HomeMy WebLinkAboutSW6201101_PN_72426_Military_Working_Dog_SWM_and_ES_Calcs_Narrative_20201006_20201130CIVIL CALCULATIONS SOF Military Working Dog Facility PN 72426 The civil calculations attached are for the storm water management and erosion and sediment control analysis. 100% Submittal: 11 Sept. 2020 Prepared by: �, Stantec Stantec Consulting Services Inc 801 Jones Franklin Road, Suite 300 Raleigh, North Carolina, 27606 (919) 851-6866 HFax (919) 851-7024 \\\\\\iI I I II/'I// `�.� �N CARD o� FEssio%, 449 = 1NE L S NV 91/6�20�611111110`\\ TABLE OF CONTENTS Sediment Erosion Control and Stormwater Management Project Narrative....................................................................................................... 01 NRCSReport................................................................................................. 05 EISA Section 438 Calculations....................................................................... 09 Rip -Rap Outlet Protection Sizing................................................................... 19 Water Quality Volume Calcs......................................................................... 21 Channel Sizing and Velocity Calcs.................................................................. 25 Ft. Bragg, SOF Military Working Dog Facility Project Sediment Erosion Control and Stormwater Management Narrative The proposed project known as Fort Bragg SOF Military Working Dog Facility project consists of a new two-story training facility along with access/maintenance roads, sidewalks and storm drainage. The new training structure is consistent with a standard building in terms of grading and access app asphalt parking lot, concrete pavement, and stormwater management infiltration basin #1. This report presents the sediment and erosion control and stormwater management calculations for the project. The property is located on Fort Bragg in Cumberland County, North Carolina with access to the site from Lamont Road. The project is located in the south/southeast portion of the compound. The scope of work for the project includes civil site work and site utilities design along with clearing and grubbing of existing trees. The project is located in a wooded area on the northeast side of a crowned highpoint which drains primarily to the north and east. The site consists primarily of hydrologic Group A soils (see NRCS report) which has been corroborated with favorable infiltration rates (1.25 in/hr and 0.22 in/hr—see geotechnical report submitted under separate cover). SEDIMENT AND EROSION CONTROL The main site sits on a crowned high point with gradual slopes typically less than 6% within the limits of disturbance (LOD). The primary disturbance activity for the construction of the facility will be mass grading; therefore, the primary means of sediment leaving the site will be through a skimmer sediment basin. Outside of the sediment basin drainage are, the remainder of the perimeter and utility corridors are protected with a combination of sediment fence, J-hooks, and sediment fence outlets. The storm drain system will use inlet protection, rip -rap outlet protection and a sediment basin to prevent sediment laden water from leaving site. There are three points of entry/exit to the site where temporary construction entrances/exits are located (the northern most areas of the LOD). A concrete washout station is also provided east of the proposed facility. All stormwater facilities will be constructed last once all drainage areas have been stabilized. The west -gate area is an access point to the Military Working Dog Facility project that needs improvement to allow the trucks with tow behind trailers to enter. The disturbance for this will be relocating rip -rap, adding fill and adding new gravel pavement to widen the entrance. The area will be protected using sediment fence and a sediment fence outlet. STORMWATER MANAGEMENT The site has one main drainage area for the purposes of determining the required stormwater management volume requirements for the infiltration basin. The site has been graded to capture all the increased impervious areas either in storm drain systems or sheet flow. The impervious areas consist mainly of the building roof, asphalt access road, gravel parking which is comprised of 6 inches of ABC stone. The southern portion of the site is captured primarily through drainage swales and storm drain network with false sumps at drop inlets. The parking lot drains to a curb inlet which connects to the same network. This network outfalls to an infiltration trench: SWM#1. Due to the nature of the site (heavily wooded and training activities and in order to comply with Federal policy (EISA Section 438)), the facilities have been oversized to ensure longevity and prevent stormwater issues at the site. a v 35° 9' 34" N 675100 Hydrologic Soil Group —Cumberland County, North Carolina v 6752M 6753M 675400 675500 675600 13�L1 i r f.# r• Oe 10 Ir WWI op R �,` /. J. R Y * * # A �+ x� i } Soil MaN may not be va.lielrv'it I I e. scal I � �' J I 675100 675200 675300 675400 675500 675600 a Map Scale: 1:4,030 if printed on A portrait (8.5" x 11") sheet. N 0 50 Meters 100 200 ?00 Feet 0 150 300 E00 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 4/24/2019 Pagel of 4 35° 9' 7' N a 2 W O W —j CL « � » L \ \/:s) —_0 > §\/W E a-- = 2 a)) k 2 'E /�\/. \ �)/\j } o a) /0 E _ § R \E ƒ � _ / : _ _ ����� CL m ��§ % / f & ��e / / _ //y ƒ \ { af §§ / J / m / \k��® 70 /g $ \\)2 2 \ \ G \ § ®% a \ z�G ® o %_ §{#� - ) U) § �gw/ § 2 \8®t° \ 7% + E mu) / /t/ƒ\ — m \.\ \�ƒ/\ /\ / \ E °� )\6 ����� �� \ # - - ...®m a $/§mm m2 \ / 2 C 2 /_/ /k ƒ():53: ° /m -- *� 2 E ®°# E£G[� \ /�� m: SU)§ � \ \Rme = \/ /\ v {7�� )k /\\ƒ§ /{ �! ee y§ o\§/ \\\ $2 \f 3* &SE \CL / / 0 & & ) c § a k J& F 7 o d 0 ) |6 )) / g § \ =J El ■ ■ 13 / . u 2 7 > // § ! 'a) / a« 2= 2 0 }« 0 0) 16 ❑ ❑ ❑ q ❑ ❑ ❑ ❑ § @ F �\ 2 \ # � ! § 2= 2 0§ o) \« 2= 2 . . . . § O E 13 13 $ _ \/ ®2 £ 2 /§ 0 § \ // 2 S §Cl) k0 �f )§ )) Hydrologic Soil Group —Cumberland County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaD Blaney loamy sand, 8 to 15 percent slopes C 4.8 17.1 % CaB Candor sand, 1 to 8 percent slopes A 9.1 32.6% JT Johnston loam A/D 0.7 2.6% NoB Norfolk loamy sand, 2 to 6 percent slopes A 13.3 47.7% Totals for Area of Interest 27.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 4/24/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Cumberland County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 4/24/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 Army LID Planning and Cost Tool Report PROJECT INFO Date Army Command IMCOM Army Installation Fort Bragg Project name MWD - DA Project description New building and parking lot User Name MILEY Master Planner SITE INFO AND EISA VOLUME REQUIREMENT Project limit of disturbance (ac) 5.05 95% rainfall depth (in) 1.8 Soil type Silty -Loam Hydrologic Soil Group (HSG) C Pre -project curve number (CN) 76 Post -project curve number (CN) 81 Pre -project runoff volume (cf) 5785 Post -project runoff volume (cf) 8831 EISA Section 438 retention volume 3047 requirement (cf) LID PLANNING SUMMARY Structural BMP Surface area Runoff volume Non-structural BMP Surface (sf retained (cf area (ac) Bioretention: 0 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Swale: 0 Veg. Filter Strip (Slope >2%, Tall Grass): 0.00 Permeable Pavement: 0 Veg. Filter Strip (Slope <2%, Short Grass): 0.00 Rainwater Harvesting: 0 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Green Roof: 0 Reforestation (Trees - Short Grass): 0.00 Infiltration Practice: 8650 3193 Reforestation (Trees - Shrubs and Tall Grass): 0.00 Total retention volume provided by BMPs (cf): 3193 Project complies with EISA Section 438. LID COST SUMMARY You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) 1-5itelnto 2-Runoff Rioretention Swale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice Water Cluality SITE INFOMNL 1TLON Str� Army Cornnund- LMCO11A .. Cinl: FORT RRAGG Arrm-Ins[allation: Fort Rmgg State: N C. - Zip: Project limit of disturbance ( 5.05 Pr je description. 1\ e,, biuldiaa and puldna lot led the site's a dl awl type: ydrologic Soil Group: C RAINFALL DEPTH E.h r the site's 95th percentile rainfall depth (inches), or click the 'Set 95% Rm,f.H' button for the ra &H depth to be populated_ S eto Rainfall 95%RaRd infall: 1.3 1-Site Info 7-Runoff. gioretention Swale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice WaterQuality ............................. LAND USE _ _ To calctilate the EISA nmoff requirement enter FMWThe the pre- and post -project land use in acres runoff volume difference between pre- and post -project is the EISA volume required to be retained on site. Note: If the runoff difference is a negative number, the past -project volume is reduced from the pre -project condition and no additional retention volume is required. Land Use CN Pre -project Percentage Post -project Percentage Rtmeffvolttmecalculations acres of site area in acres of site Wooded (poor): 77 0 D 0 Pre -project Post-proj t D�Y r.. Wooded (fair): 73 4 2.99 591 Site CN: 76 81 Wooded (good): 70 0 D 0 D Acre-feet 0.133 0.203 0.070 Meadow: 0 D 0 0 Gallons: 43169 66058 11789 Brush and weeds (poor): 0 D 0 0 Cubic feet: 5785 8831 3047 Brush and weeds (fair): '70 0 D 0 0 CFS: 0-07 0.10 D.D4 Brush and weeds (good): 65 0 D 0 0 3G47 cubic feet is the EISA Lawn: 79 0 D 0 0 runoff volume required to be Roads and drives (w/o C and G): 9? 0 D Q 0 retained on site. Roads and drives (wl C and G): 98 0 0 0 Parking, driveways and sidewalks: 98 0.08 1.02 201 Building roof: 98 0 D 0 0 Bare soil: 91 0 D 0 0 Trees - grassy (poor): 8? 0 D 0 0 Trees - grassy (fair): 76 0 D 0 0 Trees - grassy (good): T) 0 D 0 0 Open space (lawns, parks, oem-) {50%grass: 86 0 D 0 0 Open space (lawns, parks, cem-) <75%grass: 79 Q D 0 0 Open space (lawns, parks, oem-) >75%grass: 74 0 D 0 0 Gravel road: 0.97 19. 1.04 10.6 Dirt road: 0 0 0 Non Structural BMP Proposed non-structural BMPs are accounted for byadjusting the post -project land use area_ land Use Veg_ Filter Strip (Slope >2%. Short Grass): Veg_ Filter Strip (Slope >2%. Tall Grass): Veg_ Filter Strip (Slope <2%. Short Grass): Veg_ Filter Strip (Slope <2%. Tall Grass): Reforestation (Trees - Short Gram): Reforestation (Trees - Shrubs and Tall Gran Total limit of disturbance (acres): Post -project 0 IIIIIIIIIIIf 0 0 0 0 0 AM- 5.05 ]-Site Info 2-Runoff Bioretention Swale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice Water Quality ............................................................ .: Enter the total area of proposed infrItradon practices. Infiltration bed area (square feet): 8650% infiltration bed depth (feet) 1 (Recommended range: 5 to 10 feet) Stone drainage layer void ratio (default value is 0.4): 6.40 Stone volume (cubic feet) 8610 Infiltration rate for site soil trope (mcheslday) 4.43 Runoff volume storage (cubic feet) 3460 Potential unfiltration -volume: 31 N Estimated rtmoff retention volume [cubic feet] 3153 Army LID Planning and Cost Tool Report PROJECT INFO Date Army Command IMCOM Army Installation Fort Bragg Project name MWD Project description NEW BUILDING AND PARKING LOT User Name MTM Master Planner SITE INFO AND EISA VOLUME REQUIREMENT Project limit of disturbance (ac) 6.5 95% rainfall depth (in) 1.8 Soil type Silty -Loam Hydrologic Soil Group (HSG) C Pre -project curve number (CN) 76 Post -project curve number (CN) 80 Pre -project runoff volume (cf) 7446 Post -project runoff volume (cf) 10494 EISA Section 438 retention volume 3048 requirement (cf) LID PLANNING SUMMARY Structural BMP Surface area Runoff volume Non-structural BMP Surface (sf retained (cf area (ac) Bioretention: 0 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 Swale: 0 Veg. Filter Strip (Slope >2%, Tall Grass): 0.00 Permeable Pavement: 0 Veg. Filter Strip (Slope <2%, Short Grass): 0.00 Rainwater Harvesting: 0 Veg. Filter Strip (Slope <2%, Tall Grass): 0.00 Green Roof: 0 Reforestation (Trees - Short Grass): 0.00 Infiltration Practice: 8650 3193 Reforestation (Trees - Shrubs and Tall Grass): 0.00 Total retention volume provided by BMPs (cf): 3193 Project complies with EISA Section 438. LID COST SUMMARY You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) MWD Cie, Cost 1 N'ie.v Report 1 .add Project 1 Delete Project NIWD 1-Site Into 2-Runoff Bioretention Swale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice Water Quality OR.11r1TION Street: Amn- Command: WCOM City: Ft Bragg .4rmv Instillation: Fort Bra_kq State: NC .. R ojea hnut of disturbance (acres) 6.3 Project d YEW BUILDING AND PARKING LOT SOIL TYPLIM RAINFALL DEPTH Select the site's overall soil thee: Silty -Loam v Enter the site's 95th percentile rainfall depth (inches), or click the "Set 95° o Rainfall" button for the rainfall depth to be populated. Hydrologic Soil Group: C rt 93 ° ; Ra infall 95% Rainfall: 1.8 1-Site Info 2-Runoff. Bioretention Shale Permeable Pavement Rainwater Harvesting Green Roof Infiltration Practice Water Quality - ........................... . LAND USE To ealctilate the EISA nmoff requirement enter the pre- and post -project land rise in acres The runoff volume difference between pre- and post -project is the EISA volume required to be retained on site. n Note: If the runoff difference is a negative number, the post -project volume is reduced from the pre -project condition and no additional retention volume is required. . l,,. CN Pre -project Percentage Post- project Percentage Runoff volume calculations area m acres of site area in acres of site Pre -project Post -project DifferenceWooded(fair): ViroodedIpoor): 77 0 0 006 0 73 S.49 S4.S 4.4 67.S SiteCN: 76 SO Wooded (good): 70 0 0 0 Acre-feet: 0.171 0.241 0.070 Meadow- 71 0 0 0 Gallons: 33693 7S492 22799 Brush and weeds (poor): 77 0 0 0 0 Cubic feet: 7+46 10494 3048 Brush and weeds (fair): 70 0 0 0 0 CFS: 0.09 0.12 0.04 Brush and weeds (good): 65 0 0 0 0 3045 cubic feet is the EISA Lahhn: 79 0 0 0 0 runoff -volume required to be Roads and drives IN,-/o C and G): 92 0 0 0 0 retained Otl site. Roads and drives (hv/ C and G): 98 0 0 0 0 ki Parng, driveways and sidewalks: 98 0.13 2 0.59 9.0S Building roof: 98 0.07 1 0S 0-39 6 Bare soil: 91 0 0 0 0 Trees - grassy (poor): 82 0 0 0 0 Trees - grassy (fair): 76 0 0 0 0 Trees - grassy (good): 72 0 0 0 0 Open space (lawns, parks, cem.) <SO%grass: S6 0 0 0 0 Open space (lawns, parks, tern.) <75%grass: 79 0 0 0 0 Open space (lawns, parks, tern.) >75%grass: 74 0 0 0 0 Gravel road: 89 0.81 12.5 1.114 17.1 Dirt road: 37 0 0 0 0 Non-Stntctural BMP Proposed non-structural B`L Ps are accounted for by adjusting the post -project land use area. Land Use Veg. Filter Strip ( Slope >2%, Short Grass): Veg. Filter Strip (Slope >2%, Tall Grass): Veg. Filter Strip (Slope <2%, Short Grass): Veg. Filter Strip ( Slope <2%, Tall Grass): Reforestation (Trees - Short Grass): Reforestation ( Trees - Shrubs and Tall Grass) Total linut of disturbance (acres) CIS' so 75 70 65 7S 67 6.5 Post -project Percentage ar&res of site 0 0 0 0 0 0 100 0 0 0 0 ..............................................................: 1-Site Info 2-Runoff Bioretention Swale Permeable Pavement Rainwater Harvesting Green Roof i Infiltration Practice; Water Quality Enter the total area of proposed infiltration practices Infiltration bed area (square feet) qO4O Infiltration bed depth ( feet) commended ra77"Fp"M ) Stone drainage laver void ratio ( default value is '•'ter=';. `'b..f !'.�.,,'` Stone volume (cubic feet) S650 Infiltration rate for site soil ripe (inches/day) 4.43 Runoff volume storage ( cubic feet) 3460 Potential infiltration volume: 3193 Estimated nmoffretention volume (cubic feet) 3193 DATE DESIGN PHASE 20200602 PRELIM /X CONSTR PROJECT NO rFort7NC 178451236 REVISION BY RECORD MTB OTHER CHECKED BY (SPECIFY) MTB n= 0.013 STORM DRAINAGE SCHEDULE CONTINUED 9= 200 h= 20 1= 8.00 INLET INLET INLET Cc INLET TOTAL INLET PIPE Tc TIME I Cc RUNOFF FROM TO AREA AREA IMPERVIOUS RUNOFF DISCHARGE AREAS TIME TIME OF CONC. INTENSITY COEFF. (SF) (AC) (%) COEFF. (CFS) (AC) (MIN) (MIN) (MIN) (IN/HR) AO Al 7,500 0.17 100 0.95 1.31 0.17 5.00 0.00 5.00 8.00 0.95 Al A2 3,700 0.08 100 0.95 0.65 0.26 5.00 0.13 5.13 7.96 0.95 A2 A3 14,280 0.33 100 0.95 2.49 0.58 5.00 0.29 5.29 7.91 0.95 A3 A4 0 0.00 0 0.30 0.00 0.58 5.00 0.33 5.33 7.90 0.95 BO A2 44,000 1.01 50 0.63 5.05 1.01 5.00 0.00 5.00 8.00 0.63 CO C1 41,200 0.95 75 0.79 5.96 0.95 5.00 0.00 5.00 8.00 0.79 C1 C2 6,900 0.16 25 0.46 0.59 1.10 5.00 0.30 5.30 7.90 0.74 C2 A3 4,700 0.11 100 0.95 0.82 1.21 5.00 0.45 5.45 7.86 0.76 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) • T - T �iC1 :I11Ui0I0IT DATE DESIGN PHASE 20200602 PRELIM /X / PROJECT NAME PROJECT NO CONSTR Military Working Dog 178451236 REVISION LOCATION BY RECORD Fort Bragg, NC MTB OTHER CHECKED BY (SPECIFY) MTB STORM DRAINAGE SCHEDULE - CONTINUED Q Q UPSTREAM SIDE- CAPACITY SEGMENT UPPER LOWER TOP PIPE DISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. COVER (CFS) (CFS) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) (FT) 1.31 0.00 0.0200 12 5.0 6.4 50 0.13 269.45 268.45 274.80 4.26 1.94 0.00 0.0451 12 7.6 9.6 92 0.16 268.45 264.30 274.80 5.26 9.45 5.05 0.0795 18 29.6 16.7 39 0.04 263.30 260.20 275.13 10.19 16.67 7.23 0.0196 24 31.7 10.1 112 0.19 259.20 257.00 269.00 7.62 5.96 0.00 0.0202 15 9.2 7.5 136 0.30 267.85 265.10 273.21 4.00 6.47 0.00 0.0209 15 9.3 7.6 67 0.15 265.10 263.70 271.50 5.04 7.23 0.00 0.0479 15 14.1 11.5 73 0.11 263.70 260.20 269.50 4.44 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) ■ -�' ' - ' -�' -�' ■ DATE 20200602 DESIGN PHASE NAME /orking Dog PRELIM /X / CONSTR REVISION PROJECT NO 178451236 g, NC BY MTB RECORD OTHER CHECKED BY (SPECIFY) UKAULIC. UKAUC LINO GUN I INUCU BEND LOSS K's 90' = 0.70 70' = 0.61 50' = 0.47 30' = 0.28 20' = 0.16 80' = 0.66 60' = 0.55 40' = 0.38 25' = 0.22 15' = 0.10 PIPE HYDRAULIC SIDESTREAM HEAD LOSS BEND FRICTION FRICTION AREA RADIUS SUMMATION Hf He He Hb Ht LOSS SLOPE VELOCITY (FT) (FT) (CFS) K (FT/FT) (FPS) 0.7854 0.2500 0.00 0.07 0.01 0.00 0.00 0.08 0.70 0.0013 1.66 0.7854 0.2500 0.00 0.27 0.02 0.01 0.03 0.34 0.70 0.0030 2.47 1.7671 0.3750 5.05 0.31 0.11 0.03 0.07 0.52 0.70 0.0080 5.32 3.1416 0.5000 12.29 0.60 0.11 0.15 0.00 0.87 0.00 0.0054 5.28 1.2272 0.3125 0.00 0.89 0.07 0.00 0.00 0.96 0.10 0.0061 4.10 1.2272 0.3125 0.00 1.15 0.09 0.00 0.00 1.24 0.10 0.0085 4.84 1.2272 0.3125 0.00 0.67 0.11 0.13 0.25 1.16 0.70 0.0100 5.25 1.2272 0.3125 0.00 0.91 0.13 0.15 0.00 1.20 0.00 0.0125 5.87 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) • - ' ■ M-b'd 11r4A11 10 19KC1 -4' 11 M 10 1 IDATE DESIGN PHASE �llll20200602 PRELIM /X / PROJECT NAME PROJECT NO CONSTR Military Working Dog 178451236 REVISION LOCATION BY RECORD Fort Bragg, NC MTB OTHER CHECKED BY (SPECIFY) MTB DESIGN CRITERIA: HYDRAULIC GRADE LINE - CONTINUED 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET= 5 MIN. INLET W.S. ELEV. 3. INTENSITY=gl(h+T), FOR 10 YR STORM OUTLET OUTLET INLET USE FLOW FREE- UPSTREAM 4. MANNINGS"n"FACTOR=.013 W.S. ELEV CONTOL CONTROL CONDITION BOARD INLET COMMENTS 5. RATIONAL METHOD: C=.30 GRASS, C=.95 PAVEMENT (FT) (FT) (FT) (FT) CONTROL (FT) TYPE 269.21 269.29 270.07 270.07 INLET 4.73 MH OK 265.28 265.62 269.21 269.21 INLET 5.59 MH OK 261.41 261.94 265.28 265.28 INLET 9.35 CB OK 258.60 259.47 261.41 261.41 INLET 7.59 MH OK Tailwater Elev= 258.60 265.28 266.24 267.51 267.51 INLET 3.99 DI OK Tailwater Elev= 265.28 266.98 268.22 269.49 269.49 INLET 3.72 DI OK 265.82 266.98 266.92 266.98 OUTLET 4.52 DI OK 261.41 262.61 265.82 265.82 INLET 3.68 DI OK Tailwater Elev= 261.41 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) DATE 20200602 DESIGN PHASE PRELIM CONSTR / X REVISION RECORD OTHER (SPECIFY) PROJECT NAME Military Working Dog PROJEC I NU 178451236 LOCATION Fort Bragg, NC BY MTB CHECKED BY MTB Storm Outlet Structure FES No.= A4 Pipe Dia= 24 in Q10 = 16.69 cfs Qfull = 31.70 cfs Vfull = 10.10 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Q10/Qfull = 0.53 V/Vfull = 1.01 V = 10.2 fps Zone = 2 D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 12 ft Apron Width = 3xDia = 6 ft You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Step 1) Compute flow velocity V. at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do=A(>, where A.= cross -sectional area of flow at outlet. For multiple culverts, use Do=1.25xDo of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). �t�Os ®a® ®■,� ------------ mm�® ®®Y®©® ONE ------------- ■W01- -WRE ®Yamaaa�� mioma �*.�aoos -�z�amu�taQo oOo�m®ua�u�mmmuzao�o o .m�mQas®®m � vm®mm 'o®aUK I�ov®m.umDa� m®mow®ors-vn.m mmmi.�®�o�ma® 0 1 d� &C 3e 'r err a 5' Figure 8.06.b.1 I I I I 10' 15' 20' 25' DIAMETER (Ft.) W A � PROTECT CLA.VERT L1 TO PREVENT SCOUR HOLE USE L2 ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 x Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 x Do 6 x Do 3 ISTONE FILLING (MEDIUM) CL. 1 4 x Do 8 x Do 4 ISTONE FILLING (HEAVY) CL. 1 4 x Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) CL. 2 6 x Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Fig. 8.06.b.2 Width = 3 times pipe dia. (min.) 10/6/2020 NCDEQ BMP Manual INFILTRATION BASIN #1 1.0" Water Quality Volume (WQv) (ACTUAL DRAINAGE AREA TO SWM DEVICE) Rv = runoff coefficient (Runoff/Rainfall) Rv = 0.05 + 0.009( 1 ) Where "I" = % Impervious ("Simple Method" - Schueler, 1987) WQv = 1.0"RvA 12 Infiltration Basin #1 Fill in Values: 2.106 DA Impervious Area (Prop.) "1" = 41.7001 Percent Impervious of DA "A" = 5. 550 "DA (Acres) Answer: WQv = 0.179 Ac. Ft. 7,796 Cubic Feet Required 8,650 Cubic Feet Provided = 91 731 SF impervious area A = Actual Drainage Area to SWM Device Rv= 0.425301 WQv= 0.43 inches CN(WQv)= 92.5 Use to comp. Q,-- NC DEQ Draw Down Time: Infiltration Basin #1 Total Volume Provided: Infiltration Bottom Area: Maximum Release Time: Overflow Berm Elev: Bottom of Basin: Infiltration Rate: Factor of Safety (FS): Bottom of Infiltration Basin Elev: Draw Down Time for only Infiltration with FS: 8,650 cu.ft. 8,650 sq ft. 72 hrs 258.00 257.00 0.735 in/hr 2.00 257.00 33 hrs *average of 1-01 and 1-02 OK Project blame: MWD Facility @ SOTF Client blame: 5tantec Technician_ Monique Lumpkin Test Constants BUILDING & EARTH Project plumber: RD190229 Report plumber. 1 of Date- 512}2019 2 Liquid Used. Municipal Water Depth of Water Table_ MIA Water Temp l IF)- 65 IF Tost Location: 1-0? Dypth of dbsorved water r t A irxhes d:QMrants Liquid Crmtainars sming Parx cm cm Sight Tube 1 _ n tardy. u SL 2 Un Flow rate used: 105 14i>le Diameter. 3 Inches Start Saturation: 9:04 Water Head= 5-4 inches Hvlc Radius: 1.500 Hvlc depth- 45 irrrhes e5 a d Stabilized K Project Name: M D Facility 0 SOTF Client Name: 5tantec Technician_ Monique Lumpkin Teat Constants Ligpid Used: Mkinicipel Water Test 1 e{ stlon; 1-0 C.eeoahnlul, Bnd.nm.nul. and M-1i.i. EftIn—, Depth of Water TaW: Carrstants: Capacity Liquid Containers Ing aw c-. cm Sight Tube 1 L Storage U SL f n Project Number; RD190229 Report Number 2 of Date: 51212019 N/A Water TemplIF}_ Depth Of Ot served Water Flow rote used: 106 Hole Diameter. Start Saturation: 10-107 2 55 IF NIA inch" a ii`Khes Water Heart 11.75 inches Hole Radlus; 1_SU4 Hvlc Depth.- 54 inches IN@ RCFnaFkS:WcgT1hcr �IMUMMMEM ®M_E,®®�M=M® Stabilized K Selection of Sediment Control Measure - Skimmer Sediment Basin 5.05 Total Drainage Area Do Not Use Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Sediment Basin 2.65 Disturbed Area (Acres) 25.17 Peak Flow from 10-year Storm (cfs) C Coef. For Drainage Area To Skimmer Basin 2.45 Impervious (Ac) 0.95 2.60 Woods (Ac) 0.15 0.00 Grass (Ac) 0.30 0.00 Bare Soil (Ac) 0.60 C= 0.63 110year= 7.91 Q10 DA= 25.17 Proposed Conditions Q10 DA= 17.70917167 True Drainage Area, impervious Q10 DA= 2.96738 True Drainage Area, Bare Soil You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Skimmer Sediment Basin Okay 2.65 Disturbed Area (Acres) 25.17 Peak Flow from 10-year Storm (cfs) 4770 Required Volume ft3 8179 Required Surface Area ft2 63.9 Suggested Width ft 127.9 Suggested Length ft 46.0 Trial Top Width at Spillway Invert ft 185.00 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (2 to 3.5 feet above grade) 34 Bottom Width ft 173 Bottom Length ft 5882 Bottom Area ft2 14800 Actual Volume ft3 Okay 8510 Actual Surface Area ft2 Okay 50 Trial Weir Length ft 0.33 Trial Depth of Flow ft 28.4 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer (feet) 1.25 Orifice Size (1/4 inch increments) 3.23 Dewatering Time (days) Suggest about 3 days R Bottom Elev.= 257 Spillway Elev.= 259.16 Top Embankment Elev.= 260.5 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. XS 1 Triangular Side Slopes (z:1) = 10.00, 10.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 274.00 Slope (%) = 0.83 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 5.96 Elev (ft) Section 275.00 274.75 274.50 274.25 274.00 273.75 0 1 2 3 4 5 6 7 8 9 10 11 12 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Aug 5 2020 = 0.41 = 5.960 = 1.68 = 3.55 = 8.24 = 0.47 = 8.20 = 0.61 Depth (ft) 1.00 0.75 0.50 0.25 _n 1)ti You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. XS2 Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 273.00 Slope (%) = 0.83 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 6.47 Elev (ft) 275.00 274.50 274.00 273.50 273.00 27250 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Aug 5 2020 = 0.60 = 6.470 = 1.44 = 4.49 = 4.95 = 0.70 = 4.80 = 0.91 0 1 2 3 4 5 6 7 8 9 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Depth (ft) 2.00 1.50 1.00 0.50 1 -0.50 10 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. XS 3 Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 273.00 Slope (%) = 0.83 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 6.47 Elev (ft) 275.00 274.50 274.00 273.50 273.00 27250 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Aug 5 2020 = 0.77 = 6.470 = 2.37 = 2.73 = 6.35 = 0.70 = 6.16 = 0.89 0 1 2 3 4 5 6 7 8 9 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Depth (ft) 2.00 1.50 1.00 0.50 1 -0.50 10 Weir Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. SKIMMER AND SWM #1 SPILLWAY Rectangular Weir Crest = Broad Bottom Length (ft) = 42.00 Total Depth (ft) = 1.33 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 25.17 Depth (ft) 2.00 1.50 1.00 0.50 NMI -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) SKIMMER AND SWM #1 SPILLWAY Wednesday, Aug 5 2020 = 0.34 = 25.17 = 14.34 = 1.75 = 42.00 Depth (ft) 2.00 1.50 1.00 0.50 -0.50 0 5 10 15 20 25 30 35 40 45 50 55 Weir W.S. Length (ft) You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)