Loading...
HomeMy WebLinkAboutSW8050907_CURRENT PERMIT_20050930STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ft �?(% DOC TYPE r CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE r7lY1S'r9°13r7 YYYYMMDD W ATfR9 Michael F Easley, Governor p G William G Ross, Jr, Secretary North Carolina Department of Environment and Natural Resources O Alan W Klimek, P E Director Division of Water Quality September 30, 2005 Mr Mark Maynard, Manager Point South Properties, LE_C PO Box 1229 Wilmington, NC 28402 Subject Stormwater Permit No SW8 050907 Point South High Density Project New Hanover County Dear Mr Maynard The Wilmington Regional Office received a complete Stormwater Management Permit Application for Point South on September 30, 2005 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 050907 dated September 30, 2005, for the construction of the subject project This permit shall be effective from the date of issuance until September 30, 2015, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Robert Gordon, or me at (910) 796-7215 Singly, Edwar Beck Regional Supervisor Surface Water Protection Section ENBlydg S IWQSISTORMWATIPERMIT1050907 sep05 cc Mr Jeff Malpass, PE, Malpass Engineering Tony Roberts, New Hanover County Building Inspections City of Wilmington Stormwater Services Beth E Wetherill, New Hanover County Engineering Division of Coastal Management Robert Gordon Wilmington Regional Office Central Files North Carohna Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796 7215 Customer Senricel-877-623 6748 Wilmington Regional Office Wilmington NC 28405 3845 FAX (910) 350 2004 Internet h2o enrstate nc us One NorthCarol3na An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Vatuimally State Stormwater Management Systems Permit No SW8 050907 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr Mark Maynard & Point South Properties, LLC Point South Near the Int of Sanders Rd & Willow Glen Rd - New Hanover County FOR THE construction, operation and maintenance of 2 wet detention ponds in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules") and the approved stormwater mana ement plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until September 30, 2015, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit Pond #1 has been designed to handle the runoff from 169,651 square feet of impervious area Pond #2 has been designed to handle the runoff from 378,007 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans There is no additional impervious surface available for future development in this permit 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 050907 6 The following design criteria have been provided in the wet detention ponds and must be maintained at design condition Y i ±" ( NA .aF y e"1 !1i1' 34Ir1 3rdT ^h In ns P ^�WP'N' ,rNPond #I1q $tr nd-#2 Drainage Area Onsite Offsite Acres ft ft2 688 299692 0 13 11 467143 103928 Total Impervious Surfaces ft 169651 378007 Design Storm inches 1 1 Pond Depth feet 75 75 TSS removal efficiency % 90 90 Permanent Pool Elevation FMSL 170 65 Permanent Pool Surface Area ft2 11771 23436 Permitted Storage Volume ft 187369 375585 Temporary Storage Elevation FMSL 1845 80 Controlling Orifice "O pipe 1 5 2 Permitted Forebay Volume ft 941565 2314875 Receiving Stream The The Cape Fear River River Basin =��;'�„� s�l,E �., ,� ,� � ,„ � ° a Fear Cape Stream Index Number =;',�°, �' 18-(71) Classification of Water Body ,�I";�,,'�t„,`;�. SC 11 SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowin.9 and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken Page 3of7 State Stormwater Management Systems Permit No SW8 050907 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in pond 1 is 116 horsepower The maximum horsepower for a fountain in pond 2 is 113 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Ma)or permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Page 4 of 7 State Stormwater Management Systems Permit No SW8 050907 13 The Director may notify the permittee when the permuted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 30th day of September, 2005 NORTH QAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION l^ T for an limek, P E , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5of7 State Stormwater Management Systems Permit No SW8 050907 Point South Stormwater Permit No SW8 050907 New Hanover County Designer's Certification 1, , as a duly registered ^ in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 050907 Certification Requirements 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drams to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7 i SB ONL..Y '�, Date Received Fee Paid Permit Dumber V2_ g State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This fot m may be photocopied for use as an o7 tgznal 1 GENERAL INFORMATION 1 Applicants name (specify the name of the corporation, individual, etc who owns the project) �oln� Soi Qro et'}'es L L C 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) _Mark M41 UPI _ _ 1r+ 9AACI M McMher 3 Mailing Address for person listed in item 2 above F 0, Box 1221 City VidrAlal-byk __a_ State NC zip 28409 Telephone Number ( 1 Q ) 2 3030 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) Poiht 50A S Location of Project jroject (street address) 't�1 _r_ ����� �,1 �j ` S{� IS IOt&4 0,05 SS T� of I i eMo Ars .+rig O NO daY ,11v G City _U 1 I'g- en _ County ew HanoVer Directions to project (from nearest major intersection) %o Wes-t gprtxX 0,75 ^Mies Erato r1?Pmeof0t► ef� (a Oka 804A M, + 5441M , 4101 S411ders Ad70h Idt ori Wily Glen h. qo dow, 6.05 allkl... 5►`1E is or. A'a L40 s;4e 0� w,110e Glert Dr -- Latitude N 3 _i a 07 I 244 ri Longitude W 7 7 0 5 I 3" of project Contact person who can answer questions about the project Name Je If. 455 _ Telephone Number L I 10 312 - 5243 II PERMIT INFORMATION. ` 1 Specifv whether project is (check one) V New Renewal Modification Form SWU-101 Version 3 99 Paoe 1 of 4 f 2 If this application is being subrrutted as the result of a renewal or modification to an existing permit, list the existing perrrut number and its issue date (if known) 3 Specify the type of project (check one) A, Low Low Density *-,/ High Density Redevelop General Permit Other 4 Additional Project Requirements (check applicable blanks) _CAMA Major f Sedimentation/Erosion Control 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATTON 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project *rnwqfcr 2- 2 Stormwater runoff from this project drains to the c4f pe Fe4 River basin 3 Total Project Area 13. Z 2 , acres 4 Project Built Upon Area ; Hnw manv drainage areas does the vroiect have? Z 4C,4 % c7 Complete the following information for each drainage area if there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Inforrsiti>7nA 't "^ P `" y '"Dfairtage Area 1 �€ ' t° x' , t x ° Drain" a Arba 2, by Receiving Stream Name [ g gr CAB F Receiving Stream Class $ C SC Drainage Area S$ ac. 13, Existing Impervious" Area Proposed Impervious'Area Impervious' Area (total) ] Z% <Irn ervidus surface Area < - Drama eAea�1 `} wt $ h+R k> 'x'i.'. Draiiia eArea2 w w , g" On -site Buildings ] 2qs 5 z 'I Z 3g z Is q}2 On -site Streets On -site Parking q6 �� 1 On -site tndewaiKs oq6 ��2 �q50 - Other on -site Off -site $3112- -t+ Total j 1 6 51 f+ Total 37 8 007 Impervious area is defined as the built upon area including, but not limited to, buildings, roads, pa, king areas, sidewalks, gravel areas, etc Form SWU-101 Version 3 99 Paae 2 of 4 7 Hok was the off -site impervious area listed above derived? It W S- derlvecl 6 -5; tined be*w_ 6.1ED e faml. Ae r tIe -to IV aplIx WO-Impervidus, qC 6go far 4ny tr Nre 44'a bpm eel; IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following itahcized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 No more than square feet of any lot shall be covered by structures or impervious materials Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking m the water surface of swimming pools 3 Swales ahaII not be filled in, piped, or altered except as necessary to provide driveway crossings Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runoff frorn outparcels or future development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be per formed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENTFORMS The applicable state stormwater management permit supplement form(s) lasted below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet Svstem Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office 1 Please indicate that -you have provided the fallowing required information by initialing in the space pro-�zded next to each item Irutials • Original and one copy of the Stormwater Management i'ernut Application Form • One copy of the applicable Supplement Form(s) for each BMP J [ • Permit application processing fee of W'd (payable to NCDENR)$` 600 C • Detailed narrative description of stormwater treatment/maria;ement C • Two copies of plans and specifications, including CB - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high ivater line - Dimensioned property/project boundary - Lu,aziuii ALCM s IL41 IlaiIl%�U arreel-� ur nurnDerS - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII AGENT AUTHORIZATION if you with to designate authority to another individual or firm so that they may provide information on your I ehalf, please complete thus section ec _. n Designated agent (individual or firm)��T U10 k4ailing kddress ,t 34.-,..?�Yira eya City W1,1m;V1 h State NC Zip 2 8'f 02 Phone ( la } 392 ~ 5Z 3 Fax �9 �a j3q2 - 520 3 V III APPLICANT'S CERTIFICATTON 1, (print oz type name of person Ii;ted in General Infoimation, item 2) MAIY, )U.A—AMPZ certify that the information included on this permit application form is, to the best of my knowledge, correct and .bat the project will be constructed in conformance with the approved plans, that the required deed restrictions ana protects,, e covenants will be recorded, and that the proposed protect complies with the requirements of 15A \CAC 2H 1000 It Signature Date V o G C6 Torrn SVk L-101 Version 3 99 Page 4 of 4 Permit No � 2 _0 D DI (to be provided b� DVVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT Thts form may be photocopied for use as an original DWQ_St_ormwater Management Plan Review_ A complete stormwater management plan subiruttal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details I. PROJECT INFORMATION Project Name bt11t SOA Contact Person ,tT ffialpass _ Phone Number (ql0 } 312 - 52-43 For projects with multiple basins, specify which basin this work -sheet applies to boo elei ationc Basin Bottom Elevation ��� ft (floor of the basin) Permanent Pool Elevation 17 ft (elevation of the orifice) Temporary Pool Elevation 1%,q5 ft (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 17 71 sq ft (water surface area at the orifice elevation) Drainage Area ac (on -site and off -site drainage to the basin) Impervious Area 3,_ - ac (on -sire and off -site drainage to the basin) volunie s Permanent Pool Volume JV22.73 cu ft (combined volume of main basin and forebay) Temporary Pool Volume 1%1,736 . q cu ft (volume detained above the permanent pool) Forebay Volume _ Q 415s C. cu ft (approximately 20% of total volume) Other parameters SAMAi 1.7% (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1,9 in (2 to 5 day temporary pool draw -down required) Design Rainfall 1 in Design TSS Removal 2 qa % (mininium 85% required) Form SWU-142 Rev 3 99 Page 1 of 4 ,tnotes i When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual imperious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non- standard table entries In the 20 coastal counties, the requirement for a vegetative filter may be uaived if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMF manual provides design tables for both 85% TSS removal and 9051r, TSS removal II REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Secuon 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification. Aicants Initials i is 7 6 f+ a J8M b ABM d tVA e 3W f The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) The forebay volume is approximately equal to 20% of the basin volume The temporary pool controls runoff from the design storm event The temporary pool draws down in 2 to 5 days If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3 1 The basin side slopes above the permanent pool are no steeper than 3 1 A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) Vegetative cover above the permanent pool elevation is specified A trash rack or sirnilar device is provided for both the overflow and onfice A recorded drainage easement is provided for each basin including access to nearest nght- of-way JAM 1 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin Min A mechanism is specified which will drain the basin for maintenance or an emergency III WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the eaetated filter if one is provided This stistem (check one) 0 does G/does not incorporate a vegetated filter at the outlet. This si stem (check ogre) 0 does 9Cdoes not incorporate pretreatment other than a forebay Form S«'U-102 Rev 3 99 Page 2 of 4 Maintenance activities shall be performed as follows After every significant runoff producing rainfall event and at least monthly a inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative -- t,., ght of s v ,nrht-c and remove trash as needed c,uver io mairitai�� d iii;iit�ATi�i.L� �.���... „ _ , 3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment fmm the vet detention haein system semi-annually or when depth is reduced to 75% of the onginal design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i e stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads _ 50 feet in the main pond, the sediment shall be removed When the permanent pool depth reads 5' 6 3 feet in the forebay, the sediment shall be removed Coin:ent xe! opal El 11.37 _ _ Bottom Ele ation FOREBAY BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 17 �l �T ------Sediment Removal Elevation --------------------- Bottom Elevation 1 S MAIN POND 75%-- 25 % 5 Remove cattails and other indigenous wetland plants when they cover 5017c of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical Form SWLJ-102 Rev 3 99 Page 3 of 4 All components of the "et detention basin system shall be maintained in good working order I aclnowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any charges to the system or responsible party Print name OAf2.0 �AA rJjk Tit e ►UI ru 40A ddress Rr rvi Phone 10 2.�J l� 6050 Signature Date ZOD6 \cite fhe legally responsible party should not be a homeowners association unless more than SOT of the lots have been sold and a resident of the subdivision has been named the president I N, I 1 U Ot C—in oI ) , a Notary Public for the State of Uw" K&nd County of ti�1ACL(l Ae l( do hereby certify that ( Magr t4 personall} appeared before me this day of , and acknowledge the due exc,cution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, SEAL `✓iv commission expires �A. U ;VX)__7 Form SWU-102 Rev 3 99 Page 4 of 4 Permit No S� D15-Di (to be provided bti DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality t STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an of iginaI DWQ Stormwater anaaeement Plan Review A complete stormwater nianabemem PICUI �Juiaitt:d Sncl ides a^ ?^nlun inn form a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details I PROJECT INFORMATION Project Name 0 SO th Contact Person _44 A41PAss_ Phone Number (.11.0 ) 3ql - 52g3 For projects with multiple basins, specify which basin this worksheet applies to _ &1 Z elevations Basin Bottom Elevation _ -ft Permanent Pool Elevation ft Temporary Pool Elevation ft (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflox) ajea4 Permanent Pool Surface Area 23 q 3 � sq ft (water surface area at the on f ce elevation) Drainage Area 3��11 ac (on -site and off -site drainage to the basin) Impervious Area ac (on -site and off -sate drainage to the basin) volumes Permanent Pool Volume 111 317. 5S cu ft (combined volume of main basin and forebay) Temporary Pool Volume 37 559 S cu ft (volume detained above the permanent pool) Forebay Volume 23� � .�� cu ft (approximately 20% of total volume) Other parameters S VDA1 2.,14 $ (surface area to drainage area ratio from DWQ table) Diameter of Onfice Z in (2 to 5 day temporary pool draw -down required) DeSinn Rainfall in Dcsign TSS Removal 2 q0 % (minimum 85% required) Form S% U-162 Rev 3 99 Page 1 of 4 ytnotec When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non- standard table entrees '- In the 20 coastal counties the requirement for a vegetative filter may be %� aix ed if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMP manual provides design tables for both 85% TSS removal and 90%, TSS removal TT 1"f TA T TT TIN TTI TTT%R lYTTT'�/�T_T V__ AA 1'LL,VU1t�1iL XIEl.# S <.rLLI 111.1.� t The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Adrrunistrauve Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification. AaPIcants Initials s 7, a AA b Jb - c Jbm d -N e The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) The forebay volume is approximately equal to 20% of the basin volume The temporary pool controls runoff from the design storm event The temporary pool draws down in 2 to 5 days If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f The basin length to width ratio is greater than 3 1 g The basin side slopes above the permanent pool are no steeper than 3 I h A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) Vegetative cover above the permanent pool elevation is specified A trash rack or similar device is provided for both the overflow and onfce k A recorded drainage easement is provided for each basin including access to nearest right- of-way 3BM 1 If the basin is used for Sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin M m A mechanism is specified which will drain the basin for maintenance or an emergency III. WET DETENTION BASIN OPERATION AND MALNTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does Gdoes not incorporate a vegetated filter at the outlet. This system (check one) 0 does ddoes not incorporate pretreatment other than a forebay Form S" L -102 Rev 3 99 Pape 2 of 4 Maintenance activities shall be performed as follows After every significant runoff producing rainfall event and at least monthly a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the onfice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i e stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads feet in the main pond, the sediment shall be removed When the permanent pool depth reads �' 3 feet in the forebay, the sediment shall be removed BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 6.5 Sediment Re oval El U7 75 0 ______________ __ Sediment Removal Elevation Q �7 75% Bottom E e ation `_1A %------�------------------------__ �-----------1-25% ------- BottomElevation —1 FOREBAY MAIN POND 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm h If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical form SNIVU-102 Rev 3 99 Pa,-e 3 of 4 All components of the "et detention basin system shall be maintained to Mood "Orkin- order I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any proolems with the system or prior to any changes to the system or responsible party Pnnt name M 4>t=K 1MkJ4;" Tirle Addr Phon Siam Date ti Ott T'ne legally responsible party should not be a homeowners a,sociation unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I l l ! Ot GUI.„I- ) _ , a Notary Public for the State of U-Ab 12a , County of L)fJ a 14inbVee``�/ , do hereby certify that personalty appeared before me this aU day of , Alif� , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, SE ,-\L Div coirun.ission expires Form SW L -102 Rev 3 99 Pa,-e -S of 4 State Stormwater Management Systems Permit No SW8 050907 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr Mark Maynard & Point South Properties, LLC Point South Near the lnt of Sanders Rd & Willow Glen Rd - New Hanover County FOR THE construction, operation and maintenance of 2 wet detention ponds in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until September 30, 2015, and shall be subject to the following specified conditions and limitations I. DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit Pond #1 has been designed to handle the runoff from 169,651 square feet of impervious area Pond #2 has been designed to handle the runoff from 378,007 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans There is no additional impervious surface avaiable for future development in this permit 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 050907 6 The following design criteria have been provided in the wet detention ponds and must be maintained at design condition Drainage Area Onsite Offsite Acres ft ft2 688 299692 0 1311 467143 103928 Total Impervious Surfaces ft 169651 378007 Design Storm inches 1 1 Pond Depth feet 75 75 TSS removal efficiency % 90 90 Permanent Pool Elevation FMSL 170 65 Permanent Pool Surface Area ft 11771 23436 Permitted Storage Volume ft 187369 375585 Temporary Storage Elevation FMSL 1845 80 Controlling Orifice "O pipe 1 5 2 Permitted Forebay Volume ft 941565 2314875 Receiving Stream �r s.;i i,�����h�3a,i�� The Cape Fear River River Basin Cape Fear Stream Index Number; ;, ,, ;; ; 18-(71) Classification of Water Body 11;ii iIll Sc II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken Page 3 of 7 State Stormwater Management Systems Permit No SW8 050907 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in pond 1 is 116 horsepower The maximum horsepower for a fountain in pond 2 is 113 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Faermittee for a minimum of ten years from the date of the completion of construction Page 4 of 7 State Stormwater Management Systems Permit No SW8 050907 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fad to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 30th day of September, 2005 NORT AROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan ime , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8 050907 Point South Stormwater Permit No SW8 050907 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 050907 Certification Requirements 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7