Loading...
HomeMy WebLinkAboutSW8000521_HISTORICAL FILE_20110329STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS FT HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE %✓%4�D U% WYYMMDD A Q= NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director March 29, 2011 Mr Michael A Thomas, Authorized Signer Apex Lodging, Inc 2713 South Ocean Boulevard North Myrtle Beach, SC 29582 Subject: Permit Extension, Session laws 2009-406 and 2010-177 Stormwater Permit #SW8 000521 High Density — Comfort Suites — Southport NC Brunswick County Dear Mr Thomas Dee Freeman Secretary On August 5, 2009, the Governor signed Session Law 2009-406 This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any pant between January 1, 2008, and December 31, 2010 The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date On August 2, 2010, the Governor signed Session Law 2010- 177 which grants an extra year for a total of four (4) years extension Accordingly, Stormwater Permit # SW8 000521 which has already expired on January 16, 2011, is now in effect until January 16, 2015 Please resubmit the renewal application and fee at least 180 days prior to January 16, 2015, which would be July 16, 2014 A copy of the Renewal Application can be obtained from the following website http I/portal ncdenr org/weblwglws/su/statesw/forms_docs If you have any questions, please contact the Division of Water Quality in the Wilmington Regional Office at 910-796-7215 Sincerely, AA,43y:;�D), Georgette Scott Stormwater Supervisor Division of Water Quality S WQSISTORMWATERIRENEWALSISL2009-406 2010-177\000521 marl cc Wilmington Regional Office Wilmington Regional Office 127 Cardinal Drive Extension Wdmington, North Carolina 28405 One Phone 910-796 72151 FAX 910 350 2004 i Customer Service 1 877.623 6748 North Carol l na Internet vuH+rnr ncwaterquality org �irtur�rll� An Equal Opportunity 1 Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director May 11, 2010 CERTIFIED MAIL #7008 1140 0002 3401 3192 RETURN RECEIPT REQUESTED Mr Michael A Thomas, Authorized Signer Apex Lodging, Inc 2713 S Ocean Boulevard N Myrtle Beach, SC 29582 Subject, NOTICE OF VIOLATION, NOV- 2010- PC- 0566 Comfort Suites — Southport NC Stormwater Permit No. SW8 000521 Brunswick County Dear Mr Thomas Resources Dee Freeman Secretary On April 22, 2010, Wilmington Regional Office personnel performed a Compliance Inspection and file review of the subject project, located at Hwy 211 in Southport, Brunswick County, North Carolina The inspection was performed to determine the status of compliance with Stormwater Permit Number SW8 000521, issued to you on January 16, 2001 The project has been found to violation of Stormwater Permit Number SW8 000521, issued pursuant to the requirements of 15A NCAC 2H 1000 The violations found are Failure to certify the stormwater system A file review revealed that this office has not received a Designers Certificate Permit condition states that upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 2 Failure to construct as approved An inspection revealed the following • Not all runoff from the west side of the building is being directed to the forebay and It appears to be short-circuiting the stormwater system • The roof drain runoff is being directed to a depression on the west side of the building and collected in a pipe that is discharging next to the outlet structure Wilmington Regional Office 127 Cardinal Drive Extension Wilmington North Caroirna 28405 Phone 910 796 72151 FAX 910 350 20041 Customer Service 1 877.623 6748 Internet www newaterquality org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina ;Vatura!!y May 11, 2010 Comfort Suites, Southport Stormwater Permit No SW8 000521 Permit condition states that the runoff from all onsite and offsite built -upon area permitted with this project must be directed into the permitted stormwater collection system Specifically, North Carolina Administrative Code 15A NCAC 02H 1008(e)(4) states that the inlet structure must be designed to minimize turbulence using baffles or other appropriate design features and shall be located in a manner that avoids short- circuiting the pond To correct these violations you must Provide a written "Plan of Action" which outlines the actions you will take to correct the violation(s) and a time frame for completion of those actions, on or before upon 30 days of receipt of this notice 2 Submit the required Designers Certificate along with an as built that shows all field modifications Specifically, the modification of the installation of the inverted crown parking lot instead of the approved Swale used for directing runoff to the forebay 3 Direct all runoff to the forebay Failure to provide the "Plan of Action" on or before upon 30 days of receipt of this notice, or to correct the violations by the date designated in the "Plan of Action", are considered violations of 15A NCAC 2H 1000, and may result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215 6A By copy of this letter to the Brunswick County Building Inspector, this Office is requesting that the Building Inspector consider withholding building permits and Certificates of Occupancy for this project until this matter is satisfactorily resolved If you have any questions concerning this matter, please call David Cox at (910) 796- 7318 6LZ Z a-�-tt Stormwater Supervisor Division of Water Quality GDSldwc S 1WQSISTORMWATERINOTICE1000521 may10 cc Douglas Haggett, P E Brunswick County Building Inspections John Hennessey David Cox Georgette Scott Central Files WRO Page 2 of 5 May 11, 2010 Comfort Suites, Southport Stormwater Permit No SW8 000521 Comfort Suites, Southport Page 1 of 2 Brunswick County Stormwater Proiect No SW8 000521 Designer's Certification 1, , as a duly registered, in the State of North Carolina, having been authorized to observe (periodically 1 weekly 1 full time) the construction of the protect, (Protect) for (Protect Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications Required Items to be checked for this certification to be considered complete are on page 2 of this form Noted deviations from approved plans and specifications Signature Registration Number Date SEAL Page 3 of 4 May 11, 2010 Comfort Suites, Southport Stormwater Permit No SW8 000521 Certification Requirements Page 2 of 2 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 The outlet/bypass structure elevations are per the approved plan 5 The outlet structure is located per the approved plans 6 Trash rack is provided on the outlet/bypass structure 7 All slopes are grassed with permanent vegetation 8 Vegetated slopes are no steeper than 3 1 9 The inlets are located per the approved plans and do not cause short- circuiting of the system 10 The permitted amounts of surface area and/or volume have been provided 11 Required drawdown devices are correctly sized per the approved plans 12 All required design depths are provided 13 All required parts of the system are provided, such as a vegetated shelf, and a forebay 14 The dimensions of the system, as shown on the approved plans, are provided cc NCDENR-DWQ Brunswick County Building Inspections Page 4 of 4 NCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director May 11, 2010 CERTIFIED MAIL #7008 1140 0002 3401 3192 RETURN RECEIPT REQUESTED Mr Michael A Thomas, Authorized Signer Apex Lodging, Inc 2713 S Ocean Boulevard N Myrtle Beach, SC 29582 Subject NOTICE OF VIOLATION, NOV- 2010- PC- 0556 Comfort Suites -- Southport NC Stormwater Permit No. SW8 000521 Brunswick County Dear Mr Thomas Resources Dee Freeman Secretary On April 22, 2010, Wilmington Regional office personnel performed a Compliance Inspection and file review of the subject project, located at Hwy 211 in Southport, Brunswick County, North Carolina The inspection was performed to determine the status of compliance with Stormwater Permit Number SW8 000521, issued to you on January 16, 2001 The project has been found in violation of Stormwater Permit Number SW8 000521, issued pursuant to the requirements of 15A NCAC 2H 1000 The violations found are Failure to certtty the stormwater system A file review revealed that this office has not received a Designers Certificate Permit condition states that upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 2 Failure to construct as approved An inspection revealed the following • Not all runoff from the west side of the building is being directed to the forebay and it appears to be short-circuiting the stormwater system • The roof drain runoff is being directed to a depression on the west side of the building and collected in a pipe that is discharging next to the outlet structure Wilmington Regional Office 127 Cardinal Drive Extension Wilmington North Carolina 28405 Phone 916 796 7215 4 FAX 910 350 20041 Customer Service 1 877-623 6748 Internet www nwaterquahly org One NorthCarclina An Equal OppurtundylMinnotivektion Employer May 11, 2010 Comfort Suites, Southport Stormwater Permit No SW8 000521 Permit condition states that the runoff from all onsite and offsite built -upon area permitted with this protect must be directed into the permitted stormwater collection system Specifically, North Carolina Administrative Code 15A NCAC 02H 1008(e)(4) states that the inlet structure must be designed to minimize turbulence using baffles or other appropriate design features and shall be located in a manner that avoids short- circuiting the pond To correct these violations you must Provide a written "Plan of Action" which outlines the actions you will take to correct the violation(s) and a time frame for completion of those actions, on or before upon 30 days of receipt of this notice 2 Submit the required Designers Certificate along with an as built that shows all field modifications Specifically, the modification of the installation of the inverted crown parking lot instead of the approved swale used for directing runoff to the forebay 3 Direct all runoff to the forebay Failure to provide the "Plan of Action" on or before upon 30 days of receipt of this notice, or to correct the violations by the date designated in the "Plan of Action", are considered violations of 15A NCAC 2H 1000, and may result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215 6A By copy of this letter to the Brunswick County Building Inspector, this Office is requesting that the Building Inspector consider withholding building permits and Certificates of Occupancy for this protect until this matter is satisfactorily resolved If you have any questions concerning this matter, please call David Cox at (910) 796- 7318 Si erely, Georgto Scott Stormwater Supervisor Division of Water Quality GDSldwc S 1WQSISTORMWATERINOTICE1000521 may10 cc Douglas Haggett, P E Brunswick County Building Inspections John Hennessey David Cox Georgette Scott Central Files WiRO Page 2 of 5 May 11, 2010 Comfort Suites, Southport Stormwater Permit No SW8 000521 Comfort Suites, Southport Page 1 of 2 Brunswick County Stormwater Protect No SW8 000521 Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically 1 weekly 1 full time) the construction of the project, (Protect) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications Required Items to be checked for this certification to be considered complete are on page 2 of this form Noted deviations from approved plans and specifications Signature Registration Number Date SEAL Page 3 of 4 May 11, 2010 Comfort Suites, Southport Stormwater Permit No SW8 000521 Certification Requirements Page 2 of 2 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 The outlet/bypass structure elevations are per the approved plan 5 The outlet structure is located per the approved plans 6 Trash rack is provided on the outlet/bypass structure 7 All slopes are grassed with permanent vegetation 8 Vegetated slopes are no steeper than 3 1 9 The inlets are located per the approved plans and do not cause short- circuiting of the system 10 The permitted amounts of surface area and/or volume have been provided 11 Required drawdown devices are correctly sized per the approved plans 12 All required design depths are provided 13 All required parts of the system are provided, such as a vegetated shelf, and a forebay 14 The dimensions of the system, as shown on the approved plans, are provided cc NCDENR-DWQ Brunswick County Building Inspections Page 4 of 4 ri of WA14 9 Michael F Easley, Governor Q William G Ross Jr Secretary O North Carolina Department of Environment and Natural 1tesources Alan W Klimek, P E ,Director p Division of Water Quality Coleen H Sullns, Deputy Director Division of Water Quality March 22, 2004 Mr Rajendrakumar Patel Apex Lodging, Inc 400 US Highway 70 W Havelock, NC 28532 NOTICE OF INSPECTION. Comfort Suites Stormwater Project No SW8 000521 Brunswick County Dear Mr Patel Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report" The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on March 5, 2004 to determine compliance with Stormwater Permit Number SW8 000521 issued on January 16, 2001 A summary of the findings and comments are noted under Section 4 of the report Please inform this Office in writing before April 24, 2004 of the specific actions that will be undertaken and the time frame required to correct the deficiencies Failure to provide the requested information, when required, may initiate enforcement action If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 395-3900 Sincerely, Gary Beecher Environmental Technician RSSlghb S IWQSISTORMWA-RINSPECT1000521 cc Wilmington Regional Office Gary Beecher N C Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington NC 28405 (910)395-3900 (910) 350-2004 Fax Customer Service 1 800 623-7748 r (Domesticru Ir Only; • . r—i m For delivery information visit our vvebsite OFFICI m postage $ i ru Ceditd Fee © Return Receipt Fee 7 0 (Endoraemertl Required) �J Reff4icted Delhrery Fee (Endorsement Required) . HO Total PoeSage $ Foes P APO soap rvoZ7/„ 3 S D«,Q�, �G_,dc�! _ ` iIle P. Ae SG o?9S" i STORMWATER COMPLIANCE INSPECTION REPORT Project Name Project Number Comfort Suites 000521 Control Measure Wet Ponds Water Body Jump & Run Creek Classification "SC SW"' Directions to site Highway 211 before Southport 2 Inspection Date March 5, 2004 Weather Conditions Dry and Sunny 3 Compliance Issues Y N ❑ The drainage area (including offsite) and built -upon area to the permitted system are per the approved plan No unpermitted offsite drainage enters the system ❑ ❑ All the built -upon area associated with the project is graded such that the runoff drains to the system ❑ ❑ For pond shnfiltration, the outlet/bypass structure relative elevations are per the approved plan (Must be verified via as -built survey if in question) ❑ ❑ The inlets and outlet structure are located per the approved plans and do not cause short-circuiting ❑ ❑ A trash rack is provided over the outlet weir and orifice ❑ All slopes are grassed with permanent vegetation and are not eroding ❑ ❑ Vegetated slopes are no steeper than 3 1 ❑ ❑ The approximate amount of permitted surface area has been provided (Must be verified via as -built survey or designer's certification ) ❑ ❑ Required drawdown devices are correctly sized per the approved plans All required design depths are provided ❑ ❑ All required parts of the system are provided, such as a vegetated shelf, and a forebay ❑ ® The designer's certification has been submitted ❑ ® The required deed restrictions are correctly recorded and submitted ❑ ❑ The number of lots or outparcels is per the permitted amount ❑ ❑ The built -upon area on the lots or outparcels does not appear to exceed the maximum amount (must be verified via as -built survey if in question) ❑ ❑ Curb outlet swales are constructed, located properly, are 100' long and have dense vegetated cover ❑ ❑ The road, cul-de-sac, parking lot and sidewalk widths are per the approved plan ❑ Required maintenance is being performed ❑ ❑ Outparcels have their own offsite permit ❑ ❑ For low density projects, roadside swales are 3 1, vegetated and stable ❑ ❑ For low density projects, there are no unpermitted pipes on the project 4 Required Actions (Explain each deficiency and what needs to be done to bring the system back into compliance) (a) According to the plans we have, this site is only permitted for 1 detention pond Why is there a 2" 1 one? (b) According to the permitted plans, there is supposed to be a grass Swale that runs along the eastern edge of the site and drains into the fore bay of pond #1 What happened to this swale ? (c) The slopes of the pond are in desperate need of grass. This site has been in full operation for several years The pond slopes must be seeded or have sod placed on them ASAP (d) The pond and surrounding area was full of trash and debris The trash is not only an eyesore, it can also effect the operation of the pond Trash can clog the outlet structure and eventually cause the sides of the pond to blow out Please include trash/debris pickup among your routine maintenance for the pond (e) Please send us a copy of the designers certificate and a copy of the deed restrictions for this site (f) If your plans are different than ours, please send us a copy of them Thank You for your cooperation Inspector Gary Beecher Water Quality/Wilmington Regional Office/(910) 395-3900 Ext 222 RSS/ghb S IWQSISTORMWATMSPECT1000521 Mar04 Beverly Eaves Perdue Governor February 4, 2010 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H Sullins Director Mr Michael A Thomas Apex Lodging Inc 2713 S Ocean Boulevard North Myrtle Beach, SC 29582 Subject PERMIT RENEWAL REQUEST Stormwater Permit No SW8 000521 Comfort Suites — Southport, NC Brunswick County Dear Mr Thomas Dee Freeman Secretary The Division of Water Quality Issued a Coastal Stormwater Management Permit, Number SW8 000521 to Comfort Suites -- Southport, NC for a High Density Protect on January 16, 2001 This permit expires on January 16, 2011 Per 15A NCAC 2H 1003(h) (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $505 00 If this is still an active project please complete and submit the enclosed renewal application prior to July 16, 2010 If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands Your permit requires that upon completion of construction and prior to operation of the permitted stormwater treatment system, a certification of completion be submitted to the Division from an appropriate designer for the type of system installed This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation Please include a copy of the certification with your permit renewal request and processing fee Enclosed is a copy of a sample certification Also enclosed is a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215 1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day If you have any questions, please feel free to contact David Cox at 910-796-7318 Sin rely, Georgette Si5ott, Stormwater Supervisor Surface Water Protection Section Wilmington Regional Office Enclosures GDSldwc SIWQSIStormwaterlRenewallRequests120011000521 feb10 cc Wilmington Regional Office File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington North Carolina 28405 One Phone 910 796 72151 FAX 910 350 20041 Customer Service 1 877.623 6748 NofthCarolina Intemet www nwaterquahty org Natural# An Equal Opportunity 1 Affirmative Action Employer _ � Q ncDEnR Division of Water Quality 127 Cardinal Drive Ext Wilmington, NC 28405 P M I� VAR �C10- f /yv 79 MECt-Z Eo f e PUJURYL 3 Mr Michael A Thomas Apex Lodging, Inc 2713 South Ocean Blvri FFICIENT ADDRESS 0 OTHER A North M C NO SUCH D NOT R1 STREET �S 0 NOT OELIVERABLE AS ADDRESSED jo UNABLE To FORWARD 6 Ent2ty Names Page 1 of 1 North Carolina Flame F, Marshall DEPARTMENT OF THE Secretary SECRETARY of STATE Corporations InCorporations Home *Important Notice •Corporate Forms/Fees gCorporations FAQ *Tobacco Manufacturers •Verify Certification •Online Annual Reports Links •Secretary Of State Home *Business License •Register for E-Procuremen *Dept of Revenue Legislation 01999 Senate Bills 02001 Bill Summaries •Annual Reports 1997 •Corporations 1997 00ther Legislation Search •By Corporate Name *For New Corporation "By Registered Agent Online Orders *Start An Order *New Payment Procedures ISO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date 3/19/2004 Click here to View Document Filings I 11 Print a pre -populated Annual Report Form I File an Annual Report I Corporation Names Name Name Type NC APEX LODGING, INC Legal Business Corporation Information SOSID 0391620 Status Current -Active Date Formed 3/20/1996 Citizenship Domestic State of Inc NC Duration Perpetual Registered Agent Agent Name Patel, Rajendrakumar R Registered Office Address 400 Us Highway 70 W Havelock NC 28532 Registered Mailing 400 Us Highway 70 W Address Havelock NC 28532 Principal Office Address 400 Us Highway 70 W Havelock NC 28532-9509 Principal Mailing Address No Address For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to webmaster For questions or comments concerning the Corporations Division, please send e-mail to Corporations Administrator Click here for help downloading forms http //www secretary state nc us/Corporations/soskb/Corp asp?4951915 3/19/2004 A State Stormwater Management Systems Permit No SW8 000521 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Apex Lodging, Inc Comfort Suites - Southport, NC Brunswick County P'OR I'IIE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of ►ssuance unt►I January 16, 201 1 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS Fhis permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet The stormwater control has been designed to handle the runoff from 43,254 square feet of impervious area Approved plans and specifications for this project are ►ncoiporated by reference and are enforceable parts of the permit 4 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans 5 Me runoff from all ons►te and offsite built -upon area permitted with this project must be directed into the permitted stormwater control system 2 ;. r State Stormwater Management Systems Permit No SW8 000521 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name Comfort Suites - Southport, NC Permit Number SW8 000521 Location Brunswick County Applicant Mr Michael A Thomas, Authorized Signer Mailing Address Apex Lodging, Inc 2713 S Ocean Boulevard N Myrtle Beach, SC 29582 Application Date January 8, 2001 Name of Receiving Stream/lndex 9 Jump and Run Creek / 18-88-9-3-2 Classification of Water Body "SC SW" If Class SA, chloride sampling results n/a Pond Depth, feet 30 Permanent Pool Elevation, FMSL 3590 Drainage Area, acres 1 84 Total Impervious Surfaces, ft2 43,254 Buildings, ft2 13,092 Parking, ft2 27,198 Sidewalks, ft2 938 Other (Pool Deck), ft2 2,026 Offsite Area entering Pond, ft2 none, per Engineer Required Surface Area, ft2 4,931 Provided Surface Area, ft2 5,460 Required Storage Volume, ft3 3,579 Provided Storage Volume, ft3 5,773 Temporary Storage Elevation, FMSL 3680 Controlling Orifice 100"(� pipe 9 of State Stormwater Management Systems Permit No SW8 000521 iI. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded ai eas ofthe system will be iepan ed immediately The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of side slopes d Immediate repair of eroded areas e Maintenance of side slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device and catch basins and piping 9 Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ I he records will indicate the date, activity, name of person performing the work and what actions were taken Decorative spray fountains will not be allowed in the stormwater treatment system The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropi late designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 A modification must be permitted prior to any construction The following items will require a mode f ication to the permit a Any revision to the approved plans, regardless of size b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area e Further subdivision, acquisition, or sale of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 10 The Director may determine that other revisions to the project should require a modification to the permit 11 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 4 State Stormwater Management Systems Permit No SW8 000521 12 Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater faLdities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property 13 The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area 14 The Director may notify the permittee when the permitted site does not meet one or more of the minimum regw rements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittec shall provide copies of revised plans and certification in writing to the Director that the changes have been made 15 Me permittee shall notify the Division of any name, ownership or mailing address changes within 30 days III GENERAL CONDITIONS This permit is not transferable in the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems The permittec grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and rerssuance or termination does not stay any permit condition Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual Permit issued this the 16th day of January, 2001 NOR I 1-I CAROL,INA I?NVIRONMENTAL MANAGEMENT COMMISSION Kerr 1' Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 000521 APEX LODGINGS, LLC August 22, 2000 To whom it may concern IJAN 0 8 4UUiB M-T Construction Services, Inc, (Michael A Thomas) is authorized to sign on behalf of Apex Lodgings, LLC for matters relating to the grading and storm drainage systems and permits for the project known as "The Southport- Comfort Suites" 1, Raj Patel, am the president for Apex Lodgings, LLC Thank You, J Raj Patel 400 IIWY 71) WI ST IIAVI I OCK N( 28532 PIIONL (252) 444 1111 • I AX (252) 444 1510 HAVELOCK -17 ,! Pf l 01 ` 400 Highway 70 west P 0 Box 970 Havelock NG 28532 50 V11-10-14 r y 0�8' 1-7( aR — f � Z&:+06+Sv --.14 11118I111111111111110I1diIIIIII,IIIIIa11I1IJII,11:1111111111 x J I~ cn w� 0ti x L v' 05 14M s Haggett Engineering Associates, Inc PO Box 15104 Wilmington North Carolina 28408 Scott Vinson NGDENR Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 J ,cati ,t^ ® TEL 1,10 thug 22 w 2 , t 1% r r it E , I I I 40011. ,p,1nsaap 70 i � IIniclock, NorfliCaro n x (919) 4444-M • FAX S r � it I I y r ' 5 I , 't i � r E E i I i` if E q4 1 r f I i ! + IF y i 1 ' I { i I 1Jlllitt] it c11 PA( I IN111111AW. (,()V1'12 SI1FVP i, E` 1 t is I lit "I I'll, I E i I IIIIII ', , f I E it I1011DAY INNN' IIA1rELOC ; F4n. R10 • IFaVl.lOc4 NoIJ+rn 1i M32 • 1401 4441111 100 16 44 P 01 I , � F I I 1 I E TEL 110 10 \V111N111t iww t1111ttrn l �l I (+,n,tl+ls tlr,le �te�ett5, lne , (Mithael Ai' Ilia 1 11111;11► ;,, I I ( for matttl, relating tot{ lue1e)1t, f111 tilt pioltct known ns "l`h(- Si:)4 Im ,ttic let fol 11x k f ollging", I l U i Rug 22,00 16 42 P 01 i , 4 7 1 t 22, 2000 I E , i ) is authortzcc., to jign in b half 1f g and storm° dramag cyst ms a eel c lvfort Sutteq" , 1, 'Ral Patel am et I , I I i I tl r' I i '1 s , 1 I ' S I , l to h 1 fI EI a 1 I' f ,I I` z lii,1 il\\'Y 711 \N,I `! 4iI AV C1G,'N( •2A5i! 111()� i (^52) 444 111 (252) 144 15111 e TEL NO 400 lllghimy 70 11m clock, North Can (919) 444-Ml a FAX (9 Aug 21 r W, -I= f, ran k4' ± �I I V_Uf _ { '1 5 l � E I I J 1 II 11 + If H11111+1P 0I I,nl 11 111CI,ilts 4 (Y)VI-P SHF;FFT I � — — ik tit U FRI I �F f I 11MIDAY INN' HAV LO � 11o, I110 - 114vr1rrk Voih p „e V1611 • N141 44A iii1 ,00I 1 wi 11 17 P 01 TEL NO I Apex Lodgingsq .LPL A* 15, Aug 21,00 11 19 P 01 P Clr TO wlxx;l 9 may armn r►�r c „ se„ �; ( A mar )�eut>��xcaro cf.Am IodoM LLC ft M Idustoft :mr1 � rfram�,s�,t�ro aryl pan�$�r�clo�awn as ` - r�t5�" �I xu1% , { I ed i lei , 400 II VY 70 WEBI VC1 C23532 252-444 1 1 f I Corporation Information http I/corp secstate state nc us/cgi-bm/listbycorp pl DE,PARTMENi;',bF�THE ECRETARYjgF',,STA E 'ORPORA LIONS Data Current as of 02/01/00 Information for APEX LODGING, INC. Corporation Id: 0391620 Date of Corporation: Mar 20 1996 Corporation Status: ACTIVE Duration: PERPETUAL Category: Business Corporation State of Incorporation: NC Country of Incorporation: UNITED STATES Registered Agent Information Registered Agent Name: RAJENDRAKUMAR R PATEL Address: 400 US HIGHWAY 70 W City: HAVELOCK State: NC Zip: 28532 Fdmgs Return to exact name search Return to soundex search Notice Information presented on this Web site is collected, maintained, and provided for the convenience of the reader While every effort is made to keep such information accurate and up-to-date, the Secretary of State does not certify the authenticity of information herein that originates from third parties The Secretary of State shall under no circumstances be liable for any actions taken or omissions made from reliance on any information contained herein from whatever source or any other consequences from any such reliance 1 of 1 08/22/2000 9 30 AM Area of Site = Impervious Area Wet Detention Basin Design Summary 1845 Acres On -sate Buildings = On -site Streets = On -site Parking = On -site Sidewalks Other On -site = Off -site = 80,359 Square Feet 13,092 Square Feet 0 Square Feet 27,198 Square Feet Z964 Square Feet 0 Square Feet 0 Square Feet Total = 43,254 Square Feet w Percent Impervious = 538 % Permanent Pool Depth in Basin = 30 feet SAIDA Ratio for 85% TSS Removal = 45 SAIDA Ratio for 90% TSS Removal = 61 Required Basin Surface Area for 85% TSS Removal = 3,621 Square Feet too Required Basin Surface Area for 90% TSS Removal = 4,931 Square Feet Basin Width at Permanent Pool Elevation for 85% TSS Removal = 36 Feet Basin Width at Permanent Pool Elevation for 90% TSS Removal = 42 Feet (basin length to width ratio must be greater than 3 1) Basin Length at Permanent Pool Elevation for 85% TSS Removal = Basin Length at Permanent Pool Elevation for 90% TSS Removal = Select TSS Removal Efficiency for Remaining Design = 90 % Permanant Pool Depth in Forebay = 15 feet Forebay Partition Location from Inlet End = 46 Feet Width of Forebay Partition @ P P = 90 feet Runoff Coefficient = 053 inch/inch Design Rainfall = 1 inches Runoff Volume = 3,579 Cubic Feet Basin Side Slope above Permanent Pool = 3 1 Basin Side Slope below Vegetated Shelf = 3 1 111 Feet OK 130 Feet I�1 rj I OK_ E C E 6 V ED AUG 18 2OOD DWO PAOJ # Vegetated Shelf Slope = 6 1 (Vegetated shelf extends below the permanent pool) Width of Vegetated Shelf = 60 Feet Forebay Side Slope above Permanent Pool = 3 1 Forebay Side Slope below Permanent Pool = 3 1 Depth of Temporary Pool = 090 Feet Storage Volume for Temporary Pool = 4,622 Cubic Feet OK Maximum Discharge Rate = 0 027 cfs P P Volume in main Basin 9,084 Cubic Feet P P Volume in Forebay = 2,334 Cubic Feet P P Volume in Forebay 1 Total P P Volume = 204 % (Forebay should equal approximately 20% of total permanent pool volume) Total Depth of Basin = 390 Feet Elevation of Bottom = 329 Feet Permanent Pool Elevation = 359 Feet Orifice Size = 100 Inches Centerline Orifice Elevation = 3594 Feet Temporary Pool Elevation = 3680 Feet Overflow Elevation = 3680 Feet Top of Basin Elevation = 3730 Feet, Minimum Length of Basin @ Top Elevation = 1474 Feet (includes partition) Width of Basin @ Top Elevation = 504 Feet Maximum Flow Rate Through Orifice for Orifice Flow = 0 021 cfs (Flow rate when water level is at temporary pool elevation) Average Flow Rate Through Orifice = 0 011 cfs DK Minimum Drawdown Time for Temporary Pool = 945 hours OK (Minimum drawdown trme is 48 hours) Note Design includes a 10% safety factor to compensate for rounding of corners "'oHaggett Engineenng Associates, Inc. f P 0 Box 15104 Wilmington, NC 28408 s Transmittal TO SUBJECT DATE Scott Vinson Stormwater Management Plan August 18, 2000 NCDENR Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 FROM PROJECT NAME PROJECT NUMBER Doug Haggett Comfort Suites 00-1011 4963 Southport -Supply Road Southport, North Carolina In accordance with your letter dated July 18, 2000 we have made the following revisions to the Stormwater Management Plan ❖ The basin plan provided on sheet C3 has been revised to reflect the size required for 90% efficiency and to the correct scale ❖ Page 3 of 4 has been corrected per your instructions ❖ The basin has been redesigned to 90% efficiency ❖ We have added the spot elevations requested in the northwest parking area, pool area and entrances The cleanout in the pool area now includes a rim elevation and invert ❖ The ponds drainage area has been delineated on the plan ❖ The orifice has been downsized to 1-inch Although, we believe that the original orifice was sufficient to allow for the minimum 48-hour detention According to our calculations the maximum flow through a 1 25 inch orifice would be 0 033 cfs As the water drops, and the hydraulic head is reduced, this flow would theroetically approach 0 cfs Therefore the average flow would be approximately 0 016 cfs The runoff volume for the basin is 3,579 cubic feet This volume would take approximately 61 hours to drain through the 1 25-inch orifice Thank you again for your assistance with this protect 1 �r�Al� r �ecaiveD AUG 16 2MO DWQ M# „_ State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality July 14, 2000 Doug Haggett, P E Haggett Engineering Associates, Inc PO Boa 15104 Wilmington, NC 28408 1 • • v NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No SW8 000521 Comfort Suites - Southport, NC Brunswick County Dear Mr Haggett Co The Wilmington Regional Office received a Stormwater Management Permit Application for Comfort Suites -Southport, NC on May 9, 2000 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review Please have the president or vice-president of Apex Lodging, Inc write and sign a letter of authorization giving Mr Michael A Thomas the signing authority for the application The "Agent Authorization" on page 4 of 4 only gives individuals or consulting firms the authority to submit information on the owner's behalf, not sign for them 2 Please correct the pond detail scale on sheet C3 It is given as I " = 12', however the given dimensions are not to that scale I am .ncl-Airg P_ge 3 of 4 of the supplement form for coirection The sednrPnt rcrobx ai benchmarks under 4 should read 2 25 feet for the main pond and 1 12 feet for the forebay 4 For ponds designed for 85% TSS removal a vegetated filter is required to be installed after the outlet structure Include on the plans the filter and a detail of the filter (I have included an example detail of a vegetated filter ) The filter is to be a minimum of 30 feet in length gird the width is Ca1CL?1ate rl ror non ciosive flow A flow spreader niccharn,,in ib iecti icd inwrrii. tl� d��a.l i lit :,ealed calculations showing non erow1ve flow must also e suoniitted Note that this filter is not required to be built and maintained with ponds designed for 90% TSS removal 5 Please provide proposed spot elevations for the northwest parking lot, pool area, and the two entrances so that the runoff flow direction can be determined I assume the pool area will drain to the roof drain clean out Please give the elevations/inverts for the clean out to show flow directions 5 Please delineate the pond's drainage area Please design the outlet orifice to draw down the required volume in 2-5 days, not the provided volume By my calculations a 1 " orifice would suffice 127 Cardinal Dr Ext, Wilmington, North Carolina 28405 Telephone 910-395-3900 PAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr Haggett July 14 2000 Stormwater Project No SWS 000521 Please note that this request for additional information is in response to a preliminary review The requested information should be received by this Office prior to August 14, 2000, or the application will be returned as incomplete The return of a project will necessitate resubmittal of all required items, including the application fee If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the addrea5 and fax number at the bottom of this letter The r: quest mLst indicate the date by which you expect to submit the required information. the Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215 1 and is subject to enforcement action pursuant to NCGS 143-215 6A PIease reference the State assigned project number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, Scott Vinson Environmental Engineer RSq/sav ;1WQS,S-0RMWATIADDINFO1000521 J1J7 LL Wilmington Regional Office Michael A Thomas • r ' MAY 00 BY-, a IVIA r 9 UUU 1 Haggett -Engineering Associates; k., u - April 28, 2000 RECEIVVD, T AMA Mr Scott Vinson MAY 0 9 20Q0 Division of Water Quality }44 l Stormwater Section 1 DWQ 127 Cardinal Drive Extension e . # r �' Wilmington, North Carolina 28405-3845 ` Subject STORMWATER MANAGEMENT PLAN Comfort Suites -- Southport, NC 4963 Southport Supply Road , Southport, Brunswick County, North Carolina HEA Project No 00-1011 s Dear Mr Vinson , Haggett Engineering Associates, Inc (HEA) is submittitig the enclosed Stormwater Management Permit Application on behalf of Apex Lodging, Inc _ This plan is for the construction of a three-story hotel on a 1 845-acre tract of land We have enclosed two copies of the bound' plan, two complete sets of plan sheets (reduced copies are included in the bound plan), and'the application fee' If you have any questions please do,not hesitate to contact us at (910) 397-0808 , f Your assistance in preparing this application is greatly appreciated r y Sincerely, t , Hag n meering Associates, Inc , Douglas N Haggett, P E Senior Engineer A 4 01011LT700c PO Box 15104 • Wilmington, North Carolina 28408 • 910-397-0808 .� �i ' , �,- i `� t 4 r n e r � � � . � � � � 1 � , � s j 1 � J � l.. i i � i r ' � � � M 1 1 a � ^ � � ! r : a � I ` 1 f w r I ` L ` y 9 t r ti ,. e l r t 1 < i � � /� � E I , ' � � � l � � � � � � F � � � ' � � � ' ' 4 � t` f � � r t s ` r 1 ' � � � � 1 + j � 5 , { ' �+ ^' 1 ` � I i , _ 4 r � ' � r � e t � r r , ' ' c a 4 s r i � � 1 � � ' � � �} � , ` � i