HomeMy WebLinkAboutNCS000175_Inspection Report_20201211Compliance Inspection Report
Permit: NCS000175 Effective: 02/01/09 Expiration: 01/31/14 Owner : Veolia Es Technical Solutions LLC
SOC: Effective: Expiration: Facility: Veolia ES Technical Solutions, LLC
County: Granville 2176 Will Suit Rd
Region: Raleigh
Creedmoor NC 27522
Contact Person: J Leonard Beck Title: Phone: 919-529-3223
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 12/11/2020 Entry Time 10:OOAM
Primary Inspector: Aana C Gamble
Secondary Inspector(s):
Michael Meloy
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Certification:
Phone:
Exit Time: 11:30AM
Phone: 919-707-3648
Inspection Type: Compliance Evaluation
Page 1 of 3
Permit: NCS000175 Owner - Facility: Veolia Es Technical Solutions LLC
Inspection Date: 12/11/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Please reference the inspection report and inspection letter.
Page 2 of 3
Permit: NCS000175 Owner - Facility: Veolia Es Technical Solutions LLC
Inspection Date: 12/11/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Yes No NA NE
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
Comment: SWPPP was complete and thorough. Records have been kept since 1995, and SWPPP is
reviewed annually.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: The east, middle, and west outfalls were observed and found to be in good condition. There was
a small amount of flow at each outfall, and the water leaving the site was clean, clear, and free o
debris, solids, or sheen. There is very little, if any, industrial activity that comes into direct contac
with stormwater. The facility has done a very good mob of reducing industrial exposure to
stormwater.
Page 3 of 3