HomeMy WebLinkAboutSW8050429_COMPLIANCE_20050601STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
�DIQO(
YYYYMMDD
DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND1050429.WK1
PROJECT#: SW8 050429 REVIEWER: P.Bartlett
PROJECT NAME: Advance Auto L
DATE: 01-Jun-05 0A
Receiving Stream: 816 e Creek Class: SC; NSW0A
Drainage Basin: White Oak Index No. 19-8
Site Area 2.39 acres
Drainage Area square feet Area = 1.34 acres
IMPERVIOUS AREAS
Rational C
bldgs
6791.00
square feet 0.95
parking/driveways
25967.00
square feet 0.95
sidewalks
539.00
square feet 0.95
square feet
square feet
square feet
TOTAL jjjjj!jjjjjj33297�1;
square feet Rational Cc= 0.63
SURFACE AREA CALCULATION
% IMPERVIOUS
56.92%
SA/DA Ratio 4.99%
Des. Depth
4
Req. SA 2920 sf
TSS:
90
Prov. SA
VOLUME CALCULATION
place a "1" in the box if Rational is used
Rational ?*
FOREBAY
Des. Storm
inches
Perm. Pool Volume= 4430
Rv=
0.56
Req. Forebay Volume= 886
Bottom
22 msl
Provided Volume= 942.00
Perm. Pool
msl
Percent= Bala
Design Pool
s 26.89 msl
Design SA
3746 sf ✓
Req. Volume
41: cf
SA @
Prov. Volume
=fl cf
Elevation=
ORIFICE CALCULATION
Avg. Head =
0.43
ft
Q2 Area =
0.72
sq. in.
Flow Q2, cfs
0.016
cfs
Q5 Area =
0.29
sq. in.
Flow Q5, cfs
0,006
cfs
Orifice Area
0.44
sq. in.
No. of Orifices
Q=
0.010
cfs
Diameter, inches
weir H x W
in
x
in
Drawdown =
3��
days
COMMENTS
Sur -face Area , Volume and Orifice are within Design Guideline:
RECEIVED
MAY 2 S 2005
BY:
1. PROJECT DESCRIPTION
Design Calculations
Stormwater Treatment Facilities
for
Advance Auto Pond
located in
Onslow County
(r&VtsEa 5/W/6 }
The Project consists of proposed business on a 2.39 acre tract and associated sitework.
2. COMPUTE POND AREA REQUIRED
a. Compute Percent Impervious:
Impervious Areas:
On -Site Buildings
On -Site Streets
On -Site Parking
On -Site Sidewalks
Other on -site
Off -site
Sub -Total
FUTURE
FUTURE(reserved)
Total
Total Area Drainage to Pond:
Percent Impervious =
b. Compute Pond Surface Area
0 0 0 SF
0 33,297 33,297 SF
0.569 or 56,9 %
...
58,498 SF (�dcla t°si'Z+Ar1
Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and
assuming foot pond depth:
SAIDA (interpolated)
Therefore:
Surface Area = SAIDA x Drainage Area
2,920 SF say[:k#i SF
I
r
c. Compute Minimum Pond Dimensions
Assume rectangular shape with 3:1 Length (L) to Width (W) Ratio:
Length = 95.50 feet
Width = 31.83 feet
Site conditions, however, dictate irregular shaped pond:
Hydr. Length = -_> `<`- >> (;£10w:' feet
so, Hydr. Width 30.0 feet (avg)
Actual L/W = 3.4 (irregular shape)
3. DETERMINE VOLUME TO BE CONTROLLED FROM 11" STORM
Using Schuler "Simple Method":
Rv = 0.05 } 0.009(I) where I = percent impervious
Rv = 0.562 in/in
Control Volume = Design Rainfall x Rv x Drainage Area
Control Volume = 2,741 CF say =<<<< CF
4. DETERMINE REQUIRED STORAGE DEPTH
Assume: 3:1 side slopes
solving for depth (d) by trial $ error:
d = 0.89
5. DETERMINE ORIFICE SIZE
Control Volume must be drawn down over a 2 day - 5 day period.
Using orifice equation, solve for Diameter (D) that results in 3-112 day period:
D = (Q 10.026 (h)")"
Where: Q = (Control Volume 1 3.5 days x 86,400 sec/day)
0.010 cfs
h= d12
= 0.45
Solving for D:
D = 0.76 Use...3a" pipe
Actual Drawdown with actual drawdown pipe diameter (using orifice equation):
Q= 0.010 cfs
Draw Down Period = 3.56 days OK, c 5.0
6. SELECT OUTLET STRUCTURE DIAMETER
Size outlet structure such that depth of Q10 flow <1.0 feet:
Using Rational Formula (Q=CIA) where:
Cimper =
Cpery
Ccum = 0.54
Q10 = 5.21 cfs
Assuming 112 circumference is used as weir and using
Francis Formula (Q=3.33LH"6) to solve for L such that H = 1.0:
L = 1.57 Feet
Min 24 inch diameter outlet structure
Use 36 inch diameter outlet structure
7. DETERMINE Q10 STAGE
Q10 = 5.21 cfs
Using Francis Formula (Q=3.33LH"5) solve for H:
H 10 = 0.48 feet
8. DETERMINE Q100 STAGE (ELEV. OF EMERGENCY SPILLWAY)
Using Rational Formula (Q=CIA) where:
Ccum = 0.54
...........................
100 = <'><0inlhr
Q100 = 6AB
Using Francis Formula (Q=3.33LH"5) solve for H:
H 100 = 0.54 feet
9. DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV.)
Assume primary spillway blocked (i.e., emergency spillway to accommodate Q100)
Emergency spillway shall be a broad crested earthern weir designed to pass 100 year storm.
Using broad crested weir equation H = (Q/Cw x L)zra
where: Q = Q100 6.18 cfs
Cw = 3.0
Length = ................ > 20.. feet
H = 0.22 feet
10. FOREBAY SIZING
Compute Actual Pond Volumes (using average end method):
Avg
Incr.
Incr.
Cum.
Main Bay V u e
Elevation Area SF
Area (SF)
Depth (ET]
VolC
VolC
Pond Bottom
Bottom Veg Shelf
243 650<
344
2.33
800
800
Normal Pond
26 QD 2 a�fi9.
1,610
1.67
2,688
3,488
Main Bay Volume =
3,488 CIF
Forebay Volumg
Elevation Area SF
Area SF
Depth (FT)
VolC
Vol CF
Pond Bottom
22.00 >: ' -«
...........................
..........................
Normal Pond
26.00z<<zi>>47:<(
236
4.00
942
942
Forebay Volume =
942 CIF
Total Pond Volume =
4,430 CIF
Forebay Volume equates to
21.3 % of Total Volume
Temp. Storage Volume. •
Elevatipn Area (SF
Area SF
Depth (FT)
Vol (CF
Vol CF
Normal Pond
26.00 3,040
Temp. Pond Level
26 89 3,746
3,393
0.89
3,020
3,020
Temp. Pool Volume =
3,020 CIF
10 Yr Storage Volume:
Elevation Area S
Area SF
Depth FT
Vol (CT1
VolCF
Temp Pond Level
26.89 3,746
Temp. Pond Level
27 37 ! 145'
3,946
0.48
1,893
1,893
Temp. Pool Volume =
1,893 CF
100 Yr Storage Volume : Elevation Area SF Area SF Depth (FT) Vol CF Vol (CFj
Temp Pond Level 26.89 3,746
Temp. Pond Level 27.3 187j 3,967 0.54 2,131 2,131
Temp. Pool Volume = 2,131 CF
11. SUMMARY
Pond Elevations:
Top Berm (minimum)
H= 0.22
100-Yr. Flood
H100 = 0.54
10-Yr. Flood
Hf0 = 0.48
1-inch Storage
storage depth = 0.89
Permanent Pool
pond depth = 4
Pond Bottom
12. WET DETENTION BASIN SUPPLEMENT
Basin Bottom Elevation
22.00
Perm. Pool Elevation
26.00
Temp. Pool Elevation
26.89
Perm Pool Surface Area
3,040 SF
Drainage Area
1.34 AC
Impervious Area
0.76 AC
Perm. Pool Volume
4,430 CF
Temp Pool Volume
3,020 CF
Forebay Volume
942 CF
SA/DA
4.99199
Diameter of Orifice
0.75
Design Rainfall
1"
Design TSS Removal
90%
Relative
Actual
5.65
27.65
5.43
27.43 (emerg. weir elev)
5.37
27.37
4.89
26.89 (primary weir elev)
4.00
26.00 (invert out elev)
Stormwater Treatment &
Erosion Control Narrative
Advance Auto
Advance Auto proposes to construct a commercial (retail) development on a 2.39 acre lot located on NC
24/US 258 (Richlands Hwy), at the intersection with NC 53, in the Jacksonville Township, Onslow County.
The site is currently undeveloped.
The project site is located approximately 0.11 miles from an UT of Blue Creek (SC;NSW) in the White Oak
Basin_ The proposed development activities are high density (percent impervious > 25 %); therefore,
stormwater treatment facilities are required. The attached Stormwater Plan includes a 3,040 sf wet detention
basin at the eastern side of the site.
The pond is sized to accommodate 35,000 square feet of impervious area allocated as follows:
Site
Offsite
Total
Buildings
6,791 sf
-0-
6,791 sf
Streets
-0-
-0-
-0-
Parking
25,967 sf
-0-
25,967 sf
Sidewalks
539 sf
-0-
539 sf
Other (Dump. Pad)
-0-
-0-
-0-
—Reserve-for-Future-
-0-
83-sf L
32 Z- 1� t
The proposed pond is sized
for 90% TSS
removal. The pond does not incorporate pretreatment, other than
the forebay. The pond does not include a
vegetated filter at the outlet.
All stormwater emanating from new impervious surfaces that is generated on -site shall be collected and
directed to the rear western portion of the site by a system of sheet drainage, grassed swales and storm
drainage pipes.
The treatment system will require periodic maintenance_ Maintenance frequency shall be dictated by pond
depths. Pond depths shall be checked by the owner on a quarterly basis. When measured depths are less
than 3.00', the pond shall be manually dewatered (pump) and accumulated sediment removed and properly
disposed of.
Site topography is gently sloping (0 — 5%) with the lowest elevations towards the notheriy boundary of the
tract. Soils are loamy sand/sandy loam.
The entire area designated within "Clearing Limits" will be disturbed during initial construction, and will include
grading for parking, swales and storm drainage.
During construction, all runoff will be diverted by a series of temporary diversion ditches and/or storm drain
pipes to the Treatment Pond. The treatment pond is of adequate size and volume to contain sediment from
the entire disturbed area during construction. The pond will be dewatered and accumulated sediment