Loading...
HomeMy WebLinkAboutSW8010921_COMPLIANCE_20011207 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT /&VA I NO. SW 20 DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE ;2a2M�0 YYYYMMDD DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1010921.WK1 PROJECT NAME: Crafter's Pride REVIEWER: DATE: 07-Dec-2001 Receiving Stream: Godfrey Creek Class: C SW Chlorides: nla Drainage Basin: Cape Fear Index No. Site Area 5.65 acres Drainage Area "' 246114 OO]square feet Area in Acres 5.65 IMPERVIOUS AREAS Rational C Buildings 22500.00 square feet Parking 31234.00 square feet Sidewalks 690.00 square feet Future 110000.00 square feet square feet _ square feet TOTAL 164424`OO square feet Rational Cc= 0.07 SURFACE AREA CALCULATION % IMPERVIOUS 66.81% SAIDA Ratio 2.74% Des. Depth 7 Req. SA 6745 sf TSS: 90 Prov. SA :<15.1'72 sf VOLUME CALCULATION * place a "1" in the box if Rational is used Zola _:' 1 Perm. Pool Volume= 59956 Req. Forebay Volume= 11991.2 Provided Volume= 11520.00 Percent= 192% SA @ _ Elevation= ORIFICE CALCULATION COMMENTS Surface Area , Volume and Orifice are within Design Guidelines.ok •i �- ' srlsral CDC Crafters Pride Stormwater Calculations 01091 Total Drainage Area ft. acres 246.114 5.65 Impervious Area Land Use N.ft. acres buildings 22,500 0.52 pwkinglasphaft 31,234 0.72 sidewalk 690 0.02 Future 110,000 2,53 Total 164.424 3.77 Stormwater Calculations Time of Concentration: Hydraulic Length (L) = 1.300 ft. change in Height (H) = 4.5 ft. Tc = (L'!H). 1 128 17.29 min. Flow for 10 year, 6 hour Storm (Qta) QPRE _ (CPRE) x (ito) x (Area) = 8,90 cfs OPoS _ (CPos-r) x (Ito) x (Area) = 25.63 cfs sou store a Gapacjty tor 1U year storm: CN = (98)(% imp.) + (45)(1-% imp.) 81 P = 4.82 in. forlOyr, 6 hr storm S = 10001CN - 10 2.35 Depth (D)= (P-(0.2)(S)j2 r [P+(0.8)(S)1 2.83 in. Time to Peak Flow: TQ = [(43.5)(D)(Area)] / 02,POST 27.11 min. Detention Pond Design: Pond Size: Elevation ft. Surface Area .ft. Normal Pool 39.00 15,172 Flood Pool 40.50 17.438 Top of Bank 42.00 19.831 Bottom of Pool 32.00 6.630 Provided Storage Volume: Vol. _ [(Normal pool SA + Flood Pool SA) 121 x (F.P, elev. - N,P, elev.) 24,458 cu. ft. % impervious = 0.668 = 66.8% say 67.0% CPRE = 0.25 CPosT = (% imp.)(.95)+(1-% imp.)(.25) 0.72 Ito = 6,30 in/hr 125 = 7.13 in/hr Flow for 25 year, 6 hour Storm (025) QPRE _ (CPRE) x (125) x (Area) = 10.07 cis QPosT = (CPS) x (125) x (Area) = 29.00 cfs Soil Storage CaEgedy for 25 year Storm: CN = (98)(% imp.) + (45)(1-% imp.) 81 P = 5.71 in. for 25 yr, 6 hr storm S. = 10001CN - 10 2.35 Depth (D)= [P-(0.2)(S)]2! [P+(0.8)(S)] 3.62 in. Time to Peak Flow: TP = ((43.5)(D)(Area)] ! oto,Posr 30.68 min. 5tate Surface Area Requirement at normalpool: Pond side slopes = 3 :1 Depth below N.P. = 7 ft. SAIDA = 0,0275 (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Required SA = (SAIDA) x (Total Drainage Area) 6,768 s ,ft. State Volume Required for Storage of first 1" of runoff: Vol. = [(1/12) x (DA) x (% imp.)] + [(1112) x (DA) x (1-% imp.) x C] C = 0.2 15.064 cu.ft. N 01091POND 1 of 2 9/19101 Crafters Pride 01091 CDC Stormwater Calculations Pond Volume: Bottom SA = 6,630 sq. ft. Normal Pool SA = 15,172 s . ft. Vol. = [(N.P. SA + Bottom SA) 121 x (N.P, el. - Bottom el.) 59,956 cu.ft. Forebay: Required Volume Vol. = 20% of total permenant storage volume 11,991 cu.ft. Outlet Structure Design; Flow for 2-day drawdown: for 1st 1" of sormwater, Q = Required Vol./ 172,800 sec. (2-days) = 0.087 cfs Required Area of Pipe for 2-day drawdown: A= 0/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft.ls2 h = (F.P. elev.- N.P. elov.)12 0.75 ft. A = 0.0209 sq. ft. Diameter of Pioe for 2-dav drawdown DIA. = SQRT](A x 4) / pi] = 0.1631 ft, 1.96 in. 'Use: 1.75 in diameter pip2 Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)(.25) = 0.72 1 = 7.13 in. for a 25 yr. Storm A = 5.65 Acres = 29.00 cfs Q= CwxLxH''s H = [Q 1 (Cw x L)]Tr' Cw = 3 0.71 ft. Peak elevation = Flood pool elevation + H = 41,21 ft. Provided Volume Bottom SA = 2,160 sq.fL Normal Pool SA = 5,520 sq. ft. Vol, = [(N.P, SA + Bottom SA) / 21 x (N.P. el. - Bottom el.) 11,520 cu.ft. depth = 3 ft. Flow for 5-day drawdown: for 1st 1' of stormwater, 0 = Required Vol. ! 432,000 sec. (5-days) 0.035 cfs Required Area of Pipe for 5-day drawdown A= 01[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft.lsz h = (F.P. elov. - N.P. eiev.)1 2 0.75 ft. A = 0.0084 s . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.1032 ft. - 1.24 in. 01091 POND 2of2 September 14, 2001 Stormwater Narrative Crafter's Pride Pender County, NC TE 01091 The total drainage area of this project is 5.65 acres. A proposed building is being constructed with 22,500 sf. An asphalt access and parking area will total 31,234 sf. A future impervious area of 110,000 sf totals 164,424 sf of impervious area (690 sf of sidewalk) which brings the total built upon area to 66, 8% impervious. Stormwater runoff will be handled by a wet detention pond designed to exceed the state's requirement of the first one inch of runoff. This pond will drain to the Godfrey Creek with classification of C-SW. A vegetated filter is not required due to the 90% TSS removal used in the wet detention design.