Loading...
HomeMy WebLinkAboutSW8021225_COMPLIANCE_20030326STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWJ��J`� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 3/13/2003 FAMILY DOLLAR 02007 CDC Infiltration Trench 10-year Storm WATERSHED DATA Total Drainage Area s . ft. acres 76,230 1.75 Impervious Area Land Use sq. ft. acres buildings 7,812 0.18 arkin las halt 36,261 0,83 concrete 2,646 0,06 Offsite 0 0.00 Total 46,719 1.07 INFILTRATION SYSTEM: % impervious = 0.613 = 61.3°% say 62.0°% CPRE = 0,25 CPOST = (°% imp.)(.95)+(1-0% imp.)(.25) = 0,68 110 = 7.23 in/hr 125 = 8.15 in/hr alume of first two inches of runoff = impervious area(2/12) +(total area - impervious area) (2112) x .25 V= 97016.13 cu-ft )Iume of Basin provided= (Area of FP + Area of Boftom)12 ' Depth of basin Vtp= 9,714.00 cu-ft 45 elevation 3840 sf. 47 elevation 5874 sf. DRAWDOWN TIME: Depth ofintiltration system: D= 2 ft. Infiltration Rate of soils. R= 18.4 in/hr Drawdown time: DDT= 1.30434783 hrs. \```�,�tttlilifflffff�� CAR pZZ��i,,�l� SEAI. 4r: _ _ - J7314 a RECEIVED MAR 2 6 W DWQ PROD # Sw502/ZZ5 3.25-03 INFILTRATION BASIN ANALYSIS FILENAME: G:IDATAIWPDATAIWQSIINBASIN1021225.WK1 PROJECT NUMBER: 021225 DATE: 23-May-03 PROJECT NAME: Family Dollar Shipyard Plaza DRAINAGE BASIN: Cape Fear REVIEWER: L. Lewis RECEIVING STREAM: Cape Fear River CLASS: SC Index No.: CPF17 18-(71) If ORW, is site within the 575' AEC? SITE AREA 1.75 acres DRAINAGE AREA: 7623 SF IMPERVIOUS AREA CALCULATION Rational C BUILDINGS 7812 1 PARKING/ASPHALT 36261 1 CONCRETE 2646 1 OTHER TOTAL % IMPERVIOUS, 1= �. 3%n ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS :......::671: C :> T Place a "1" here if Rational 1: RV= .05f.009 (1) FEET MSL INCHES/HOUR Elev. (ft) Area, sq ft Inc. Volume Acc. Volume BOTTOM 45 3840 0 0 0 TOP 47 5874 9714 9714 VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES 2 DESIGN VOLUME 016;`: CUBIC FEET TOTAL VOLUME AVAILABLE :::>9714 CUBIC FEET DEPTH OF RUNOFF FEET TIME TO DRAWDOWN 1 6l HOURS MUST BE <120 25 YEAR 24 HOUR STORM Intensity, i = .33 inches 1 hour Qr= C i A = 0.41 CFS Qp through the bottom of the basin= 1.64 CFS Must be > Or 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches 1 hour Volume for 10 yr. 10 min. event = 4694.35 CF < 9714 CF COMMENTS Volume and drawdown are within Design Requirements. December 3, 2002 Stormwater Narrative Family Dollar New Hanover County, NC TE 02007 The proposed site for Family Dollar is lot 45 of Shipyard Plaza. The lot is 1.75 acres and has 7,812 sf of proposed building, 2,646 sf of concrete sidewalk, and 36,261 sf of asphalt parking and roadway. Runoff will be treated by an infiltration basin system. The system will treat the total 1.75 acres with 46,719 sf of impervious area. The system is sized to meet the State's 1" and the City's pre -post requirement. Runoff from the site will drain to a tributary of the Cape Fear River, classification C-SW. Due to the high rate of infiltration within the soils and additional sizing of the system, we request a vegetated filter for overflow not be required. SEP-04-199Q 12:54 2IM'1ER DEVELOPMENT CO 1 910 762 1999 P.02/20 zjftmr Development Comwny Law Projea No. 310004.1045 Page 2 08'UM considered accurate only to the degree implied by the methods used. The approximate locations of the borings are shown on Drawing No. 2 in the Appendix. The borings were performed by a C,'iE 45 power drilling rig. Borings were drilled using wash rotary techniques with a drilling slurry to stabilize the boreholes. Samples were taken by driving a 1-3/8 inch I.D. split -spoon sampler in general accordance with ASTIM D 1586 specifications at 2- 1/2 to 5 feet intervals. Representative portions of all samples were sealed in glass jars and returned to our laboratory where they were visually classified by a geotechnical engineer in general accordance with the Unified Soil Classificat on System (USCS). Test boring records showing visual descriptions of the sail strata encountered and the sampling and field test data are included in the Appendix. Information sheets describing L�e Unified Soil Classification System and L4e terms and symbols used on the soil boring records are also included. The evaluation and recommendations presented in this report were developed from our interpretation of the general subsurface Conditions at the site based on information obtained from ;he soil borings. The stratification lines indicated on the boring records represent the approximate boundaries between soil types. The t =itions may be more gradual in situ. Variations in soil conditions can also occur between soil boring locations. One sample from boring B-6, from a depth of one to five feet was submitted for permeability .-sting. SITE AND SUBSLWACE COND171IONS Site Description The proposed site is located southeast corner of Carolina Beach Road and Shipyard Boulevard in Wilmington, North Carolina, as shown on Drawing No. 1 in the Appendix. The site is essentially rectangular in shape with a gas station located in the north half with an overhead pump station canopy, car wash, concession buildings. and asphalt paving. The southern half of the propemy is lat. undeveloped and has a grass cover. Subsurface Conditions . The borings performed across the site generally revealed loose to dense fine sands containing variable amounts of clay and silt to a depth of boring termination 20 ftet. A laver of loose to firm clayey sands was encountered from approximateiy 6 to la feet BGS in baring B-2, 3, and 5. Underlying the clayey Sands, a firm fine sand was encountered. These soils are classified as SP and SC soils according to the Unified Soil Classification System. The upper sands have Standard Penetration Test (SPT) resistance values (N-values) ranging from 9 to 16 blows per foot. The underlying clayey sands have SPT values ranging from 10 to 36 blows per foot. The underlying Fine sands have SPT values ranging from 14 to 50* blows per foot. Asphalt overlying marl and gravel was encountered to a depth of one foot in the borings located throughout the area of the old gas station. Loose sand was encountered in Boring B-s to a depth of 3 feet. This boritHk(TIVED an area formerly occupied by an old UST tank pit which has MAR' 2 6 2003 ' LAW 'rVct ICALs\zinv= 1c6311065 dog ENGINEERING AND ENVIRCNNENTAL 9EIVECE8 DWQ PROJ # nCyE02122.5 -=`�- c,g ?'S� [-iMER &)ELCFNE�I 1:C 1 910 762 1999 P.05/20 i Vmmer DrvslopmnK Company Od/101➢8 !.w. Project Na 31000,J.106J fagr r•. reportedly been removed. Fuel odors were apparent in samples collected from borings B-I and B-4. A soil sample from boring B-6 from 1.0 to 5.0 feet below ground surface was.laboratory tested for permeability. The results of laboratory testing indicate a permeability of 1.3E-0_2 cmisec. f Ground -Water Conditions Accurate groundwater readings could not be made at the completion of the borings since a slurry or "mud" was used in the drilling process. However, based on the observed soil moisture conditions and ground -water measurements obtained :n open borehole monitoring wells 24 hours alter drilling, we expect ground water is present be -we -ea 12 and 14 feei below the existing ground surface. Ground -water observations are recorded on the Soil boring logs in the Appendix. Fluctuations in the groundwater table may occur depending on variations in precipitation, evaporation, and surface water runoff. The ground -water level is generally higher during, the wetter months of the year (November to March). RECONCKENDATIONS Site Pre aration u'e anticipate fill will be placed above existing grades in the prcaosed building areas to establish sur:ace: drainage away from the structures. We assume no more than about one foot of fill will be placed. We do not expect any significant lowering of existing grades over the remainder of the site, except for an infiltration pond. Site preparation should begin with demolition and removal of buildings associated with the existing gas station. The existing mari encountered beneath the asphalt paving may remain in place or be salvaged for use elsewhere on the site. All vegetaticn, topsoil, and unsuitable soil should be stripped From proposed building and pavement areas in the southern parcel. The strippings should be removed from the site or s-,cckpiled for use in landscaped areas. We recommend a nominal snipping depth of one foot to remove surface vegetation and topsoil, although deeper stripping may be necessarysn localized areas to allow for more complete removal of unsuitable materials if encountered. If areas of unstabie soils are observed during stripping, these soils should be undercut and replaced with either compacted washed crushed stone (N.C-DOT No. 57 or 67) or compacted soil ill. In general, we do not anticipate significant undercutting at this site based on shallow soil conditions revealed by the borings. Cnce demo Iitionlremoval and stripping is complete, the shallow sands in building and pavement areas should be densifaed by vibratory rolling with a heavy -weight smooth steel drum vibratory roller. The vibratory roller should make eight passes over each section of the building- and pavement subgrades in order to improve the densiry of shallow sands in an effort to provide more uniform subgrade support for compaction of structural fill and for floor slabs and pavements. The` second set of four passes should be perpendicular to the first set of four passes. The geotechn'scal ., engineer or technician should observe the vitrratory rolling to ' elp identify localized areas of LAW H:luirnatummerta+s.! 065.3gc � °M6WCERIHG ANQENVIRvNUrtnT.tLSEAVrc>:5