Loading...
HomeMy WebLinkAboutSW8060826_HISTORICAL FILE_20061113STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWTaplPblrl DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �!�((/l YYYYMMDD State Stormwater Management Systems Permit No SW8 permit# STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Michael T Macomson Red Fish Grille 2550 Holden Beach Road, Supply, Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater mans ement plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until November 13, 2016, and shall be subject to the following specified conditions and limitations I. DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 37,788 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans This permit makes no allocation for any future built -upon area 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 permit# 6 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a DrainaArea, 9cres gnsite, 1 62 ft 70,377 Offsite, ft2 0 b Total Impervious Surfaces, ft2 37,788 c Design Storm, inches 1 d Pond Depth, feet 350 e TSS removal efficiency 90% f Permanent Pool Elevation, FM! I, 1150 g Permanent Pool Surface Ares, ft 3,910 h Permitted Storage Volume, ft 4,340 i Temporary Storage Elevation, FMSL 1160 t Controlling Orifice 0 75"0 pipe k Permitted Forebay Volume, ft3 1,067 I Max Fountain Horsepower 118 1 Receiving Stream/River Basin Bell Branch 1 LBR59 m Stream Index Number 15-25-2-15-4 n Classification of Water Body "C Sw HQW" II. SCHEDULE OF COMPLIANCE 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 The facilities shall be constructed as shown on the approved plans This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 6 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility Page 3 of 7 State Stormwater Management Systems Permit No SW8 permit# 7 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in this pond is listed in Section 16 (1) of this permit 8 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Ma)or permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made Page 4 of 7 State Stormwater Management Systems Permit No SW8 permit# III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 13th day of November 2006 NORmTH ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for n ie ,Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 East Coast v Engineering Company, P.A. Consulting Engineers 4918 Main Street Telephone 910 754 8029 �� Post Office Box 2469 Fax 910 754 8049 �Shallotte North Carolina 29459 TO Ms Linda Lewis NCDENR - Stormwater Wilmington. NC SUBJECT: Red Fish Grille SW8 060826 We are sending you [X ] Attached or Enclosed Via US Mail , the following items DATE __ 10/30/06______ PROJECT: Red Fish Grille _ _EC1EYV�]D OCT 3 1 2006 [ ] Under Separate Cover [ X ] Plans [ ] Contract Documents [ ] Specifications [ ] Samples [ ] Copy of Letter [ ] Reproducibles [X] Other Response to Stormwater Comments Sheet No (s) No Copies Date These are Transmitted as Checked Below [X] As Requested [ ] For Your Use [ X ] For Approval [ ] Approved as Noted [ ] Comments [ ] For Your Information [ ] Shop Drawings [ ] Computer Disk Sheet or Item Description [ ] Approved as Submitted [ ] Rejected [ ] Submit Additional Copies [ ] Resubmit For Approval REMARKS. Linda, Per your e-mail we have added a revision note and note to the plans identifying the Stormwater Outlet structure If you have any further questions, please contact our office IJ Christian Russell East Coast Engineering Company, PA pc File 06-0703 — Red Fish Grille Red Fish Grille SW8 060826 Subject: Red Fish Gnlle SW8 060826 From: Linda Lewis <Iznda lewis@ncmail net> Date: Wed, 25 Oct 2006 14 29 11 -0400 To: Elizabeth Nelson <enelson@ececpa com> Elizabeth Good news[ I only need one small thing added to these plans in order to issue a permit Please label the small square in the pond as the outlet structure on sheet C3 and submit 2 copies of the revised plans You may also want to reference it to the detail on that same sheet Linda I of 1 10/27/2006 10 33 AM V 4918 Main Street PO Box 2469 East Coast 324 Village Road, Suite C Shallotte, North Carolina 28459 Engineering Company, P.A. Leland North Carolina 28451 Office 910 754 8029 Consulting Engineers Office 910 371 3526 Fax 910 754 8049 Fax 910 371 3448 August 14, 2006 Ms. Linda Lewis Water Quality Section NC Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Subject Red Fish Grille Holden Beach, NC High Density Submittal Dear Ms. Lewis: On behalf of our client, enclosed is a submittal package for Red Fish Grille located in Holden Beach, NC The project is a high -density restaurant project, and runoff will be directed to catch basins then to an onsite stormwater pond via underground storm drains The following presents the various components of the enclosed submittal package 1 One original and one copy of the Stormwater Management Permit Application Form 2 One original and one copy of the Wet Detention Basin Supplement to the Stormwater Plan 3 Two sets of plans, sheets C 1, C2 and C3 4 A Project Narrative, sheet t of 1 5 Calculations pages 1 thru 5 If you have any questions or require any additional information, please contact our Shallotte office Sincerely, J Christian Russell Enclosures copy: Mr Brian Garrett (Johnson & Garrett Architects) File 0703 (Red Fish Grille) lrr -1q- AU G 1 5 Z006 East Coast Engineering Company, P.A. 4918 Main Street Fax 910 754 8049 Consulting Engineers Post Office Box 2469 Office 910 754 8029 q Shallotte, NC 28459 Red Fish Grille Brunswick County, North Carolina STORMWATER AND EROSION CONTROL NARRATIVE Red Fish Grille is located in Brunswick County on NC 130 between Shallotte and Holden Beach The project proposes to build a restaurant and associated parking The developer proposes to construct parking, construct a stormwater collection system including a stormwater pond and install water and sewer utilities to serve the site The total project area is 162 acres The developer proposes to disturb 1 5 acres Stormwater will sheet flow from all impervious areas to catch basins then to an onsite stormwater pond The developer proposes to install paved parking lots and driveways to serve the new site The overall impervious area of the project will be high -density The project will be approximately 54 percent impervious Temporary silt fence will be installed on the south side of the project between the disturbed area and existing ditch, block and gravel inlet protection will be installed around the catch basins and a graveled construction entrance will be used to prevent any significant amounts of sediment from leaving the site The proposed stormwater pond may be utilized for sediment storage during rough grading of the site The block and gravel inlet protection may be used for sediment storage during final grading of the site These measures shall be inspected regularly, and the accumulated sednnent removed to prevent the conveyance of sediment to any off -site areas The primary permanent erosion control measures that will remain after the temporary measures are removed will be permanent grassing