Loading...
HomeMy WebLinkAboutSW6201202_Calcs (Pipe 3)_20201210Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Pipe 3 Invert Elev Dn (ft) = 137.25 Calculations Pipe Length (ft) = 44.00 Qmin (cfs) Slope (%) = 0.57 Qmax (cfs) Invert Elev Up (ft) = 137.50 Tailwater Elev (ft) Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.012 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 139.89 Hw/D (ft) Top Width (ft) = 20.00 Flow Regime Crest Width (ft) = 0.00 Elev (ft 140.0E 130.5E 130. DD 138.5E 138.0D 137.50 137.OD 135.5E 0 Pipe 3 Wednesday, Nov 25 2020 = 7.41 = 7.41 = (dc+D)/2 = 7.41 = 7.41 = 0.00 = 4.62 = 5.57 = 138.53 = 138.56 = 139.11 = 1.08 = Inlet Control Hw Depth (ft! 2.50 2.0D 1.50 1.0D 0.50 p.DD -0.50 -1.00 5 10 15 20 25 3D 35 4D 45 50 55 56 5.5 Circular Culvert•.....................................I HGL Erilaank Reach (ft}