Loading...
HomeMy WebLinkAboutSW8050534_COMPLIANCE_20050906STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�j(l �0� `t DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD CITY OF JACKSONVILLE STORM DRAINAGE DESIGN DATA SHEET PROJECT: Wliite Oak Congregatimr of lebovab's Wimesses DESIGNED BY: JBF DATE: 916lOS LOCATION: Jacksonville, North Carolina CHECKED BY: EJF SHEET 1 OF I STORM FREQUENCY: I0-Year FROM TO SUB TOTAL INLET PIPE TIME OF 1 Cc Q-CIA TYPE N S Dthco SIZE Vfull Qavail LENGTH SEGMENT REMARKS AREA AREA TIME TIME CONC TIME [acl [acl [min] (min] (min] [inful [cfs] [fVR] [in] [m] [fllsecl [cfs] In1 [min] CBI C92 0.37 0.37 5.0 0.0 5.0 7.4 0.85 2.3 RCP 0.012 0.00820 10.3 15 5.2 6.4 71 0.2 C132 C133 0.08 OAS 5.0 0.2 5.2 7.3 0.85 2.8 RCP 0.012 0.00700 11.4 15 4.8 5.9 '71 0.2 CB3 C84 0.27 0.72 5.0 OA 5.4 7.3 0.85 • 4.4 RCP 0.012 '0.00430 14.9 15 3.7 4.6 95 0.4 C64 FES 0.11 0.83 5.0 0.8 5.8 7.2 0.85 5.1 RCP 0.012 0.00560 14.8 15 4.3 5.3 16 0.1 CB4 EXIST CB 0.22 0.83 5.0 0.9 5.9 7.) 0.95 5.0 RCP 0.012 0,01330 12.6 15 6.6 8.1 60 0.2 15" RCP Outlet - S.W. I - RAINFALL INTENSITY S - SLOPE NOTE: DESIGN IS BASED ON THE Cr - COMPOSITE RUNOFF COEFFICIENT Dthco - THEORETICAL. MINIMUM PIPE DIAMETER SUM OF THE AREAS AND NOT THE QDESIGN DISCHARGE Vfull -FULL FLOW VELOCITY SUM OF THE DISCHARGES. N - COEFFICIENT OF FRICTION Qavail - AVAILABLE DISCHARGE RIVERS & ASSOCIATES, INC. ENGINEERS PLANNERS SURVEYORS C17Y OFJACKSONVILLE STORM DRAINAGE DESIGN DATA SHEET PROJECT: white Oak Congregation of JchovaWs Witnesses DESIGNED BY: JBF DATE: 9/6105 LOCATION: Jacksou%ille, North Camlioa CHECKED BY: FJF SHEET I OF l STORM FREQUENCY: 10-Year FROM TO SUB TOTAL INLET PIPE TIME OF I Cc Q=CIA TYPE N S. Dthco SIZE Vfull Qavail LENGTH SEGMENT REMARKS AREA AREA TIME TIME CONC TIME (ac] [ac) [min] (min) [min] [inATI [cfs] [fvfk] [in) [m] [f /sec] [cfs] [f1) [min] CB1 C132 0.37 0.37 5.0 0.0 5.0 7.4 0.85 2.3 RCP 0.012 0.0OS20 10.3 15 5.2 6.4 7l 0.2 CB2 CB3 0.08 0.45 5.0 0.2 5.2 7.3 0.83 2.8 RCP 0.012 0.00700 11.4 15 4.8 5.9 71 0.2 C83 CB4 0.27 0,72 5.0 0.4 5.4 7-3 0.85 4.4 RCP 0.012 '0.00430 14.8 15 3.7 4.6 95 0.4 C134 FES 0.11 0.83 5.0 0.8 5.8 7.2 0.35 5.1 RCP 0.012 0.00560 14.8 15 4.3 5.3 16 0.1 CB4 EXIST CB 0.22 0.S3 5.0 0.9 5.9 7.1 0.85 5.0 RCP 0.012 0.01330 12.6 15 6.6 8.1 60 0.2 15" RCP Outtct - S.W. I - RAINFALL INTENSITY S - SLOPE NOTE: DESIGN IS BASED ON THE Cc - COMPOSITE RUNOFF COEFFICIENT Dthco - THEORETICAL MINIMUM PIPE DIAMETER SUM OF THE AREAS AND NOT THE Q - DESIGN DISCHARGE Vfull - FULL -FLOW VELOCITY SUM OF THE DISCHARGES. N -COEFFICIENT OF FRICTION Qavatl - AVAILABLE DISCHARGE RIVERS & ASSOCIATES, INC. ENGINEERS PLANNERS SURVEYORS Bioretention Basin Design File Name: S:1WQSIBIORETENTION1050534.augO5.WK1 Project Number: SW8 050534.augO5 Date 9-Aug-2005 Project Name: White Oak Congregation of Jehovah's Witnesses Receiving Stream: Mill Creek Classification: SC NSW Drainage Basin: White Oak Index Number: WOK02 19-9 Minimum Surface Area c=.95 for BUA, c=.25 for grass Minimum Provided Basin # DA BUA Sum C x A BR Area Area 1 65340 36590 40118.50 2808 3350 sf 2 0.00 0 sf 3 0.00 0 sf 4 0.00 0 sf 5 0.00 0 sf Volume Reauired Percent Required Basin # BUA Design Storm Rv Value Volume 1 56.00% 1 0.55 .—__..3017 2 #DIV/O! #DIV/01 #DIV/O! 3 #DIV/O! #DIV/O! #DIV/O! 4 #DIV/O! #DIV/O! #DIVIO! 5 #DIVIO! #DIV/O! #DIV/O! Volume Provided Bottom Bottom Top Top Volume Prov. Req. Vol. Met Basin # Area Elevation Area Elevation 2Top @ elev. 1 3350 ^ 23.000 3996.00 23.75 2755 23.82 ft 2 0 #DIVIO! ft 3 0 #DIVIO! ft 4 0 #DIV/O! ft 5 0 #DIV/O! ft Plantina Guidelines Basin # Min. # Plants Ratio of Prov. # Trees Prov. # Shrubs Shrubs/Trees 1 77 21 70 3.33 (must be 2-3) 2 0 #DIV/01 (must be 2-3) 3 0 #DIV/O! (must be 2-3) 4 0 #DIV/O! (must be 2-3) 5 0 #DIV/OI (must be 2-3) Comments BMP Manual does not require storage for 1". The .7" storm event is stored and infiltrated per the BMP Manual design guidance.