Loading...
HomeMy WebLinkAboutSW8120607_CURRENT PERMIT_20120726STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 04&t'J DOC TYPECURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD J * NCDEE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P E Dee Freeman Governor Director Secretary July 26, 2012 Michael Pace, President Friendly Mart, Inc 141 McKee Oil Company Road Mount Olive, NC 28365 Subject State Stormwater Management Permit No. SW8120607 Friendly Mart — Hwy 258 at Northridge Subdivision High Density Commercial Wet Detention Pond Project Onslow County Dear Mr Price The Wilmington Regional Office received a complete Stormwater Management Permit Application for Friendly Mart on July 9, 2012 Staff review of the plans and specifications has determined that the protect, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 and Session Law 2008-211 We are forwarding Permit No SW8 120607 dated July 26, 2012, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project This permit shall be effective from the date of issuance until July 26, 2020, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory heanng by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be fled with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH corn Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Steve Pusey at (910) 796-7215 Sincerely, '�Vm harle Wakild, P E , Director Division of Water Quality GDS/ sgp S 1WQS1Stormwater\Permits & Protects120121120607 HD12012 07 permit 120607 cc John Pierce, PLS — John L Pierce & Associates, P A David Newsom — Crystal Coast Engineering, P A Onslow County Budding Inspections Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Phone 910 796 72151 FAX 910-350 20041 DENR Assistance 1-877-62M748 Internet www rimaterquality org An Equal Opportunely 1 Aifirmatvs Acton Employer State Stormwater Management Systems Permit No SW8 120607 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Friendly Mart, Inc Fnendly Mart — Hwy 258 at Northndge Subdivision 4981 Hwy 258, Jacksonville, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules") the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until July 26, 2020, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 17 of this permit The stormwater control has been designed to handle the runoff from 63,972 square feet of impervious area 3 A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters 4 The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans The built -upon area for the future development is limited to 7,200 square feet This future amount is included in the total allowable built -upon area of 63,972 square feet 5 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 6 The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system Page 2 of 8 State Stormwater Management Systems Permit No SW8 120607 7 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a Drainage Area, Acres Onsite, ft Offsite, ft2 b Total Impervioul Surfaces, acres Onsite, ft Offsite, ft' c Design Storm, inches d Average Pond Design Depth, feet e TSS removal efficiency f Permanent Pool Elevation, FMS!2 g Permanent Pool Surface Arei, ft h Permitted Storage Volume, ft i Temporary Storage Elevation, FMSL 1 Pre-dev 1 yr-24 hr discharge rate, cfs k Controlling Orifice I Orifice flowrate, cfs m Permitted Forebay Volume, ft3 n Fountain Horsepower o Receiving Stream/River Basin p Stream Index Number q Classification of Water Body II. SCHEDULE OF COMPLIANCE 1 634 71,185 0 1 469 63,972 0 15 31 90% 465 7,573 7,677 at temporary pool elev 474 004 1 5" diameter 003 4,973 NIA UT New River 1 New River 19-(1) 11c,SW" 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 The facilities shall be constructed as shown on the approved plans This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 6 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 7 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility Page 3of8 State Stormwater Management Systems Permit No SW8 120607 8 Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times 9 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Redesign or addition to the approved amount of built -upon area or to the drainage area c Further development, subdivision, acquisition, lease or sale of any, all or part of the protect area The protect area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought d Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 10 Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval 11 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 12 Approved plans and specifications for this protect are incorporated by reference and are enforceable parts of the permit A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times 13 Prior to the sale of any lot, the following deed restrictions must be recorded a The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 120607, as issued by the Division of Water Quality under NCAC 2H 1000 b The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit c These covenants are to run with the land and be binding on all persons and parties claiming under them d The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality e Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality f The maximum built -upon area per lot is 63,972 square feet This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools g All runoff from the built -upon areas on the lot must drain into the permitted system This may be accomplished through providing roof drain gutters, which drain to the pond or street, grading the lot to drain toward the street or directly into the pond, or grading perimeter swales and directing them into the pond or Page 4 of 8 State Stormwater Management Systems Permit No SW$ 120607 street h Built -upon area in excess of the permitted amount will require a permit modification i All affected lots shall maintain a 50' wide vegetative buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of streams and rivers and the mean high water line of tidal waters I Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G S 143, Article 21 k Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot I If permeable pavement BUA credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction 14 A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds III GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director At least 30 days prior to a change of ownership, or a name change of the permittee or of the protect, or a mailingg address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form The approval of this request will be considered on its merits and may or may not be approved 2 The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request Neither the sale of the protect in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit 3 Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G S 143 Article 21 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 5 In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management fcility 7 The permit remains in force and effect until modified, revoked, terminated or renewed The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition Page 5 of 8 State Stormwater Management Systems Permit No SW8 120607 8 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 9 The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate documentation and the processing fee Permit issued this the 26th day of July, 2012 TH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 5Wision of Water Qualityr --,- By Authority of the Environmental Management Commission Page 6 of 8 =s� Y pWQ USE' ONLY ' � rd`." �.. ..�,yy '4- 1 -.M1 ? xr ' ]v i bx r, ✓ �i..0 �i�3'� "` a�.t�. 4�'k`'^z+` r'a,.r�,Rr .. ,. xa �. er A" �^ � Date Rgceivfid Fee Paid Permit Number S Applicable Rules (select all that apply) Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph II - Post Construction ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This farm may be photocopied for use as an original GENERAL INFORMATION 1 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc) Friendly Mart Highway 258 at Northridge Subdivision 2 Location of Project (street address) City Jacksonville Township County 0onslaw _ Zip 28540 3 Directions to project (from nearest major intersection) From Jacksonville, NCB head east towards Richlands on Hwy 258 (_Richlands Hwy) Property is located on the left, approx 1800 feet south of NC 111 (Catherine Lake Road) 4 Latitude 34' 48' 39 55" N Longitude 77' 30' 40" W of the main entrance to the project II PERMIT INFORMATION• 1 a Specify whether project is (check one) ®New []Modification b If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction 5ONot Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2 Specify the type of project (check one) ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3 If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4 a Additional Project Requirements (check applicable blanks, information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748) ❑CAMA Major NSedimentation/Erosion Control 2 22 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Pernut Proposed Impacts b If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit T — Cft MAY 3 0 '-:'.2 Form SWU-101 Version 07Jun2010 Page 1 of 6 III CONTACT INFORMATION 1 a Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc who owns the protect) Applicant/Organization Friendly mart, Inc Signing Official & Title Michael Price, President__ b Contact information for person listed in item la above Street Address 141 McKee Oil Companv Road City Mount Olive State NC Zip 28365 Mailing Address (if applicable) P O Box1019 City Mount Olive T State NC Zip 28365 Phone (919 ) 658-2851 Fax ( ) Email c Please check the appropriate box The applicant listed above is ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below) 2 a Print Property Owner's name and title below, if you are the lessee, purchaser or developer ('Plus is the person who owns the property that the project is located on) Property Owner/Organization . ._.. ._,.. &o w rrr end Signing Official & Title Dewey Edwards Ir, President Ue t d e* b Contact information for person listed in item 2a above Street Address 405 Iohnson Blvd _ City Jacksonville _ State SIC-__ _ Zip 28540 Mailing Address (if applicable) P O Box 1685 _ City Jacksonville State NC. Zip 28540 Phone (910 ) 346-9800Fax Email 3 a (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project Other Contact Person/Organization Signing Official & Title b Contact information for person listed in item 3a above Mailmg Address City State Phone ( ) _ _ Fax Email 4 Local jurisdiction for building permits Point of Contact Vanes Phone # Form SWU-101 Version 07Jun2010 Page 2 of 6 Zip 161 ` IV. PROJECT INFORMATION I In the space provided below, bnefly summarize how the stormwater runoff will be treated Detention Pond via network of undeUound storm pipes a If claiming vested rights, identify the supporting documents provided and the date they were approved ❑ Approval of a Site Specific Development Plan or PUD Approval Date ❑ Valid Building Perrrut Issued Date ❑ Other Date b If claiming vested rights, identify the regulation(s) the project has been designed in accordance with ❑ Coastal SW --1995 ❑ Ph II — Post Construction 3 Stormwater runoff from this project drains to the White Oak River basin 4 Total Property Area 2 41 acres 5 Total Coastal Wetlands Area -0- acres 6 Total Surface Water Area _-0- acres 7 Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area` 2 41 acres + TotaI project area shall be calculated to exclude the followin the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line The resultant project area is used to calculate overall percent built upon area WrAj Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area 8 Project percent of impervious area (Total Impervious Area / Total Project Area) X 100 = 61 % 9 How many drainage areas does the protect have?l (For high density, count I for each proposed engineered stormwater BMP For Iow density and other projects, use I for the whole property area) 10 Complete the following information for each drainage area identified in Project Information item 9 If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Baslrir'Informatiori` �� � , I?raina a Area`l� D`raina` e Area` ;Draiiia enAreai~1- ,Drama e�rea1�R Receiving Stream Name UT of New River Stream Class * C,NSW Stream Index Number * 19-(1) Total Drainage Area (so 71,185 sf On -site Drainage Area (sf) 71,185 sf Off -site Drainage Area (so -0- Proposed Impervious Area** (sf) 63,972 sf % impervious Area** (total) 89 9 °gyp 1Iin�` rvioiis Surface Aie� „�°� D'raina e'Aiea t tDraina e Ar a� $Draina0 a Area �'k Draina e'W ea On -site Buildings/Lots (sf) 11,360 sf On -site Streets (so -0- On-site Parking (so 44,757 sf On -site Sidewalks (sf) 655 sf Other on -site (sf) -0- „ I Future (sf) 7200 sf Off -site (sf) -0- Existing BUA*** (so -0- Total (sf) 63,972 sf * Stream Class and Index Number can be determined at ht ortal ncdertr or g/web s csu classi ications ** Im ,pervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc *** Report only that amount of existing BUA that will remain after development Do not report Any existing BUA that is to be removed and which will be replaced by new BUA Form SWU-101 Version 07Jun2010 Page 3 of 6 1 11 How was the off -site impervious area listed above determined? Provide documentation N/A_ Projects in Union County Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B 0600 V SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project The latest versions of the forms can be downloaded from h ortal ncdenr org/webZwqZwsZsuZbmp-manual VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below A detailed application instruction sheet and BMP checklists are available from hffp I Z12ortal ncdenr org/web/wq/ws/su/statesw/fon-ns does The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the mteracbve online map at h ortal ncdenr org/web/wqJwsZsuZma12s } Please indicate that the following required information have been Rrovided by initialing in the space provided for each item All original documents MUST be signed and imbaled in blue ink Download the latest versions for each submitted application package from h ortal ncdenr orgZweb/wq/ws/su/stateswZforms does 1 Original and one copy of the Stormwater Management Permit Application Form 2 Original and one copy of the signed and notarized Deed Restnchons & Protective Covenants Form (if required as per Part VII below) 3 Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP 4 Pernut application processing fee of $505 payable to NCDENR (For an Express review, refer to hUp / /www envhelp orgLpagesjonestopexpress html for information on the Express program and the associated fees Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting ) 5 A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project This is required in addition to the brief summary provided in the Project Information, item 1 6 A USGS map identifying the site location If the receiving stream is reported as class SA or the rr receiving stream drams to class SA waters within 1h mile of the site boundary, include the Yz mile radius on the map ��- 7 Sealed, signed and dated calculations 8 Two sets of plans LQWgd_to 8 5" x 14" (sealed, signed, & dated), including a Development/Project name b Engineer and firm c Location map with named streets and NCSR numbers d Legend e North arrow f Scale g Revision number and dates h Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lutes • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters i Dimensioned property/project boundary with bearings & distances j Site Layout with all BUA identified and dimensioned k Existing contours, proposed contours, spot elevations, finished floor elevations l Details of roads, drainage features, collection systems, and stormwater control me ur1AAY 3 0 2012 in Wetlands delineated, or a note on the plans that none exist (Must be delineated qualified person Provide documentation of qualifications and identify the perso ho made the determination on the plans BY. n Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations o Drainage areas delineated (included in the main set of plans, not as a separate document) p Vegetated buffers (where required) Form SWU-101 Version 07Jun2010 Page 4 of 6 9 Copy of any applicable soils report with the associated SHWT elevations (Please identify \ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs Include an 8 5"x11" copy of the MRCS County Soils map with the project area clearly delineated For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determinimg the infiltration rate (Infiltration Devices submitted to WiRO Schedule a site visit for DWQ to verify the SHWT prior to submittal, (970) 796-7378 ) f} 10 A copy of the most current property deed Deed book 2813 Page No 105-11Q_ �( 11 For corporations and lunited liability corporations (LLC) Provide documentation from the NC _�N Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H 1003(e) The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned http //www secretary state nc us/Corporations/CSearch aWx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form The appropriate deed restrictions and protective covenants forms can be downloaded from http //portal ncdenr org/web/wq/ws/su/statesw/forms does Download the latest versions for each submittal In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information) Consulting Engineer David K Newsom, PE _ Consulting Firm Crsytal Coast Engineering, PA _ Mailing Address 20 3 Ward Road City Swansboro State NC____ Zip 28584 Phone (910 ) 325-0006 Email crvstalcoasteng®bizec rr com Fax (910 ) 326-0060 IX PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, stern 2a) Dewgy Edwards Ir, President , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person Iisted in Contact Information, item 1a) Michael Price with (print or type name of organization listed in Contact Information, item 1a)_Friendly Mart, Inc _^ _ to develop the project as currently proposed A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system EC;E0 MAY 3 0 2012 8Y Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days, otherwise I will be operating a stormwater treatment facility without a valid peanut I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215 1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215 6 1 Signature Date 51 Z-L (I Z I, a Notary Public for the State of N _ County of do hereby certify that J !�4 Uhl S personally appeared before me this = day of 2-01 2and acknowledge the due execution of the application for a stormwater permit Wntne my hand and official seal, 0 %. 'Z 20IARI- Oy ,oUB1.�t' ? °w coy X. APPLICANT'S CERTIFICATION SEAL My commission expires l0(24 _ U L (f _ I, (print or type name of person Iisted in Contact Information, item 1 a) Michael Price, President certify that the information included on this permit application form is, to the best of my knowledge, correct and that the protect will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, W that the proposed protect complies with the requirements of the applicable stormwateryules Wder 154 Nf4t 2H 1000, SL 2006-246 (Ph 11-- Post Construction) or SL 2008-211 Signature Date fi� az3 zz-15102— I, a Notary Public for the State of County of Q ►• � do hereby certify that 4 Y l_ t dA&L L. PC,`LA-- personally appeared before me this ,�S day of . Y� OU, � ZQ1 Z , and acknowledge the due execution of the application for a stormwater pernut Witness my hand and official seal,1 '0� 1I La- 4- n SEAL My commission expires _ IT- 5 " Act-7 ,'JCEUVE i MAY 3 0 2012 �r Form SWU-101 Version 07Jun2010 Page 6 of 6 High Density Commercial Subdivisions Deed Restrictions & Protective Convenances In accordance with Title 15 NCAC 2H 1000 and S L 2006-246, the Management Regulations, deed restrictions and protective covenants are required for High Density Commercial Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility Deed restrictions and protective covenants are necessary to ensure that the development maintains a built -upon area consistent with the design criteria used to size the stormwater control facility I, Michael Price, acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot within the project known as Friendly Mart — Highway 258 at Northridge Subdivision 9 The following covenants are intended to ensure ngoing compliance with State Stormwater Management Permit Number �SLy�/��D , as issued by the Division of Water Quality under the Stormwater Management Regulations 2 The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit 3 These covenants are to run with the land and be binding on all persons and parties claiming under them 4 The covenants pertaining to stormwater may not be altered or rescinded without the express wntten consent of the State of North Carolina, Division of Water Quality 5 Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality 6 The maximum allowable built -upon area per lot is 63,972 square feet *Note- If the BUA per lot varies, please substitute the following statement for the one above and provide a complete listing of the proposed BUA for each lot: The maximum built -upon area per lot, in square feet, is as listed below Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, buck, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools 7 All runoff from the built -upon areas on the lot must drain into the permitted system This may be accomplished through a vanety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system Lots that will naturally drain into the system are not required to provide these add►tional measures 6 The owner of each lot, whose ownership is not retained by the permittee, is required to submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction 9 The project and each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters **50 foot for projects located in the 20 coastal counties. w _GEUVE a MAY 3 0 2012 Form DRPC-1 Rev 2 05Nov2OO9 Page I. of 2 High DealLty Commercial Subdivisions Si State of N L , C� County of �L, (� do hereby certify that i C ll�,� L �`' Cf� u— personally appeared C before me this the 3 day of �aq , 20 �I , and acknowledge the due execution of the foregoing instrument Witness my hand and official seal, SEAL R Qn I- - .6 �. � Signature n My Commission expires ' 3 " n' C;EIVE MAY 3 0 2012 Form DRPC-1 Rev 2 05Nov2009 Page 2 of 2 Permit No — (to be provided by DWQ) AA o�OF W a r�RpG h NCDENR O � STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Part tit) must be printed, filled out and submitted elorig wdh all of the required information I PROJECT INFORMATION Project name Friendly Mart Highway 258 at Northridge Subdivision Contact person David K Ne%wm PE Crystal Coast Engineering PA Phone number 910-325 0006 Date 4127/2012 Drainage area number 1 II DESIGN INFORMATION Site Characteristics Drainage area 71,185 re Impervious area, post -development 63,972 ftz % impervious 8987 % Design rainfall depth 1 5 in Storage Volume Non SA Waters Minimum volume required Volume provided Storage Volume SA Waters 1 5' runoff volume Pre -development 1 yr, 24 hr runoff Post -development 1 yr, 24 hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1yr 24hr storm peak flow required? 1 yr, 24 hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity 1 yr, 24 hr storm Pre -development 1 yr 24 hr peak flow Post -development 1 yr 24 hr peak flow PrelPost 1 yr, 24 hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx at the perm pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment deanout bottom elevation Sediment storage provided Is there additional volume stored above the stale required temp pool? Elevation of the top of the additional volume 7,642 fe 7,677 ft3 OK, volume provided is equal to or in excess of volume required to ft3 ft3 ft3 ft3 y (Y or N) 37 in 015 (unitless) 082 (umtless) 015 in/hr OK 004 ft3lsec 020 ft3lsec 016 ft3lsec 47 40 fmsl 4650 fmsl 47 00 fmsl 4700 fmsl 4600 fmsl Data not needed for calculation option #1, but OK if provided 39 00 fmsl 3800 fmsl Data not needed for calculation option #1 but OK d provided 100 It ----------------- (YarN) RECEIVEl7 47 4 fmsi OK JuN og 2012 BY: Fond SW401 Wet Detention Basin Rev 9-4/18112 Pads I & 11 Design Summary Page 1 of 2 Permit No SW? 1 Z0&0% (to be provided by DWQ) -011 I11DI;SIGNIINFORMATION Surface Areas Area temporary pool 9,488 ft Area REQUIRED, permanent pool 7,387 ft SAIDA ratio 1038 (unidess) Area PROVIDED, permanent pool, Ap„r ,w 7,573 fe OK Area, bottom of 10ft vegetated shelf, A i ,,w 5,554 Area, sediment cleanout, top elevation (bottom of pond), A,,_P,, 352 Volumes Volume, temporary pool 7 677 ft' OK Volume permanent pool Vp—_p , 23,403 ft3 Volume, forebay (sum of forebays if more than one forebay) 4,973 ft' Forebay % of permanent pool Volume 21 2% % OK SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountainlPiedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table) Calculation option 1 used? (See Figure 10 2b) Volume permanent pool, Vpe--DCd Area provided, permanent pool Ap._p. Average depth calculated Average depth used in SAIDA, d. (Round to nearest 0 5ft) Calculation option 2 used? (See Figure 10 2b) Area provided, permanent pool, Ap.-p. Area, bottom of 14ft vegetated shelf, Abuedr Area sediment deanout, top elevation (bottom of pond) A,a p m 'Depth' (distance b/w bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA d. (Round to down to nearest 0 5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if non -circular) Coefficient of discharge (Cfl) Driving head (Hr,) Drawdown through weir? Weir type Coefficient of discharge (C ) Length of weir (L) Onvrng head (H) Pre -development 1 yr 24 hr peak flow Post -development 1 yr, 24 hr peak flow Storage volume discharge rate (through discharge onfice or weir) Storage volume drawdcwn time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to vndth ratio Length to vndth ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is 90 % Y (YorN) N (Y or N) 10 38 (unittess) Y (Y or N) 23,403 5' 7,573 f!' 309 ft 31It N (Y or N) 7,573 5,554 ft 352 fe 700 ft 309 ft 31ft Y (Y or N) 150 in in 060 (unitless) 031 It N (Y or N) (unidess) (unifless) ft ft 004 ft'Isec 003 fe/sec 003 fP/sec 270 days OK OK OK OK OK, draws down in 2 5 days 3 1 OK 10 1 OK 100 It OK 3 1 OK 40 1 OK Y (Y or N) OK 10 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump Form SW401 Wet Detention Basin -Raw 9-1119112 Parts i & t1 Design Summary Page 2 of 2 Permit Number (to be provided by DWQ) Drainage Area Number Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP This maintenance record will be kept in a log in a known set location Any deficient BMW elements noted in the inspection will be corrected, repaired or replaced immediately These deficiencies can affect the mtegnty of structures, safety of the public, and the removal efficiency of the BMW The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures -- Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks) — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin — If the basin must be drained for an emergency or to perform EOVE flushing of sediment through the emergency drain should be ed to the maximum extent practical MAY 3 0 2012 — Once a year, a dam safety expert should inspect the embankm Y After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County) Records of operation and maintenance should be kept in a known set location and must be available upon request Inspection activities shall be performed as follows Any problems that are found shall be repaired immediately BMP element Potential problem How I will remediate the problem The entire BMP Trash debris is present Remove the trash debris The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed remove the gully, and then plant a ground cover and water until it is established Provide lime and a one-time fertilizer application Vegetation is too short or too Maintain vegetation at a height of long approxurtately six inches Form SW40I-Wet Detention Basin O&M -Rev 4 Page 1 of 4 Permit Number 54 120(00.7 (to be provided by DWQ) Drainage Area Number BMP element- Potential problem How I will remediate the problem The inlet device pipe or The pipe is clogged Unclog the pipe Dispose of the Swale sediment off -site The pipe is cracked or Replace the pipe otherwise damaged Erosion is occurring in the Regrade the swale if necessary to swale smooth it over and provide erosion control devices such as reinforced turf matting or nprap to avoid future problems with erosion The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible Remove the sediment and sediment storage dispose of it in a location where it will not cause impacts to streams or the BMP Erosion has occurred Provide additional erosion protection such as reinforced turf matting or nprap if needed to revent future erosion j2roblems Weeds are present Remove the weeds, preferably by hand If pesticide is used, wipe it on the pjants rather than spraying The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health Plants are dead, diseased or Determine the source of the dying problem soils, hydrology, disease, etc Remedy the problem and replace plants Provide a one -tune fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably by hand If pesticide is used, wipe it on the 121ants rather than spraying The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if onginaI design sediment possible Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP Algal growth covers over Consult a professional to remove 50% of the area and control the algal growth Cattails, phragnutes or other Remove the plants by wiping them invasive plants cover 50% of with pest3cxde (do not spray) the basin surface EC E IVE MAY 3 Q 2012 Form SW401-Wet Detention Basm O&M -Rev 4 Page 2 of 4 �jY_ _ —_ ft Permit Number 5W 6 I 2ob67 _ (to be provided by DWQ) Drainage Area Number BMP element- Potential problem How I will remediate the problem The embankment Shrubs have started to grow Remove shrubs immediately on the embankment Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree An annual inspection by an Make all needed repairs appropriate professional shows that the embankment needs repair if a hcable The outlet device Clogging has occurred Clean out the outlet device DLspose of the sediment off -site The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet the 401 Oversight Unit at 919-733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads 7 5 feet in the maul pond, the sediment shall be removed When the permanent pool depth reads 6 5 feet in the forebay, the sediment shall be removed Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) 4000 To anen----------- lume 3900 Mtn Sedument Storage FOREBAY Permanent Pool Elevation 46 50 Pool ,- - - - - -Sediment Removal Elevation 39 00- I Volume Bottom Elevation MAIN POND I-ft Storage Form SW401-Wet Detention Basin O&M -Rev 4 Page 3 of 4 Permit Number S W 9 t Z.o (o o 7 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Project name Friendly_ Mart -_Highway 258 at Northridge Subdivision _ BMP drainage area number 1 and only Print name Michael Price Title President Address 141 McKee Oil Company Road _ Phone Signatt Datea�-- Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, QL)� iIL 'I? "z2 , a Notary Public for the State of f C, , County of iC , do hereby certify that personally appeared before me this 2 3 day of M , Z%zi 1 I , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official SEAL My commission expires Form SW401-Wet Detention Basin O&M -Rev 4 Page 4 of 4