Loading...
HomeMy WebLinkAboutSW3201003_Calculations_20201103mi YARBROUGH-WILLIAMS & HGULE, INC. Planning • Surveying • Engineering 730 WINDSOR OAK COURT (28273) P.O. BOX 7007 (28241) CHARLOTTE, NC PHONE (704)556-1990 FAX (704)556-0505 NC CORPORATE REGISTRATION #C-0475 CALCULATIONS AUTO FINANCE & CAR CARE CENTER DATE:10/15/20 CONTENTS: • STORM DRAINAGE CALCULATIONS • DROP INLET CALCULATIONS • EROSION SEDIMENT BASIN CALCULATIONS • SKIMMER CALCULATIONS • SAND FILTER CALCULATIONS tiN iiilip /�o W 4s-4p STORM DRAINAGE CALCULATIONS .. a a G m Im DROP INLET CALCULATIONS S W Q a � W a J cWii 3 p i K w X F W 3 F2 a w a U c7 ? w -j F O a N N O co 0 o F o 0 0 0 0 0❑ o � V Q Ga Q F N N O M J CcOCC 3 Q 00000❑ T O t9 0) ��2 w L x o � Q u., y O o o O- Lo Oa w O O O O O Q Q O K W Lu �[ F co W co co co w W 0 0 0 0 0 c. 3 a 0 w a () w w z o (ococo(0(oo CD Co Co Co Co O cL w ¢ ririririmo C7 O Q w ornc0000 O (o CM LO O LID O M O O O Z } 0 H op oo oo oD oo � z U Q 0 a U O W co (o (o Co (O Co O 0 (o (o d w o 0 0 0 0 w a o wLu a vr(o�o Q mg �d 4 o 0 0 0 o U 06 �2 0 ¢FHI- F Q ti of w 0, 0' of M w C7 C7 C7 C� C� U o 04 LU F O W W W W W Zf a: N U w J J J J J Z 5 } _Z Z_ _Z Z_ Z_ F aO O U U) U CO U U oQ0 Q OW M r O N Q z ma❑ EROSION SEDIMENT BASIN CALCULATIONS AUTO FINANCE & CAR CARE CENTER SEDIMENT BASIN CALCULATIONS DATE: OCTOBER 15 2020 - BASIN # 1 DRAINAGE AREA 5.16 AC WKD INTENSITY (I) 7.03 (10 yr) Qio=CIA= 0.6 x 5.16 x 7.03 = 21.76 cfs REQUIRED STORAGE _ UIRED SURFACE AREA BASIN STORAGE DIMENSIONS STORAGE PROVIDED - TOP OF DAM HEIGHT (Y) = Z — 3 + SPILLWAY - L = Q / (3 x h15) 5.16 x 1800 = 9,288 CF 325 x Q10 = 7,074 SF CONTOUR 688 CONTOUR 687 CONTOUR 686 19,412 CF 685 H + SPILLWAY DEPTH +1 .0' FREEBOARD I + 1 = 5 FT 7,25 ft 20' MIN. SURFACE AREA 7,966 6,938 5,967 5,052 TOTAL 19,413 SKIMMER CALCULATIONS kk k k U q q "It CD § § � c e cu & it E E k k cn 0 0 \ / 0 = 2 ® & � 2 wo co U- / - § c �� c ■ � � k o / c _ k 3 c LL/LL SAND FILTER CALCULATIONS SAND FILTER CALCULATIONS references: NCDENR Stormwater BMP Manual Chapter 11 Date 7-Oct-20 PROJECT AUTO FINANCE & CAR CARE CENTER SAND FILTER 1 Rama nw;% 730 Windsor Oak Ct Charlotte, NO 28241 704-556-1990 YARBROUGH-WILLIAMS & HOULE, INC. Planning - Surveying s Engineering Site Area Post = Total Drainage Area (A) = Site Area Pre = Total Drainage Area (A) = Measured Impervious Area - Hydrologic Data Pre - ON 2.fi2 ac 4.86 aC. 4.86 8c 53 8596 Acrea a Land Use Soil T e H r I i rou CN wei hted CN 005 Ex Pvmt 98 1 01 4.81 Woods ScA C 70 6928 0.00 000 486 Post - CN CNP„ 70 Acrea a Land Use Soil Type H drolo is Grou CN (weighted) CN 262 Bld /Pvt/SW 98 52.77 2.24 Grass SCA C 74 34.15 000 0.00 4.66 Pre CN 70 Post 87 CNP,,, 87 Steps 1, 2 Determine if the development site and conditions are appropriate for the use of a Sand Filter pond and consider any site -specific design considerations. Step 3 Compute Water Quality Volume (WQv) Compute Runoff Coefficient, Rv, using (Schueler's Method) Equation 3,1 Rv = 0.05 + 0.009 (1) 1 = percent impervious over basin area = 618 % Total Rainfall amount (P) _ =in Rv = 0534618916 RE) = 4 Compute Water Quality Volume, WQv, using Equation 3.2 Design Volume WQv = 1.0RvA/12 = 0.22 ac-ft or 9432 cf Convert Water Quality Volume, WQv to inches of runoff using Equation 3.3 WQv = 1 0(Rv) = 0.53 in Compute Site Hydrologic Input Parameters Using SCS hydrologic procedures and/or computer models the following data can be determined for the example development site. Step 4 Summary of Hydrocad Input and Output HYDROLOGIC INPUT DATA Condition Area ac CN tc hours tc min Pre-dev 4.86 70 0.08 5 Post dev 4.86 87 0.08 5 Results of Preliminary Hydrologic Calculations (From Computer Model Results Using SCS Hydrologic Procedures) Condition 1 YR Q2- ear Q10- ear Runoff cfs cfs cfs Pre-Dev 3.22 3.27 11.12 w/ out controls Post Dev 10.04 12.64 1 23.27 w/ controls Post Dev 0.47 0.73 9.58 POST MODIFIED CN Step 5 Compute Water Quality Peak Flow (WQp) using modified CN (adjusted) value Compute modified SCS curve number, CN, using Equation 3.4 CN mod -post = 1000/[10 + 5P + 10WQv — 10(WQV2 + 1 25 WQVP)0 51 CN mod -post = 95 Compute WQp using SCS the hydrograph procedure documented in the CMSWDM using Hydrocad hydrologic model, A 1-inch, 6-hour balanced storm event is required. See Hydrocad Report WQp = 6.48 cfs Step 5 Compute Sedimentation Chamber Minimum Surface Area Per Section 11.3.5 NCDENR Stormwater BMP Manual Also Min As (ftz) = [240 " Rv " AD] . Ro (fe) = 623.58 sf As provided = 1850.0 sf Forebay Chamber Storaga-El ovation Data Elevation Area sf Area ac Ht ft Inc. Vol ac-ft Acc. Vol ac-ft Acc. Vol cf 685 1000.0 0.023 0.0 0,00 000 000 686 1400.0 0.032 1.0 0,03 003 120000 687 1850.0 0.042 2.0 1.00 1.03 44760 00 Step 6 Compute Sand Filter Area to Treat Water Quality Volume Af = (WQv)(df)/[(k)(hf+df)(tf)j where: Af = surface area of filter bed (ft2) WQv = Treatment Water Quality Volume (cf) 9431.64 cf df = filter bed depth (ft) 1.50 k = coefficient of permeability of filter media (ft/day) 3.5 hA = average height of water above filter bed (ft) 0.96 tf = design filter bed drain time (days) 1.67 Af = 981.9 sf required min area of sand filter Est. Sand filter area 31.3 foot by 31.3 Filter Surface Area (At= ) 982 Isf for calculations NOTE: top sand filter provided is 43' X 43' bottom of sand filter (41' X 41) is used to calculate outflow through the filter Actual Sand Surface Area Provided = 1000 Isf Step 7 Verify the Volumes [Af (sf) + As (sf)] x hMaxriiter = 26220 sf >_ Filter area provided = 5500 sf Forebay area provided = 1400 sf hMaxriiter= 3.80 ft max head interpolated 34500 Step 8 Develop Water Quality Storage -Elevation Table 4100.0 485000 Water Qualitv Storage -Elevation Data fincludino Fornhavl 9432 40 hrs sf minimum Elevation Area sf Area ac Ht ft Inc. Vol ac-ft Acc. Vol ac-ft Acc. Vol c 6845 1000.0 0.023 000 0.00 0.00 0.00 685 4450.0 0102 0.50 0.03 0.03 1362.50 686 5500.0 0.126 1.50 0.11 0.15 6337.50 687 6700,00 0 154 2.50 0.14 029 12437.50 688 7950.00 0183 3.50 0.17 0.45 19762.50 689 9050.00 0.208 4.50 0.20 065 28262.50 690 10150.00 0233 5.50 0.22 0.87 37862.50 Top of Sand Filter Elevation 684.50 100 yr WSE 688.65 WQv Elevation = 686.43 WQv Required = 9431 6 cf 0.217 ac-ft per sand filter WQv treated = 944001 cf 0.217 ac-ft per sand filter Forebay Weir Elevation = 687 Top of Box Weir Elevation = 688.30 WQv release in (max 40 hrs) = I YES ! Step 9 Develop Stage -Discharge for Sand Filter Media Af = (WQv)(df)/[(k)(hf+dfl(tf)1 WQv/tf = Qo = Af (k)(hf+df)/(df)) where: Af = surface area of filter bed provided (ft2) df = filter bed depth (ft) k = coefficient of permeability of filter media (ft/day) hA = average height of water above filter bed (ft) At Elevation 687 2.5 Feet above sand filler Qo = 9383 coda 0.108 cfs At Elevation 686 1.5 feet above sand filter Qo = 7000 cf/da 0.081 I I cfs At Elevation 685 0.5 feet above sand filter Qo = 4667 coda 0 054 cfs At Elevation 684.5 sand filter surface Qo = 0 cf/da 0.000 I I cfs Bottom of Sand Filter Elevation = 1 682.00. Time to Drain WQV through sand filter = 40 hr SHWT elevation = 0 1000.00 sf 1.50 ft 3.5 0.96 fl Step 10 Design Underdrain System The underdrain capacity must be greater than the filter media capacity. The capacity must drain the runoff volume from the system within design duration of 40 hours. The design must assume that 50 percent of the underdrain system (perforations and pipe system capacity) is lost due to clogging. Design specifications require the underdrain system to be a 8-inch perforated PVC pipe with 3/8-inch perforations spaced 3 inches on center, along 4 longitudinal rows spaced 90 apart. Minimum underdrain slope is 0.5 percent Sand Filter Area = 981.92 sf The filter media is the controlling outflow condition. Compute minimum drawdown discharge Water Quality Volume = Drawdown = Compute Performation Capacity The maximum underdrain spacing is 10 feet on center The dimension of the sand filter bottom is Actual length of pipe containing holes is 29 feet. Number of perforations = 50 percent of perforations = Capacity of one hole = CA(2gh)05 Total Capacity Filter Media Capacity = Total Capacity of Compute underdrain pipe capacity 9431.64 cf 9431.64 cf /(120 hrs)(3600 sec/hour) 0.022 cfs 33'x33' 1( pipe)(3 rows)((29) ft/pipe)(4 holes/ft) 3481 holes 174 holes -(0.6)(3.1416)[(3/8in)(1/24)]2[(64.4)(5 0ft)]05 0.0083 cfs = 0.083 x 174 = 1.44 cfs 0.068 cfs at 1 foot of head 1.44 cfs is greater than Filter Media Capacity and Minimum Drawdown Discharge Underdrain Pipe Size = © in = Area= For 6-inch PVC underdrain pipe at 0,005 ft/ft slope: Capacity of pipe = (1.49/n)(A)(A/P)061(S)05 _ =(1 49/0.013)(0.196)(0,125)0'67(0.005)0.5 = 0,39 cfs Fifty percent assuming clogging = 0.20 cfs The underdrain pipe capacity (0.20 cfs) is greater than the filter media capacity of 0 068 cfs, and greater than the minimum drawdown capacity requirement (0.020 cfs computed in this step) Therefore the design is acceptable. Step 11 Design Overflow Weir A 16 foot emergency spillway overflow weir is designed with a weir elevation of 688 3 design elevation Step 12 Access Maintenance Access and Safety Features All areas of both chambers must be within 25 feet of an access location from the surface that is large enough for personnel to enter in order to remove trash, debris, sediment, etc In addition, the sand filter media must be accessible in order to facilitate complete replacement when the sand filter ponds runoff without filtration Check 50 year storm elevation - The 50 year storm events bypass the sand filters. The partial flow from these storms flowing to the sand filter stays within the sand filters with overflow over the outlet structure. 0.196 sf 0.125 Pre-dev Subcat Reach on Link Sf # 1 HydroCad Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCAD®10.10-4a s/n 05047 ©2020 HvdroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1 yr Charlotte 24-hr 1-yr Default 24.00 1 2.58 2 2 2-yr Charlotte 6-hr 2-yr Default 6.00 1 2.28 2 3 10-yr Charlotte 6-hr 10-yr Default 6.00 1 3.72 2 Sf # 1 HydroCad Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCADO 10.10-4a s/n 05047 © 2020 HydroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 7S: Pre-dev Runoff = 3.22 cfs @ 12.04 hrs, Volume= 0.200 af, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Area ac CN Description 4.860 70 Woods, Good. HSG C 4.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) ft/ft) (ft/sec) (cfs 5.0 Direct Entry, Direct Entry Subcatchment 7S: Pre-dev Hydrograph Charlotte 24-hr 1-yr 3 1 yr: Rainfall=2.58" Runoff Area=4:860 ac Runoff Volume=0.200 of Runoff Depth=0.49'' LL Tc=5.0 min CN=70 t•�v►.rrrr�r�si�rs��ii�iiE�r�Eiir�rirrr�«rim.F�,rimrrr��rrriirri�r����rrvaf�vffrrrii� Time (hours) U Runoff Sf # 1 HydroCad Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCAD® 10.10-4a s/n 05047 © 2020 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 7S: Pre-dev Runoff = 3.27 cfs @ 3.18 hrs, Volume= 0.144 af, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 4.860 70 Woods, Good.. HSG C 4.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) ft/ft) ft/sec cfs 5.0 Direct Entry, Direct Entry Subcatchment 7S: Pre-dev Hydrograph 6- Charlotte:Sdhr 2-yr 3 Rainfall=2.28" Runoff Area--4.860 ac Runoff Volume=0.144 of Runoff :Depth=0.35 LL Tc=5.0 m i n CN-70 1 5 10 15 20 25 30 35 1 45 50 55 .1 65 70 75 81 85 91 95 100 105 110 115 120 125 130 135 140 C! Runoff Sf # 1 HydroCad Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCAD®10.10-4a s/n 05O47 ©2020 H droCAD Software Solutions LLC Pa e 5 Summary for Subcatchment 7S: Pre-dev Runoff = 11.12 cfs @ 3.16 hrs, Volume= 0.464 af, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area ac CN Description 4.860 70 Woods, Good, HSG C 4.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec) (cfs) 5.0 Direct Entry, Direct Entry Subcatchment 7S: Pre-dev Hydrograph 12 i2 cfs Charlotte 67hr 10-yr 10 Rainfall=3.72" Runoff Area=4860 ac Runoff Volume=0.464 of Runoff 'Depth=1.15" e Tc=5.0 min U. CN=70 4 c y � r r r+rrr �J.r.►.►.�!lI.IA.IIFili/lirJAJFJ!/JJ.//J//J/J//J//JJJ/f�/JJF/JJJ>/Jf/J//JJJJ///J//,rFJIF/I' 15 10 15 20 25 30 35 41 45 50 55 61 65 70 75 :1 85 91 95 100 105 110 115 120 125 130 135 140 Runoff Sf # 1 HydroCad Table of Contents Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCAD®10.10-4a s/n 05047 ©2020 HvdroCAD Software Solutions LLC TABLE OF CONTENTS Protect Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 1 yr Event 3 Subcat 7S: Pre-dev 2-yr Event 4 Subcat 7S: Pre-dev 10-yr Event 5 Subcat 7S: Pre-dev 8s) � 6� Post Development 1 in w/ Mod CN n� Subcat) Reach. Pon4.. Link Sand Filter Sf # 1 HydroCad Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1 inch Charlotte 6-hr 1 INCH Default 6.00 1 1.00 2 Sf # 1 HydroCad Charlotte 6-hr 1 INCH 1 inch Rainfall=1.00" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCAD® 10 10-4a s/n 05047 © 2020 H droCAD Software Solutions LLC Page 3 Summary for Subcatchment 8S: Post Development 1 in w / Mod CN Runoff = 6.48 cfs @ 3.11 hrs, Volume= 0.228 af, Depth= 0.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 1 INCH 1 inch Rainfall=1.00" Area (ac) CN Description 4.860 95 post dev 4.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) ft/ft (ft/sec) cfs 5.0 Direct Entry, Post Dev Subcatchment 8S: Post Development 1 in w / Mod CN Hydrograph '.1 Charlotte 6-hr 1 INCH 1 inch Rainfall=1.00" Runoff Area-4.860 ac Runoff Volume=0.228 of Runoff Depth=0.56 Tc=5.0 min CN=95 1 5 10 15 20 25 30 35 41 45 50 55 61 65 70 75 81 85 90 95 100 105 110 115 120 125 130 135 140 ED Runoff Sf # 1 HydroCad Charlotte 6-hr 1 INCH 1 inch Rainfall=1.00" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD® 10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Pape 4 Summary for Pond 26P: Sand Filter Inflow Area = 4.860 ac, 0.00% Impervious, Inflow Depth = 0.56" for 1 inch event Inflow = 6.48 cfs @ 3.11 hrs, Volume= 0.228 of Outflow = 0.09 cfs @ 6.02 hrs, Volume= 0.228 af, Atten= 99%, Lag= 174.6 min Primary = 0.09 cfs @ 6.02 hrs, Volume= 0.228 of Routing by Stor-Ind method, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs / 2 Peak Elev= 686.43' @ 6.02 hrs Surf.Area= 6,013 sf Storage= 8,944 cf Plug -Flow detention time= 1,047.6 min calculated for 0.228 of (100% of inflow) Center -of -Mass det. time= 1,047.9 min ( 1,257.6 - 209.7 ) Volume' Invert #1 684.50' Avail.Storape Storage Descri 37,863 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store feet (sq-ft) (cubic -feet) (cubic -feet) 684.50 1,000 0 0 685.00 4,450 1,363 1,363 686.00 5,500 4,975 6,338 687.00 6,700 6,100 12,438 688.00 7,950 7,325 19,763 689.00 9,050 8,500 28,263 690.00 10,150 9,600 37,863 Device Routing Invert Outlet Devices #1 Primary 683.24' 24.0" Round Culvert L= 59.0' Ke= 0.500 Inlet / Outlet Invert= 683.24' / 682.91' S= 0.0056 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 684.50' Special & User -Defined Head (feet) 0.00 0.50 1.50 2.50 Disch. (cfs) 0.000 0.054 0.081 0.108 #3 Device 1 687.30' 4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 688.30' 16.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.09 cfs @ 6.02 hrs HW=686.43' (Free Discharge) '�-1=Culvert (Passes 0.09 cfs of 21.30 cfs potential flow) 2=Special & User -Defined (Custom Controls 0.09 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) =Sharp -Crested Rectangular Weir ( Controls 0.00 cfs) Sf # 1 HydroCad Charlotte 6-hr 1 INCH 1 inch Rainfall=1.00" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Paae 5 Pond 26P: Sand Filter Hydrograph Inflow Area=4.8:60 ac g Peak E l ev=686.43' 5 Storage=8,944 cf w 4 u 3 0 LL 3 2 is r�s Q 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 160 165 110 115 120125130135140 Time (hours) E: Inflow p Primary Sf # 1 HydroCad Table of Contents Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HvdroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 1 inch Event 3 Subcat 8S: Post Development 1 in w / Mod CN 4 Pond 26P: Sand Filter 9S ) � Post Development Subcat Reach on [Link Sand Filter Sf # 1 HydroCad Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 H droCAD®10.10-4a s/n 05047 ©2020 H droCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1 yr Charlotte 24-hr 1-yr Default 24.00 1 2.58 2 2 2-yr Charlotte 6-hr 2-yr Default 6.00 1 2.28 2 3 10-yr Charlotte 6-hr 10-yr Default 6.00 1 3.72 2 4 50 yr Charlotte 6-hr 50-yr Default 6.00 1 4.92 2 5 100 YEAR Charlotte 6-hr 100-yr Default 6.00 1 5.34 2 Sf # 1 HydroCad Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 H droCADO 10.10-4a s/n 05047 ©2020 H droCAD Software Solutions LLC Page 3 Summary for Subcatchment 9S: Post Development Runoff = 10.04 cfs @ 11.99 hrs, Volume= 0.558 af, Depth= 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Area (ac) CN Description 2.620 98 Paved parking, HSG C 2.240 74 >75% Grass cover, Good, HSG C 4.860 87 Weighted Average 2.240 46.09% Pervious Area 2.620 53.91% Impervious Area Tc Length Slope Velocity Capacity Description min (feet) ft/ft) (ft/sec) (cfs)_ 5.0 Direct Entry, Post Dev 11 8 [ •o C14 Cry ] Subcatchment 9S: Post Development Hydrograph Charlotte 24-hr 1-yr 1 yr Rainfall=2.58',' Runoff Area=4.860:ac Runoff Volume=0.558 of Runoff Depth=1.38 Tc=5.0 m i n CN=87 i sr -.--ter- - -- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 �E Runoff Sf # 1 HydroCad Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCADO 10.10-4a s/n 05047 © 2020 HvdroCAD Software Solutions LLC Paoe 4 Summary for Pond 27P: Sand Filter Inflow Area = 4.860 ac, 53.91 % Impervious, Inflow Depth = 1.38" for 1 yr event Inflow = 10.04 cfs @ 11.99 hrs, Volume= 0.558 of Outflow = 0.47 cfs @ 13.63 hrs, Volume= 0.558 af, Atten= 95%, Lag= 98.5 min Primary = 0.47 cfs @ 13.63 hrs, Volume= 0.558 of Routing by Stor-Ind method, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs / 2 Peak Elev= 687.39' @ 13.63 hrs Surf.Area= 7,187 sf Storage= 15,290 cf Plug -Flow detention time= 1,263.0 min calculated for 0.558 of (100% of inflow) Center -of -Mass det. time= 1,263.4 min (2,090.0 - 826.7 ) Volume Invert Avail.Stora a Storage Description #1 684.50' 37,863 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 684.50 1,000 0 0 685.00 4,450 1,363 1,363 686.00 5,500 4,975 6,338 687.00 6,700 6,100 12,438 688.00 7,950 7,325 19,763 689.00 9,050 8,500 28,263 690.00 10,150 9,600 37,863 Device Routing Invert Outlet Devices #1 Primary 683.24' 24.0" Round Culvert L= 55.0' Ke= 0.500 Inlet / Outlet Invert= 683.24' / 682.91' S= 0.0060 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 684.50' Special & User -Defined Head (feet) 0.00 0.50 1.50 2.50 Disch. (cfs) 0.000 0.054 0.081 0.108 #3 Device 1 687.30' 4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 688.30' 16.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.46 cfs @ 13.63 hrs HW=687.39' (Free Discharge) L =Culvert (Passes 0.46 cfs of 26.84 cfs potential flow) 2=Special & User -Defined (Custom Controls 0.11 cfs) 3=Sharp-Crested Rectangular Weir (Weir Controls 0.35 cfs @ 0.98 fps) -Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) Sf # 1 HydroCad Charlotte 24-hr 1-yr 1 yrRainfall=2.58" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 H droCADO 10 10-4a s/n 05047 © 2020 H droCAD Software Solutions LLC Page 5 Pond 27P: Sand Filter Hydrograph I I Inflow q Primary 7 N w 6 O LL " 1 3 •. �047 •:�y Inflow Area=4.860 ac Peak Elev=687.39' Storage=15,29'0 cf 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Time (hours) Sf # 1 HydroCad Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCADO 10.10-4a s/n 05047 © 2020 HydroCA❑ Software Solutions LLC Page 6 Summary for Subcatchment 9S: Post Development Runoff = 12.64 cfs @ 3.16 hrs, Volume= 0.457 af, Depth= 1.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 2.620 98 Paved parking, HSG C 2.240 74 >75% Grass cover, Good, HSG C 4.860 87 Weighted Average 2.240 46.09% Pervious Area 2.620 53.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) feet ft/ft(ft/sec) (cfs) 5.0 Direct Entry, Post Dev Subcatchment 9S: Post Development Hydrograph 14 1 1«.Gh Cfe 12 Charlotte 6-hr 2-yr 11 Rainfall=2.28" 10 Runoff Area=4.860 ac 9 Runoff Volume=0.457 of 7 Runoff Depth=1.13' 7 LL 6 Tc=5.0 min CN= 87 3 2 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) 1 Runoff Sf # 1 HydroCad Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCADO 10.10-4a s/n_ 05047 © 2020 HydroCAD Software Solutions LLC Page 7 Summary for Pond 27P: Sand Filter Inflow Area = 4.860 ac, 53.91% Impervious, Inflow Depth = 1.13" for 2-yr event Inflow = 12.64 cfs @ 3.16 hrs, Volume= 0.457 of Outflow = 0.73 cfs @ 4.44 hrs, Volume= 0.457 af, Atten= 94%, Lag= 77.1 min Primary = 0.73 cfs @ 4.44 hrs, Volume= 0.457 of Routing by Stor-Ind method, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs / 2 Peak Elev= 687.43' @ 4.44 hrs Surf.Area= 7,238 sf Storage= 15,589 cf Plug -Flow detention time= 1,157.2 min calculated for 0.457 of (100% of inflow) Center -of -Mass det. time= 1,157.5 min ( 1,372.4 - 214.9 ) Volume Invert Avail.Stora a Storage Description #1 684.50' 37,863 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) s -ft (cubic -feet) (cubic -feet 684.50 1,000 0 0 685.00 4,450 1,363 1,363 686.00 5,500 4,975 6,338 687.00 6,700 6,100 12,438 688.00 7,950 7,325 19,763 689.00 9,050 8,500 28,263 690.00 10,150 9,600 37,863 Device Routinq Invert Outlet Devices #1 Primary 683.24' 24.0" Round Culvert L= 55.0' Ke= 0.500 Inlet / Outlet Invert= 683.24' / 682.91' S= 0.00607' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 684.50' Special & User -Defined Head (feet) 0.00 0.50 1.50 2.50 Disch. (cfs) 0.000 0.054 0.081 0.108 #3 Device 1 687.30' 4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 688.30' 16.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.72 cfs @ 4.44 hrs HW=687.43' (Free Discharge) 't- =Culvert (Passes 0.72 cfs of 27.02 cfs potential flow) 2=Special & User -Defined (Custom Controls 0.11 cfs) 3=Sharp-Crested Rectangular Weir (Weir Controls 0.61 cfs @ 1.18 fps) =Sharp -Crested Rectangular Weir ( Controls 0.00 cfs) Sf # 1 HydroCad Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Paae 8 Pond 27P: Sand Filter Hydrograph 14 +&a cfs l i3 Inflow Area=4.860 ac 12 11 Peak Elev=687.43' 10 Storage=15,589 �cf 9 w 8 u 3 7 0 LL 6 5 !. 3 2 0 73 d. 1 Q .. .. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 BS 90 95 100105110115120125130135140 Time (hours) F11—in—flow,vi CI Primary Sf # 1 HydroCad Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 9S: Post Development Runoff = 23.27 cfs @ 3.15 hrs, Volume= 0.964 af, Depth= 2.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 2.620 98 Paved parking, HSG C 2.240 74 >75% Grass cover. Good. HSG C 4.860 87 Weighted Average 2.240 46.09% Pervious Area 2.620 53.91% Impervious Area Tc Length Slope Velocity Capacity Description min feet ft/ftft/sec) (cfs 5.0 Direct Entry, Post Dev Subcatchment 9S: Post Development Hydrograph 26 25 2 23.?.7 d; 23 Charlotte 6-hr 10,-yr 22 20 Rainfall=3.72�' 18 Runoff Area=4860 ac 16 Runoff Volume=0.964 of 14 Runoff 'Depth=2.38" 3 13 ° 12 Tc=5.0 m i n a 11 10 CN=87 8 7 6 5 4 3 8 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) r] Runoff Sf # 1 HydroCad Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCADO 10 10-4a s/n 05047 © 2020 HydroCAD Software Solutions LLC Page 10 Summary for Pond 27P: Sand Filter Inflow Area = 4.860 ac, 53.91 % Impervious, Inflow Depth = 2.38" for 10-yr event Inflow = 23.27 cfs @ 3.15 hrs, Volume= 0.964 of Outflow = 9.58 cfs @ 3.32 hrs, Volume= 0.964 af, Atten= 59%, Lag= 10.1 min Primary = 9.58 cfs @ 3.32 hrs, Volume= 0.964 of Routing by Stor-Ind method, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs / 2 Peak Elev= 688.13' @ 3.32 hrs Surf.Area= 8,093 sf Storage= 20,864 cf Plug -Flow detention time= 564.8 min calculated for 0.964 of (100% of inflow) Center -of -Mass det. time= 565.2 min ( 774.4 - 209.2 ) Volume Invert Avail.Stora a Storage Description #1 684.50' 37,863 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store feet s -ft (cubic -feet) cubic -feet) 684.50 1,000 0 0 685.00 4,450 1,363 1,363 686.00 5,500 4,975 6,338 687.00 6,700 6,100 12,438 688.00 7,950 7,325 19,763 689.00 9,050 8,500 28,263 690.00 10,150 9,600 37,863 Device Routing Invert Outlet Devices #1 Primary 683.24' 24.0" Round Culvert L= 55.0' Ke= 0.500 Inlet / Outlet Invert= 683.24' / 682.91' S= 0.0060'/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 684.50' Special & User -Defined Head (feet) 0.00 0.50 1.50 2.50 Disch. (cfs) 0.000 0.054 0.081 0.108 #3 Device 1 687.30' 4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 688.30' 16.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=9.58 cfs @ 3.32 hrs HW=688.13' (Free Discharge) L1=Culvert (Passes 9.58 cfs of 29.83 cfs potential flow) Z=Special & User -Defined (Custom Controls 0.11 cfs) 3=Sharp-Crested Rectangular Weir (Weir Controls 9.47 cfs @ 2.98 fps) =Sharp -Crested Rectangular Weir ( Controls 0.00 cfs) Sf # 1 HydroCad Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Paae 11 Pond 27P: Sand Filter Hydrograph 2.6 24 Inflow Area=4.860 ac 22 Peak Elev=688.13' 20: 1s Storage=203864 .d 16- T u W. 0 12 LL asa di. ta- 8..` ?. 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 BS 90 95 100105110115120125130135140 Time (hours) LI Inflow L"] Primary Sf # 1 HydroCad Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCADO 10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Paae 12 Summary for Subcatchment 9S: Post Development Runoff = 32.67 cfs @ 3.11 hrs, Volume= 1.414 af, Depth= 3.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Area (ac) CN Description 2.620 98 Paved parking, HSG C 2.240 74 >75% Grass cover, Good, HSG C 4.860 87 Weighted Average 2.240 46.09% Pervious Area 2.620 53.91% Impervious Area Tc Length Slope Velocity Capacity Description min feet ft/ft) (ft/sec) (cfs 5.0 Direct Entry, Post Dev 36 32 30 28 26 24 22 20 18 0 LL 16 14 12 10 8 6 4 2 0 0 Subcatchment 9S: Post Development Hydrograph Charlotte 6-hr 50'-yr 50 yr Rainfall=4.92�' Runoff Area=4.860 ac Runoff Volume=1.414 of Runoff Depth=3.49 Tc=5.0 m i n CN=87 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) �❑ Runoff Sf # 1 HydroCad Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 H droCAD®10.10-4a s/n 05047 ©2020 H droCAD Software Solutions LLC Page 13 Summary for Pond 27P: Sand Filter Inflow Area = 4.860 ac, 53.91 % Impervious, Inflow Depth = 3.49" for 50 yr event Inflow = 32.67 cfs @ 3.11 hrs, Volume= 1.414 of Outflow = 23.91 cfs @ 3.18 hrs, Volume= 1.414 af, Atten= 27%, Lag= 4.3 min Primary = 23.91 cfs @ 3.18 hrs, Volume= 1.414 of Routing by Stor-Ind method, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs / 2 Peak Elev= 688.55' @ 3.18 hrs Surf.Area= 8,557 sf Storage= 24,454 cf Plug -Flow detention time= 391.7 min calculated for 1.414 of (100% of inflow) Center -of -Mass det. time= 392.1 min ( 596.8 - 204.7 ) Volume Invert #1 684.50' Avail.Storage Storaqe Descri 37,863 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) s -ft) cubic -feet cubic -feet 684.50 1,000 0 0 685.00 4,450 1,363 1,363 686.00 5,500 4,975 6,338 687.00 6,700 6,100 12,438 688.00 7,950 7,325 19,763 689.00 9,050 8,500 28,263 690.00 10,150 9,600 37,863 Device Routing Invert Outlet Devices #1 Primary 683.24' 24.0" Round Culvert L= 55.0' Ke= 0.500 Inlet / Outlet Invert= 683.24' / 682.91' S= 0.0060 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 684.50' Special & User -Defined Head (feet) 0.00 0.50 1.50 2.50 Disch. (cfs) 0.000 0.054 0.081 0.108 #3 Device 1 687.30' 4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 688.30' 16.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=23.85 cfs @ 3.18 hrs HW=688.55' (Free Discharge) L =Culvert (Passes 23.85 cfs of 31.41 cfs potential flow) 2=Special & User -Defined (Custom Controls 0.11 cfs) 3=Sharp-Crested Rectangular Weir (Weir Controls 17.16 cfs @ 3.66 fps) =Sharp -Crested Rectangular Weir (Weir Controls 6.57 cfs @ 1.64 fps) Sf # 1 HydroCad Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD® 10.10-4a s/n 05047 © 2020 HydroCAD Software Solutions LLC Paae 14 Pond 27P: Sand Filter Hydrograph 36 { ax.ai ors .l 34 Inflow Area=4.060 ac 32 30 Peak Elev=688.55' 2S n z,�,�.. Storage=24,454 d 22 20 3 18 0 LL 16 14 12 10 4- 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) C] Inflow 10 Primary Sf # 1 HydroCad Charlotte 6-hr 100-yr 100 YEAR Rainfall=5.34" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HydroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Paoe 15 Summary for Subcatchment 9S: Post Development Runoff = 36.77 cfs @ 3.11 hrs, Volume= 1.575 af, Depth= 3.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs Charlotte 6-hr 100-yr 100 YEAR Rainfall=5.34" Area (ac) CN Description 2.620 98 Paved parking, HSG C 2.240 74 >75% Grass cover, Good. HSG C 4.860 87 Weighted Average 2.240 46.09% Pervious Area 2.620 53.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post Dev Subcatchment 9S: Post Development Hydrograph 40. 3 3677 cfs 36 Charlotte 6-hr 34- 32 100-yr �$ 100 YEAR Rainfall=5.34" 26 Runoff Area=4.860.ac 24 22 Runoff Volume=1.575 of 20 18 Runoff Depth=3.89" 1S Tc=5.0 m i n 14 12 CN=87 10 8 6 4 2 a 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) © Runoff Sf # 1 HydroCad Charlotte 6-hr 100-yr 100 YEAR Rainfall=5.34" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 H droCAD@ 10.10-4a s/n 05047 ©2020 H droCAD Software Solutions LLC Page 16 Summary for Pond 27P: Sand Filter Inflow Area = 4.860 ac, 53.91% Impervious, Inflow Depth = 3.89" for 100 YEAR event Inflow = 36.77 cfs @ 3.11 hrs, Volume= 1.575 of Outflow = 29.95 cfs @ 3.16 hrs, Volume= 1.575 af, Atten= 19%, Lag= 3.3 min Primary = 29.95 cfs @ 3.16 hrs, Volume= 1.575 of Routing by Stor-Ind method, Time Span= 0.00-140.00 hrs, dt= 0.01 hrs / 2 Peak Elev= 688.65' @ 3.16 hrs Surf.Area= 8,665 sf Storage= 25,284 cf Plug -Flow detention time= 353.3 min calculated for 1.575 of (100% of inflow) Center -of -Mass det. time= 353.6 min ( 557.5 - 203.9 ) Volume Invert Avail.Stora a Storage Description #1 684.50' 37,863 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 684.50 1,000 0 0 685.00 4,450 1,363 1,363 686.00 5,500 4,975 6,338 687.00 6,700 6,100 12,438 688.00 7,950 7,325 19,763 689.00 9,050 8,500 28,263 690.00 10,150 9,600 37,863 Device Routinq Invert Outlet Devices #1 Primary 683.24' 24.0" Round Culvert L= 55.0' Ke= 0.500 Inlet / Outlet Invert= 683.24' / 682.91' S= 0.0060 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 684.50' Special & User -Defined Head (feet) 0.00 0.50 1.50 2.50 Disch. (cfs) 0.000 0.054 0.081 0.108 #3 Device 1 687.30' 4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) #4 Device 1 688.30' 16.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s) Primary OutFiow Max=29.97 cfs @ 3.16 hrs HW=688.65' (Free Discharge) L1=Culvert (Passes 29.97 cfs of 31.76 cfs potential flow) 2=Special & User -Defined (Custom Controls 0.11 cfs) 3=Sharp-Crested Rectangular Weir (Weir Controls 19.12 cfs @ 3.80 fps) =Sharp -Crested Rectangular Weir (Weir Controls 10.75 cfs @ 1.93 fps) Sf # 1 HydroCad Charlotte 6-hr 100-yr 100 YEAR Rainfall=5.34" Prepared by Yarbrough -Williams & Houle, Inc. Printed 10/14/2020 HvdroCAD®10.10-4a s/n 05047 ©2020 HydroCAD Software Solutions LLC Pace 17 Pond 27P: Sand Filter Hydrograph 40 3s.77 dz 38. Inflow Area=4:.860 ac 36 34 Peak EI'ev=688.65' 3 z9 as cra 3 28 0 Storage=25,284'cf 26 -. 24 22 20 0 LL 18 16 14 12- 4. 2. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 160165 110115120125130135140 Time (hours) Inflow p Primary Sf # 1 HydroCad Prepared by Yarbrough -Williams & Houle, Inc. HydroCADO 10.10-4a s/n 05047 © 2020 HvdroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 1 yr Event 3 Subcat 9S: Post Development 4 Pond 27P: Sand Filter 2-yr Event 6 Subcat 9S: Post Development 7 Pond 27P: Sand Filter 10-yr Event 9 Subcat 9S: Post Development 10 Pond 27P: Sand Filter 50 yr Event 12 Subcat 9S: Post Development 13 Pond 27P: Sand Filter 100 YEAR Event 15 Subcat 9S: Post Development 16 Pond 27P: Sand Filter Table of Contents Printed 10/14/2020