Loading...
HomeMy WebLinkAboutSW8990923_Compliance Evaluation Inspection_20191112STATE OF NORTH CAROLINA, Department of Environmental Quality, 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 FILE ACCESS RECORD DEQ SECTION: Edit VIEW TIME / DATE : 1 ' 3O — 3 :p6 PM NAME: j5 U2I A.C (A 8= L EMAIL: ISA A C C L4 SPT ( we [_ on.a REPRESENTING: !C e 1 PHONE: 4j I q Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:00pm.. Viewing time ends at 4:45pm. Anyone arriving. without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3. GAIAMW Pe imb we "=medpm qLft Mm*MACLftThe CCrAr1Pk 1 I lick ius' - Of&C aMd 4. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is $.05 cents. Payment may be made by check, money order, or cash at the reception desk. 5. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.60. No briefcases, large totes, etc. are permitted in the file review area. k. -Necessary large plan copies can be scheduled with Cameron.Weaver. nedenr.gov 919-796-7475 for a later date/time at an offsite location at your expense. Large plan copies needed should be attached on top of the file. Allways Graphics can be contacted to setup payment options. eai'iiraor UWTbe kftih sthin.i I 7. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY i. (- - a 2. _ Z-3 NOW ff-4AloV62 4/k Wj�� Si ature d N of Firm/Business Date D/YY Time In 11me Out COPIES MADE._ PAID � D INVOICE GIADM/Shared/File Review Access Form rev 2018 STATE OF NORTH CAROLINA Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910)796-7215 I FILE ACCESS RECORD DEQ SECTION: L f �1 W REVIEW TIME / DATE: NAME: � 3 t �''1 PO le 5 C_ k 1- � S �t P r EMAIL: 1 (L-i.A) k.SCAL-.L J /� rnra1+. A _G 6, REPRESENTING: P RfZA rn yyL" i fits LPL PHONE: 0► l b " 7 q I ` CQ 7 ,0 Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files: Appointments will be scheduled between 9:00am and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is $.05 cents. Payment may be made by check, money order, or cash at the reception desk. 4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases, large totes, etc. are permitted in the file review area Necessary large plan copies can be scheduled with Cameron.Weaver@ncdenr.gov 919-796-7475 for a later date/time at an offsite location at your expense. Large plan copies needed should be attached on top of the file. Allways Graphics can be contacted to set up payment options. Written Qitestiobs may be left with this completed: form and a staff member wall be in eoritact: With you.1F you provide your' tact i formgtion where ridicatieil above: 6. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY 2. _ y' Signature and Name of Firm/Business Date COPIES MADE `47� PAID ,�, �f Time In INVOICE ', 3 Time Out G:/ADM/Shared/File Review Access Form rev 2018 J.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-02036 County: New Ranover U.S.G.S. Quad: Castle Havne NOTIFICATION OF ,JURISDICTIONAL DETERIV INATI01*. Applicant: _Criser Troutman Tanner Consulting Attn: Mark Arcurl Address: 38.09 Peachtree Ave. Wilmington. NC 28403 Telephone No.: Property description: Size (acres) —162 Nearest Waterway Prince Georges Creek USGS HUC 03030007 Location description P userty is kwwn as_ A C'FCC N Indicate Which of the Following Ani)ly: A. Preliminary Determination Owner: Cane Fear Community College 411 North Front Street Wilmington, NC 28401 Nearest Town Castle Havne River Basin Cane Fear'River Coordinates N 34.3222 W-77.8764 Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). B. Approved Determination X There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. The wetland on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The ttrenerty is 1O¢ LW in oge of the 20 Coastal:�['.'anWWs nkiec Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Emily Hughes at (910) 251-463$. C. Basis For Determination D. Remarks E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: Emily Hughes, Project Manager, Wilmington Regulatory Field Office 69 Darlington Ave. Wilmington, North Carolina 28403 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP, Should you decide to submit an RFA form, it must be received at the above address by 3/3/2013. "It is not necessary to su' RFA form to the Aiturict tHticre if you do not object to the determination in this correspondence." t, Carps Regulatory Official:, Date January 3.2013 , Expiration Date January 3.2018 Copy furnished: r ♦ Ni % sal a me t; t o "+ 31t#i5 W ' htsvillte we S i e 15 Ail ttt IVt' 2M11.3 NOTIFICATION OF AIDAHNISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL µp 2012-0203 h Date: 1 /3/2013 A licant• Mark Arcuri File Number: Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of ermission) A - PROFFERED PERMIT Standard Permit or Letter of permission) B PERMIT DENIAL C - X APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION' E SECTION I - The following identifies your rights and options regarding an. administrative appeal of the above decision. Additional information may be found at ;"/Wwvv.usace.army.mil/CE(,WEa'-el materials.am or C_lap m n + 331 ,at 33 CFR Part . A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may acceptor appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II—RESTFOR APPEAL of OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL. INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, Zou maprovide additional. information tocla.rify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUJ STIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal If you only have questions regarding the appeal process you may process you may contact: also contact: Ms. Emily Hughes Jason Steele Regulatory Specialist Administrative Appeals Review Officer 69 Darlington Avenue 60 Forsyth Street, SW (Room 9M10) Wilmington, NC 28403-1343 Atlanta, GA 30303-8801 91.0-251-463 5 404-562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, -and will have the opportunity. to participate in all site investigations - of appellant or agent. i ommw "0100AROD) W RRRMm W W OC95ft Lard=.. I= OCID" 4" &GWO Me o""fo 0 w NPOV HPmM aft,,,W 4W.. WRAW UWI X aoW,M )Pam* AAROM NAi WQA-6- : Rff Of — VIA."' 00 P. Gf w — Iw 4rARgNr tr mw—=m ama.1C6ROEM w 0 , Aw wy. mw 0 FlaoJ. sLalEts A P&POR r Pld AlkWW VE *4M C - w S,M m u I mmy caw AM X. A J. mw 9mg now -----•--I -If I in acuZ AMMP ACS AMPJrUvNMw AbIft #j 4 At *SrAf"fi AW Qj�ZAL TO PDKW4ffNfS ea� I AWA ON04M AW mm CALL TABLE IM *T;7AJVD AREA 'A Wl TABLE FOR WETLAND AM T. al N, ®R A j.4 PG 137 A; !_­.. 4 1. pm er0.ff t. �r 6,1­ MNa.— w__ SEAL L-297i IZ &IRANal r W—M e.Jv.Ait* coammqs -0 ON Vill.*X A01. 7AT A� I 20S • LAR., �,4 A* :;. , r - lk i 404 NXIIAND AM T" 1 a ed Act 404 WMAND AREA "C' 115 Aa I MAWS 4r Al", ­ lot NORTp CAFIOUNA OEPAR "I'll L OF M-SPORTATION q INTERSTATE 140 NOR w CALL TABLE MR NT17AND ARP.4 "D' 404 WULANDS DELIV&4rjCN AW, FOR CALL TABLE FOE. TRUSTEES OF CAPE FEAR COMMUNITY COLLEGE Ar mr ,.-A CAPE FEAR COMMUNITY COLLEGE NORTH CAMPUS 45W MAE CLAY Rav, wwworcov. mc WE FEAR IOW14Wr ­ NEW MNOWR COEWrY - NORN C4MM SCAEC, I' , 200' DATE: DECEAWR 4, 2012 200 0 200 4QD SGQ INCH 200 ?EFT - t. •- t, -?., " w ", R 1-2: C E I l.,E D -DEC q_ it POO* PA coastal Land D esign, PLLC Civil Engineering / Landscape Architecture 1 Constriction Management P.O.Box 1172 Wilmington, NC 28402 NCDENR Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Attn: Linda Lewis Phone:910-254-9333 Fax: 910-254-0502 Re: Cape Fear Community College Soccer Fields SW8 990923 Mod. New Hanover County Dear Ms. Lewis: December 22, 2005 The aforementioned project proposes no impervious area. A sediment and erosion control permit was obtained due to the fact that a disturbed area over 1 acre was anticipated. The project consists of two grass soccer fields graded to sheet flow to an existing perimeter ditch. With no impervious area we are requesting an exemption letter from your office. Thank you for your time and if you have any questions, please contact this office. Sincerely, Jeffrey B. Petroff, P.E. Coastal Land Design, PLLC cc: File SW8 051062 & SW8 990923 Subject: SW8 051062 & SW8 990923 From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 04 Jan 2006 12:18:40 -0500 To: Jeff@coastalsitedesign.com Jeff: Prior to issuing exemption letters, please submit a copy of the plans for these projects. For the waterline, I only need the overall view with the streets shown, not each individual line's profile. Thanks, Linda 1 of 1 1/4/2006 12:19 PM Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality December 8, 2005 Cape Fear Community College Mr. Carl Brown, VP, Institutional Services 411 North Front Street Wilmington, NC 28401 Subject: Request for Stormwater Management Permit Application Cape Fear Community College Soccer Fields Stormwater Project No. SW8 990923 Mod. New Hanover County Dear Mr. Brown: On October 28, 2005, the Wilmington Regional Office received a copy of an Erosion Control Plan for the subject project. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than January 8, 2006. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-796-7215. Sincerely, Linda Lewis Environmental Engineer II ENB/arl: S:1WQSISTORMWATISTORMSUB1990923 Mod. Oct. 05 cc: Tony Roberts, New Hanover County Building Inspections Coastal Land Design, PLLC Wilmington Regional Office File Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington Regional Office Wilmington, NC 28405-3845 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Phone (910) 796-7215 Customer Service 1-877-623-6748 FAX (910) 350-2004 Internet: h2o.enr.state.nc.us NoithCarolina Jvaturallu NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michaei F. Easie governor Director and State Geologist William G. Ross Jr., Secretary October 27, 2005 LETTER OF RECEIPT OF EROSION CONTROL PLAN Cape Fear Community College Mr. Carl Brown, VP, Institutional Services 411 North Front Street Wilmington, NC 28401 RE: Project Name: Cape Fear Community College Soccer Fields (Mod) Project ID: Newha-2006-118 County: New Hanover River Basin: Cape Fear Submitted By: Coastal Land Design, PLLC Date Received by LQS: October 25, 2005 Plan Type: NEW Dear Mr. Brown: This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. if you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Schuyler . Snowdon Land Quality Section cc: Jeffrey B. Petroff, Coastal Land Design, PLLC LQS-WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-796-7215 / FAX: 910-350-2004 - l , ;r41 r tLibWOW I � l�►WDICKS"-)N WK community infrastructure consultants August 16, 2005 Ms. Linda Lewis NCDENR Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Re: Stormwater Project No. SW8 990923Mod Cape Fear Community College - North Campus Engineering Building New Hanover County WKD Project Number 10706.00.WL Dear Ms. Lewis: RECEIVED AUG 2 2 2005 BY: We received your letter of August 9, 2005, requesting the submittal of a Plan Revision for the CFCC North Campus Engineering Building. The stormwater permit for this project was originally applied for in October of 2003 and the permit was received on December 12, 2004. This approved permit included the construction of the Engineering Building and associated site work. We have attached a copy of the stormwater management permit received for the project. The Notice of Violations of the Sedimentation Pollution Control Act referred to in your letter was received due to an unapproved extension of the proposed stockpile area and use of additional CFCC property for a staging area for the contractor, but no additional built upon area has been added to the project. Since receipt of the violation, a revised erosion control plan has been submitted to and approved by NCDENR. In light of the above information, we do not believe a Plan Revision for the stormwater permit is required. Please call me at (910) 762-4200 to discuss if you have any questions or need additional information. Sincerely, W. K. DICKSON & CO., INC. ff'� rl'a'�--- Daniel E. Dawson, P.E. /pb Enclosure CC: Mr. Carl Brown, with enclosure 909 Market Street Wilmington, NC 28401 Tel. 910.762.4200 Fax 910.762.4201 www.wkdickson.com North Carolina . South Carolina . Georgia . Florida Michael F. Easley, Governor North Carolina Department of Environmlent and Natural'�esources Alan W. Klimek PE.,Director Division ofWiter Quality Coleen H. Sullins, Deputy Director Division of Water Quality uecrrmbrrr 12, 2003 w x DICKSON Dr. Eric McKeithan President Trustees of Cape dear Community College [� 1 ? 2003 411 South Front Street Wilmington, NC 28401 RECEIVED Subject: Permit No. SW8 990923 Mod. Cape Fear Community College -North Campus High Density Stormwater Project New Hanover County Dear Dr. McKeithan: The Wilmington Regional Office received a complete modification to the Stormwater Management Permit Application for Cape Fear Community College -North Campus on December 11, 2003. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 990923 dated December 12, 2003, for the construction of Cape Fear Community College -North Campus. This permit shall be effective from the date of issuance until January 28, 2010, (10 years from the original issue date) and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, You have the right to request an adjudicatory hearing upon written request within thirty - 0) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:IWQSISTORMWA RPERMIT1990923.dec03 cc: Marts Hargrove, P.E., WK Dickson. Tony Roberts, New Hanover County Inspections Beth E. Wetherill, New Hanover County Engineering Linda Lewis Wilmington Regional Office Centraf Files N. C. Division of Water Quality 127 Cardinal Drive Extension 910 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (91 ) 350-2004 Fax 1 800 623 78 7 I-.g State Stormwater Management Systems Permit No. SW8 990923 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Trustees of Cape Fear Community College Cape Fear Community College -North Campus New Hanover County FOR THE construction, operation and maintenance of three wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rulesl and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until, January 28, 2010 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1.- This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater controls designated as Ponds 1, and 3, have been designed tj? handle the runoff from a total of 1,268,467 ft`, 280,526 ft , and 1,219,680 ft`, respectively, of built -upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 990923 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Cape Fear Community College North Campus Permit Number: SW8 990923 Location: Blue Clay Road, New Hanover County Applicant: Dr. Eric McKeithan, President Mailing Address: Trustees of Cape Fear Community College 411 South Front Street Wilmington, NC 28401 Application Date: January 28, 2000 December 11, 2003 Modification Name of Receiving Stream/Index #: Prince George Creek / CPF23 (18-74-53) Classification of Water Body: "C Sw" Pond Number Pond 1 Pond 2 Pond Drainage Area, acres: 41.60 9.20 40.00 Onsite: 41.60 9.20 40.00 Offsite: 0 0 0 Total Impervious S rfaces, ft2: 1,268,467 280,526 1,219,680 Buildings, ft 31,363 0 117,176 Streets, A2• Parking, ft': 11,761 91,040 23,958 74,488 Sidewalk, ft2: 22,216 , 57,500 0 526,640 120,226 Tennis Court, : 0 0 46,174 Future Area, ft 1,112,087 199,068 334,976 Pond Depth, feet: 6.00 5.00 5.50 Permanent Pool Elevation, FMSL: 27.50 25.00 25.00 Provided Surface Area, ft2: 96,948 31,061 78,605 Provided Storage Volume, ft3: 104,272 25,661 99,805 Temporary Storage Elevation, FMSL: 28.55 25.80 26.20 Controlling Orifice Pipes: 3 @ 3.0" cp 1 @ 2.0" cp 2 @ 3.0" T Forebay Volume, ft3: 105,041 20,404 59,461 Page 3of8 State Storm -hater Management Systems Permit No. SW8 990923 II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. 2. inuring construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The following items will require a modification to the permit: a. Any'revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the. proJ'ect area. r'. approved plan. Filling in, altering, or piping of any vegetative conveyance shown on the Page 4 of 8 State Stormwater Management Systems Permit No. SW8 990923 10. The Director may determine that other revisions to the project should require a modification to the permit. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construciion. 12. Prior to the sale of any Portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The runoff from all built -upon area within the three specified drainage areas on the project must be directed into the appropriate permitted stormwater control system. 15. The Director may notify the permittee when the permitted site does not meet one or more of.the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity without notice to and approval by the Director. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by document- tation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the transfer is approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.68. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. Page 5of8 State Stormwater Management Systems Permit No. SW8 990923 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 12th day of December, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 111-11 • V . 1 \111111i1%, 1 . V.1 L011 W%0Lw1 Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 990923 Page 6of8 State Stormwater Management Systems Permit No. SW8 990923 Cape Fear Community College -North Campus Page 1 of 2 Stormwater Permit No. SW8 990923 New Hanover Countv Designer's Certification 1, , as a duly registered ving b in the State of North Carolina, haeen authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best pf my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 990923 Page 2 of 2 Certification Requirements: I. The drainage area to i<he system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than" the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided, 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspector Page 8 of 8 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality August 9, 2005 Dr. Eric McKeithan, President Cape Fear Community College 411 North Front Street Wilmington, NC 28401 Subject: Request for Stormwater Management Permit Application CFCC North Campus Engineering Building Stormwater Project No. SW8 990923Mod New Hanover County Dear Dr. McKeithan: OnJune 20, 2005, the Wilmington Regional Office received a copy of a Notice of Violations of the Sedimentation Pollution Control Act for the subject project. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. The last update to the approved plans was on June 18, 2004. A Plan Revision for the addition of the Engineering Building, including 2 sets of plans, must be received in this Office no later than September 9, 2005. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit -that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-796-7215. Sincerely, Linda Lewis Environmental Engineer ENB/arl: S:IWQSISTORMWATISTORMSUB1990923.aug05 cc: Tong Roberts, New Hanover County Building Inspections Denise L. Freund, P.E., WKDickson Wilmington Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Servicel.877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet h2o.enr.state.nc.us No iCarohna An Equal Opportunity/Affirmative Action Empbyer— 50% Recycled/10% Post Consumer Paper Aatirdltl A•� Jl?Ni 200 � NCDENR--- North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor Director and State Geologist William G. Ross Jr., Secretary June 20, 2005 O NOTICE OF VIOLATIONS OF THE 0 SEDIMENTATION POLLUTION CONTROL ACT 0� CERTIFIED MAIL 7004 2 890 0002 3417 6483 61 RETURN RECEIPT REQUESTED Cape Fear Community College ` AP Dr. Eric McKeithan, President 411 North Front Street Wilmington, NC 28401 �" RE: Project Name: CFCC North Campus, Engineering Building Project ID: Newha-2001-254 County: New Hanover Compliance Deadline: 20 days from receipt Dear Dr McKeithan: On June 16, 2005, personnel of this office inspected a project located on Sidbury Road, Wilmington in New Hanover County, North Carolina. This inspection was performed to determine compliance with the North Carolina Sedimentation Pollution Control Act (Act) of 1973. The inspection revealed a land -disturbing activity of approximately 58 acres being conducted. It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The purpose of this letter is to inform you that this activity was found to be in violation of the Act, G.S. 113A-50 to 66, Title 15A, North Carolina Administrative Code (NCAC), Chapter 4. If you feel that you are not responsible for the following violations, please notify this office immediately. The violations that were found are: b. Failure to conduct a land -disturbing activity in accordance with the provisions of an approved erosion and sedimentation control plan. 15 NCAC 4B .0113. The slopes of the pond behind the engineering building and the drainage swales around the stockpile area have sparse to no vegetation and are eroding. Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 - Phone: 910-395-3900 / FAX: 910-350-2004 Notice of Violations Cape Fear Community College Dr. Eric McKeithan, President June 20, 2005 Page 2 of 3 d. Failure on a tract of more than one acre, when more than one acre is uncovered, to provide a permanent ground cover sufficient to restrain erosion on such exposed areas within 15 working days or 90 calendar days, whichever is shorter, after completion of construction or development. G.S. 113A-57(3) and 15A NCAC 4B .0107(b). The slopes of the pond behind the engineering building and the drainage swales around the stockpile area, across from the engineering building have sparse to no vegetation and are eroding. e. Failure on a tract of more than one acre, when more than one acre is uncovered, to install sedimentation and erosion control devices sufficient to retain the sediment generated by the land -disturbing activity within the boundaries of the tract during construction upon and development of the tract. G.S. 113A-57(3). The drainage swale, in the area across the road from the engineering building is eroding and transporting sediment into the storm water pond downstream. f. Failure to take all reasonable measures to protect all public and private property from damage by such land -disturbing activities. 15A NCAC 4B .0105. The swales and ponds associated with this project have had little to no work done and are eroding. i. Failure within 15 working days or 30 calendar days (whichever period is shorter) of completion of any phase of grading to plant or otherwise provide exposed, graded slopes or fills with ground cover, devices, or structures sufficient to restrain erosion. G.S. 113A-57(2). The slopes of the pond behind the engineering building and the drainage swales around the stockpile area have sparse to no vegetation and are eroding. To correct these violations, you must: 1. All disturbed areas must be seeded, fertilized and mulched per approved plans. 2. Swale across from engineering building must be returned to original conditions. It must be cleaned out, regraded in eroded areas, and seeded, fertilized and mulched until adequate vegetation is established. Please note that merely planting grass seed does not satisfy the requirements of"vegetative cover" or of "ground cover sufficient to restrain erosion." These requirements are not satisfied until an adequate cover of grass or other ground cover (such as properly applied and secured, mulched seeding or appropriate rip -rap) is established which is, in fact, sufficient to restrain accelerated or man-made erosion. Notice of Violations Cape Fear Community College Dr. Eric McKeithan, President June 20, 2005 Page 3 of 3 The penalty for an initial violation could be an assessment of up to $5,000.00. A time period for compliance is not required for enforcement of this violation pursuant to NCGS 113A-61.1(c) and NCGS 113A-64(a)(1). Therefore, the initial violation maybe referred to the Director, Division of Land Resources, for appropriate action. Please be advised that if these violations are not corrected within 20 days of receipt of this notice the Director of the Division of Land Resources, will be requested to take appropriate legal action against you pursuant to NCGS 113A-64. That action could be the assessment of a civil penalty, and the amount may be up to $5000 per day for each day of the violation. The penalty may be assessed from the date of the violation, NCGS 113A-64(a)(1). If the violations are corrected within the time period specified for compliance, no further legal action will be pursued. Please be advised that any new land -disturbing activity associated with this project should not begin until the area presently disturbed is brought into compliance with the Act. When corrective actions are complete, you should notify this office so that work can be inspected. You should not assume that the property is in compliance with the Act until we have notified you. After installation, all erosion control measures must be maintained in proper working order until the site is completely stabilized. We solicit your cooperation, and would like to avoid taking further enforcement action. At the same time, it is your responsibility to understand and comply with the requirements of the Act. Copies of the relevant statute and administrative rules may be examined at this office or will be sent to you upon request. Should you have questions concerning this notice or the requirements of the Act please contact either Schuyler Snowdon or me at your earliest convenience. Sincerely, v Daniel Sams, P , Regional Engineer Land Quality Section Enclosures: Sedimentation Inspection Report cc: State Sedimentation Specialist Regional Water Quality Supervisor WIRO - LQS Case.t---- . I NORTH C4ROLINA DEPARTMENT OFEAWRONMENTAAFD NATURAL RESOURCES LAND QUALIYYSECTION.- 127 Cardinal Drive, Ext., Wilmington, NC28405-3845 (910) 395-3900 e. County OL�J-1— lr-iil.rl --,± .1 Project: L River Basin Ckj3l fc. w Person Financially Responsible:_., L j7 el C I- e— Project # �v F! -�Q! - Address: C /J. � 1. Project Location 4 Pictures: No,,O Yes 0 Prints Ll Slides U Digital El Video U 2. Weather and Soil Conditions 5 3. Is site currently under notice of violation? Yes U No,pro 001 4. Is the site in compliance with the S.P.C.A. and the rules? Yes El No ,P If no, check violations below: 5. Violations: U §, No approved plan, G.S. 113A-57(4) and 15A NCAC 4B.0107(q) El g. Inadequate buffer zone, G.S. 113A-57(l) ,31. Failure to follow approved plan, G.S. 113A-61.1 El h. Graded slopes and fills too steep, G.S. 113A-57(2) L3 c. Failure to submit revised plan, G.S. 113A-54.1(b) and or 15A NCAC 4B.0124(d) ' 15A NCAC 4B.0118(a) i. Unprotected exposed slopes, G.S. 113A-57(2) 10 d. Failure to provide adequate groundcover, G.S. 113A-57(3) and EJ j. Failure to maintain erosion control measures, 15A NCAC 4B.0107(b) or 15A NCAC 4B.0124(c) 15A NCAC 413.0113 $Ue. Insufficient measures to retain sediment on site, G.S. 113A-57(3) 0 k. Other (describe) f Failure to take all reasonable measures, 15A NCAC 4B.0105 6. NPDES Permit Violation? Yes ;a NoU Describe 7. Has sedimentation damage occufred since last inspection? �a.2r If yes, where? (check all that apply): No Ll Lake/natural watercourse on the tracta Lake/natur�l watercourse off the tract El Other property ❑ Description: 'S( J � V.-A &vereV Q — A 04'1 - k d - 4'--' " -Y ,a C."I d -S Degree of damage: Slight #I W Moderate U Severe 13 8. Contact made with (Name) to Title Inspection Report given El orsent to Person Financially Responsible Date given/sent 17,2005- 9. Corrective actions needed: 94 -,bc,od 41 e-Lr C' 5 4 ter 16 5 F 5fi - P, '-f fr 1, e'1( C. 10, 'Commtnzs: wo, ef -5 �C-x i'-.1 40'r-te -f 0 orb, .V. ac -; tt% 0 d Ar ry beA i r04EC4 A C' 1.kl 1. C. V er I-C3 /0 Ak IT 0, it C'e J &4adletE 4-76Y - I 6* t/1'-rey-4rip 1- 44 2C)0? $:I . -Z d rt!v *), -ee &I t "o j4 C 0 C4. o "e fnc' Report by:,—Sc "l th Date of Inspection: 1-Y (( z g ;COS' /--Others present -5- A,— Time arriving at site: Time leaving site: 50 cc: ,QF,1 JUN 6 2005 NCDENR y: North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, ^G, f- E Director and State Geologist Land Quality Section Michael F. Easley, Govemcr William G. Ross Jr., Secretary June 16, 2005 LETTER OF RECEIPT OF REVISED EROSION CONTROL PLAN Cape Fear Community College Dr. Eric McKeithan, President 411 North Front Street Wilmington, NC 28401 RE: Project Name: CFCC North Campus Modifications Project ID: Newha-2001-254 County: New Hanover River Basin: Cape Fear Submitted By: W.K. Dickson Date Received by LQS: June 14, 2005 Plan Type: REVISED Dear Dr McKeithan: qqoq MU� n This office has received the revised soil erosion and sediment control plan submitted for the project listed above. G.S. 113A-54.1(a) requires that this office approve or disapprove a submitted revised plan within 15 days of receipt of such plan. Failure to act by this office within this time period shall be deemed approval of the revised plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Comment # 7 in the approval letter dated August 22, 2003 states that the permit allows for land disturbance of 58 acres. Exceeding that is a violation and requires additional fees. Please calculate the area and submit a letter and appropriate fees. Stormwater calculations and/or alterations may be needed to handle additional areas. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Schuyler J. Snowdon Land Quality Section cc: Denise L. Freund, PE, W.K. Dickson LQS — WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, NC 28450 Phone: 910-796-7215 Fax: 910-350-2004