Compliance Inspection Report
Permit: SW8041215 Effective: 01/24/05 Expiration: Owner: Keith Andrews Builders, Inc.
Project: Osprey Point Townhomes
County: Pender New River Dr
Region: Wilmington
Surf City NC 28445
Contact Person: Keith Andrews Title: Phone: 910-791-9065
Directions to Project:
From the intersection of US 17 & NC 50, east on 50 approx 5.3 miles to New River Drive (NC 210), turn left on New River Drive approx
0.8 mile, site on right.
Type of Project: State Stormwater- High Density State Stormwater- Infiltration System
Drain Areas: 1 -
2-
3-
4-
On-Site Representative(s):
Related Permits:
Inspection Date: 04/0712011 Entry Time: 11:40 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Reason for Inspection: Other
Permit Inspection Type: State Stormwater
Facility Status: Q Compliant ■ Not Compliant
Question Areas:
a State Stormwater
(See attachment summary)
Exit Time: 12:10 PM
Phone: 919-796-7215
Ext.7317
Inspection Type: Compliance Evaluation
4
Page: 1
Permit: SW8041215 Owner - Project: Keith Andrews Builders, Inc.
Inspection Date: 04107/2011 Inspection Type: Compliance Evaluation Reason for Visit: Other
Inspection Summary:
The following deficiencies were noted during the inspection:
1. An engineers' certification of the stormwater system was not found in the file.
2. The vegetated filter and swales of the project were not observed.
To bring this system into compliance, the following must be completed:
1. Submit an engineers' certification of the stormwater system to this office.
2. Verify the stormwater system is installed according to the approved plan — this can be done by the PE.
(Vote: It was observed that 6 units have been constructed on New River Drive and 6 units have been constructed on
Topsail Drive.
File Review
Yes
No NA
NE
Is the permit active?
■
❑ ❑
❑
Signed copy of the Engineer's certification is in the file?
❑
0 ❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
®❑
❑
❑
Copy of the recorded deed restrictions is in the file?
❑
❑ ■
❑
Comment: A copy of the engineers' certificate was not found in the DWQ file.
SW Measures
Yes
No NA
NE
Are the SW measures constructed as per the approved plans?
❑
■ ❑
❑
Are the inlets located per the approved plans?
Cl
❑ ❑
■
Are the outlet structures located per the approved plans?
Q
❑ ❑
0
Comment: The vegetated filter on the north side of the project and the swales
throughout the project were not observed.
Page: 2
Swale Calculations
Project: Osprey Point
By: DKN
Procedure:
Adjust y until zav = zreq
Where: Let:
B = bottom width n = 0.03
y = trial depth
A=By+My2 M=2.5
P = B + 2y(1+Mz 111
R=AIP
z, = AR2'3
Use:
n = .02 for earth lined
n = .03 for mowed grass
n = .05 for unwowed grass
n = .013 for concrete lined
Location
Qio
5
zTe
I B
y
A
P
R
za„
VEL
Vegetated Filter 1
Vegetated Filter 1
Vegetated Filter 2
3.24
3.96
3.96
0.0035
0.0035
0.0035
1.10
1.35
1.35
##
3.5
6.5
2.5
0.47
0.38
0.60
2.17
6.00
8.54
5.74
0.36
0.33
0.42
1.10
1.35
1.35
1.49
1.40
1.64
######
2.82
2.41
()i(-
v1c
01c
'INFIL"i+RATION TRENCH ANALYSIS
Y 1
Project # SW 8 0412151
Project Name Osprey Pt. Townhomes l
Recvng Stream Intracoastal waterway
Drainage Basin Cape Fear
Site Area 1.7 acres
Impervious Area Calculation
Buildings
Parking/Asphalt
Concrete
Total
Volume/Storage Calculation
Filename
Date
Reviewer
*Classification
Index #
Drainage Area
S:\WPDATA\WQS\INTRENCH\041215-1
06-Jan-05
P. Bartlett
SA
23574 SF ✓
0.54 Acres
" outside the 575' AEC
Rational Cc (list C after each BUA)
10302 1
7446 1
695 / 1
✓V o o
A43, /o Impervious_ 78.2/0
If Rational Method is used, place a 1 in this box
Required
Design Storm
RV
1f-1'uiii e t a Stti ire
Provided
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
VT&al Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
pugrWkr'Overflow Elevation
Exfiltration Rate / Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
.. .. .. ............
iDkdd� #i:Qv tn' , ime
25 YEAR 24 HOUR STORM NIA
Intensity, i = .33 inches / hour
Qr-CiA=
Qp through the bottom of the basin=
Cc- 0.83
1.5 in
0.75
NTCF ✓
Pipe Size 1 Pipe Size 2
2 Feet
152 Feet /
3
1433 Cubic Feet
€ € A438 ' Cubic Feet
9.425
152 Feet
9 Feet
2.5 Feet
22.50 SF
7g5':
CF
Cubic Feet
Feet
Cubic Feet
I_
:.
2228
0.15 CFS
0.1900 CFS
4.6 Mean Sea Level --"
2.6 Mean Sea Level./
7.1 Mean Sea Level &,""
.4
0 • L_
0.5 Cubic Feet Per Hour Per Sq Ft
1368 Square Feet
€3s5€ hours
Must be > Qr
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches / hour
Volume for 10 yr. 10 min. event =
1689.48 CIF <
2228 CF
a._
I`NFIL-rikATION TRENCH ANALYSIS
Filename:
S:IWPDATAIWQSIINTRENCH1041215-2
Project # SW8 041215-2 (�9 '
Date
06-Jan-05
Project Name Osprey Pt. Townhome�
Reviewer
P. Bartlett
Recvng Stream Intracoastal waterway
*Classification
SA
Drainage Basin Cape Fear
Index #
/
Site Area 1.7 acres
Drainage Area
12019 SF ✓
0.28 Acres
* outside the 575' AEC
Impervious Area Calculation
Rational Cc (list C after each BUA)
Buildings 3777
1
Parking/Asphalt 7166
1
Concrete 300
1
Total `1143.
/
✓
% Impervious= 93.5%
Volume/Storage Calculation
/
If Rational Method is used, place a 1 in this box
J Cc:
0.95
Required
Design Storm
1.5 in
RV
0.89 ✓
...............
ulurietoStae
€i34t} CF
Provided
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfiltration Rate / Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
'Dri3wdow�ri�"me
25 YEAR 24 HOUR STORM N/A
intensity, i = .33 inches / hour
Qr=CiA=
Qp through the bottom of the basin=
Pipe Size 1 1 Pipe Size 2
4.6 Mean Sea Level
2.6 Mean Sea Level
7.42 Mean Sea Level
0.5 Cubic Feet Per Hour Per Sq Ft
768 Square Feet
hours
0.09 CFS
0.1067 CFS Must be > Qr
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches / hour
Volume for 10 yr. 10 min. event =
989.10 CF < 1343 CF
INFILTRATION TRENCH ANALYSIS Filename:
S:\WPDATA\WQS\INTRENCH\041215-3
Project # SW 8 041215-3 0 J L Date
Project Name Osprey Pt. Townhomes ✓J Reviewer
Recvng Stream Intracoastal waterway *Classification
Drainage Basin Cape Fear Index #
Site Area 1.7 acres Drainage Area
outside the 575' AEC
Impervious Area Calculation
06-Jan-05
P. Bartlett
SA
12268 SF
0.28 Acres
Rational Cc (list C after each BUA)
Buildings 3777 1
Parking/Asphalt 7487 1
Concrete 342 1
Total 1'160.6 % Impervious-
Volume/Storage Calculation
If Rational Method is used, place a 1 in this box
Required
Provided
Design Storm
RV
:VoluinetoS#ore
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfltration Rate / Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
Draw wn: Ti'rrie
25 YEAR 24 HOUR STORM NIA
Intensity, i = .33 inches / hour
Qr=CiA=
Qp through the bottom of the basin=
Cc: 0.96
94.6%
1.5 in
0.90
Pipe Size 1 Pipe Size 2
2 Feet
132 Feet
2
829 Cubic Feet
829 Cubic Feet
6.283
132 Feet
6 Feet
2.8 Feet
16.80 SF
55 €
CIF
Cubic Feet
Feet
Cubic Feet
104R
385
0.09 CFS
0.1100 CFS
4.6 Mean Sea Level
2.6 Mean Sea Level
7.42 Mean Sea Level
0.5 Cubic Feet Per Hour Per Sq Ft
792 Square Feet
hours
Must be > Or
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches / hour
Volume for 10 yr. 10 min. event =
1018.62 CIF <
1385 CIF
`INFILTRATION TRENCH ANALYSIS Filename:
S:\WPDATA\WQS\INTRENCH1041215-4
Project # SW8 041215-4 0,' Date
Project Name Osprey Pt. Townhomes Reviewer
Recvng Stream Intracoastal waterway *Classification
Drainage Basin Cape Fear Index #
Site Area 1.7 acres Drainage Area
Impervious Area Calculation
* outside the 575'AEC
06-Jan-05
P. Bartlett
SA
26122 SF
0.60 Acres
Rational Cc (list C after each BLIA)
Buildings 10515 1
Parking/Asphalt 4861 1
Concrete 701 1
Total '126 % Impervious=
Volume/Storage Calculation
If Rational Method is used, place a 1 in this box
Required
Provided
Design Storm
RV
:Vol u,m:etQ Store
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfiltra tion Rate / Dra wdo wn
Reported Hydraulic Conductivity
Bottom Surface Area
rAw wn,::, Ime
25 YEAR 24 HOUR STORM N/A
Intensity, i = .33 inches / hour
Qr= C i A =
Qp through the bottom of the basin=
Cc: 0.69
61.5%
1,5 in
0.60 F v11 C
Pipe Size 1 Pipe Size 2
2 Feet
135 Feet
3
1272 Cubic Feet
-272:;
,.. Cubic Feet
9,425
135 Feet
9 Feet
2.5 Feet
22.50 SF
....... .......
............
:657
978:7
0.14 CFS
0.1688 CFS
CIF
Cubic Feet
Feet
Cubic Feet
4.6 Mean Sea Level
2.6 Mean Sea Level V/�
7.1 Mean Sea Level
0.5 Cubic Feet Per Hour Per Sq Ft
1215 Square Feet, -
hours
Must be > Qr
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches / hour
Volume for 10 yr. 10 min. event =
1569.45 CF <
1978 CIF
Design Calculations
Infiltration System
for
Osprey Point Townhomes
December 22, 2004
1. Proiect Description
•r*rr�t���ierrrrrr
CA
EAL _
814` _
r'rr,111161Zz1
1
The project consists of construction of residentialTownh6meS : and associated sitework on a 1.70 acre tract
located on N.C. Hwy. 210 in Surf City near its intersection with Shell Drive.
2. Design Requirements
Project will be designed in accordance with NC Administrative Code Section 15A NCAC 21-1.1000 —
Stormwater Management (hereinafter "Regulations". Due to density, the project is considered "high density
development ". Runoff in excess of the design volume must flow overland through a vegetative filter.
3. Impervious Surface Areas & Design Volume
In accordance with Section .1008(c)(1), the required design volume is computed as follows:
Using Schuler "Simple Method":
Rv = 0.05 + 0.009(1) where I - Percent Impervious
Design Volume = Desig/n Rainfall (1.5")) x Rv x Drainage Area
Area 1 Area 2 Area a Area 4
Existing 6,034 -0- -0- 6,229 -
Buildings 3,268 3,277 3,277 3,286
(Streets -0- -0- -0- -0-
Parking 7,446 7,166 7,487 4,861
Sidewalk 695 300 342 761 �
Other -0- -0- -0- -0-
Reserve 1000 500 500 1,000 AA
TOTAL 18,443 sf 11,243 sf 11,606 sf v sf—
Drain Area - 23,574 sf 12,019 sf 12,268 sf 26,122 sf
% Impervious 78.23% 93.54% 94.60% 61.55%
Rv .7541 '8919 .9014 .6039
Req'd Volume 2,222 cf 1,340 of 1,382 cf 1,972 cf
y
4. System Configuration and Infiltration Time
Cross Sectional Areas and volumes of infiltration trenches is calculated as follows:
Trench Area (cross sectional) = Trench Height x Trench Width
Pipe Area (cross sectional) = Pipe Area x Number of Pipes
Voids Area (cross sectional) = (Trench Area - Pipe Area) x .40 (void ratio)
Unit Volume = Pipe Area * Voids Area
Length Required = Req'd Volume / Unit Volume
System Volume = Length Provided x Unit Volume
Actual storage volume is required to infiltrate completely within 5 days. The Land & Soils Evaluation (copy
attached) indicates that existing sail conductivity is as high as 20 in/hr. Assuming conservatively that existing
soils have a minimum hydraulic conductivity of 6.0 in/hr, infiltration rate is computed as follows:
Infiltration Rate = Hydraulic Conductivity x Basin Bottom Surface Area
where:
Bottom Surface Area = Trench Width x Length Provided
Draw Down Time is then calculated:
Draw Down Time = Actual Volume / infiltration Rate
System 1
System 2
System 3
System 4
Trench Height (ft)
2.5 used
2.8 used
2.8 used
2.5 used
Trench Width (ft)
9
6
6
9
Trench Area(sf)
22.5
16.8
16.8
22.5
Pipe Area (sf)
9.42
6.28
6.28
9.42
Voids Area (so
5.23
4.21
4.21
5.23
Unit Volume (cf/ft)
14.7
10.5
10.5
14.7
Length Required (ft)
151.7
127.7 /
131.7
134.6
Length Provided (11)
152
128 �/
132
135
System Volume (cf)
2234.4
1344.0
1386.0
1984.5
Bottom Area (sf)
1368
768
792
1215
Infiltration Rate (cf/hr)
684.0
384.0
396.0
607.5
Draw Down Time (hr)
3.3
3.5
3.5
3.3
Project: Osprey Point
By: DKN
Procedure:
Adjust y until z, = zry
Where:
B = bottom width
y = trial depth
A=By+My2
P = B + 2y(1 +M�12
R=AIP
z.=AR'
Use:
n = .02 for earth lined
n = .03 for mowed grass
n = .05 for unwowed grass
n = .013 for concrete lined
Swale Calculations
Let:
n = 0.03
M = 2. I
Location
Q10
S
zr
B-F
y
A
P
R
ze„
VEL
Vegetated Filter 1
Vegetated Filter 1
Vegetated Filter 2
3.24
3.96
3.96
0.0035
0.0035
0.0035
1.10
1.35
1.35
# #
3.5
7
3
0.47
0.36
0.56
2.17
6.00
8,96
6.00
0.36
0.32
0.41
#t fift
1.10
1.35
1.35
WINNOW
1.49
1.38
1.61
�#
2,88
2.45
## #
Stormwater Treatment &
Erosion Control Narrative
Osprey Point Townhomes
Keith Andrews Builders, Inc. proposes to construct a residential townhome development on
a 1.70 acre tract located near the intersection of NC 210 and Shell Drive in Surf City,
Pender County. The site has been previously developed as a mobile home park, however,
all structures were removed in early 2004. Since removal of mobile homes, six (6)
townhome units have been constructed along Topsail Drive and six (6) units are presently
under construction along New River Drive.
The project is to be designed and constructed in accordance with NC Division of
Environmental Management Stormwater Management- Rules (15A NCAC 2H.1000).
Section .1005(2)(b). The proposed project is "High Density" (i.e., percent impervious >
25%). Division of Water Quality requires that the first 1.5" of rainfall be treated in an
infiltration system.
The project site is located approximately 0.1 mile from the Intracoastal Waterway (SA:HQW)
in the Cape Fear Basin, however, the site does not have a defined drainage outlet. Existing
site topography is gently sloping (0 — 2%) with highest areas toward center of tract.
Topography suggests that precipitation currently infiltrates into the sandy soils or sheet
flows onto adjacent street right-of-way. Soils are Medium to Coarse Sands (see attached
soils evaluation) which have hydraulic conductivities ranging from 10 — 20 in/hr.
Proposed grading activities will be limited to installation of building pads and sloping parking
areas as minimally required for drainage. The site will be drained to one of four (4)
proposed infiltration systems. Any excess stormwater which does not infiltrate will exit the
site via one of two provided vegetated filters discharging to adjacent street right-of-way.