HomeMy WebLinkAboutNCC210459_ESC Approval Submitted_20210203a wa
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
°u"
Director
NORTH CAROLINA
Eavlranmentaf Quality
January 20, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Carolinas, LLC
Attention: Mehdi Maibodi, General Manager
526 S Church St
Charlotte, NC 28202
RE: Project Name: Belews Creek Ash Basin Landfill E&SC
Acres Approved: 95
Project ID: STOKE-2021-008
County: Stokes
City: Belews Creek
Address: Pine Hall Road
River Basin: Roanoke
Stream Classification: WS-IV
Submitted By: Duke Energy Carolinas, LLC
Date Received by LQS: January 6, 2021
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The modifications required for
approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST
obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette. lucas(i!ncdenr.gov or Paul Clark at Paul.clark(a)ncdenr.gov. If the owner/operator of this project
changes in the future, the new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
336-776-9800
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
January 20, 2021
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A=61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Tamera Epli PE
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: AECOM
Attention: Ramachandran Kulasingam, PE
6000 Fairview Road, Suite 200
Charlotte, NC 28210
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
January 20, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Belews Creek Ash Basin Landfill E&SC
Project ID: STOKE-2021-008
County: Stokes
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Additional Comments:
1. Approval of this erosion and sediment control plan does not supersede any requirements or
provisions of North Carolina Senate Bill 729, "The Coal Ash Management Act", the Dam
Safety Act of 1967, as amended, or any other applicable regulation.
2. The NPDES General Construction Stormwater Permit does not supersede any existing or
potential wastewater and/or industrial stormwater permit requirements, or any other
applicable regulation.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities