HomeMy WebLinkAboutNCC210052_ESC Approval Submitted_20210119ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BR1AN WRENN
Director
NORTH CAROLINA
Environmental Quality
October 14, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Redwood Living, Inc.
Attention: David Conwill, Manager
7510 East Pleasant Valley Road
Independence, Ohio 44131
RE: Project Name: Redwood Kannapolis
Acres Approved: 29.69
Project ID: CABAR-2020-078
County: Cabarrus, City: Kannapolis
Address: Kannapolis Pkwy.
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Daniel Renckens, PE, Bohler Engineering NC, PLLC
Date Received by LQS: October 1, 2020
Plan Type: Revised
Dear Mr. Conwill:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@nedenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept
on file at the job site:
e::o<fREQ2A
UeP.( tof Em4-1m i7uality
North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue. Suite 301 Mooresville, North Carolina 28115
704,663,1699
Letter of Approval with Modification
October 14, 2020
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1913 (North Carolina General Statute I I3A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
ec: Daniel Renckens, PE
Letter of Approval with Modification
October 14, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Redwood Kannapolis
Project ID: CABAR-2020-078
County: Cabarrus
1. A revised Financial Responsibility/Ownership Form (FRO) shall be submitted to this office
upon transfer of property ownership.
2. Temporary Skimmer Basin #1 shall be installed to a minimum elevation of 691.5'.
3. In Phase 1 B (Sheet C-604), temporary culverts of adequate size shall be used for equipment
access in Diversion Ditch #5 to facilitate moving fill material to North side of site.
4. Diversion Ditch #3 in Phase 1B (Sheet C-604) shall remain intact and functional
throughout all phases of construction.
5. In Phase IA (Sheet C-601), the emergency spillway for Sediment Basin # 1 shall be
installed as shown on Sheet C-407.