Loading...
HomeMy WebLinkAboutSW7061003_HISTORICAL FILE_20200511STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW74tz --- DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE ��e_) , YYYYMMDD Bootk&Assodates, LLC engineering for the future since 1960 May 4, 2020 VIA UPS Division of Energy, Mineral & Land Resources Stormwater Program 1612 Mail Service Center 512 North Salisbury Street Raleigh, NC 27699-1612 Subject: Morgan's Corner Substation Permit Renewal SCM As -Built Certification To Whom It May Concern: 1, James C. 'burley, P.E, (License No. 020762), President of Booth & Associates, LLC, contend that the permanent stormwater pond built for Albemarle Electric Membership Corporation's Morgan,-, Corner Substation was built and maintained in accordance with the NCDEQ-approved permit plans and that the pond is fully functional. 1 attest to this based on an on -site inspection and survey data obtained by Mark E. Cullifer, P.L.S. (License No. L-4810) on April 29, 2020. If you have any questions, please call James C. Turley at Booth & Associates, LLC at 919-851-8770 ext. 170 or email at j.turiev(i)booth-assot:.com. JCT/dmc cc: Briana D. Eddy 20-9624-8021 Sincerely, B OTfI & ASSOCIATES, LLC Jaynes C. Turley, P.E. President 5811 Glenwood Avenue 919.851.8770 office Raleigh, NC 27612 919.859.5918 focsirrile www.boolh-assc)c.com �Vc, Y,-d ROY COOPER Governor MICHAEL S. REGAN Secretary SRIAN WRENN Acting Director NORTH CAROLINA Environmental Quallty April 17, 2020 Albemarle Electric Membership Corporation Attention: Mr. Everette P. Winslow, Registered Agent 416 Morson Street Raleigh, NC 27601 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7061003 Morgans Corner Substation Pasquotank County Dear Mr. Winslow: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7061003 for a stormwater treatment system consisting of a wet detention pond serving the Morgans Corner Substation located on Firetower Road, Elizabeth City, NC expires on October 30, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Also, it was noted in the file review that a designer's certification that the project was constructed in accordance with the approved plans as required by the permit has not been submitted. Please include this with your application. Permit application forms for renewal can be found on our website at: h d n - rules/stormwater-erosram/cost-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger.thorpe(ancdenr.go_v. Sincerely, � % Ro r K. Thorpe Environmental Engineer E North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27689 air" 252.946.6481 Energy, Mineral & Land Resources ENVIRONMENTAL, QUALITY October 4, 2017 Albemarle Electric Membership Corporation Attention: Mr. Bradley V. Furr P.O. Box 69 Hertford, NC 27944 Dear Mr. Furr: wadi 0 ROY COOPER coveriau' MICHAEL S. REGAN Secrelary TRACY DAVIS Direc•I or Subject: Stormwater Permit Inspection Stormwater Management Permit SW7061003 Morgans Corner Substation Pasquotank County On September 28, 2017, a stormwater compliance inspection was conducted at the wet detention pond serving the Morgans Corner Substation located near Morgans Corner, NC. State Stormwater permit SW7061003 was issued on October 30, 2006 for the construction and operation of a wet detention pond to treat stormwater runoff from impervious surfaces on the site. Section 116. of permit SW7081206 requires that upon completion and prior to operation of the permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with the permit, the approved plans and specifications, and other supporting documentation. Please submit the required certification within .60 days. Failure to comply with a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer 'Nothing Compares State of Norrh Carolina I Envir onmenlal Quality I Energy, Mineral and Lancl kesoomm-, Wnsf�inntnn Rcninnal (Nfii-c 943 W;�tihinnc nr� Snunr'r Malt War:hinnYnn, N(; 77fiR4 1> 17 SOUTH MILLS Its fo I57;r25- &-✓ SUBSTATION -_South Gills . r PAor& s Cornea ALBEM ARLE EMC /} ! HERTFORD• NORTH CAROUNA MORGANS CORNER TO SOUTH MILLS 115 kV TRANSMISSION LINE � A,u5 VICINITY MAP � } Booth&Assoc_ia_tes In_c. t L SSA DWN. BDE�A DATE: 02 26 2013 CKD. BDM APPD. BDM DWG. N0. SCALE: NTS FILE: 6325_VMi ((( JOB NO.477-6325 DATE REVISION VM-1 ® 02/13 =R-R ~ � fATION Mai a��4��' ! ._ 17 -. H'i OO IT AT njj. V •1 I 1 � i 1 Fjj I � _ 1 I1 7 Y . 1 �1 I } 1 � a t � } n , 1 i „ I OQiT+1' -7c:;l, �-� f � �-' mar �;- r9 r . . s •.� �-. i I A:11.LTAj } ,"_?Vl ,t„YJiifi 1 � •° v 67, i of WA rF9 Michael F. Easley, Governor QG William G. Ross Jr., Secretary rNorth Carolina Department of Environment and Natural Resources 0 Alan W. Klimek, P.E. Director Division of Water Quality October 30, 2006 Mr. Jeffrey S. Edwards, Exec.VP & General Manager Albemarle Electric Membership Corporation PO Box 69 Hertford, NC 27944 Subject: Stormwater Permit No. SW7061003 Albermarle Electric Membership Corporation High Density Project Pasquotank County Dear Mr. Edwards: The Washington Regional Office received a complete Stormwater Management Permit Application for Albemarle Electric Membership Corporation on October 20, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7061003 dated October 30, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until October 30, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an'adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written' petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. incerely, Al Hodg Regional Supervisor Surface Water Protection Section AHlsav: C:ISTORMWATERIPERMIT1SW7061003 cc: James Turley, PE P squotank County Building Inspections fashington Regional Office Central Files Ou carp �aturnt North Carolina Division of Water Quality Washington Regional Office Phone (252) 946.6481 FAX (252) 946-9215 Customer Smice Intemet A-ww,ncwaterqualitv,ora 943 Washington Square Mali, Washington, NC 27889 1-877-623-6748 An Equal OpportunitylAHirma6ve Action Employer -- 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW7061003 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Albemarle Electric Membership Corporation Albemarle EMC — Firetower Road Substation Pasquotank County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the. Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 30, 2016, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 1.08 acres of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing ail such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system per approved plans. 6. Final plans including site layout and drainage for the "Future" area shall be submitted and approved by the Division prior to the construction of any of the future impervious area. Page 2 of 7 State Stormwater Management Systems, Permit No. SW7061003 7. The following design criteria have been provided in the wet detention pond and ' must be maintained at design condition: a. Drainage Area, acres: b. Total Impervious Surfaces, acres: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ftz: h. Permanent Storage Volume, ft3: i. Permitted Forebay Volume, ft3: j. Temporary Storage Elevation, FMSL: k. Temporary Storage Volume, ft3: I. Controlling Orifice: m. Receiving Stream / River Basin: n. Stream Index Number: o. Classification of Water Body: 11. SCHEDULE OF COMPLIANCE 2.30 1.08 1.0 3.00 90% 6.00 6,000 13,356 2,744 r 1H 7,890 1.50" � pipe Newland Drainage Canal 1 Pasquotank 30-3-1.5 "C • Sw" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to, the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately, 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted Stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b.. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3of7 State Stormwater Management Systems Permit No. SW7061003 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, .and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Mayor permit was sought. f.. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. ' The Director may notify the permittee when the permitted site does not meet one or more.of.the minimum requirements of the permit. Within the time frame specified- in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. This permit shall be effective from the date of issuance until October 30, 2016. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Page 4 of 7 State Stormwater Management Systems Permit No. SW7061003 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division. approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. -The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 30th day of October, 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION L- 1-- I for Alan'W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7061003 Page 5of7 State Stormwater Management Systems Permit No. SW7061003 Albemarle EMC — Firetower Substation Stormwater Permit No. SW7061003 Pasauotank County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7061003 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Pasquotank County Building Inspections Page 7 of 7 3oofh&Assoeia,-es, I -ic. CONSULTING ENGINEERS. engineering for the future since 1960 October 19, 2006 Mr. Scott A. Vinson Environmental Engineer North Carolina Department of Environment & Natural Resources Division of Water Quality 943 Washington Square Mall Washington, North Carolina 27889 VIA UPS/GROUND RIECEIVEU OCT 20 2006 nw@ P80J # Subject: Albemarle Electric Membership Corporation Hertford, North Carolina Morgans Corner 115 kV to 15 x 25 kV Substation Stormwater Management Plan Dear Scott: Per your request, I have attached the following modified items: • Two (2) copies of the Small Diameter Drawdown Calculation using the Temporary Pool Volume • Two (2) complete sets of drawings showing the revised vegetated shelf. • Two (2) copies of Page l of 4 of the West Detention Basin Supplement Form SWU-102 If you should have any questions, please call our office. Sincerely, BOOTH & ASSOCIATES, INC. Bryan D. Maness, EI bdmlkpp cc: Mr. David A. Gross, PE Mr. James C. Turley, PE Enclosures 04-6170-SC061447.26 1011 Schaub Drive 919.851.8770 office Raleigh. NC 27606 919,859.5918 facsimile www.booth-assoc.com Q07RO O�QF WArF9QG Michael F. Easley, GDYernOr William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Q 'C Alan W. Klimek, P.E. Director Division of Water Quality October 18, 2006 Mr. Jeffery S. Edwards, Exec.VP & General Manager Albemarle Electric Membership Corporation PO Box 69 Hertford, NC 27944 Subject: Stormwater Review SW7061003 Albemarle EMC — Morgans Corner Substation Pasquotank County Dear Mr. Edwards: This office received a Coastal Stormwater permit application and plans for the subject project on October 4, 2006. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. The small diameter drawdown orifice calculation incorrectly uses the permanent pool volume to determine the size of the orifice. The Required Temporary Pool Volume, RTPV, or the F volume should be used to determine the size of the drawdown orifice. Please provide modified sealed calculations with two copies of revised plan sheets with the new orifice size noted on the outlet structure detail and revised page 1 of 4 of Wet Detention Basin Supplement form SWU-102. The vegetated shelf should start at the permanent pool elevation and go down into the pond. Please revise the plans to show the shelf located below the permanent pool elevation of 6,0 fmsl,• The above requested information must be received in this office prior to October 25, 2006 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to S 10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feet free to contact me at (252) 948-3848, Sincerely, Scott Vinson Environmental Engineer Washington Regional Office cc_ la es C. Tnrley, PE — Booth & Associates shington Regional Office -J& a North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252)946-9215 Customer Service Intemet: h2o.enr.state.nc.us 943 Washington Square Mall, Washington, NC 27E89 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Past Consumer Pager OFFICE USE ONLY Date Received Fee Paid Permit Number 16A106 1 &#OmS State of North Carolina Iblif No Department of Environment and Natural Resources RECEUVEE) Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM OCT — 4 2006 This form may be photocopied for use as an original 1)1 Q"WVk1 kt"A)L INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Albemarle Electric Membership Corporation 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): leffreu S. Edwards, Executive Vice President & General Mangier 3, Mailing Address for person listed in item 2 above: Post O, lice Box 69 _. City: Hertford State: NC Zip: 27944 Telephone Number: 052) 426-5735 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Albemarle Electric Membership Co oration Morgans Corner 115 kV to 15 x 25 kV Substation 5. Location of Project (street address): Firetower Road City: Elizabeth Citu County: Pas uotank 6. Directions to project (from nearest major intersection): _ The substation entrance is located at the intersection of U.S. Highway 1i.i 58 and Firetower Road 7. Latitude: 36' 25' 20" Longitude: 76° 22' 01" W of project 8. Contact person who can answer questions about the project: Name: lames C. Turley, PE Telephone Number: (919) 851-8770 II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Form SWU-101 Version 3.99 Page I of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number NIA and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control _____404/401 Permit Y NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . Stormwater will be collected in a vress-lined channel and diverted into a wet detention pond. The water will be released r from the detention through a Riser -Barrel Outlet 2. Stormwater runoff from this project drains to the Pasquotank River basin. 3. Total Project Area: 2.3 acres 4. Project Built Upon Area: 47 % 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Newland Drainage Canal N/A Receiving Stream Class C;SW N/A Drainage Area 1.64 Acres N/A Existing Impervious* Area 0.08 Acre N/A Proposed Impervious*Area 1.08 Acres N/A % Impervious* Area (total) 66% N/A Impervious' Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings N/A N/A On -site Streets (Driveway) 0.08 N/A On -site Parking N/A NIA On -site Sidewalks N/A N/A Other on -site (Electric Substation) 1.00 Acre N/A Off -site NIA N/A Total: 1.08 Acres Total: N/A Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? No o{f-site impervious area IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or fitture development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. I. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form 114—r • One copy of the applicable Supplement Form(s) for each BMP S72:-7' • Permit application processing fee of $420 (payable to NCDENR) 7G7 • Detailed narrative description of stormwater treatment/ management JGT • Two copies of plans and specifications, including: SL-r Development/Project name Engineer and firm Legend - North arrow Scale Revision number & date Mean high water line Dimensioned property/project boundary - Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated - Vegetated buffers (where required) V11. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Bootli & Associate4 hic. Mailing Address: 7011 Schaub Drive Suite 300 City: Raleigh_ _ _ State: NC Zip: 27606 Phone: 919 851-8770 Fax: (939)_8.59-5918 VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 2) le(Leu S. Edwards certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. , -If Signatu Form SWU•101 Version 3,99 Page 4 of Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION PORNO WET DETENTION BASIN SUPPLEMENT OCT 2 0 2006 This form maybe photocopied for use as ati original DWQ PROD # DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Albemarle Electric Membership Corporation — Morgans Corner 115 kV io 15 x 25 kV Substation Contact Person:. B an D. Maness EI Phone Number: (919) 851-8770 _ For projects with multiple basins, specify which basin this worksheet applies to: Detention Basin I elevations Basin Bottom Elevation Permanent Pool Elevation 3 ft 6 ft Temporary Pool Elevation 7 (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 6.000 sq. ft. (ivater surface area (it the orifice elevation) Drainage Area 1.64 ac. (on -site and off -site drainage to the basin) Impervious Area 1.08 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 13,356 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 7,890 cu. ft. (volume detained above the permanent pool) Forebay Volume 2,744 cu. ft. (approximately 20% of total volume) Other parameter SA/DA I Diameter of Orifice Design Rainfall Design TSS Removal 2 0.66 1.5 in. 1 in. 90 % (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary pool drain -down required) (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 I— . t I=ootnotes: When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 in the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an. agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants initials �L a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). ST - b. The forebay volume is approximately equal to 20% of the basin volume. 7LT c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow -,7:e- 7- calculations) �L7 f. The basin length to width ratio is greater than 3:1. ,Z-jrL7- g. The basin side slopes above the permanent pool are no steeper than 3:1. 7�--T h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). �•L7 i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right-of-way. ELT 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. z m• A mechanism is specified which will drain the basin for maintenance or an emergency. I11. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does Vdoes not incorporate a vegetated filter at the outlet. This system (check one) 0 does not incorporate pretreatment other than a forebay. Form S W U-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. lnsp�ct and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 2.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 6 Sediment Re oval El. 3.75 � 75 0 Sediment Removal Elevation 3.75 75% Bottom El ation 3 % ---------------------------------------------t ------ Bottom Elevation 3 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form S WU-102 Rev 3.99 Page 3 of 4 9. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. ` Print name: JeffreE S. Edwards - Albemarle Electric Membership Cor oration Title: Executive Vice President & General Manager Address: Post Office Box 69-1-lertford, North Carolina_ 27944 Phone; (252) 426-5735 1.7 M'u'.�-+� Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, EA J , At r\S , a -Notary Public for the State of Iy - C. . County of (J)n((,l}Gt YN __ , do hereby certify that �tj Lo:-,( personally appeared before me this 7 r� \ day of 1�v1 0 l'`, cli �% , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My con-intission expires a i-e-13 9,DQ� Form SWU-102 Rev 3.99 Page 4 of 4 Goa NCDENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all information below and CHECK required Permit(s). Fax or email this completed form along with a narrative and vicinity map of the project location to the appropriate One -Stop Coordinator. • Fayetteville or. Raleigh Region -David Lee 919-791-4203; david.leenc,ncmail.not • Winston Salem Region -Sonja Basinger 336-771-4633 or sonla.basinueri@ncmail.net REcEnE[D • Mooresville & Asheville Region -Patrick Grogan 704-663-3772 or pa trick. arocan(c7_ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lvn.hardison5ncmail.net t ' - • Wilmington Region -Cameron Weaver 910-350-2004 or cam eron.weaverfamcmail.net OCT ' 4 2006 Project -application received after 12 noon will be stamped in the following work day. D1A►/'Z_tp1A pO APPLICANT Name JeffreyS. Edwards — - Y�L� �}II1It Company Albemarle Electric Membership Corporation Address Post Office Box 69 City/State Hertford. NC Zip 27944 Phone (252; 426-5735 Fax (252) 426-8270 _mail JeF adwards(o-)ALBEI�,.4RLE.ncem s.com PROJECT SYSTEM(S) TRIBUTARY TO Newland Draina'ae Canal SURFACE INAT-R C! = SSIFICATION C.-SW PROJECT Name Albemarle Electric Membership Corporation - Moroans Corner 115 kV to : 5 x 25 kV S rustation_ Ccunh, Pasouotank PROJECT LOCATION (ADDRESS) Firetower Road ENGINEERICONSULTANT James C. Turley, PE Company Booth & Associates. Inc. Address 1011 Schaub Drive CiN;Stai= Raleioh. NC Zip 27606 Phone (919) 851-8770 Fax (919) 859-5918 Email ru:fevic5bootr-9sscc.com State or National Environmental Policy Act (SFPA, NEPA) - EA or EIS Required ❑`'es 1❑i No ❑ STREAM ORIGIN Determination: of Stream calls; Stream Na;,;_ STORMWATER ❑Low Density ❑ High Density -Detention =e; d ❑i Higr: Dens�y Other ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Or mite WETLANDS MUST BE ADDRESSED BELOW ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Siructures lnrc,-maii:;r, MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urt,an'ti':aieron: LAND QUALITY 0 Erosion and Sedimentation Control Plan with 1.90 acres i ...stur5e .(9�` s -z (; , DEi WETLANDS (401): Check all that ao lv !solaced wetland � n Prcparn• ❑ Ye_ ❑ i Ito Wetlands on Site ❑ Yes 0 No I Buffer Impac*s: ❑ I No J `'ES: acres) Wetlands Delineation has been completed: ❑ Yes ❑ No I i"linor Variance : ❑ No ❑ `'=S Maior General Variance ❑ No ❑ YES US ACOE Approval of Delineation completed; ❑ Yes ❑ No 401 Application reeu'red: ❑Yes ❑ Nc If Y=S, ❑Regular 404 Application in Process wl US ACOI=: ❑Yes ❑ No I ?ermit n= .e;ved from US ACOc ❑ Yes I No Perennial, Blue line stream, etc on site ❑ yes ❑ No The legislation allows additional fees, not to exceed 50% of the origir,=al Express review permit application fae, to be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only Fee Split for multiple permits: (Check m b j4� E• 3 ) Total Fee Amount S SUBMITTAL Fee DATES SUBMITTAL DATES ; CAMA I I Variance {1 I Mla': ❑ Mind 1 1 SW (y'1 HD; ❑ LD) rf� 5 401: i 1 LQS 12i : 0-- 0 E -9 LJ_ L41- L4 , 4 '_� Stream Deter:_ I