 crs QzS= 1,SS cis 12" RCP-10 Yr. Storm West Parking Lot Worksheet for Circular Channel Project Description Project File c:lhaestadlfmw102281 so.fm2 Worksheet 02281 Southport Commons 10 Yr. West Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.0030 ft/ft Discharge 1.40 cfs Results Depth 10.6 in Diameter 10.60 in Flow Area 0.61 fF Wetted Perimeter 2.77 ft Top Width 02e-7 ft Critical Depth 0.52 ft Percent Full 100.00 Critical Slope 0.0070 fUft Velocity 2.29 fUs Velocity Head 0.08 ft Specific Energy 0.96 ft Froude Number 0.72e-4 Maximum Discharge 1.51 cfs Full Flow Capacity 1.40 cfs Full Flow Slope 0.0030 ftlft Flow is subcritical. 04r25103 FlowMaster v5.13 11:57:17 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 7555-1666 Page 1 of 1 �� / 10 12" RCP-25 Yr. Storm West Side Parking Worksheet for Circular Channel Project Description Project File c:\haestad\fmwk02281 so.fm2 Worksheet 02281 Southport Commons 25 Yr. West Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.0030 ft/ft Discharge 1,58 cfs Results Depth 11.1 in Diameter 11.09 in Flow Area 0,67 ft2 Wetted Perimeter 2.90 ft Top Width 0.00 ft Critical Depth 0.55 ft Percent Full 100.00 Critical Slope 0.0069 ft/ft Velocity 2.36 ftls Velocity Head 0.09 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 1,70 cfs Full Flow Capacity 1.58 cfs Full Flow Slope 0.0030 fttft 04f25103 FlowMaster v5.13 11:58:08 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06706 (203) 755-1666 Page 1 of 1 47/ qo 12" RCP-50 Yr. Storm West Side Parking Worksheet for Circular Channel Project Description Project File c:lhaestadlfmw102281 so.fm2 Worksheet 02281 Southport Commons 50 Yr. West Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.0030 ft/ft Discharge 1.72 cfs Results Depth 11.4 in Diameter 11.45 in Flow Area 0.71 ftz Wetted Perimeter 3.00 ft Top Width 0.00 it Critical Depth 0.57 ft Percent Full 100.00 Critical Slope 0.0069 fUft Velocity 2.41 f is Velocity Head 0,09 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 1.85 cfs Full Flow Capacity 1.72 cfs Full Flow Slope 0.0030 ftlft 04125M FlowMaster v5.13 11:58:53 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 75&1666 Page 1 of 1 12" RCP-10 Yr. Storm Center Parking Worksheet for Circular Channel Project Description Project File c:Ihaestadlfmw102281 so.fm2 Worksheet 02281 Southport Commons 10 Yr. Center Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.0030 ft/ft Discharge 1.38 cfs Results Depth 10.5 in Diameter 10.54 in Flow Area 0.61 ft2 Wetted Perimeter 2.76 ft Top Width 0.00 ft Critical Depth 0.52 ft Percent Full 100.00 Critical Slope 0.0070 ft/ft Velocity 2.28 ftls Velocity Head 0.08 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 1.48 cfs Full Flow Capacity 1.38 cfs Full Flow Slope 0.0030 ft/ft 0425A3 FlowMaster v5.13 11:56A3 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06706 (203) 755-1666 Page 1 of 1 12" RCP-25 Yr. Storm -Center Parking Lot Worksheet for Circular Channel Project Description Project File c:lhaestad\fmvA02281 so.fm2 Worksheet 02281 Southport Commons 25 Yr. Center Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0,0030 ft/ft Discharge 1.55 cfs Results Depth 11.0 in Diameter 11.01 in Flow Area 0.66 ft' Wetted Perimeter 2.88 ft Top Width 0.2e-7 ft Critical Depth 0.54 ft Percent Full 100.00 Critical Slope 0.0070 ft/ft Velocity 2.35 ft/s Velocity Head 0.09 ft Specific Energy 1.00 ft Froude Number 0.72e-4 Maximum Discharge 1.67 cfs Full Flow Capacity 1.55 cfs Full Flow Slope 0.0030 ft/ft Flow is suberitical. 04r25103 FiowMaster v5.13 11:57:45AM Haestad Methods, Inc. 37 Brookside Road Waterbury, C706708 (203) 755-1666 Page 1 or 1 12" RCP-50 Yr. Storm -Center Parking Lot Worksheet for Circular Channel Project Description Project File c:lhaestadlfmw102281 so.fm2 Worksheet 02281 Southport Commons 50 Yr. Center Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.0030 ftlft Dischar a 1.69 cfs Results Depth 11.4 in Diameter 11.37 in Flow Area 0.71 ft2 Wetted Perimeter 2.98 ft Top Width 0.00 ft Critical Depth 0.56 ft Percent Full 100.00 Critical Slope 0.0069 ft/ft Velocity 2.40 ft/s Velocity Head 0.09 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 1.82 cfs Full Flow Capacity 1,69 cfs Full Flow Sloe 0.0030 ft/ft 04/25M FlowMaster v5,13 11:58:32 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 r Li n. N Q N o C 1np � Q c U w � u - m N G q 8 I G � � Y1 O :1 U Y� 8 a ro 77 � c a U C p V O z 0 E NN C U h E o o � U _ 8. l'o his .. 2 )/- .. P f �_. fey Lu CL }2 §a;? § mo �� � n k 2 § fU i 0 kt0 ®t;E k $�$ 12 §\FLC)� 4 % E$ § Q nF � < �R ±k c�E c-_ § / Z) mUJ mf 0 G /Fn § �k f k� |a 2EL J� - »E2^ I / ,LL a � �\? § t 77 § § f£ ) f \R 2 c 2 !§ (M'D kk otk 6 v� 22> t, i7 k§/ §/§ $ &P,7 M 1tlm�°a o Z) E v i y �w 0 1°ta o m � > iu-v m Q W N tl OR m 12 N U 3 O fA O o to a aQ o CO— LL R U v fA N) O 0 0 C � O ..I C O W N C N i7o at°+o Q nz O E z a Ave' 4volo cs / _a cv 7^/ M1 t m J c CD vi 0 � e � 0 2 � CL (L Y $ « oof ;p 6v // go / --d air -7/*/ �7� 0b14-5 Infiltration Bypass -Outlet Velocity-25Yr Worksheet for Circular Channel /S10#044*0 dwTG41157- Project Description Project File f:lhaestadlflowma-1\02281s-1.fm2 Worksheet 02281 Infiltration Outlet Energy 25 Yr. Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0,0125 fUft Diameter 15.00 in �"'J► Discharge 2.02 cfs eA,00.1w 0-e-VAPAO 4=4vo Results . Depth 5A in Flow Area 0.40 fF Wetted Perimeter 1.61 ft Top Width 1.20 ft Critical Depth 0.57 ft Percent Full 36.17 Critical Slope 0.0055 ft/ft Velocity 5.05 fUs Velocity Head 0.40 ft Specific Energy 0.85 ft Froude Number 1.54 Maximum Discharge 7.77 cfs Full Flow Capacity 7.22 cfs Full Flow Slope 0.0010 ftlft Flow is supercritical. /`/O d Are Afrf - -4tz J-7aA­,.v7 el'T /o (1JC4"L 04 29103 FlowMaster v5.13 01:54:34 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 756-1666 Page 1 of 1 02282 Southport Outfall Pipe Design 50Yr Worksheet for Circular Channel Project Description Project File f:lhaestadlflowmaster102281 so.fm2 Worksheet 15" Outfall Pipe 50 Yr. Storm Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth _ _ Input Data Mannings Coefficient 0.013 Channel Slope 0.0125 ft/ft Diameter 15.00 in Discharge 5.09 cfs 0" AL-* QA..* [ Results Depth 0.77 ft Flow Area 0.80 ftz Wetted Perimeter 2.26 ft Top Width 1.21 ft Critical Depth 0.91 ft Percent Full 61.93 Critical Slope 0.0079 fVft Velocity 6.38 ft/s Velocity Head 0.63 ft Specific Energy 1.41 ft Froude Number 1.39 ---- SOMaArnurn Discharge 7.77 cfs Full Flow Capacity 7.22 cfs Full Flow Slope 0.0062 ftlft Flow is supercritical. 04r4003 FlowMaster v5.13 10:50:00 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 02282 Southport Outfall Pipe DesignlOOYr Worksheet for Circular Channel Project Description Project File f:Ihaestadlflowmaster102281 so.fm2 Worksheet 15" Outfall Pipe 100 Yr. Storm Flow Element Circular Channel Method Manning's Formula Sole For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.0125 Rift --iJ► Discharge 9.79 cfs AA-rO-r /" VIO I4-10 40"" Results Depth 16.8 in Diameter 16.81 in Flow Area 1.54 ftZ Wetted Perimeter 4.40 ft Top Width 0.00 ft Critical Depth 1.21 ft Percent Full 100.00 Critical Slope 0.0115 ftlft Velocity 6.35 ft/s Velocity Head 0.63 ft Specific Energy FULL ft Froude Number FULL .`•Oft Maximum Discharge 10.53 cfs Full Flow Capacity 9.79 cfs Full Flow Slope T, 0.0125 ft/ft 04rd O3 FlowMaster +F.13 10:38:19 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06-706 (203) 755-1666 Page 1 of 1 Date Design Andrew and Kuske Sheet<10 5X-3 _ CONSULTING ENGINEERS, INC. O902 Market St. Wilmington, N.C. 2.-1 Check Job L For Job No, C/`fGG�/L/7'17cry r lit//G C- c c�t7E e- / C o .v 7 -o G --7/v-'o L vN-r /2 � /✓ 77y r /I•/ G G-Tf % ✓-i/•�/a -�"� _/ �i/ E G CIS C6 �J�S'Tyf�vC 77v�1 �i✓T%�/77!VLE /h'v Q S' / � � �Ei�1G� rti7�JTj�t.1 G /TE-' il,-ye- y E/lrt_. S 7-b'eL A- r OOP- C /-0 P,//�E ,Q= /8" //'r/ ✓ - -5.38 1'--.pr 00/C,- z49A/4r / G STl'^-iC ��.r /'p9 ♦ is fiF / Cmoa X S'yli`.--s ovrz_�r .�io ,,/07K _77b ez-✓1. S-i Z4e!:7 ✓ = S. OS f�.r ZS '7•Eira+L �ib.�.-,...r v� � ac i ,may T2-�^-7 4mrG-aG..-,, ��STaC2 C��Ti��✓T Date Design Andrew and Kuske 4tz-r/0'7 --W902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 pf U Check Job C�rtp For SpvT/I�2T.•••�,•Job No. c.rx. tie. 07-7-61 I.SE -jr & " X /S -' X / ' ^/G 4 oT G L 4 Js B '—'Co f/ o- . C o ,, J 7-, . L• 4 ^"- r+71 A- /vF / K'OO K oc=ri C TL/L_ F�B�/G I; vbr� ; �v� �✓�sc .nE �rT` .�r� is yc , sz� , S Ll 2 S Tv et. ,..� . ID f=.za.h G� o�.. r•i, �rL�.,� -/�� •-� v � � So/J crry�J �v oLG � �,o F�.S Vegatative Filter Velocity 25 Yr. Storm Worksheet for Trapezoidal Channel Project Description Project File f:Ihaestadlflowmaster102281 so.fm2 Worksheet Vegatative Filter Flow Element Trapezoidal Channel Method Manning's FOrmula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.0125 ft/ft Left Side Slope 1.0000 H : V Right Side Slope 3.0000 H : V Bottom Width 8.00 ft Discharge 2.02 cfs Results Depth 0.16 ft Flow Area 1.30 ftz Wetted Perimeter 8.71 ft Top Width 8.62 ft Critical Depth 0.12 ft Critical Slope 0.0268 fttft •'Velocity 1.56 ftls Velocity Head 0.04 ft Specific Energy 0-19 ft Froude Number 0.71 Flow is subcritical. 04r-40M FlowMaster v5.13 12:00:39 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755.1666 Page 1 of 1 Cross Section Cross Section for Trapezoidal Channel Project Description Project File f:lhaestadlflowmaster102281 so.fm2 Worksheet Vegatative Filter Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coefficient 0.030 Channel Slope 0.0125 ft/ft Depth 0.16 ft Left Side Slope 1.0000 H : V Right Side Slope 3.0000 H : V Bottom Width 8.00 ft Discharge 2.02 cfs V. 1V I 8.00 ft V H '1 NITS 044r-XIC3 FlowMaster r5.13 12:00:56 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 0670E (203) 756-16W Page 1 of 1 f 0 w w IL N Q . uJ ww Z > 0 .1 . Cn U LL X 00 LL z 0 Co -- z �o �Cn �z �- w C� �u � 0 a y 6 � f M C 3 • Y � O � 4 u ti 1 Q o C q c oo > ti0 • k . .. V • • u Y •-� a Y • i a o aC • o gu cL z 0 I% A ^ 4 � d r.0 0 0 C_ CL O % - .ti O- U i..z Q p d P r CC • c a Y Y o v > s• � � C O w �. ` P 4 C C V O { N Vl Yl NV 111 Vt fI'1 O 2NOz f- I - l- l- lr•lnl, A 6Z/10 ul u Cl- `631� 0 CHART G-3 Maximum Allowable Design Velocities for Vegetated Channels' Permissible Velocity Typical for Established Channel Slope Soil Characteristics Grass Lining Grass Lining (ft/sec) 0-5 % Easily Erodible Bermuda -grass 0 Non -plastic Tall Fescue 4.5 (sand & silts) Bahiagrass 4.5 Kentucky bluegrass 4.5 Grass -legume mixture 3.5 Erosion Resistant rpermudagrass ,� Plastic I ali Fescue 5.5 (clay mixes) Bahiagrass 5.5 Kentucky bluegrass 5.5 Grass -legume mixture 4.5 5-10% Easily Erodible Bermudagrass 4.5 Non -plastic Tall Fescue 4.0 (sand & silts) Bahiagrass 4.0 Kentucky bluegrass 4.0 Grass -legume mixture 3.0 Erosion Resistant Bermudagrass 5.5 Plastic Tall Fescue 5.0 (clay mixes) Bahiagrass 5.0 Kentucky bluegrass 5.0 Grass -legume mixture 3.5 >10 % Easily Erodible Bermudagrass 3.5 Non -Plastic Tall Fescue 2.5 (sand & silts) Bahiagrass 2.5 Kentucky bluegrass 2.5 Erosion Resistant Bermudagrass 4.5 Plastic Tall Fescue 3.5 (clay mixes) Bahiagrass 3.5 Kentucky bluegrass 3.5 *Source: USDA-SCS Modified, Erosion and Sediment Control Planning and Design Manual, NC Department of Natural'Resources and Community Development, Land Quality Section, May 1994. NOTE: 'Permissible velocity based on 10-year storm peak runoff. Soil erodibility based on resistance to soil movement from concentrated flowing water. 3Before grass is established, the type of temporary litter used determines permissible velocity. Stormwater Management Technical Manual 46 Southport, North Carolina z 0° 0' D 1' 0 z � ��I't t ¢Ff' �� "�°} i5 i6��Jy_ 1 )J' '!',� �: _... 'F,Y ! ,� Y%!' M $ J(/%S�UV" "LV {�✓ FF` � T►r {{ s7 il' 1r/# LS k3 y-er�1'- .� may- 'r{ ! { KiV' rs 4' _ +. sY. (� Z V r \ � ^�+Ga[4e�i a�,� 1 ".�,kv�'Y,F�I;\` �hbP�' '�`• Y��.• ��' �+F y0 SI )c 4 � gip. / • (j.''F � � M, �.l\ +�i+�ti f+t � h � gi„q C •.�;'r}s'+� 7fF r �,. .,. � k. ��'el�'*<iria�s5" I pT� ��8y•) }'� — IV ��*ry�y�Pdfi� Wi1r>l Y +,��nyd. X"t7.., P ` � r � } &"'�$ is { a � �i`�� � ��..,k.f"' 30 z +,,F.F .�' �•1•.�'y. `{'���' yq8=.i, C�.y�''yr�ii� �+ '�', � ' v it r ,,• i§ M�OF' � , > � � r �"'�� S® j ! _,r s �Aw� � �, � F.�U �r �:i ''" �t,' �.� "�' � 3` eM92��4�1',����' {'�� a • dy¢� ➢ ,�'�� +� ��1 .� 1 JfC:�° 'i{�%�a Z G-�> 'ut'kv iV} 521� �+�yC � F w F�Fyy ��„�,y : 1.• y�F� 'Sf,�� yit i'•�d �� � 14Wai3 � ., t- ��j� -0 p I ! \. �r`dr -_.-_ — (1 •�_ [p 1dTf� : �'u"Is"k,��ii N 3'y }! +w,�s` f $°7, E s • "-�, ei'Lat4 ; .v. �. 1 ifs s �` i r ���' � rZ�J{ �tx � 8a� `°� i►" -w--✓-� r..l. � 1�t� t.,'# i ��'r`>c4:�y�k, r :aJ� "w ^rT+' + -'7 \" �LG4" �A y�� � 36s R2 i 'h' •�" �.' '1�..' NS J y vF� ~ I ! b �� � rHri kyif r1 qs E I tai f{ Ax �`�,�aWcca� fil \ ,}$.'.� � q/� ! -.� �)�5A +Kt 1S! ,-""`l ♦ ,*^ " •'...�,3�',,.. - - ?'i • .i, ♦I~. �.��)?ter' - .+y � -`a•. - ��f,� fi 2 Fit, hy'S y(f � � �"'4- - ���I ] �' y 1M 6 �*•v 'l r^ Vn Z_{(18 4 ! r `;+ 9�% � i� �•iv�., � S+h.!' ✓iA' �' �'��if 1 •��•� N�'�� �f % � "fir 0. i h+ s - „���r' �r��''.+i'�'� � �' ' �$ i iit �Cr 'Fr � � • • • ,f, � ♦ �+ky... k .,1}�! .�"„r.��'g � 5: � � ° �k1}1��-j.�Z'�°j J y�am, .�, �y',(,� f k� i n��.j t. -'.Fr �'1F�.,��'•>'-,X �1 ♦ .=R'.. ,;. _ hx�. �,,P6D• pY�li'�`�' t 7.k+"i3�� 1yP U � `� ,Ugg A ��'1�.:i,,gtSSf P? F� {i !f Y'X� J•�l,I^ � �rAMr'^. Y v�. �� Y�y ,�`I'�S 1� .w'•-'Jy' �:Y 2��� !/.�Y'Y' 1 �yk .rk-� 1'. y � Y G�f• ^` �Jl �'*'4f,ry f�Y�'•`CV b}� ( }I{{ � VI 3�'1' '„S ac sW. ;iY, `'^Yfra s j iF 3. y�.. �,: s -'""" r;•YfS9 a1\v. � y � x � �r� ••Ir ��i$ �� ,,, 4� 'FL]triYpt, �r ���."�d+ �'�"��� y. ��E,� _ ��k 'V. �0 . is�'F Y`"`.�"� \ — Ln' 'n yy 'k'1. ✓h+ ?l4' A:+ yry- gF�y9�f Sc ly, ''slot`.' y .' �. .p 3"�1.,.'♦ �y1�iygc" t r ^+� f,,". M1 r+. + 'TI��' ^F • '4}�'�'9 758 y70 f V— 1'i/7 ! bl�n�� P i i � }S ` if�.� ft�r j6�'y ., CtJ� � k.`�4���,� �l �ie �di �".r'fJ`4r � ..- • �Fw� Y i!y/ ; � 'S ka9i �"`t}. ri ,�y is ' � £ �� Vl� 57, f � • 4♦ � s � �'-} \ �y -? +l J y ( trl it } gtt1 'y 4• S T ( i t �� _. •s t ,�, � w f 'nth Y? [ rS , �: +54�. is .t,., 3I � :,1 � F+{'-` 1 ''yy9p�•�' Y(i%. ! '• �r� � L � li} 1 % �n Y'r -1 `'iFC �i i - tS S. [7 '7)w/! Z DSglFl7t'ygy i wr S`" >•2n,\ y ^.. •.'i,'a r _ _ 1 - roa , '' J�. �?�' s `~i.ia w s 1' > �!S rq' �'��` i, � • . .� E � roRP F�: � �,k � ,,�� F . , ! J J� 7 , � �r � � , 3 t ��^r.� Y �- � •+ �®,M t : i1r 'dM ry F,y 4+y�8 m� p 1. Ii � ��� � t z c f( F, �tv r, � V' 4�Ir4 1 �' h'Y4 7,4. � la -S4A.� �, - ��•_.. 1S ��•r. ,c� � � '�' �3! .�snr � a � - ^•^ w 's .. Fes. rf — ro � n 1 8 °0 '0. 8 0 "D '0. 8 0 of Name: SOUTHPORT L.ocabon: 033° 56' 03,9" N 078° 01' 13.8" W Date: 4/23/103 Caption: Southport Commons Ditch/Creek Scale: 1 inch equals 2000 feet Copyright (C) 1997, Maptech, Inc. , II 5 Jan- 10-03 07 : 23A ENGINEERING CONSULTING SNRVICES, I,CD. _ Gcotcchnical Construction Materials Environmental December 13, 2002 Mr. Jim Wcnning Wrightsville Builders 1430 Cornmonwcaith Drive Wilmington, North Carolina 28403 Re: Infiltration Evaluation highway 211 Site Southport, Torch Carolina Job # 22.10534 Dear�Ir. Wenning Engineering Consulting Services, Ltd. (ECS) recently conducted an infiltration evalualion for the development of the Highway 211 site located near Southport, North Carolina- This letter, with attachments, is the report of our investigation. Field and Laboratory Investlgations- On December 16, 2002, ECS conducted an investigation of the subsurface soil and ground .eater conditions within an area at the rear of the site as indicated on the provided Site Sketch. The purpose of our investigation was to determine the suitability of the in -place soils for the infiltration Rf storm water runoff. This location was selected because of its surface elevation and for its location outside of the prime developable areas. Our representative investigated the subsurface soil and ground water conditions by drilling a hand auger boring to depths of approximately six feet below the existing ground surface at the appmxirmte location indicated. We visually classified the subsurface soils and obtained represen(ativc samples of each soil type encountered. The attached Site Soil Evaluation form provides a summary of the subsurface conditions encountered at the auger boring location. Selected soil samples frorn the hand auger boring were tested in our laboratory for grain size in accordance with the American Society for Testing & Materials (ASIM) Procedures, entitled ASTM D-422.; "''article Size Analysis of Soils". Results of those tests are tabulated on the attached GTain Size: Analysis Summary Form. Our field classifications and laboratory test results indicate that the subsurface soils Consisted of 6-inch surface organic topsoil strata which is underlain by a tan fine to medium sand strata.. This tan sand strata extended to a depth of 48 inches below the existing surface where a free draining gray fine to medium sand strata was encountered. This gray sand strata extended to the depths we were capable of investigating to using hard tools. P.02 6Z-/r D P. O. Box 10434, Wiloiinglon. NC �8404 . i9to) 686.91 14 . FAX (910) 686.9666 . 1.800-327-5837 . Jacksonville. NC 1910) 355-2727 . www.ccsFmilcd.cnm Aberdecr.,1NU' A:fanta, CIA Aaaq T?{ H.ilrirru+;c. MU Chzaeilly,\ d Clueluete. KC - (h eagn, N_ (arreLu.GA' ' bjllas. TX - Oanc:11c. VA- Frtx!c6ek. MD - Fj-dcrwk rg- VA Gretnsbaro, NC Gr gvirlc. SC Nnrfol�. VA Rrar;uch'1ri,gak Perk. N(: Rs hwand. �'A Kouuke. V A $aa Aroor e, TX will,rni,,boq. VA W dmmgir4n, NC • µ'imj.mt-r• VA 'rL%3irt& timices Only , [i" P.03 Jan-10-03 07:24A J.]ri UO UJ UC:Lrt+ Ground water was nut encountered at the time of our exploration to the depths we were capable of investigating using hand tools during this site visit. We did however denote a gray coloration in the drainable sand strata below 48-inches. It is our opinion, that this is an indication of a seasonal high groundwater condition in this area. We also conducted an infiltration test near the hand auger boring location to estimate infiltration rates for the subsurface soils. The infiltration test was conducted within the upper stratum of tan drainable fine to medium sands, where the base of an infiltration system wilt need to be located in order to be at least 24 inches above seasonal high ground water levels. The infiltration test was performed at a depth of approximately 24 inches below surface grade and indicated an infiltration rate of-0.3 inches per minute. EValuations Based on observations in the hand auger boring, it is our judbmrcnt the seasonal high ground water level at the site at the location selected will be at a depth of approximately 48- inches below surface grade. 1'_n order to keep the base of the infiltration system at least 24 incites above the level of the seasonal high ground water levels, the infiltration system will need to extend no deeper than 24 inches below surface grade at the location selected.. Such installation depths will place the base of the infiltration systetn within the upper stratum of tan drainable fine to medium sands. Our lest results indicate that the infiltration rate for these materials is as low as 0.3 inches per minute. The lower stratum of relatively fee -draining fine to medium sands, within which seaw)nal high ground water levels arc likely to occur, is expected to have infiltration rates considerably greater than the controlling infiltration rate of 0.3 inches per minute for the shallow soils. It is also likely the seasonal high groundwater conditions and infiltration rates can vary across tins site due to naturally occurring soil type and because of the surface topography, Attached please find the results of our field testing and a sketch of the location tested. If you have any qucstit)ns after rcvieuring this report, please do not hesitate to contact us. Respectfully, Engineering Consulting Services, Inc. Parks A. Downing, Jr. � t 1 11eri yeas, F.E. � Wilmington Area Manager Principal EnginecrINC Licensed I6085 Attachments: Site Sketch Site Soil Evaluation Form Grain Size Analysis Summary Form .. .Jan-10-03 07:24A Jtl11 ViJ V3 f-•LVr P_04 1 6 7% D Location kl Site Evaluation Highway 211 Site Southport, North Carolina 17eplh Soil DescrhWon 0.81' Crass and Topsoil R-48" Tan Fine to Medium SAND 48-72" Gray Finc to Mediiint SAND No Groundwater encountered at depths explored during this site visit Grain Size Analysis Highway 211 Site Southport, North Carolina I .ocation # 1 #2 Depth 8A8" 43 72" Sieve Sire Percent Fassia II 10 100.0 99.8 40 90.2 79.3 80 11.2 8.4 200 3A 1.5 Moisture Content/Percent 6.4% 17.5% Soil Description Tan Fine to Medium Gray Fine to Medium SAND SAND - 11, • Jan-10--03 07 24A �_. _.._ --- _-- ---- P.05 r. It ! r H o r 1 1 Y JA 4 \ r 1 it 4 � ►y ,I'll +� ` t, } _ i � wS � i� ' 1 � y tl t 1's � �► i � F� � � /'�� '� t ty 1 +lr • j' ; s � / i r 1 11 � 0 ' � t 1 �i4-1 Pat`\ IL ti It. 26.30 \ 1 Mr lii�l � 1 +f f�fr �o / III" i Jill y a ill Jill f � 5\ , � _ � � -'+• � � �' � � �- r :ak II�1 1141 471 �F� C L9 1 Andrew & Kuske CONSULTING ENGINEERS, INC. John R. AnTew, P.E. J. Phillip Norris, P.E. 902 Market Street Wdmingion,lVC 284014733 John S. Tunstall, P.E. Neal W. Andrew, P.E: John A. Kuske, tll, P.E. J.A. Kuske, P.E. of Counsel 910/343-9653 910/343-9604 Fax www.amtewandanke.eorn James T. Pyrlle, P.E. C. Lawrence 5needen, Jr., P.E. January 8, 2003 Mr. Steve E. Niemeyer, Owner Wrightsville Builders, Inc. 1650 Military Cutoff Rd., Suite 200 Wilmington, NC 28403 Re: Southport Commons - Hwy. 211 Site Southport, NC A & K Project No. 02281 Dear Mr. Niemeyer: We met Vincent Lewis, NC DENR Regional Soil Specialist today at the subject site to review and confirm the infiltration evaluation results done by Engineering Consulting Services, Ltd. Vincent Lewis advanced three hand auger borings in the approximate locations shown on the attached sketch. The seasonal high groundwater table varied between 50"-52" in the locations of the three hand auger borings. Based on the soils encountered and the depth to the seasonal high groundwater table, Vincent Lewis determined that the site would be acceptable. for stom-water infiltration in the three areas explored. We appreciate the opportunity to assist you on this project. Please contact us with any questions or comments you may have. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. . �, 4A . Jo n A. Kuske, , JAKI II/asn 02281 01-08-03ttr cc: Vincent Lewis I NC DENR Regional Soil Specialist Linda Lewis I NC DENR Parks Downing, Jr. I ECS, Ltd. Greg Kot, AIA I Kot Murphy Architects r A & K Project No. 02281 —II I J�II I I S i I F / ` I; r }_ #' • SHGT 50" tff oo or I � r I ►1 !r + � • �� FF1 Ji Cot M lid ; i Legend r ; ► `�� • SHGT 54" • approximate location of hand auger boring by Vincent Lewis, r NC DENR Regional PIV _�"-- Soil Specialist ��%ti,,,•«�; f SHGT Seasonal High Groundwater Table t Andrew & Kuske CONSULTING ENGINEERS, INC. 902 Market Street Wu"on, NC 28401.4733 910IU3-9653 9101343-9604 Fox www.arKkewanckzke.com January 8, 2003 Mr. Steve E. Niemeyer, Owner Wrightsville Builders, Inc. 1650 Military Cutoff Rd., Suite 200 Wilmington, NC 28403 Re: Southport Commons - Hwy. 211, Site Southport, NC A & K Project No. 02281 Dear Mr. Niemeyer: John R. Andrew, P.E. John S. Tunslall, P.E. John A. Kuske, III, P.E. James T. Pyrtle, P.E. J. Phillip Norris, P.E. Neal W. Andrew, RE J.A. Kuske, P.E. of Counsel C. Lawrence 5needen, Jr.. P.E. We met Vincent Lewis, NC DENR Regional Soil Specialist today at the subject site to review and confirm the infiltration evaluation results done by Engineering Consulting .Services, Ltd. Vincent Lewis advanced three hand auger borings in the approximate locations shown on the attached sketch. The seasonal high groundwater table varied between 50"-52" in the locations of the three hand auger borings. Based on the soils encountered and the depth to the seasonal high groundwater table, Vincent Lewis determined that the site would be acceptable for stormwater infiltration in the three areas explored. We appreciate the opportunity to assist you on this project. Please contact us with any questions or comments you may have. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. Jo n A. Kuske, , JAKI lVasn Q2281 01-08-0311r cc: Vincent Lewis 1 NC DENR Regional Soil Specialist Linda Lewis I NC DENR Parks Downing, Jr. I ECS, Ltd. Greg Kot, AIA I Kot Murphy Architects z r r N A & K Project No. 02281 r- 1 1 1 1 1 \ !1•IlJ. � r 1 I r n � • fay Ifiyli ,� / Legend k�, .:•,I oili r ``� • SHGT 51" Approximate location Olt r i �► of hzind auger boring I it ! � \ \ It : ii # rr by Vincent Lewis, x- }li�l ,► ± �� :�,� NC DENR Regional u{,� Soil Specialist i 1sf111� .� � R�M� s r � ` SHGT Seasonal High Groundwater Table Andrew & Kuske CONSULTING ENGINEERS, INC. John R. Andrew, P.E. 902 Market Street Wilmington, NC 28401-4733 John S. Tunstall, P.E. John A. Kuske, III, P.E. 910/343-9653 910/343-9604 Fax www.andrewandkuske.com Jaynes T. Pyrtle, P.E. April 28, 2003 Ms. Linda Lewis, Environmental Engineer NC DENR Division of Water Quality 127 Cardinal Drive Extension ` Wilmington, NC 28405-3845'�•) Re: State Stormwater Permit Submittal Southport Commons Southport, NC A & K Project No. 02281 Dear Ms. Lewis: 0- J. Phillip Norris, P.E. Neal W. Andrew, P.E. J.A. Kuske, P.E. of Counsel C. Lawrence Sneeden, Jr., P.E. vc oso 3 ;ECEIVI MAY 0 1 Z003 Enclosed are two (2) sets of plans for the subject project, one (1) set of calculations, one (1) copy of the infiltration evaluation done by Engineering Consulting Services, Ltd. (ECS), one (1) copy of correspondence documenting the site visit with Vincent Lewis, the original Division of Water Quality Stormwater Management Permit application, the original SWU-107 supplement form, one (1) copy of the stormwater narrative and a $420.00 check for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. ( VtA Jo n A. Kuske, Ill, P.E. JAKI I Ilasn 02281 04-28-03-s-sw-@r Enclosures cc: Steve Niemeyer, Member I Manager I Tricoast Properties, LLC Greg Kot, AIA I Kot & Murphy Architects, P.A. Jim Henry, Public Works Director / City of Southport Wayne Strickland, Building Inspector 1 City of Southport :w STORMWATER SYSTEM & EROSION CONTROL NARRATIVE SOUTHPORT COMMONS NC HIGHWAY 211 1 HOWE STREET SOUTHPORT, NORTH CAROLINA For Tricoast Properties, LLC 1508 Military Cutoff Rd., Suite 302 Wilmington, NC 28403 (910) 256-1162 �,���aCA aoaaopra�� . e•ao � • L 4 • a p / Q April 2003 Prepared by: ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) E-mail: office@andrewandkuske.com A & K Project No. 02281 NARRATIVE PROJECT DESCRIPTION: The project site is located within the Extraterritorial Jurisdiction (ETJ) of Southport, North Carolina near the intersection of Howe Street (NC Hwy. 211) and NC Highway 87 in Brunswick County. Two professional office buildings are proposed on the site. The Phase I building and all of the parking, access and site utilities will be constructed first. The Phase II building will be constructed at a later date. Stormwater from the site will be treated in an onsite below ground infiltration system. The total site area is 1.74 acres. A portion of the 1.74 acres is on the north side of a ditch that traverses the property. The portion of the site on the north side of the ditch will not be used for this development at this time. Therefore, the project drainage area for the stormwater infiltration system design is 1.61 acres. The disturbed area 1 construction limits is approximately 2.64 acres. A portion of the disturbed area 1 construction limits is for required offsite improvements on NC Highway 211 1 Howe Street and for the installation of an offsite 2" sanitary sewer forcemain. The 2" sanitary sewer forcemain is being installed in the power company's power line easement. SITE DESCRIPTION AND INFORMATION: As mentioned above, improvements will take place on the site as shown on the attached plans. The majority of the site is cleared with very few trees remaining. Grades on the site range from 0.10% to 10.00%. The stormwater runoff from the undeveloped site currently sheet flows to an existing ditch located along the northern property line. EROSION CONTROL MEASURES: The attached plans and specifications give the requirements for erosion control measures. Silt fence shall be installed on the site prior to grading as shown on the attached plans. A stone filter check dam will be installed in the existing ditch as shown on the plans to act as a sediment basin during construction. The stone filter check dam will be removed from the ditch after construction is complete. A classification of the existing ditch has been requested through NC DENR to determine if there are any problems associated with regrading the south slope of the ditch as shown on the plans. Erosion control measures shall be installed around the drop inlets and within -the infiltration inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain to make repairs as needed. Remove sediment as necessary to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unsuitable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact it. Appropriately stabilize all bare areas around the drop inlets. Gravel construction entrances will be provided as noted on the plans. Maintain the gravel construction entrances in a condition to prevent mud or sediment from leaving the site. STORMWATER MANAGEMENT MEASURES: The project site is located within the ETJ of Southport, North Carolina. Land disturbing on the site will exceed one acre, which requires the site to comply with the state stormwater regulations. In addition, the site will also have to comply with the City of Southport Stormwater Ordinance. Therefore, the proposed onsite below ground storrrrwater infiltration system will be designed to meet both state and city design standards. This narrative will focus on the aspects of the state design criteria. An onsite below ground stormwater infiltration system has been designed to store and infiltrate the first one -inch (1") of runoff from the site drainage area. The stormwater volume above the one -inch (1 ") storm event will bypass the system and flow through a 30' minimum vegetated filter. In general, the system consists of two (2) infiltration pipes within a stone trench and one (1) bypass pipe. The bottom of the system and stone trench is two feet (2) above the seasonal high ground water table. The location of the seasonal high ground water table was determined in an infiltration test done by Engineering Consulting Services, Ltd. (ECS) and by Vincent Lewis of NC DENR during a site visit. A copy of the infiltration test report by ECS, Ltd. and a copy of correspondence documenting Vincent Lewis' site visit is enclosed for review. See the plans, specifications and calculations for more detail on the infiltration system design. CONSTRUCTION SEQUENCE: The contractor will install the gravel construction entrance, silt fence and other erosion control measures specified as required prior to beginning any grading operations. Disturbed areas will be landscaped or stabilized upon completion. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. Install erosion control measures before beginning construction or as soon thereafter as possible. All erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall but in. no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 3. Maintain the gravel construction entrances in a condition to prevent mud or sediment from leaving the construction site. The contractor shall inspect the construction entrances on a daily basis. This will require periodic top dressing with additional No. 4 stone. Any objectionable materials spilled, washed, or tracked onto public roadways shall be removed immediately. 4. Install erosion control measures around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain and make repairs immediately. Remove sediment when it becomes 0.50 deep to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade and appropriately stabilize all bare areas around the drop inlets. 5. Sediment will be removed from behind the silt fence when it becomes 0.5 feet deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 6. No cut or fill slopes shall exceed a side slope of 1 vertical to 3 horizontal unless otherwise specified on the plan. All slopes shall be seeded and stabilized within 15 days. i. All disturbed areas shall be seeded within 15 days of disturbance. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. 8. More stringent measures shall be used to halt erosion if those shown on this plan are not effective. 9. All erosion shall be controlled including side slopes before the project is completed. 10. Remove temporary measures upon completion of project. All permanent measures will be well established before project closeout. SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 15 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period. Use the specified seed for both temporary and permanent seeding. f►��:TiI�11L+��? 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by wood or metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Bamers are required where sedimentation on off site property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1000 square feet and wood chips at a rate of 500 pounds per 1000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A rip rap at minimum two feet high and three feet thick across the watercourse, with a one -foot thick layer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1000 square feet Fertilizer. 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 114 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION