Loading...
HomeMy WebLinkAboutSW8031214_CURRENT PERMIT_20040330STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. sw.,�QJ/ �/ DOC TYPE CURRENT PERMIT ff APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD of WArFR Michael F Easley, Governor p William G Ross Jr Secretary North Carolina Department of Environment and Natural itesources cow'� Alan W Klimek, P E ,Director p Division of Water Quality Coleen H Sullins, De uty Director Division of Water Quality March 30, 2004 Mr Bradley Parker, Manager NRP Vineyard Pointe, LLC 4030 Wake Forest Road, Suite 300 Raleigh, NC 27609 Subject- Stormwater Permit No. SW8 031214 Vineyard Pointe High Density Project New Hanover County Dear Mr Parker The Wilmington Regional Office received a complete Stormwater Management Permit Application for Vineyard Pointe on February 23, 2004 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 031214 dated March 30, 2004, for the construction of the subject project This permit shall be effective from the date of issuance until March 30, 2014, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611- 7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900 Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl S 1WQSISTORMWATIPERMIT1031214 mar04 cc David Hollis, P,E„ Hanover Design Services Tony Roberts, New Hanover County Building Inspections Beth E Wetherill, New Hanover County Engineering City of Wilmington Development Services-Stormwater Linda Lewis Wilmington Regional Office Central Files N C Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 State Stormwater Management Systems Permit No SW8 031214 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bradley Parker, NRP Vineyard Pointe, LLC Vineyard Pointe New Hanover County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until March 30, 2014, and shall be subject to the following specified conditions and limitations I. DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet The stormwater controls has been designed to handle the runoff from 69,496 and 52,272 square feet of impervious area, respectively, for Ponds 1 and 2 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans The built -upon area for the future development is limited to 4,650 and 6,412 square feet, respectively for Ponds 1 and 2 4 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area Page 2 of 8 State Stormwater Management Systems Permit No SW8 031214 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name Vineyard Pointe Permit Number SW8 031214 Location 4818 Franklin Avenue Wilmington, NC 28403 New Hanover County Applicant Bradley Parker, Manager Mailing Address NRP Vineyard Pointe, LLC 4030 Wake Forest Road, Suite 300 Raleigh, NC 27609 Application Date February 23, 2004 Receiving Stream/River Basin Burnt Mill Creek 1 Cape Fear Stream Index Number CPF17 18-74-63-2 Classification of Water Body "C Sw" i Pond Number Drainage Area, 9cres Onsite, ft Offsite, ft2 Total Impervious Surfaces, ft2 Pond Depth, feet QTSS removal efficiency Permanent Pool Elevation, FMSL OPermitted Surface Area, ft2 Permitted Storage Volume, ft3 Temporary Storage Elevation, FMSL ®Controlling Orifice Permitted Forebay Volume, ft3 1 2 350 250 350 250 0 0 69,496 52,272 70 60 90% 90% 420 420 3,710 4,270 6,696 7,549 432 432 1 0"0 pipe 1 0" 0 pipe 1,610 1,665 fQ No vegetated filter is required O The permitted surface area must be provided at the permanent pool elevation 03 The orifice must draw down the 1" storage volume to the permanent pool elevation in 2-5 days Page 3 of 8 State Stormwater Management Systems Permit No SW8 031 �14 II. SCHEDULE OF COMPLIANCE The stormwater management systems shall be constructed in their entirety, vegetated and operational for their intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for the fountain's pump is based on the permanent pool volume The maximum pump power for a fountain in this pond is 118 HP 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility Page 4 of 8 State Stormwater Management Systems Permit No SW8 031214 9 At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or ieasee An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, or sale of all or part of the project area The project area is defined as all property owned by the permittee, for whichh Sedimentation and Erosion Control Plan approval or a CAMA Major ppermit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction If the proposed SUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved pnor to construction 12 A copy of the approved plans and specifications shall be maintained on file by the PermEttee for a minimum of ten years from the date of the completion of construction 13 The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system 14 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 15 The permittee must maintain the current permitted drainage area No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification Page 5 of 8 State Stormwater Management Systgms Permit No SW8 031214 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction 4 In the event that the facilities fad to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 30th day of March, 2004 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan ime�"ector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No SW8 031214 Vineyard Pointe Stormwater Permit No SW8 031214 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No SW8 031214 i l Certification Requirements 1 The drainage area to the system contains approximately the permitted I acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 8 of 8 z lRiSfial Date Received Fee Paid Fernut Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM Thus form may be photocopied for use as an original GENERAL INFORMATION 1 Applicants name (s ecify the name of the corporation, individual, etc who owns the project) � R P cLc _Pot 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) Qi .(.'� T>Q.0 ".v , 3 Mailing Address for person listed in item 2 above City State T-X_ Zip '2760g Telephone Number �L �J -7 ( °— 'Z-70C. 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) C� L CL.LrCC., l"�Ci l i�t{r� 5 Location of Project (street address) 4 6:5( e--(ti,_ 4CX.—, City (AA(C)l ( County b Directions to project (from nearest major intersection) � Acre 7 Latitude �t4 ` Longitude —7—7c'of project 8 Contact person who can answer questions about the project Name t2l) VV_C#_ "PCW Telephone Number (g 49 D 0(o II PERMIT INFORMATION: 1 Specify whether project is (check one) kZNew Renewal Modification y Form SWU-101 Version 3 99 Page I of 4 P� t2 If this application is being submitted as the result of a renewal or modification to an existing pernut, list the existing permit number and its issue date (if known) 3 Specify the type of project (check one) .� Low Density V High Density Redevelop General Penrut Other 4 Additional Project Requirements (check applicable blanks) CAMA Major ✓ Sedimentation/Erosion Control ✓ 4/401 Permit �NPDES Stormwater r Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project 2 Stormwater runoff from this project drains to the River basin 3 Total Project Area GQ,rZ:Z acres 4 Project Built Upon Area 4E5 % 5 How many drainage areas does the project have? 2- 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below On -site Buildings '22�R�4`T SIP l S C On -site Streets ti 7 jrj cv-P On -site Parking j 9 489 -�-, P 2 ( 0-7 g �� On -site Sidew ( i?_aS SP la58g �(= Other on -site 442,,50 -' 6,4- Off -site I,-3A Total GC Sp Total 5 2 Z")2 SF " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc _ i , & 0-c-, = ( , 2. 0_A=..t Form SWU-101 Version 3 99 Page 2 of 4 v 7 How was the off -site impervious area listed above derived? 04) IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot if lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment 1 Thefollowing covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 No more than 121 g &a square feet of any Iot shall be covered by structures or impervious materials Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools 3 Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings 4 Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runofi'from outparcels or future development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Bann Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 ,�VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office 1 Please indicate that you have provided the following required information by initialing in the space provided next to each item Irutials • Original and one copy of the Storrnwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP TJ7 w • Permit application processing fee of $420 (payable to NCDENR) MW • Detailed narrative description of stormwater treatment/management LB 1A • Two copies of plans and specifications, including z8 w - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section -Dcrs.�7� 3-. 4c:)w-S ,->e", [=>C_S Designated agent (individual or firm) L Mailing Address _73 ( City .. t `A (rn t,yLnjg: ti: State 0(— Zip ZZA0 Phone ( ©J (n ,) '5.� --g "L' Fax ( S (0 ) '34 3 -- .95 Qr t — VIII APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) � �-�/�c12i✓ certify that the information included on this peruut application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protecbvd covenants will be recorded, and that the proposed project complies with the requirements of 15A Date Form SWU-101 Version 3 99 Page 4 of 4 P w w x N M C-4 00 L.0 L4_ Permit No. _5wb v3 12k 4 State of North Carolina Department of Environment and Natural Resources oDivision of Water Quality r WET DETENTION BASIN SUPPLEMENT Thus farm may be photocopied for use as an ortg of (to be provided by DWQ) DM ,Stormwater N mA&§M= 90 &view A complete stormwater management plan submittal includes an application fom a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION PCs,.@, d Project Name K&C— Contact Person. 1z:5� 1CxLLe Phone Number 15-- _-7 0& For projects with multiple basins, specify which basin this wo&sheet applies to: FO-Kd �-Jcs eIevatioris Basin Bottom Elevation '25�a•(Q ft. (floor of the basin) Permanent Pool Elevation 4e - ® ft, (elevation of the onfice) 'Temporary Pool Elevation dam. ft (elevation of the discharge structure overflow) areas Permanent Pool Surface Area t� sq ft. (water surface area at the orifice elevation) Drainage Area - ac. (on -site and off site drainage to the basin) Impervious Area ac (on -site and off --site drainage to the basin) volumes e5a3o _Z C tCv : Permanent Pool Volume cu. ft. (combined volume of main basin ail forebay) Temporary pool Volume C*Cv5)0 cu. ft (volume detained above the permanent pool) Forebay Volume Cu. ft (approximately 20% of total volume) l ?R-thS e� 2 . tf3 -04� i7&�ttt s Otherparameters SAIDA1 (surface area to drainage area ratio from DWQ table) Diameter of Orifice in (2 to 5 day temporary pool draw -down required) Design Rainfall _ R in Design TSS Removal 2 % (minimum 85% required) Form SWU-102 Rev 3 99 Page 1 of 4 Footnotes. i When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non- standard table entries 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification. Applicants Initials 24 -7 t IDS C4 a TheApermanent pool depth is between 3 and 6 feet (required minimum of 3 feet) L-A b The forebay volume is approximately equal to 20% of the basin volume IZE LA c The temporary pool controls runoff from the design storm event L;t3 CA d The temporary pool draws down in 2 to 5 days .� QA e If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow M calculations) f The basin length to width ratio is greater than 3 1 -�S� ��e�KaC'�i#, bLt /a-�e SA i s(XW g The basin side slopes above the permanent pool are no steeper than 3 1 h. A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) Vegetative cover above the permanent pool elevation is specified A trash rack or sirrular device is provided for both the overflow and onfice k A recorded drainage easement is provided for each basin including access to nearest nght- of -way If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin i in A mechanism is specified which will drain the basin for maintenance or an emergency 11 III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does 7does oes not This system (check one) 0 does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Form SWU-102 Rev 3 99 Page 2 of Maintenance activities shall be performed as follows After every significant runoff producing rainfall event and at least monthly a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i a stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads feet in the main pond, the sediment shall be removed When the permanent pool depth reads feet in the forebay, the sediment shall be removed BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevauon 42• O Sediment R\Ele val El 75 --------- ` - -- Sediment Removal Elevation 75% BottomAnon �� 0 qb------------------------------------------- -- Bottom Elevation 3�J. O 125% FOREBAY MAIN POND 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical Form SWU-102 Rev 3 99 Page 3 of 4 7 All components of the wet detention basin system shall be maintained in good working order `JI acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print name Bi2tcU--L�—*a..l L'-k� air K)RE. Title RTrAl.-ar.,og OR!t-I&M Note' The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president C- , a Notary Pub for the State of �� ' T c r o /11 County of -� , do hereby certify that o- d k personally appeared before me this S t day of D e C-e "-. 40 ✓, and acknowledge the due ,--execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, **t !y AUB4�G G �FCourl i SEAL My Commission Expires 0-25•2097 My commission expires Form SWU-102 Rev 3 99 Page 4 of 4 .s 0 r t t - to g Cn cp N A m w Permit State of North Carolina Department of Environment and Natural Resom Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATI, 0 WET DETENTION BASIN SUPPLEM +� This forme mmy be photocopied for use as an anginal (q- (to be provided by DWQ) FORM DWQ StgMwatetManag&=nt P1anRevsew. A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name `4 C lrj s, ["b c c. _-_ Contact Person: 7[b_V*_ .T-:hJLgy Phone Number. QL43 Z70CP For projects with multiple basins, specify which basin this worksheet applies to: *PCYX09 'Z elevations Basin Bottom Elevation :5Coa 0 ft Permanent Pool Elevation 42, Cn ft. 'Temporary Pool Elevation ft areas Permanent Pool Surface Area 4'Z.-7o sq. ft. Drainage Area ?—,5 ac. Impervious Area 6.0— ac volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DAI Diameter of Orifice Design Rainfall Design TSS Removal 2 Porm SWU-102 Rev 3 99 (floor of the basin) (elevation of the onfrce) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off --site drainage to the basin) (on -site and off -site drainage to the basin) E33770 P�cAs2dL 2 • L 3.4¢ 04� a cu. ft. (combined volume of main basin and forebay) cu ft. (volume detained above the permanent pool) cu. ft (approximately 20% of total volume) (surface area to drainage area ratio from DWQ table) in (2 to S day temporary pool draw -down required) 4 in �® % (minimum 85% required) Page 1 of 4 Fbodn—M t When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual imperious % and permanent pool depth Linear interpolation should be employed to deternune the correct value for non- standard table entrees 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification. Applicants Initials & !- ����-! a The ermanent pool depth is between 3 and 6 feet (required minimum of 3 feet) �-I b The forebay volume is approximately equal to 20% of the basin volume 14 c The temporary pool controls runoff from the design storm event TZG" d The temporary pool draws down in 2 to 5 days IDS" e If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) --11 �-� f The basin length to width ratio is greater than 3.1 -�� y C�Fnol buf lay SA +5 pmv-' g The basin side slopes above the permanent pool are no steeper than 3 1 h A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) i Vegetative cover above the permanent pool elevation is specified A trash rack or similar device is provided for both the overflow and onfice k A recorded drainage easement is provided for each basin including access to nearest right- of-way 1 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin F LA in A mechanism is specified which will drain the basin for maintenance or an emergency III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does `O'd es not This system (check one) 0 does Wdoes not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Form SWU-102 Rev 3 99 Page 2 of 4 Maintenance activities shall be performed as follows After every significant runoff producing rainfall event and at least monthly a inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i a stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads~ _ feet in the main pond, the sediment shall be removed �. When the permanent pool depth reads feet in the forebay, the sediment shall be removed Sediment Bottom El FOREBAY BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 4'2' .O Sediment Removal Elevationy'� --------------------------------- Bottom Elevation 52:)<o MAIN POND 75% 25% 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical Form SWU-102 Rev 3 99 Page 3 of 4 a . 7 '- All components of the wet detention basin system shall be maintained in good working order I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Printname Title !L �� Phon 4 Signf Date CI r Note' The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Publi' for the State of 'V n y r Cc ro �r County of Way �� , do hereby certify at � r� r� �� personally appeared a eared before me this � day of �✓" r' and acknowledge the due p Y PP �_ Y , -� g execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, / �NPM S� TA q �9 a w w AU$ LAG V couls SEAL , My commission egftsImission ExPM 1-11-1111 Form SWU-102 Rev 3 99 Page 4 of 4 R ti State Stormwater Management Systems Permit No SW8 031214 Vineyard Pointe Stormwater Permit No SW8 031214 New Hanover County Designer's Certification as a duly registered 1 , ��--4z-p _ in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full tirne) the construction of the project, V t +1 (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification •.• ��N CARp� ''�.. `� ff•af 4 .JLA.K a -. �CkLWA- t'�' �'°�o�Essiq I SEAL cavtj- Pvc nU-9% -f= 20007 Signature Registration Number 2(5�5C)I Date �7' eo f t I 't, �� SEAL Page 7 of 8 State Stormwater Management Systems Permit No SW8 031214 Certification Requirements m �1 The drainage area to the system contains approximately the permitted acreage ✓ 2 The drainage area to the system contains no more than the permitted amount of built -upon area a ✓ 3 All the built -upon area associated with the project is graded such that the runoff drains to the system s�4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan ✓6 The outlet structure is located per the approved plans ✓7 Trash rack is provided on the outlet/by I ass structure ' 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 �10 The inlets are located per the approved plans and do not cause short- circuiting of the system �11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans _V-" 13 All required design depths are provided ✓14 All required parts of the system are provided, such as a vegetated shelf, and a forebay �15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Budding Inspections vvciir._( 7 ?_1J • t 4 7 r Page 8 of 8