INFILTRATION BASIN ANALYSIS
Basin #1 (DA#1)
PROJECT NUMBER SW$
0608434 ,P,'
PROJECT NAME
jospreylanding SD
DRAINAGE BASIN
Cape4Fearlll3t�
RECEIVING STREAM
UT Dutchman Creek
Index No
18-88`,9'-3= 2 5)
SITE AREA
IMPERVIOI
% IMPERVI
SOILS INF(
ELEVATIOI
SOIL TYPE
REPORTE1
SURFACE,
FILENAME S 1WQS11NBASIN1060843-1 WK1
DATE 19-Oct-06
REVIEWER F"Bartlett""'1"'
CLASS ISA, HOW
If ORW, is site within the 575' AEC?
d„', ,�6413 acres
DRAINAGE AREA
;; ` 1 1;378;238
IS AREA CALCULATION
Rational C
BUILDINGS
PARKINGIASPHALT+,Ey,'
CONCRETE
OTHER
;;361800
095
339768
095
;Of'sj'��;
»"
TOTAL
701568
C
058
Place a "1" here if Rational
DUS, 1=
50 9%
RV= 05+ 009 (1 } =
0 51
)RMATION
I OF SEASONAL HIGH WATER TABLE'
, +, € ',14
FEET MSL
Mandann , r,
INFILTRATION RATE
, 20 2
INCHESIHOUI
or
0 000468
FPS
kREAS 1 ELEVATIONS 1 VOLUMES
Elev (ft
Area, s �ft
Inc Volume
Acc Volume
BOTTOM
Mw'10 ,10 2311
21
t4l�j4t`,,&231,732
849075
849075
IS; 10h 44� 20 2
I:I111,'' 26,932
25332
1102395
TOP
'' ,bt 24
3€i , ' t33;802
60734
1709735
)EPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
87540
CUBIC FEET
TOTAL VOLUME AVAILABLE
170973 5
CUBIC FEET
DEPTH OF RUNOFF
7 77
FEET
TIME TO DRAWDON
W
99
HOURS
IMUST BE <1Z
25 YEAR 24 HOUR STORM NIA
Intensity, i = 33 inches 1 hour
Qr=CiA= 607 CFS
Op through the bottom of the basin= 4 78 CFS
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6 3 inches / hour
Volume for 10 yr 10 min event = 69579 73 CF <
COMMENTS
Volume and drawdown are (not) within Design Requirements
Must be a Or
t
170973 5 CIF
INFILTRATION BASIN ANALYSIS
Basin #2 (DA#2)
PROJECT NUMBER SW8
060843-2,',; ',,
PROJECT NAME
Os re' Laniding SD
DRAINAGE BASIN
[Cape'lFear,,+;1
RECEIVING STREAM
UT,Dutchm`an Creek
Index No
1,18-88'9-3-(2'5)
SITE AREA
IMPERVIOI
% IMPERVI
SOILS INFO
ELEVATIOP
SOIL TYPE
REPORTE1
SURFACE,
FILENAME S 1WQSIINBASIN1060843-2 WK1
DATE 19-Oct-06
REVIEWER PBartlett,;,,
CLASS [SA,e1-1QW"'111)`W)
If ORW, is site within the 575' AEC?
'64 13 acres
DRAINAGE AREA
229;561,
IS AREA CALCULATION
Rational C
BUILDINGS
PARKING/ASPHALT
CONCRETE
OTHER
ll54000
095
s `i ' 22651,
095
TOTAL
76651
C
045
Place a "1" here if Rational
DUS, 1=
33 4%
RV= 05+ 009 1 =
035
)RMATION
I OF SEASONAL HIGH WATER TABLE
121
FEET MSL
Ma6danri`'Tl
► INFILTRATION RATE
„q`3, , ,,,' 20 4
INCHESIHOUI
or
0 000472
FPS
kREASIELEVATIONS IVOLUMES
Elev ft
Area, sq ft
Inc Volume
Acc Volume
BOTTOM
3pi�;'9 r i2 4
,,� ��gl�'�i,'��233,�'i,,,
,`0 ,E�
7.909'
a 1 i in.�...�
��,
tF4'ilalvlflils'Eill 25
a'4,140','13,731,�
21640
21640
15322
36962
TOP
27„
,lils�11161,js20,,274
185935
555555
)EPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
30174
CUBIC FEET
TOTAL VOLUME AVAILABLE
55555 5
CUBIC FEET
DEPTH OF RUNOFF
3 94
FEET
TIME TO DRAWDOWN
41
HOURS
MUST BE <12.
25 YEAR 24 HOUR STORM NIA
Intensity, i = 33 inches 1 hour
Qr=CiA= 078 CFS
Qp through the bottom of the basing 3 73 CFS
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6 3 inches 1 hour
Volume for 10 yr 10 min event = 8972 77 CF <
COMMENTS
Volume and drawdown are (not) within Design Requirements
Must be > Qr
SF
1�
(�ss ekel
55555 5 CF
INFILTRATION BASIN ANALYSIS
Basin #3 (DA#3)
PROJECT NUMBER SW8
060843-14iili4l
PROJECT NAME
Os re Landing SD
DRAINAGE BASIN
CCape+Fear,°1
RECEIVING STREAM
UTi{Dut he man Creek
Index No
118'-88'-9-3-' 2�5)
SITE AREA
IMPERVIOI
% IMPERVI
SOILS INF(
ELEVATIOP
SOIL TYPE
REPORTS[
SURFACE+
VOLUME 1
FILENAME S IWQSIINBASIN1060843-3 WK1
DATE 19-Oct-06
REVIEWER I P Bartlett'
CLASS 1SAJHQW,,,,i,,ili,j
If ORW, is site within the 575' AEC?
64+;13 acres
DRAINAGE AREA
��<;} Jl' _ °3952;657
IS AREA CALCULATION
Rational C
BUILDINGS
PARKING/ASPHALT
CONCRETEi�,`i�llh'�I'sf,!h�l�sii�,�i
OTHER
194400
095
„, 1.15434
095
�, +
TOTAL
309834
C
044
Place a " 1 " here if Rational
DUS, 1=
32 5%
RV= 05+ 009 ( 1 } =
034
IRMATION
I OF SEASONAL HIGH WATER TABLE
"205
FEET MSL
Mandarin v,
i INFILTRATION RATE
, iui'oi"T' ",, ,,`,18
INCHES/HOUI
or
0000417
FPS
1REAS 1 ELEVATIONS 1 VOLUMES
Elev ft
Area, s ft
Inc Volume
Acc Volume
BOTTOM
23'5
'' 1, 22,817
1,,';3,',
l, ,' ,,
+�+il3=� s��`dealilhUi i24
;[II11j'ifl11 231,842
1166475
1166475
6ira���'9, `-%;14',26
11 �,28,090
51932
6359675
TOP
.+i i+ s 27,'5
31',424
44635 5
108232 25
)EPTH 1 DRAWDOWN CALCULATION
T1
DESIGN STORM, INCHES
,,�, I„��"I;�� I' lo13
DESIGN VOLUME
81621
CUBIC FEET
_
TOTAL VOLUME AVAILABLE
108232 25
CUBIC FEET
_
DEPTH OF RUNOFF
3 99
FEET
TIME TO DRAWDOWN
3 2
HOURS
MUST BE <121
25 YEAR 24 HOUR STORM NIA
Intensity, i = 33 inches 1 hour
Qr=CiA= 320 CFS
Op through the bottom of the basin= 9 51 CFS
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6 3 inches 1 hour
Volume for 10 yr 10 min event = 36698 53 CF <
COMMENTS
Volume and drawdown are (not) within Design Requirements
Must be > Qr
SF
108232 25 CF
INFILTRATION BASIN ANALYSIS
Basin #4 (DA#4)
PROJECT NUMBER SW8 0608434 )l
PROJECT NAME Os re IL'and ng SD
DRAINAGE BASIN 1CApe Feadilll
RECEIVING STREAM UT!Dutchman Creek
Index No 18-88=9-34215)
SITE AREA ' IVil'";i;;,4'm�;:64"313 1 acres
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE
OTHER
TOTAL
FILENAME S IWQSIINBASIN1060843-4 WK1
DATE 19-Oct-06
REVIEWER P'Bartletth,,,,,#t ,
CLASS ISA, HQW ; ,at I_I
If ORW, is site within the 575' AEC?
DRAINAGE AREA ""0,1, 175;982 SF
Rational C
f 27000 095
i;114714 095
`,luill�!!►���,Ei�;�E�i,�l�liilGlfii
41714 C
Place a " 1 " here if Rational
% IMPERVIOUS, 1= 23 7% RV= 05+ 009 (I ) =
SOILS INFORMATION
038
026
ELEVATION OF SEASONAL HIGH WATER TABLE ,dfl' 6 14 %§; i,„22 FEET MSL
SOIL TYPE Mandannisiii„I�!
REPORTED INFILTRATION RATE 1,10'2 INCHES/HOUR
or 0 000236 FPS
SURFACE AREAS 1 ELEVATIONS 1 VOLUMES
Elev ft Area, sq ft Inc Volume Acc Volume
BOTTOM
Ii, , 25 8,830 7879 7879
'0'26 10,796 9813 17692
TOP k;j ;`_, `, "',F128 '{ i ,o;14';906 25702 43394
VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES ,,' 1415
DESIGN VOLUME 17378 CUBIC FEET
TOTAL VOLUME AVAILABLE 43394 CUBIC FEET
DEPTH OF RUNOFF 397 FEET
TIME TO DRAWDOWN 74 IHOURS MUST BE <120
25 YEAR 24 HOUR STORM NIA
Intensity, i = 33 inches 1 hour
Qr=CiA= 050 CFS
Op through the bottom of the basin= 1 64 CFS
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6 3 inches 1 hour
Volume for 10 yr 10 min event = 5769 09 CF <
COMMENTS
Volume and drawdown are (not) within Design Requirements
Must be > Qr
43394 C F
rY
I
AT4A
RCDENR
North Carolina Department of Environment and Natural Resources
Division of Land Resources
James D Simons, PG, PE Land Quality Section Michael F Easley, Governor
Director and State Geologist William G Ross Jr, Secretary
8/28/2006
LETTER OF RECEIPT FOR AN EROSION CONTROL PLAN EXPRESS REVIEW
Bill Clark Homes of Wilminton, LLC
Ms Sonya Culler, Manager
430 Eastwood Rd
Wilmington, NC 28403
RE Project Name Osprey Landing Phase 1 Express
Project Number Bruns-2007-060
County Brunswick, Southport, NC Hwy 211
River Basin Cape Fear 90Q� env
Submitted By Paramount Engineering
Date Received by LOS August 28, 2006
Plan Type NEW
Dear Ms Culler
This office has received a soil erosion and sediment control plan for the protect listed above which
was submitted as required by the North Carolina Sedimentation Pollution Control Act (G S 113A-57 (4)) The
Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil
erosion control plan prior to the commencement of the land -disturbing activity (G S 113A-54(d) (4))
The review period for an express review is three days of receipt of a complete plan If additional
information is requested, it must be submitted within five working days of receipt
Commencement or continuation of a land -disturbing activity under the }unsdiction of this Act prior to
the approval of an erosion and sediment control plan is a violation of the Act
We have performed a preliminary review of your submitted plan and have determined that additional
information will be necessary before a final review can be completed Enclosed is a checklist of items that
must be submitted before we can complete the review, process Failure to provide the additional information
may result in disapproval of your plan
The approval of an erosion and sediment control plan is conditioned on the applicant's compliance
with Federal and State water quality laws, regulations and rules
If you have questions please do not hesitate to contact this office Your cooperation in this matter is
appreciated and we look forward to working with you on this project
Sincerely,
Carol N Miller
Assistant Regional Engineer
cc Mr Timothy Clinkscales, P E , Paramount Engineering
LQS-WiRQ, SWS-WiRO
Wilmington Regional Office
127 Cardinal Drive Ext , Wilmington, North Carolina 28405-3845 - Phone 910-796-7215 / FAX 910-350-2004
I
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES
LAND QUALITY SECTION
EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST
PROJECT NAME* Osprey Landin,9 Phase 1_ _ DATE 8/28, 12006
PROJECT NO Bruns-2007-080 COUNTY Brunswick
To expedite the approval process, a cursory review of your submitted Erosion and Sediment Control Plan application has been made and
has shown the need for additional information as specified below To meet: our review schedule, any additional information should be
received by this office no later than —September 5, 2005 Failure to meet this schedule may result in
disapproval of your plan The following items shall be Incorporated with respect to specific site conditions, to an erosion and sediment
control plan
LOCATION INFORMATION
Project location (roads streets landmarks)
North arrow and scale
GENERAL SITE FEATURES (Plan elements)
Legend North arrow, scale, etc
Property lines
Existing contours (topographic lines)
Proposed contours ri, iI
Limits of disturbed area (p(ovide acreage total, delineate limits,
and label)
Planned and existing building locations and elevations
Planned & existing road locations & elevations
Lot and/or building numbers
Geologic features rock outcrops seeps, springs, wetland and
their limits, streams lakes, ponds dams, etc
Easements and drainageways
Profiles of streets utilities, ditchlines etc
Stockpiled topsoil or subsoil locations
If the same person conducts the land -disturbing activity & any related borrow
or waste activity, the related borrow or waste activity shall constitute pad of
the land -disturbing activity unless the borrow or waste activity is regulated
under the Mining Act of 1971 or is a landfill regulated by the Dmsion of Waste
Management. if the land -disturbing activity and any related borrow orwaste
activity are not conducted by the same person, they shall be considered
separate land -disturbing activities and must be permitted either thru the
Sedimentation Pollution Control Act as a one -use borrow site or through the
Mining Act
Required Army Corps 404 permit and Water Quality 401 certification (e g
stream disturbances over 150 linear feet)
EROSION CONTROL MEASURES (on plan)
Legend
Location of temporary measures
Location of permanent measures
Construction drawings and details for
temporary and permanent measures
Maintenance requirements of measures
Contact person responsible for maintenance
SITE DRAINAGE FEATURES
i
Existing and planned drainage patterns (include off -site areas
that drain through project)
Method of determination of and calculations for Acreage of land
being disturbed
Size and location of culverts and sewers
Soil information type special characteristics
Soil information below culvert storm outlets
Name and classification of receiving watercourse
(only where stormwaler discharges are to occur)
Comments Please see next page
STORMWATER CALCULATIONS
Pre -construction runoff calculations for each outlet from the site
(at peak discharge points)
Design calculations for peak discharges of runoff (including the
construction phase & the final runoff coefficients of the site)
Design talcs of culverts and storm sewers
Discharge and velocity calculations for open channel and ditch
flows (easement & nght-of-ways)
Design tales of cross sections and method of stabilization of
existing and planned channels (include temporary linings)
Design talcs and construction details of energy dissipators
below culvert and storm sewer outlets (diameters & apron
dimensions)
Design catcs and dimension of sediment basins
Surface area and settling efficiency information for proposed
sediment traps andlor basins
VEGETATIVE STABILIZATION
Area & acreage to be vegetatively stabdizec
Method of soil preparation
Seed type & rates (temporary & permanent)
Fertilizer type and rates
Mulch type and rates
NOTE Plan should include provisions for groundcover on
exposed slopes within 15 working days or 30 calendar
days (whichever is shorter), following completion of any
phase of grading, permanent groundcover for all
disturbed areas within 15 working days or 90 calendar
days (whichever is shorter) following completion of construction or
development
FINANCIAL RESPONSIBILITYiOWNERSHIP FORM
Completed signed & notarized FR/O Form
Accurate application fee ($50 00 per acre rounded up the
next acre with no ceding amount)
Certificate of assumed name, if the owner is a partnership
Name of Registered Agent (if applicable)
Copy of the most current Deed for the site
NOTE For the Express Permitting Option, inquire at the local
ReglonalOffice for availability
NARRATIVE AND CONSTRUCTION SEQUENCE
Narrative describing the nature and purpose of the
construction activity
Construction sequence related to erosion and sediment
control(including installation of critical measures prior to
the initiation of the land -disturbing activity & removal of
measures after areas they serve are permanently stabilized)
Bid specifications related only to erosion control
Continuation of Erosion and Sedimentation Control Plan Preliminary Review Checklist
Project Name Osprey Landing Phase 1
Project Number Bruns-2007-080
1 Please provide a copy of the most current deed
2 As per our meeting on 8/28/06, please indicate on the plan that roads, drainage easements and ponds
must be stabilized with ground cover prior to grading lots prior to lot development If this proves
impractical the amount sediment storage will need to be increased to include the amount of disturbed area
associated with lot development
3 The proposed roads intersect existing ditches in at least three places on the site Please indicate whether
or not the ditches are to be filled (partially or entirely — if the latter please include in the disturbed area)
Additional measures other than silt fence will be necessary as silt fence is not an acceptable measure in
areas of concentrated flow
4 Additional silt fence and/of undisturbed buffers are needed between wetlands and the limits of
disturbance See sheet C-6 2 temporary sediment trap (TST) #10 and the wetland between Road A and
TST # 12 Sheet C-6 3 TST # 13
5 Provide diversion ditch calculations
Wilmington Regional Office
127 Cardinal Dnve Extension, Wilmington, NC 28405 Phone 910-395-3900 Fax 910-350-2004
INFILTRATION SITE VISIT REQUEST
Name of the Project _OsoMy Landing
E�( F r0S5
ti j,�4 'J.' -IL�4 '
Location (attach a clear vicinity map) Rj ht of Robertnark Drive in Southport at the
intersection of Hwy 211 and Hwy 87
Street address SR number community, etc
Directions from the nearest major intersection At the intersection of Hwy 87 and Hwy211.
take a right, travel +1- 0 25 miles on Robert Ruark Drive. Project on the right T-
Owner/Applicant Name Bill Clark Homes of Wilmington, LLC
Consultant Name Tim Clinkscales, PE clo aramounte Engineering, Inc
Consultant Contact Information Ph (910)520-1991. Fx (910) 763-4517, Email
telinkscales(ftaramounte-ena com , ,
Pharle fax emall, etc
y
#1 #2 #3 #4 #5 #6 #7 #8
Existing ground elev @basin/trench= 161
Nf
SHWT elev = 4
SHWT plus 2' (max bottom elev )_
Date/Time of Soils Investigation L '4 -.64 3."Jo
Summary/Comments
IM921 _ -
All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench
must be marked and flagged If these areas are not flagged, the Soils Scientist reserves the nght to
decline to do the investigation if the proposed infiltration system will be located in an area of existing
pavement and there is no open area nearby, equipment capable of breaking through the impervious
layer must be provided The soils investigation does not take the place of a soils report prepared by
an appropriate professional The Soils Scientist will only verify the soil conditions that are reported in
the Sods Report, and make a determination as to the suitability of the site to meet the infiltration
design requirements under NCAC 2H 1000, and assumes no liability should the system fail
9 /I�D6 t4l/
V, 4a's, 10 , ' ( (
s otor Q 4
Mvir Sf' f 5t "4-,-
l•- 0 f1V
70 IcyA imn10311HONta 31SI-1 LiSPESIZ016
59 9 C S00Z,`9z"So
05 25, 2006 16 56 9107634517
LISLE ARCHITECTURE
Hwy
cl
,X� X
_1 1
Y fl,
1
_PAI
M0
e N G I N r r R 1 N o, 1 N C
FAX COVER SHEET
To Cameron Weaver
Affiliation NCDENR Infiltration Site Visit
Fax # 350-2004
Number of pages (Including Covet) 2
Date May 25, 2006
From Tmi Clinkscales
RE Infiltration Site Visit Request, Vicuuty Map
Pro)ect No 06110 PEI
Comments
Cameron,
Enclosed is the request for setting a mfiltration test site vi}it for Vincent Please let me
know the. first available ttrne for hts tune '1 he project is located in Brunswick County near
the intersection of Hwy 211 and Hwy 87 if you have any que,tions, please feel free to call
me at 791-6707 `Fhanks for your time and have a great days
Tim Chnitscales
I 2 7 R A G I N C O G t V L 9 u I r E l O 8, W 16 M I N G Y O N, N C 3 o s O 9
Y 1.1 ( fi 1 U I 7 9 1 0 7 O 7 17 A A 1 9 1 0 1 7 O 3 4 b 1 7
TR -4gr,,r �i�nj03iIHOHV 3-ISI-I L TGVE9L0 % SS 9 L 900Z/ SZ r 50
r MpryJ IG K Npft .'tl W%C� 90F1NGs exp E'6I2w I IV. Gn. rMbl
PRELIMINARY DESIGN - NO C FOR CONSTRUCTION
% I
r V tPmje Nojp CIM N u\06110 PE OfpW L IM%O dtl Ml,%S BORINGS &q MMS 3 42 77 PK Qvb MiN
PRELIMINARY DESIGN — NOT FOR CONST.
CTION
1
p
A7
pmM
SHW1- BORING
IOCA'i IONS
OSPRG1 LANDING
011MVILILIMNSHIP RRUNSIVI(KI CUN9)
SOUTHPORI NORMCARUI INA
PARA?slo UNTF,BILL
127 A.—D., %uim 202
Wil%jg,�,n N-1, L.,6Ln 23403
(vlul 41 B7u ,a,Nlg7�s4SIr(F7
CLARI
HOMES
�x CMTWOOp ROAD
r1RWNc7p+ Npen1 GulgLw 26403
S
August 14, 2006
Paramounte Engineering, Inc
5911 Oleander Drive, Suite 201
Wilmington, North Carolina 28403
Attention Mr Tim Clinkscales, P E
Reference Double Ring Infiltrometer Testuig
Robert Ruark Drive
Osprey Landing
Southport, North Carolina
S&MEProjectNo 1061-06-232D
Dear Mr Clinkscales
RNub
��
�oS q 3
In accordance with S&ME Proposal 236-06 dated June 26, 2006, S&ME personnel have recently conducted
double -ring infiltrometer testing of the surficial soils at the subject site at the approximate locations shown
m Figure 1 Specifically, our representatives performed the following work items
Conducted 3 double -ring trifiltrometer tests at a depth of approximately 12 inches
below the existing ground surface This testing was conducted in general accordance
with American Society for Testing and Materials (ASTM) procedure D-3385
entitled, "Infiltration Rate of Soils in Field Using Double -Ring Infiltrometer"
Coordinated site clearing activities This included meeting with cleaning contractors,
and marking test locations and pathways to be cleared
Hand auger borings were not advanced, as you had met with DWQ personnel to determine seasonal high
water table depths prior to our involvement in the project
The average infiltration rate at the test locations ranged from 20 4 to 40 4 inches per hour A summary of
the field test results is presented in Table I
S&ME, INC / 6409 Amsterdam Way, Budding 83 / Wilmington NC 28405 / p 910 799 9945 1910 799 9958 / wwwsmeinc com
Paramounte Engineering, Inc
S&ME Job Number 1061-06-232D
August 14, 2006
Page Two
S&ME appreciates the opportunity to provide our services during this phase of the project Should you
have any questions after reviewing this letter, or if we can be of additional assistance, please do not hesitate
to contact us at your convenience
Sincerely,
S&ME, INC.
wt��—
Paul A Masten
Environmental Professional
PAM RGMljns
Attachments
Randy Marbn, P E
Branch Manager
TABLE I
Double Ring [nfiltrometer Testing
Robert Ruark Drive
Osprey Landing
Southport, North Carolina
S&MEProject No 1061-06-232D
Location: 1
Date of Test August 4, 2006
Depth of Test Below Site Grade —12 inches
Depth of Water in Clings 3 inches
Average Infiltration Rate 40 4 inches per hour
High Water Table >6 feet below land surface*
Soil Series Mandarin*
Date of Test August 4, 2006
Depth of Test Below Site Grade —12 inches
Depth of Water in Rings 3 inches
Inner Diameter of Inner Ring l l'/, inches
Inner Diameter of Outer Ring 22'/s inches
Location. 2
Average Infiltration Rate 20 4 inches per hour
High Water Table >6 feet below land surface*
Soil Series Mandarin *
Inner Diameter of Inner Ring 11'/a inches
Inner Diameter of Outer Ring 22% inches
Note *As interpolated from the "Soil Survey of Brunswick County" prepared by the United States
Department of Agriculture Soil Conservation Service
H
TABLE 1 - Continued
Double Ring Inf ltrometer Testing
Robert Ruark Drive
Osprey Landing
Southport, North Carolina
S&ME Project No 106I-06-232D
Location- 3
Date of Test August 4, 2006
Depth of Test Below Site Grade —12 inches
Depth of Water in Rings 3 inches
Average Infiltration Rate 37 4 inches per hour
High Water Table >6 feet below land surface*
Soil Series Mandarin*
Inner Diameter of Inner Ring 113/4 inches
Inner Diameter of Outer Ring 22% inches
Note *As interpolated from the "Soil Survey of Brunswick County" prepared by the United States
Department of Agriculture Soil Conservation Service
� r rWPlrmis � IIm�sW6116PE dP.Y � ICRMfla44�Mlmb 7Mi 71 Pro Pw rw
PRELIMINARY DESIGN — NOT FOR CONSTRUCTION
�... u:
SHWI. BORING
LOCATIONS
OSPRI7Y LANDING
5,,{ITUVILI.E TOWNSMP BRUNSWICK COLNTS
SOUTIIPORT NORTH CAROLINA
P1RAMOUNT1.
(9SQj 79S�70r (p)(9SJj rt-1517 p�°TM
BIL4 CLARU
*� E HOMES
HS + S woAD
�A =
ems
INFILTRATION SITE VISIT REQUEST
Name of the Project _Osprey_ Landing
rX F rels5
&014'4460
Location (attach a clear vicinity map) Right of Robert Ruark Dave in Southport at the
intersection of Hwy 211 and Hwy 87
Street address SR number, community, etc
Directions from the nearest major Intersection At the intersection of Hwy 87 and Hwy 211
take a right, travel +1- 0.25 miles on Robert „Ruark Drive_, Project on the right
Owner/Applicant Name _ Bill Clark Homes of Wilmington, LLC
Consultant Name Tim Clinkscales PE c!o earamou to Engineering. Inc
Consultant Contact Information. Ph _(910)520_;1991, Fx C910i 763-4517, Email
tclinkscalesODaramounte-ena com
Phone, fax, emall, etc �.
#1 #2 #3 #4 #5 #6 #7 #8
1-0
Existing ground elev @basinitrench= le? y0 �r 3� 7�
N
SHWT elev = {
SHWT plus 2' (max bottom elev
Y
Date/Time of Soils Investigation L
Summary/Cornments _
(man)
All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench
must be marked and flagged If these areas are not flagged, the Soils Scientist reserves the right to
decline to do the investigation If the proposed infiltration system will be located in an area of existing
pavement and there is no open area nearby, equipment capable of breaking through the impervious
layer must be provided The soils investigation does not take the place of a soils report prepared by
an appropriate professional The Soils Scientist will only verify the soil conditions that are reported in
the Soils Report, and make a determination as to the suitability of the site to meet the infiltration
design requirements under NCAC 2H 1000, and assumes no liability should the system fail
Z0 39Vd 3anio31IH06V 3-ISI-I LISbE9L9IG 69 9r- 900Z/GZ/90
05/25/2006 16 58 9107634517 LISLE ARCHITECTURE PAGE 03
F7
OLD RIvfR RD
�4
Pj4,R,A1vf0UNT
E N a 1 N 9 B R 1 N a. 1 14 C
FAX COVER SHEET
To Cameron Weaver
Affibuon NCDENR Infiltration Site Visit
Fax # 350-2004
N„mber of pages (Including Covet) 2
Date May 25, 2006
From Tam Clinkscales
RE Infiltration Site Visit Request, Vicinity Map
Project No 06110 PEI
Comments
Cameron,
Enclosed is the request for setting, a infiltration test site visit for Vincent Please let me
know the first available time for his tune The project is located in Brunswick County ntar
the intersection of Hwy 211 and Hwy 87 If you have any questions, please feel free to call
me at 791-6707 71lataks for youL time and have a great dayl
Tun Clinlsscales
1 2 7 R A C 1 N E O IQ
I V S, 9 u 1 7 E 7 0 7, W i L.M I N r. T O N, N C 2 O a C 9
M N f 9 7 O 1 7 9 1 G 7 0 7 F A% 49 1 a 1 7 d 3 a b 1 V
Z0 3E)ad 3an1331IHOati 3-1SI7 LTSVEgL0t6 89 91: 908Z/SZl96