Loading...
HomeMy WebLinkAboutSW8060660_CURRENT PERMIT_20060908STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �T DOC TYPE (If CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD W A FER Michael F. Easley, Governor ` b G William G. floss .1r., Secretary ` od r- North Carolina Department of Environment and Natural Resources (� Alan W. Klimck, N.E. Director Division of Water Quality September 8, 2006 Richard Genova, Vice President Coastal Communities @ Ocean Ridge Plantation, Inc. 351 Ocean Ridge Parkway, SW Ocean Isle Beach, NC 28469 Subject: Stormwater Permit No. SW8 060660 Leopard's Chase Clubhouse and Maintenance Facility High Density Project Brunswick County Dear Mr. Genova-. The Wilmington Regional Office received a complete Stormwater Management Permit Application for Leopard's Chase Clubhouse and Maintenance Facility on June 23, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 060660 dated September 8, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until September 8, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwate.r management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 796-7215. Sincerely,/^ Ed Beck Regional Supervisor Surface Water Protection Section ENB/rbh- S:1WQSISTORMWATIPERMIT1060660.sep06 CC' Jason Clark, P.E., Houston and Associates, P.A. Brunswick County Building Inspections Brunswick County Engineer Rhonda Hall Wilmington Regional Office Nont%hCarolina Central Files [Naturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wihnington, NC 2K405 Phone (910) 796-7215 Cuszon]Cr Service Wilmington Kegional Oft -Ice Internet: www.ncwatertlualily orr; Fax (910) 350-2004 1-977-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycledll0% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 060660 4 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Richard Genova, Coastal Communities At Ocean Ridge Plantation, Inc.. Leopard's Chase Clubhouse and Maintenance Facility Brunswick County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 8, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2.. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 290,994 square feet of impervious area. 3. The overall tract built -upon area percentage for the project must be maintained at 30% as specified by State Stormwater Management Permit Number SW8 020221 for Golf Clubhouse at 4.18 acres, Amenity Center at 1.11 acres, and Maintenance Facility at 1.42 acres, and as required by Section .1005 of the stormwater rules. 4. This portion of the tract (the high density pocket associated with the Golf Clubhouse, Amenity Center and Maintenance Facility) will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project Page 2 of 8 State Stormwater Management Systems Permit No. SW8 060660 will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. The following design criteria have been provided in the two.wet detention ponds and must be maintained at design condition: Pond 1 Pond 2 a. Drainage Area, acres: 10.66 6.80 Onsite, ft2: 464,411 296,160 Offsite, ft2: None None b. Total Impervious Surfaces, ft2: 229,522 61,472 Buildings, ft : 32,914 7,501 Roads/Parkiq ft2: 148,566 53,971 Sidewall s, ft : 25,757 0. Other, ft : 22,285 0 C. Pond Depth, feet: 6 6 d. TSS removal efficiency: 90 90 e. Design Storm, inches: 1 1 f. Permanent Pool Elevation, FMSL: 48.5 49.5 g. Permitted Surface Area @ PP, ft2: 23,239 56,455 h. Permitted Storage Volume, ft3: 24,710 28,849 i. Temporary Storage Elevation, FMSL: 49.5 50.0 j. Controlling Orifice: 2.0" 1.5° k. Permanent Pool Volume, ft3: 77,322 235,832 I. Forebay Volume, ft3: 18,111 56,394 m. Maximum Fountain Horsepower: 114 314 n. Receiving Stream Saw Pit Swamp Saw Pit Swamp o. River Basin Lumber Lumber p. Stream Index Number: 15-22-2-2 15-22-2-2 a. Classification of Water Body: C;Sw C;Sw Ill. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of Page 3of8 State Stormwater Management Systems Permit No. SW8 060660 the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for fountains in the two ponds is as follows: Maximum Fountain Horsepower Description Maximum Horsepower Pond 1 114 horsepower Pond 2 3/ horsepower 6.. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 4 of 8 State Stormwater Management Systems Permit No..SW8 060660 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the. Director that the changes have been made. Ill. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not Pe approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this perrnit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the'creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 060660 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. , 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 81h day of September, 2006. NOR ' CA ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 060660 Leopard's Chase Clubhouse and Maintenance Facility Stormwater Permit No. SW8 060660 Brunswick County Designer's Certification I as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 060660 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. .3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. .6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 11. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are' provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections OFFICE USE ONLY Date Received Fee Paid Permit Number — n Sfae � North n � T�I 0� Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be pholucopiety for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): �a� ll]Mmurltti � ���� nk��� L► � YnC. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing Address for person listed in item 2 above: 3S 1 Ocean ?"'aa e- k wo. City: cSoo e\:It tt sco&\ State: NC, Zip: Telephone Number: ( ql0 ) Z '7- 11Q3 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Leopo.L4is Chose ClkbkQLASe. anA A1wA4e e FaJl'j�j 5. Location of Project (street address): city: a� Z51e aeock County: Sru.asuaIck 6. Directions to project (from nearest major intersection): I1 AJC 5L_� - C_. _&�Or�ttion c.lS['? a.ef M,.(t o r Q a 7. Latitude: 3� ��o Longitude: `7V 30 of project 8. Contact person who can answer questions about the project: Name: R 1C r�Cr[[]Q�Q� Telephone Number: C(( I0 ) ZS%- IC11`03 11. PERMIT INFORMATION: 1. Specify whether project is (check one): _%_New Renewal Modification Form SWU-101 Version 3.99 Page 1 o1_4 IL 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density K High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major _X_Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. SAC.-"_�a.�e r {'cor+� C �ebinnu`S e 5 fs� �� Il fie iecc �� _. i t o r nn tea ita" 2. Storrnwater runoff from this project drains to the LnAbec River basin. 3. Total Project Area: 3 (0,1Z- acres !��} 4. Project Built Upon Area: 18,4 /n 5. How many drainage areas does the project have? G-. ("2C sue. ZA. ,) 6. Complete the following information for each drainage area. if there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. '1t- t 4'M '6 1 SL i AnAA-t' 2— Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Receiving Stream Class r Drainage Area tO GG4 4 41t5 i(V 0 s Existing Impervious* Area — -- Proposed Impervious*Area SZwtt 27,17.6ZZsP 1,411Z& 6 LM sF % Impervious* Area (total) 49,41% 1 z 05C. Impervious* Surface Area Drainage Area I Drainage Area 2 On -site Buildings 0.7SS6Ae. G O. 17ZZ lac. SD p On -site Streets 3.410f, 114 8, S Sr+ 4 e. 63 R7 sp On -site Parking -- On-site Sidewalks 0.5"INe _ 5 sF Other on -sit N S c ZZ F ~ Off -site Total: 5. 7 Y Z Z9 52ZSF Total: I,tr 1 Z /H SF " Impervious area is defined as the built upon area including, but not limited to, buildings, rands, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Puke 2 of 4 7. How was the off -site impervious area listed above derived? MIA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly,it table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. The followiit�i covenants are infended to ensure ongoing compliance zoith state storrrrzvater management permit number 5W L7 C)?_oL \ _ as issued by the Division of Water Quality. These covenants may riot be changed or deleted without the consent of the State. `Th '7oW Nojeek 2. No nrore than 246 CH4 _ square feet of l shall be covered 2?y structures or impervioifs materials. Impervious materials include asphalt, gravel, concrete, brick, stare, slate or similar material but do not include wood decking or the water surface of swirnrning pools. 3. Swales shall not be filled in, piped, or altered except as necessnry to provide driveway crossings. 4. Built -upon area in excess of the permitted amourit requires a state stormwater management permit modification prior to construction. 5. All perrrritted runoff from out parcels or future development shall 17e directed into the permitted stormwater control system. These connections io the storrtrwater control system shall be per formed in a marnzer tlmt uraintnins the iritegt•ity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 ]nnova6ve Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Es ' 'als • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each 6IM1' • Permit application processing fie of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm' - Legend - North arrow' - Scale - - Revision number & date` - Mean high water line - Dimensioned property/project boundary- - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations- - Details of roads, drainage features, collection systems, and stormwater control measures' - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations- - Drainage areas delineated' - Vegetated buffers (where required)' VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): _ t. Mailing Address: .a &,, (,Zr? City: 5lhAhAiL State: &)C— Lip: �{S9 Phone: ( q to ) 754 - G9Z4 V111. APPLICANT'S CERTIFICATION Fax: ( 910 ) 1-75q-zlzl 1, (print or type mmne of person listed in General Information, itern 2) R,tCYMA ee.,_o a, certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be record and that the proposed project complies with the requirements of 15A NCAC 2H .I000. --t r, Signatur Forn SWU-101 Version 3.99 Page 4 of 4 Date: 5- i_' -,1_bbtp Stormwater and Erosion Control Narrative for Ocean Ridge Plantation Leopard's Chase Clubhouse and Maintenance Facility The subject project is located within Ocean Ridge Plantation, in southern Brunswick County. Ocean Ridge Plantation, Phase IV has an Overall Stormwater Plan under the low density option. There is one eighteen hole golf course in the Phase IV development, Leopard's Chase Golf Club. This submittal is for the construction of the Leopard's Chase Clubhouse, the Phase IV Amenity Center and the golf course Maintenance Facility. Coastal Communities @ Ocean Ridge Plantation, Inc., are the owners of Ocean Ridge Plantation. Development of this project will be accompanied with curbed and guttered roadways with open throat and grate curb inlets and piping. Stormwater ponds have been designed for treatment. This project will utilize two (2) Stormwater Ponds to treat runoff from the 1" Design Storm. An Overall Stormwater Permit for Phase IV was approved under the Low Density Option, Permit ## SW8 020221. The clubhouse, amenity center and the maintenance facility were included in the Overall Low Density Permit. The Overall Low Density Permit is also being updated in this submittal. \1llllj A o' SEAL �• W 030869 G 61� N 3, I �}�0