Loading...
HomeMy WebLinkAboutSW6200704_O&M Agreement_20201203Project Name: Project Location: Cypress Pointe Fennell Road, Hope Mills, NC Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced liiiinirnediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: O&M tables will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): be added automatically) Fennell Road I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. " Responsible Party: Palmer N. Williams Title & Organization: Vice President, Pelican Property Holdings, LLC Street address: 2769 Thorn rove Court City, state, zip: 'Fayetteville, NC 28303 Phone number(s): 910-864-3232 Email: pwjIIjarns@w_)c-sprop.com Signature: Date: I, t a Notary Public for the State of County of PA) k do hearby certify that personally appeared before me this ' day of .0and acknowledge the due execution of the O ions and inten ce Agreement . Witness my hand And official seal, Sea/ '"+►++� My commission expires STORM-EZ 11 /30/2020 Version 1.4 O&M Manual Page 1 of 3 Infiltration System Maintenance Requirements Important maintenance procedures: - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin. _ Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). _ No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the sediment off -site. swale applicable). The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale (if applicable). control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. Erosion has occurred or riprap is displaced. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the sediment and remedy the problem if has accumulated. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than 5'Replace the top few inches of filter media and see if this corrects the days after a storm event. standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants Remove the plants by hand or by wiping them with pesticide (do not are growing in the main spray). treatment area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. to grow on the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-EZ 11/30/2020 Version 1.4 O&M Manual Page 2 of 3