Loading...
HomeMy WebLinkAboutSW8050431_COMPLIANCE_20051128STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�(i DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v DOC TYPE ❑ HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD Permit No..S(,ti g V 3 / (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied far use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: North Countv Road Retail Contact Person: Brad Sedgwick, PE Phone Number: For project with multiple basins, specify which basin this worksheet applies to: Elevations (910) 619-9990 1 Basin Bottom Elevation 93.5 ft. (door of the basin) Permanent Pool Elevation 98 ft. (elevation of'the orifice) Temporary Pool Elevation 99.11 ft. (elevation of the discharge structure overflow) Area Permanent Pool Surface Area 1920 sq. ft. (water surface area at the orifice elevation) Drainage Area 1.38 ac. (on -site and off -site drainage to the basin) Impervious Area 0.73 ac. (on -site and off -site drainage to the basin) Volumes Permanent Pool Volume } _2639 cu. ft. (combined volume of main basin andforebuv) Temporary Pool Volume 2635 cu. ft. (volume detained above the permanent pool) Forebay Volume 564 cu. ft. (approximately 20% of total volume) Other parameters SA/DA ' 3.15 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 0.75 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) Norm: SWU-102 Rev. 3.99 Page 1 of 4 Permit Na. (to be provided by DWQ) q-ZZ -01S State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: North Coun Road Retail Contact Person: Brad Sedgwick, PE Phone Number: (910) 619-9990 For project with multiple basins, specify which basin this worksheet applies to: 1 Elevations Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Area Permanent Pool Surface Area Drainage Area Impervious Area Volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA' Diameter of Orifice Design Rainfall Design TSS Removal 2 93.5 ft. (floor of the basin) 98 ft. (elevation of the orifice) 100.3 ft. (elevation of the discharge structure overflow) 2510 sq. ft. (water surface area at the orifice elevation) 1.38 ac. (on -site and off -site drainage to the basin) 0.73 ac. (on -site and off -site drainage to the basin) 4172 cu. ft. (combined volume of main basin and forebay) 7351 cu. ft. (volume detained above the permanent pool) 834 cu. ft. (approximately 20% of total volume) 4.168 (surface area to drainage area ratio from DWQ table) 0.625 in. (2 to 5 day temporary pool draw -down required) 1 in. 90 % (minimum 85% required) Form: SWU-102 Rev. 3.99 Page 1 of 4 f Footnotes: t When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. N/A a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) £ The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use a wet detention basin. Pump m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including fore bays and the vegetated filter if one is provided. This system (check one) (X) does ( ) does not incorporate a vegetated filter at the outlet. This system (check one) ( ) does (X) does not incorporate pretreatment other than a fore bay. Form: SWU-102 Rev. 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately; re -seed as necessary to maintain good vegetative cover, now vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. 3.375 Amu, q VC6 When the permanent pool depth reads .. feet in the main pond, the sediment shall be removed. '3:3-75 AV0,70-05 When the permanent pool depth reads =PW feet in the fore bay, the sediment shall be removed. BASIN DIAGRAM Ull in the blanks) Permanent Pool Elevation 98 Sediment RemovaKEL 94.63 1 75% Sediment Removal Elevation 94.63 75% -------------- k- Bottom Elevation\ 93.5 1/25% Bottom Elevation 93.5 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and fore bay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. T. All components of the wet detention basin system shall be maintained in good working order. Form: SWU-102 Rev. 3.99 Page 3 of 4 I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: TrennSy Eason Title: President Address 400 Carl Street, Wilmington, NC 28403 Phone (910)790-9031 Signature ` / AL -., ,/ //M Date � ,lr S r Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, k � "i LA, •• a Notary Public for the State of N C— , County of tU 0 ".; . ✓ , do hereby certify that fps o personally appeared before me this �_�_ day of `�, 20 C5, and acknowledge the due execution of the foregoing wet detention basin maintenance requirements. Witness my hand and official seal, `off?OIARy. �y U8VY VER SEAL My commission expires '553 -, Form: SWU-102 Rev. 3.99 Page 4 of 4 WET DETENTION POND ANALYSIS 'FILE NAME: S:IWQSIPOND1050431.WK1 PROJECT * SVV8 050431 REVIEWER: L. Lewis PROJECT NAME: North County Road Retail DATE: 28-Nov-05 Legend Builders Receiving Stream: ;*less Creels Class: C SW Drainage Basin: Cape Fear Index No. CPF17 18-74-62 Site Area 1.38 acres Drainage Area 6,,11; a0 square feet Area in Acres 1.38 IMPERVIOUS AREAS Buildings Parking SW TOTAL SURFACE AREA CALCULATION 11250.00 square feet 191 '10.00 square feet 1493.00 square feet square feet square feet square feet square feet 3185square feet Rational C Rational Cc= 0.09 % IMPERVIOUS 52.99% SA/DA Ratio 4,17% Des, Depth 4.5 Req. SA 2506 sf TSS: 90 Prov. SA "t`. sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* FOREBAY Des. Storm 1,100 inches Perm. Pool Volume= 4172 Rv= 0.527 Req. Forebay Volume= 834.4 Bottom 93.5 assumed Provided Volume= 834.00 Perm. Pool I' i'98"0, assumed Percent= Design Pool *100.3 assumed Storage met @elev 98.77 assumed Elevation Area Inc. Vol. Acc. Vol. Req. Volume =T91 cf 98.00 2510.00 0.00 Vol. Prov. at DP cf 101.00 4388.00 10347.00 10347.00 ORIFICE CALCULATION Avg. Head = 1.14 ft Q2 Area = 0.43 sq. inches Flow Q2, cfs 0.015 cfs Q5 Area = 0.17 sq. inches Flow Q5, cfs 0.006 cfs Orifice Area 0,31 sq. inches No. of Orifices iL 1 Q= 0.011 cfs Diameter, inches F 0 62 , weir H x W in x in Drawdown = 21cs days Surface Area @DP = 39150 sq. ft. Falling Head Drawdown = 11.1 days C� 3,371064815 L= -0.227 COMMENTS Surface Area and Volume are within design Guidelines. Orifice is too large Basin #1 Wet Detention Pond Calculations NC DENR Retention Requirements Objective: design a wet detention basin with the following characteristics. a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3:1. av Step 1: Determine the surface area required for bi6va TSS removal Post -Development Conditions Total Drainage Area Impervious Drainage Area Impervious Cover Elevation of Permanent Pool Surface Depth of Permanent Pool 1.38 ACRE Value from CAD 0.73 ACRE Value from CAD 52 9% Impervious Covet --(Impervious Drainage Area)/(Total Drainage Area)'100% 98.0 FT Value selected by designer 4.6 FT Value selected by designer Elevation of Wet Detention Pond Bottom 93.5 FT (Bottom Elevation)=(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Approximate Pond Length 110 FT Value from CAD Approximate Pond Width 40 FT Value from CAD Len th:Width Ratio 3.1 Ratio=(Len th)/(Width):1 Required SAIDA Ratio for 90% TSS Removal 4.168 Value from chat. Reference: "90% TSS — Removal Required Permanent Pool Surface Area 2,506 SF Required Surface Area=(Required SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 2,510 SF Interpolated value from stage -storage calculations Step 2: Determine the 1-inch runoff elevation within the wet detention pond. Runoff Coefficient, Rv 0,526 MIN Rv=0.05+0.009'(% Impervious) Required 1" Runoff Volume (Volume of Temporary 2,635 CF 1"Runoff Volume=1 inch'Rv'1 foot/12 Pool) inch'(Total Drainage Area) Value from stage -storage calculations Volume Below Permanent Pool 4,172 CF (cumulative pond volume at permanent pool elevation) Total Volume at Overflow Elevation 7.351 CF Total Volume to be Controlled=(Volume Below F- - Overflow), _,- 1" Runoff Volume Elevation 99.003 FT Value is interpolation based upon stage -storage values. See stage -storage calculations RECEIVED SEP 2 '2 2005 DWQ nROJ # 5W F050 43( SteD 3: Calculate the required forebav volume (f8-22% of total pond volume) and compare to the forebay volume provided. Total Pond Volume 4,172 CF Value from stage -storage calculations Required Forebay Volume 834 CF Forebay Volume= Total Pond Volume *20% Provided Foralbay Volume 834 CF Value from stage -storage calculations (Provided Forebay Volume)/(Total Pond Provided Forebay Volume -Total Pond Volume 20% Volume)'100% Step 4_ Verify that time required to drawdown the ?-inch runoff volume is within 2 to 5 da Diameter of Proposed Low -flow Orifice 0.625 IN Value chosen by designer Overflow elevation 100.30 FT Value chosen by designer (Total Elevation Head Above Orifice)=(Weir Total Elevation Head Above Orifice 2.30 FT Elevation) -(Elevation of Permanent Pool Surface) (Average Elevation Head Above Orrflce)=[(Storage Elevation at Required Average Elevation Head Above Orifice 1.15 FT Volume)+(Elevation of Permanent Pool Surface)X-(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0.60 Value chosen by designer O, Flowrate Through Low -flow Orifice 0.01 CFS G?=7Cd'(P)-((ti,am�eter�of Orrflce) (? )ft/92 IDrawdown Time for 14nch Runoff 2.77 DAYS (Drawdown Time)=(1" Runoff Volume)1Q*(1 Wet Detention Pond #1 Calculations Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond. Pond side slope above Permanent Pool 3 Planted shelf 2' below Permanent Pool 6 Side Slope below planted shelf 2 incremental and cumulative storage of the wet detention Dond per contour interval. Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) CF 98.0 2,510 0 0 Permanent Pool 99.0 2,745 2,628 2,628 99.0031 2,747 9 2,636 -Treatment Volume 99.2 3,000 566 3,202 99.3 3,066 303 3,505 100.0 4,230 2,554 6,059 101.0 4,766 4,498 10,557 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 93.5 199 0 0 +•Pond Bottom 94.0 328 132 132 95.0 488 408 540 96.0 681 585 1,124 97.0 1,452 1,066 2,191 98.0 2,510 1,981 4,172 -Permanent Pool 99.0 2,745 2,098 6,270 100.0 4,230 3,370 9,640 101.0 4,766 4,498 14,138 Forebay Only (20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 93.5 40 0 0 -Bottom Elev. 94.0 66 26 26 95.0 98 82 108 96.0 136 117 225 97.0 290 213 438 98.0 502 396 834 *-Forebay Volume NCDENR STORMWATER CALCULATIONS AND SUPPORTING DATA NORTH COUNTY ROAD RETAIL Castle Hayne, NC New Hanover County March 28, 2005 Prepared for: Legend Builders, Inc. 400 Carl Street Wilmington, NC 28403 Prepared by: JBS Consulting 7332 Cotesworth Dr. Wilmington, NC 28405 71YVED 6 mn5 so¢3 l %%Os HC � Y .. ; : ., � , { ar , _ �� � ,t { ' ��. i� t� ', � 1 �• � . � �'_ . �' i. '. � NORTH COUNTY ROAD RETAIL Castle Hayne, NC New Hanover County March 28, 2005 Table of Contents March 28, 2005 DESIGN NARRATIVE Existing Site Proposed Improvements Post Developed Basin Maps Post -Developed Stormwater Storage Calculations 1" Treatment Volume Calculations • ?. . ? ... 3 5 . `l .�' '�. -. � ... .. ,r� � � .n .'�' �: � �• 'i . ,t�r' �' .. , ..' ... NORTH COUNTY ROAD RETAIL Castle Hayne, NC New Hanover County March 28, 2005 DESIGN NARRATIVE Existing Site Legend Builders, Inc. is proposing the development of a retail shop on a 1.38 acre tract of land, located in New Hanover County on the south side of North County Road. The property has approximately 400 feet of frontage on North County Road, a developed commercial property is to the east, an undeveloped commercial property is to the south and a residential subdivision is to the west of the proposed site. Fioure 1 - USGS Because the existing vegetation on the undeveloped site is up of immature trees and under story growth, it is apparent that the site has been cleared in the past. Longleaf pines, red oak, black oak, post oak, hickory, dogwood and holly are native vegetations that would be typical in this area. The New Hanover SCS Soil Survey indicates that the property's soil is Norfork fine sandy loam (No) Norfork fine sandy loam is a well drained soil with moderate to rapid permeability of 2 to 6 inches per hour, the high water table is 6 feet or greater below the surface. No wetlands have been identified on the property. The property is located in a basin that drains to Ness Creek, which is within the Cape Fear River Basin and is a classified C, SW. The classification is dated 09/01/1974 and the index # is 18-74-62. Proposed Improvements The proposed development will consist of a retail building, �- paved access drives and parking, the necessary utilities and a stormwater management system. Water services will be provided to the site from an existing water main on the south side of North County Road, sewer services will be on -site septic The site will be accessed from North County Road a two locations and a total of 28 parking spaces are provided to serve the retail building. The proposed impervious areas will be 11,250 sq.ft. Of building, 19,111 sq.ft. of drives and parking. 427 sq.ft. of concrete walk, and 1,066 sq.ft. of impervious area for the dumpster pad, making the total built upon area 31,854 sq.ft., 53% of the 1.38 acre total property area. New Hanover County requires that the Storm water runoff from the developed site for the 2, 10 and 25-year storm event does not exceed the peak discharge from the same storm events prior to development. New Hanover County also recommends and NCDENR requires that a BMP be provided to remove stormwater pollutants (treatment). In order to meet the treatment and attenuation requirement, the project's stormwater runoff will be captured in swales and transported to a detention pond located toward the westerly property line. The swales not only transport runoff but will also provide additional storage once the water elevation of the detention pond reaches the swale elevations. The proposed detention pond's permanent pool elevation is 98, the bottom elevation is 94 and the top elevation is 101.25. An overflow structure is provided to discharge excess stormwater to an existing ditch at the westerly property line through a 15" RCP. The overflow structure is configured to return the 1 " treatment volume of 2635 cu.ft. to the 98 permanent pool elevation in 2.77 days with the use of a 3/4" orifice set at elevation 98. The 2, 10 and 25 year storms are controlled by the same overflow structure with a 0.51 foot wide weir slot set at elevation 100.30 and the 50 and 100 year storms are allowed to discharge the overflow structure's top at elevation 101.00. Post Developed Basin Maps • m� POST DRAINAGE MAP SCALE : t"=54' 1' p o o O bb f �t 1 � I- oal lot �• yy {�f R S v' ns . g �. tc ' �I. is 2 .e IV-J7 �' �ZZ -+s ob p Gb bz'ol o o 0 99'g6 (' }•�-h+'�-� �8, Ndi1-,�C, ••V:� S".v,1-7-�C� f•-?�`l� ,�, i �rade i �,ro,L�-►S I� za c Yl I 1 All r ftgo o a - tcao.p 3b5 b A-,�o 1 Zi 95 fall b9 G Basin #1 Wet Detention Pond Calculations NC DENR Retention Requirements Objective: design a wet detention basin with the following characteristics: a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the initial I inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3:1. Step 1: Determine the surface area required for 85% TSS removal Post -Development Conditions Total Drainage Area 1.38 ACRE Impervious Drainage Area 0.73 ACRE impervious Cover 52.9% Value from CAD Value from CAD Impervious Cover --(Impervious Drainage Area)!(Total Drainage Area)*100% Elevation of Permanent Pool Surface 98.0 FT Value selected by designer Depth of Permanent Pool 4.5 FT Value selected by designer Elevation of Wet Detention Pond Bottom 93.5 FT (Bottom Elevation)=(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Approximate Pond Length 300 FT Value from CAD Approximate Pond Width 100 FT Value from CAD Lenath:Width Ratio 3:1 Ratio=(Lenoth)/Midth):1 Required SAIDA Ratio fo 94% TSS Removal 3.150 Value from chart. Reference: "90% TSS Removal Required Surface Area=(Required SAIDA Required Permanent Pool Surface Area 1,894 SF Ratio) *(Total Drainage Area) Interpolated value from stage -storage Provided Permanent Pool Surface Area (1,9201SF calculations Stem 2: Determine the 1-inch runoff elevation within the wet detention pond. Runoff Coefficient, Rv 0.526 INIIN Rv=0.05+0.009*(% Impervious) Required 1" Runoff Volume (Volume of Temporary 2,635 CF 1 "Runoff Volume=1 inch*Rv*1 foot/12 Pool) inch*(Total Drainage Areal Value from stage -storage calculations Volume Below Permanent Pool 2,820 CIF (cumulative pond volume at permanent pool elevation) Total Volume to be Controlled 2,635 CIF Total Volume to be Controlled=(Volume Below Total Pool + 1" Runoff Volume orage Elevation at Required Volume F 99.1100 FT Value is interpolation based upon stage -storage values. See stage -storage calculations Stec 3: Calculate the required forebav volume (18-22i6 of total oond volume) and compare to the forebav volume urovided Total Pond Volume 2,820 CF Value from stage -storage calculations Required Forebay Volume 564 CIF Forebay Volume=(Total Pond Volume)*20% Provided Forebay Volume 564 CIF Value from stage -storage calculations Provided Forebay Volume:Total Pond Volume 20% (Provided Forebay Volume)/(Total Pond Volume)*100 Step 4: Verifv that time required to drawdown the 1-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -flow Orifice 0.75 IN Value chosen by designer 1" treatement volume elevation 99.11 FT Value chosen by designer (Total Elevation Head Above Orifice)=(Weir Total Elevation Head Above Orifice 1.11 FT Elevation) -(Elevation of Permanent Pool Surface) (Average Elevation Head Above Orifice)=((Storage Elevation at Required Average Elevation Head Above Orifice 0.56 FT Volume)+(Elevation of Permanent Pool Surface)X-(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0.60 Value chosen by designer Q, Flowrate Through Low -flow Orifice 0.01 CFS Q=Cd'(Pi)'((Diameter of Orifice A4) 11192 ` (Drawdown Time)=(1 " Runoff Volume)/Q*(1 `Drawdown Time for 1-inch Runoff 2.77 DAYS Wet Detention Pond #1 Calculations Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond. Pond side slope above Permanent Pool 3 Planted shelf 2' below Permanent Pool 6 Side Slope below planted shelf 1.5 incremental and cumulative storage of the wet detention aond oer contour interval. Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) CF 98.0 1,920 0 0 Permanent Pool 99.0 2,745 2,333 2,333 99.1 2,808 278 2,610 99.1100 2,821 28 2,638 -Treatment Volume 99.3 2,943 548 3,186 100.0 4,230 3,488 5,820 101.0 8,699 6,465 12,285 Stage/Storage Total Pond (including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 93.5 117 0 0 Pond Bottom 94.0 191 77 77 95.0 283 237 314 96.0 393 338 652 97.0 1,012 703 1,354 98.0 1,920 1,466 2,820 -Permanent Pool 99.0 2,745 1,879 3,233 100.0 4,230 3,075 5,895 101.0 8,699 6,465 12,360 Forebay Only (20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 93.5 23 0 0 -Bottom Elev. 94.0 38 15 15 95.0 57 47 63 96.0 79 68 130 97.0 202 141 271 98.0 384 293 564 Forebay Volume Wet Detention Pond Calculations Reference: SAIDA Ratio for TSS Removal (NC DENR) Surface Area/Drainage Area for 85% TSS Removal with 30' Vegetative Filter (Coastal Counties) Permanent Pool Depth (ft) Impervious % 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10% 0.9 0.8 0.7 0.6 0.5 0.0 0.0 0.0 0.0 0.0 20% 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 2.3 1 00% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 Surface ArealDrainage Area for 90% TSS Removal without Vegetative Filter (Coastal Counties) Permanent Pool Depth (ft) Impervious % 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 1 0% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 0.6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 0.8 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 Reference: "Stormwater Best Management Practices" by NCDENR DWQ Water Quality Section, April 1999