W ATfR9 Michael F Easley, Governor
p G William G Ross, Jr, Secretary
North Carolina Department of Environment and Natural Resources
O Alan W Klimek, P E Director
Division of Water Quality
September 30, 2005
Mr Mark Maynard, Manager
Point South Properties, LE_C
PO Box 1229
Wilmington, NC 28402
Subject Stormwater Permit No SW8 050907
Point South
High Density Project
New Hanover County
Dear Mr Maynard
The Wilmington Regional Office received a complete Stormwater Management Permit Application for
Point South on September 30, 2005 Staff review of the plans and specifications has determined that
the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC
2H 1000 We are forwarding Permit No SW8 050907 dated September 30, 2005, for the construction
of the subject project
This permit shall be effective from the date of issuance until September 30, 2015, and shall be subject
to the conditions and limitations as specified therein Please pay special attention to the Operation and
Maintenance requirements in this permit Failure to establish an adequate system for operation and
maintenance of the stormwater management system will result in future compliance problems
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this
permit This request must be in the form of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447,
Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding
If you have any questions, or need additional information concerning this matter, please contact Robert
Gordon, or me at (910) 796-7215
Singly,
Edwar Beck
Regional Supervisor
Surface Water Protection Section
ENBlydg S IWQSISTORMWATIPERMIT1050907 sep05
cc Mr Jeff Malpass, PE, Malpass Engineering
Tony Roberts, New Hanover County Building Inspections
City of Wilmington Stormwater Services
Beth E Wetherill, New Hanover County Engineering
Division of Coastal Management
Robert Gordon
Wilmington Regional Office
Central Files
North Carohna Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796 7215 Customer Senricel-877-623 6748
Wilmington Regional Office Wilmington NC 28405 3845 FAX (910) 350 2004 Internet h2o enrstate nc us One
NorthCarol3na
An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Vatuimally
State Stormwater Management Systems
Permit No SW8 050907
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Mr Mark Maynard & Point South Properties, LLC
Point South
Near the Int of Sanders Rd & Willow Glen Rd - New Hanover County
FOR THE
construction, operation and maintenance of 2 wet detention ponds in compliance with
the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules")
and the approved stormwater mana ement plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit
This permit shall be effective from the date of issuance until September 30, 2015, and
shall be subject to the following specified conditions and limitations
I DESIGN STANDARDS
1 This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data
2 This stormwater system has been approved for the management of stormwater
runoff as described in Section 16 on page 3 of this permit Pond #1 has been
designed to handle the runoff from 169,651 square feet of impervious area
Pond #2 has been designed to handle the runoff from 378,007 square feet of
impervious area
3 The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans There is no additional impervious surface
available for future development in this permit
4 All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans
5 The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system
Page 2 of 7
State Stormwater Management Systems
Permit No SW8 050907
6 The following design criteria have been provided in the wet detention ponds and
must be maintained at design condition
Y i ±" ( NA .aF y e"1 !1i1' 34Ir1 3rdT ^h
In ns P
^�WP'N' ,rNPond #I1q
$tr
nd-#2
Drainage Area
Onsite
Offsite
Acres
ft
ft2
688
299692
0
13 11
467143
103928
Total Impervious Surfaces
ft
169651
378007
Design Storm
inches
1
1
Pond Depth
feet
75
75
TSS removal efficiency
%
90
90
Permanent Pool Elevation
FMSL
170
65
Permanent Pool Surface Area
ft2
11771
23436
Permitted Storage Volume
ft
187369
375585
Temporary Storage Elevation
FMSL
1845
80
Controlling Orifice
"O pipe
1 5
2
Permitted Forebay Volume
ft
941565
2314875
Receiving Stream
The The Cape Fear River
River Basin
=��;'�„� s�l,E
�., ,� ,� � ,„ � °
a Fear
Cape
Stream Index Number
=;',�°, �'
18-(71)
Classification of Water Body
,�I";�,,'�t„,`;�.
SC
11 SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface
2 During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately
3 The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to
a Semiannual scheduled inspections (every 6 months)
b Sediment removal
c Mowin.9 and revegetation of slopes and the vegetated filter
d Immediate repair of eroded areas
e Maintenance of all slopes in accordance with approved plans and
specifications
f Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping
g Access to the outlet structure must be available at all times
4 Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ The records will indicate the date,
activity, name of person performing the work and what actions were taken
Page 3of7
State Stormwater Management Systems
Permit No SW8 050907
5 Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria
a The fountain must draw its water from less than 2' below the permanent
pool surface
b Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond
c The falling water from the fountain must be centered in the pond, away
from the shoreline
d The maximum horsepower for a fountain in pond 1 is 116 horsepower
The maximum horsepower for a fountain in pond 2 is 113 horsepower
6 The facilities shall be constructed as shown on the approved plans This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data
7 Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation Any deviations from the
approved plans and specifications must be noted on the Certification A
modification may be required for those deviations
8 If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility
9 Access to the stormwater facilities shall be maintained via appropriate
easements at all times
10 The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below
a Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc
b Project name change
c Transfer of ownership
d Redesign or addition to the approved amount of built -upon area or to the
drainage area
e Further subdivision, acquisition, lease or sale of all or part of the project
area The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Ma)or permit was sought
f Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan
11 The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction
12 A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction
Page 4 of 7
State Stormwater Management Systems
Permit No SW8 050907
13 The Director may notify the permittee when the permuted site does not meet one
or more of the minimum requirements of the permit Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made
III GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate
The approval of this request will be considered on its merits and may or may not
be approved The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request
2 Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215 6A to 143-215 6C
3 The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction
4 In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems
5 The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility
6 The permit may be modified, revoked and reissued or terminated for cause The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition
7 Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual
8 Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit
9 The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days
Permit issued this the 30th day of September, 2005
NORTH QAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
l^ T
for an limek, P E , Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5of7
State Stormwater Management Systems
Permit No SW8 050907
Point South
Stormwater Permit No SW8 050907
New Hanover County
Designer's Certification
1, , as a duly registered ^
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications
The checklist of items on page 2 of this form is included in the Certification
Noted deviations from approved plans and specification
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No SW8 050907
Certification Requirements
1 The drainage area to the system contains approximately the permitted
acreage
2 The drainage area to the system contains no more than the permitted
amount of built -upon area
3 All the built -upon area associated with the project is graded such that the
runoff drams to the system
4 All roof drains are located such that the runoff is directed into the system
5 The outlet/bypass structure elevations are per the approved plan
6 The outlet structure is located per the approved plans
7 Trash rack is provided on the outlet/bypass structure
8 All slopes are grassed with permanent vegetation
9 Vegetated slopes are no steeper than 3 1
10 The inlets are located per the approved plans and do not cause short-
circuiting of the system
11 The permitted amounts of surface area and/or volume have been
provided
12 Required drawdown devices are correctly sized per the approved plans
13 All required design depths are provided
14 All required parts of the system are provided, such as a vegetated shelf,
and a forebay
15 The required system dimensions are provided per the approved plans
cc NCDENR-DWQ Regional Office
Tony Roberts, New Hanover County Building Inspections
Page 7 of 7
i SB ONL..Y '�,
Date Received
Fee Paid
Permit Dumber
V2_
g
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This fot m may be photocopied for use as an o7 tgznal
1 GENERAL INFORMATION
1 Applicants name (specify the name of the corporation, individual, etc who owns the project)
�oln� Soi Qro et'}'es L L C
2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance)
_Mark M41 UPI _ _ 1r+ 9AACI M McMher
3 Mailing Address for person listed in item 2 above
F 0, Box 1221
City VidrAlal-byk __a_ State NC zip 28409
Telephone Number ( 1 Q ) 2 3030
4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc )
Poiht 50A
S Location of Project
jroject (street address)
't�1 _r_ ����� �,1 �j `
S{� IS IOt&4 0,05 SS T� of I i eMo Ars .+rig O NO daY ,11v G
City _U 1 I'g- en _ County ew HanoVer
Directions to project (from nearest major intersection) %o Wes-t gprtxX 0,75 ^Mies Erato r1?Pmeof0t► ef� (a Oka
804A M, + 5441M , 4101 S411ders Ad70h Idt ori Wily Glen h. qo dow, 6.05 allkl...
5►`1E is or. A'a L40 s;4e 0� w,110e Glert Dr --
Latitude N 3 _i a 07 I 244 ri Longitude W 7 7 0 5 I 3" of project
Contact person who can answer questions about the project
Name Je If. 455 _ Telephone Number L I 10 312 - 5243
II PERMIT INFORMATION. `
1 Specifv whether project is (check one) V New Renewal Modification
Form SWU-101 Version 3 99 Paoe 1 of 4
f
2 If this application is being subrrutted as the result of a renewal or modification to an existing permit, list the
existing perrrut number and its issue date (if known)
3 Specify the type of project (check one) A,
Low Low Density *-,/ High Density Redevelop General Permit Other
4 Additional Project Requirements (check applicable blanks)
_CAMA Major f Sedimentation/Erosion Control 404/401 Permit _NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748
III PROJECT INFORMATTON
1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative
(one to two pages) describing stormwater management for the project
*rnwqfcr 2-
2 Stormwater runoff from this project drains to the c4f pe Fe4 River basin
3 Total Project Area 13. Z 2 , acres 4 Project Built Upon Area
; Hnw manv drainage areas does the vroiect have? Z
4C,4 %
c7 Complete the following information for each drainage area if there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below
Basin Inforrsiti>7nA 't "^
P `" y '"Dfairtage Area 1 �€ ' t° x'
, t x ° Drain" a Arba 2,
by
Receiving Stream Name
[ g gr
CAB F
Receiving Stream Class
$ C
SC
Drainage Area
S$ ac.
13,
Existing Impervious" Area
Proposed Impervious'Area
Impervious' Area (total)
]
Z%
<Irn ervidus surface Area < -
Drama eAea�1 `}
wt $
h+R k> 'x'i.'.
Draiiia eArea2
w w , g"
On -site Buildings
] 2qs
5 z
'I Z 3g z
Is q}2
On -site Streets
On -site Parking
q6 �� 1
On -site tndewaiKs
oq6 ��2
�q50 -
Other on -site
Off -site
$3112- -t+
Total j 1 6 51 f+
Total 37 8 007
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, pa, king areas,
sidewalks, gravel areas, etc
Form SWU-101 Version 3 99 Paae 2 of 4
7 Hok was the off -site impervious area listed above derived? It W S- derlvecl 6 -5;
tined be*w_ 6.1ED e faml. Ae r tIe -to IV aplIx WO-Impervidus,
qC 6go far 4ny tr Nre 44'a bpm eel;
IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following itahcized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment
The following covenants are intended to ensure ongoing compliance with state stormwater management permit
number as issued by the Division of Water Quality These covenants may
not be changed or deleted without the consent of the State
2 No more than square feet of any lot shall be covered by structures or impervious materials
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking m the water surface of swimming pools
3 Swales ahaII not be filled in, piped, or altered except as necessary to provide driveway crossings
Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction
5 All permitted runoff frorn outparcels or future development shall be directed into the permitted stormwater control
system These connections to the stormwater control system shall be per formed in a manner that maintains the
integrity and performance of the system as permitted
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot
V SUPPLEMENTFORMS
The applicable state stormwater management permit supplement form(s) lasted below must be submitted for
each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the
status and availability of these forms
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet Svstem Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3 99 Page 3 of 4
VI SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ)
A complete package includes all of the items listed below The complete application package should be
submitted to the appropriate DWQ Regional Office
1 Please indicate that -you have provided the fallowing required information by initialing in the space
pro-�zded next to each item
Irutials
• Original and one copy of the Stormwater Management i'ernut Application Form
• One copy of the applicable Supplement Form(s) for each BMP J [
• Permit application processing fee of W'd (payable to NCDENR)$` 600 C
• Detailed narrative description of stormwater treatment/maria;ement C
• Two copies of plans and specifications, including CB
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number & date
- Mean high ivater line
- Dimensioned property/project boundary
- Lu,aziuii ALCM s IL41 IlaiIl%�U arreel-� ur nurnDerS
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII AGENT AUTHORIZATION
if you with to designate authority to another individual or firm so that they may provide information on your
I
ehalf, please complete thus section ec _. n
Designated agent (individual or firm)��T U10
k4ailing kddress ,t 34.-,..?�Yira eya
City W1,1m;V1 h State NC Zip 2 8'f 02
Phone ( la } 392 ~ 5Z 3 Fax �9 �a j3q2 - 520 3
V III APPLICANT'S CERTIFICATTON
1, (print oz type name of person Ii;ted in General Infoimation, item 2) MAIY, )U.A—AMPZ
certify that the information included on this permit application form is, to the best of my knowledge, correct and
.bat the project will be constructed in conformance with the approved plans, that the required deed restrictions
ana protects,, e covenants will be recorded, and that the proposed protect complies with the requirements of 15A
\CAC 2H 1000 It
Signature
Date V o G C6
Torrn SVk L-101 Version 3 99 Page 4 of 4
Permit No � 2 _0 D DI
(to be provided b� DVVQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
Thts form may be photocopied for use as an original
DWQ_St_ormwater Management Plan Review_
A complete stormwater management plan subiruttal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details
I. PROJECT INFORMATION
Project Name bt11t SOA
Contact Person ,tT ffialpass _ Phone Number (ql0 } 312 - 52-43
For projects with multiple basins, specify which basin this work -sheet applies to boo
elei ationc
Basin Bottom Elevation ��� ft (floor of the basin)
Permanent Pool Elevation 17 ft (elevation of the orifice)
Temporary Pool Elevation 1%,q5 ft (elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area 17 71 sq ft (water surface area at the orifice elevation)
Drainage Area ac (on -site and off -site drainage to the basin)
Impervious Area 3,_ - ac (on -sire and off -site drainage to the basin)
volunie s
Permanent Pool Volume JV22.73 cu ft (combined volume of main basin and forebay)
Temporary Pool Volume 1%1,736 . q cu ft (volume detained above the permanent pool)
Forebay Volume _ Q 415s C. cu ft (approximately 20% of total volume)
Other parameters
SAMAi 1.7% (surface area to drainage area ratio from DWQ table)
Diameter of Orifice 1,9 in (2 to 5 day temporary pool draw -down required)
Design Rainfall 1 in
Design TSS Removal 2 qa % (mininium 85% required)
Form SWU-142 Rev 3 99 Page 1 of 4
,tnotes
i When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual imperious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non-
standard table entries
In the 20 coastal counties, the requirement for a vegetative filter may be uaived if the wet detention basin is designed to provide
90% TSS removal The NCDENR BMF manual provides design tables for both 85% TSS removal and 9051r, TSS removal
II REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Secuon 15 A NCAC 2H 1008
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below If a requirement has not been met, attach justification.
Aicants Initials
i is 7 6 f+ a
J8M b
ABM
d
tVA e
3W f
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet)
The forebay volume is approximately equal to 20% of the basin volume
The temporary pool controls runoff from the design storm event
The temporary pool draws down in 2 to 5 days
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
The basin length to width ratio is greater than 3 1
The basin side slopes above the permanent pool are no steeper than 3 1
A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail)
Vegetative cover above the permanent pool elevation is specified
A trash rack or sirnilar device is provided for both the overflow and onfice
A recorded drainage easement is provided for each basin including access to nearest nght-
of-way
JAM 1 If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin
Min A mechanism is specified which will drain the basin for maintenance or an emergency
III WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
eaetated filter if one is provided
This stistem (check one) 0 does G/does not incorporate a vegetated filter at the outlet.
This si stem (check ogre) 0 does 9Cdoes not incorporate pretreatment other than a forebay
Form S«'U-102 Rev 3 99 Page 2 of 4
Maintenance activities shall be performed as follows
After every significant runoff producing rainfall event and at least monthly
a inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition
b Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed
2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
-- t,., ght of s v ,nrht-c and remove trash as needed
c,uver io mairitai�� d iii;iit�ATi�i.L� �.���... „ _ ,
3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to
maintain proper functioning
4 Remove accumulated sediment fmm the vet detention haein system semi-annually or when depth is
reduced to 75% of the onginal design depth (see diagram below) Removed sediment shall be disposed
of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality
(i e stockpiling near a wet detention basin or stream, etc )
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments
When the permanent pool depth reads _ 50 feet in the main pond, the sediment shall be removed
When the permanent pool depth reads 5' 6 3 feet in the forebay, the sediment shall be removed
Coin:ent xe! opal El 11.37
_ _
Bottom Ele ation
FOREBAY
BASIN DIAGRAM
ill in the blanks)
Permanent Pool Elevation 17
�l �T
------Sediment Removal Elevation
---------------------
Bottom Elevation 1 S
MAIN POND
75%--
25 %
5 Remove cattails and other indigenous wetland plants when they cover 5017c of the basin surface These
plants shall be encouraged to grow along the vegetated shelf and forebay berm
6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent practical
Form SWLJ-102 Rev 3 99 Page 3 of 4
All components of the "et detention basin system shall be maintained in good working order
I aclnowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any
charges to the system or responsible party
Print name OAf2.0 �AA rJjk
Tit e ►UI ru 40A
ddress Rr rvi
Phone 10 2.�J l� 6050
Signature
Date ZOD6
\cite fhe legally responsible party should not be a homeowners association unless more than SOT of the lots have been sold and
a resident of the subdivision has been named the president
I N, I 1 U Ot C—in oI ) , a Notary Public for the State of Uw" K&nd
County of ti�1ACL(l Ae l( do hereby certify that ( Magr t4
personall} appeared before me this day of , and acknowledge the due
exc,cution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal,
SEAL
`✓iv commission expires �A. U ;VX)__7
Form SWU-102 Rev 3 99
Page 4 of 4
Permit No S� D15-Di
(to be provided bti DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
t
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an of iginaI
DWQ Stormwater anaaeement Plan Review
A complete stormwater nianabemem PICUI �Juiaitt:d Sncl ides a^ ?^nlun inn form a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details
I PROJECT INFORMATION
Project Name 0 SO th
Contact Person _44 A41PAss_ Phone Number (.11.0 ) 3ql - 52g3
For projects with multiple basins, specify which basin this worksheet applies to _ &1 Z
elevations
Basin Bottom Elevation _ -ft
Permanent Pool Elevation ft
Temporary Pool Elevation ft
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflox)
ajea4
Permanent Pool Surface Area 23 q 3 � sq ft (water surface area at the on f ce elevation)
Drainage Area 3��11 ac (on -site and off -site drainage to the basin)
Impervious Area ac (on -site and off -sate drainage to the basin)
volumes
Permanent Pool Volume 111 317. 5S cu ft (combined volume of main basin and forebay)
Temporary Pool Volume 37 559 S cu ft (volume detained above the permanent pool)
Forebay Volume 23� � .�� cu ft (approximately 20% of total volume)
Other parameters
S VDA1 2.,14 $ (surface area to drainage area ratio from DWQ table)
Diameter of Onfice Z in (2 to 5 day temporary pool draw -down required)
DeSinn Rainfall in
Dcsign TSS Removal 2 q0 % (minimum 85% required)
Form S% U-162 Rev 3 99 Page 1 of 4
ytnotec
When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non-
standard table entrees
'- In the 20 coastal counties the requirement for a vegetative filter may be %� aix ed if the wet detention basin is designed to provide
90% TSS removal The NCDENR BMP manual provides design tables for both 85% TSS removal and 90%, TSS removal
TT 1"f TA T TT TIN TTI TTT%R lYTTT'�/�T_T V__
AA 1'LL,VU1t�1iL XIEl.# S <.rLLI 111.1.� t
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N C Department of Environment, Health and Natural Resources, February 1999) and Adrrunistrauve Code
Section 15 A NCAC 2H 1008
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below If a requirement has not been met, attach justification.
AaPIcants Initials
s 7, a
AA b
Jb - c
Jbm d
-N e
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet)
The forebay volume is approximately equal to 20% of the basin volume
The temporary pool controls runoff from the design storm event
The temporary pool draws down in 2 to 5 days
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
f The basin length to width ratio is greater than 3 1
g The basin side slopes above the permanent pool are no steeper than 3 I
h A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail)
Vegetative cover above the permanent pool elevation is specified
A trash rack or similar device is provided for both the overflow and onfce
k A recorded drainage easement is provided for each basin including access to nearest right-
of-way
3BM 1 If the basin is used for Sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin
M m A mechanism is specified which will drain the basin for maintenance or an emergency
III. WET DETENTION BASIN OPERATION AND MALNTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided
This system (check one) 0 does Gdoes not incorporate a vegetated filter at the outlet.
This system (check one) 0 does ddoes not incorporate pretreatment other than a forebay
Form S" L -102 Rev 3 99 Pape 2 of 4
Maintenance activities shall be performed as follows
After every significant runoff producing rainfall event and at least monthly
a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition
b Check and clear the onfice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed
2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed
3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to
maintain proper functioning
4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed
of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality
(i e stockpiling near a wet detention basin or stream, etc )
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments
When the permanent pool depth reads feet in the main pond, the sediment shall be removed
When the permanent pool depth reads �' 3 feet in the forebay, the sediment shall be removed
BASIN DIAGRAM
(fill in the blanks)
0 Permanent Pool Elevation 6.5
Sediment Re oval El U7 75 0
______________ __ Sediment Removal Elevation Q �7 75%
Bottom E e ation `_1A %------�------------------------__ �-----------1-25%
-------
BottomElevation —1
FOREBAY
MAIN POND
5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These
plants shall be encouraged to grow along the vegetated shelf and forebay berm
h If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent practical
form SNIVU-102 Rev 3 99 Pa,-e 3 of 4
All components of the "et detention basin system shall be maintained to Mood "Orkin- order
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above I agree to notify DWQ of any proolems with the system or prior to any
changes to the system or responsible party
Pnnt name M 4>t=K 1MkJ4;"
Tirle
Addr
Phon
Siam
Date
ti Ott T'ne legally responsible party should not be a homeowners a,sociation unless more than 50% of the lots have been sold and
a resident of the subdivision has been named the president
I l l ! Ot GUI.„I- ) _ , a Notary Public for the State of U-Ab 12a ,
County of L)fJ a 14inbVee``�/ , do hereby certify that
personalty appeared before me this aU day of , Alif� , and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal,
SE ,-\L
Div coirun.ission expires
Form SW L -102 Rev 3 99 Pa,-e -S of 4
State Stormwater Management Systems
Permit No SW8 050907
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Mr Mark Maynard & Point South Properties, LLC
Point South
Near the lnt of Sanders Rd & Willow Glen Rd - New Hanover County
FOR THE
construction, operation and maintenance of 2 wet detention ponds in compliance with
the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit
This permit shall be effective from the date of issuance until September 30, 2015, and
shall be subject to the following specified conditions and limitations
I. DESIGN STANDARDS
1 This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data
2 This stormwater system has been approved for the management of stormwater
runoff as described in Section 16 on page 3 of this permit Pond #1 has been
designed to handle the runoff from 169,651 square feet of impervious area
Pond #2 has been designed to handle the runoff from 378,007 square feet of
impervious area
3 The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans There is no additional impervious surface
avaiable for future development in this permit
4 All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans
5 The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system
Page 2 of 7
State Stormwater Management Systems
Permit No SW8 050907
6 The following design criteria have been provided in the wet detention ponds and
must be maintained at design condition
Drainage Area
Onsite
Offsite
Acres
ft
ft2
688
299692
0
1311
467143
103928
Total Impervious Surfaces
ft
169651
378007
Design Storm
inches
1
1
Pond Depth
feet
75
75
TSS removal efficiency
%
90
90
Permanent Pool Elevation
FMSL
170
65
Permanent Pool Surface Area
ft
11771
23436
Permitted Storage Volume
ft
187369
375585
Temporary Storage Elevation
FMSL
1845
80
Controlling Orifice
"O pipe
1 5
2
Permitted Forebay Volume
ft
941565
2314875
Receiving Stream
�r s.;i i,�����h�3a,i��
The Cape Fear River
River Basin
Cape Fear
Stream Index Number;
;, ,, ;; ;
18-(71)
Classification of Water Body
11;ii iIll
Sc
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface
2 During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately
3 The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to
a Semiannual scheduled inspections (every 6 months)
b Sediment removal
c Mowing and revegetation of slopes and the vegetated filter
d Immediate repair of eroded areas
e Maintenance of all slopes in accordance with approved plans and
specifications
f Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping
g Access to the outlet structure must be available at all times
4 Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ The records will indicate the date,
activity, name of person performing the work and what actions were taken
Page 3 of 7
State Stormwater Management Systems
Permit No SW8 050907
5 Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria
a The fountain must draw its water from less than 2' below the permanent
pool surface
b Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond
c The falling water from the fountain must be centered in the pond, away
from the shoreline
d The maximum horsepower for a fountain in pond 1 is 116 horsepower
The maximum horsepower for a fountain in pond 2 is 113 horsepower
6 The facilities shall be constructed as shown on the approved plans This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data
7 Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation Any deviations from the
approved plans and specifications must be noted on the Certification A
modification may be required for those deviations
8 If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility
9 Access to the stormwater facilities shall be maintained via appropriate
easements at all times
10 The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below
a Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc
b Project name change
c Transfer of ownership
d Redesign or addition to the approved amount of built -upon area or to the
drainage area
e Further subdivision, acquisition, lease or sale of all or part of the project
area The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought
f Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan
11 The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction
12 A copy of the approved plans and specifications shall be maintained on file by
the Faermittee for a minimum of ten years from the date of the completion of
construction
Page 4 of 7
State Stormwater Management Systems
Permit No SW8 050907
13 The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made
III GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate
The approval of this request will be considered on its merits and may or may not
be approved The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request
2 Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215 6A to 143-215 6C
3 The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction
4 In the event that the facilities fad to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems
5 The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility
6 The permit may be modified, revoked and reissued or terminated for cause The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition
7 Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual
8 Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit
9 The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days
Permit issued this the 30th day of September, 2005
NORT AROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for Alan ime , Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No SW8 050907
Point South
Stormwater Permit No SW8 050907
New Hanover County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications
The checklist of items on page 2 of this form is included in the Certification
Noted deviations from approved plans and specification
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No SW8 050907
Certification Requirements
1 The drainage area to the system contains approximately the permitted
acreage
2 The drainage area to the system contains no more than the permitted
amount of built -upon area
3 All the built -upon area associated with the project is graded such that the
runoff drains to the system
4 All roof drains are located such that the runoff is directed into the system
5 The outlet/bypass structure elevations are per the approved plan
6 The outlet structure is located per the approved plans
7 Trash rack is provided on the outlet/bypass structure
8 All slopes are grassed with permanent vegetation
9 Vegetated slopes are no steeper than 3 1
10 The inlets are located per the approved plans and do not cause short-
circuiting of the system
11 The permitted amounts of surface area and/or volume have been
provided
12 Required drawdown devices are correctly sized per the approved plans
13 All required design depths are provided
14 All required parts of the system are provided, such as a vegetated shelf,
and a forebay
15 The required system dimensions are provided per the approved plans
cc NCDENR-DWQ Regional Office
Tony Roberts, New Hanover County Building Inspections
Page 7 of 7