Loading...
HomeMy WebLinkAboutSW7061003_APPROVED PLANS_20061030STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD \ \ 4 SITE \ \ CD us \\ HWr s ,9r V \ � A li \ O \ y `r 'Y = i fir" �., `" \ '�,•, \\A` v \ v /0 . \4 �a d VICINITY MAP \\ i N TS jr - r / r : IS 3 }, � , _. M1: { OD "z - r gr c 1� _ - -� ` F IRS THE CO i ON JUL' NO JUR " WETLAN SUBSTA h A'' Q P NOOGF'S / s° / �{o co J 1 � STORMWATER MANAGEMENT PLAN — PRE —DEVELOPMENT SCALE: 1 "=30'--0" PROPOSED DISTURBED AREA 1,90 ACRES LEGEND LIMIT OF DISTURBANCE PROPERTY LINE -- EXISTING FENCE EXISTING CONTOURS �--- TIME OF CONCENTRATION STORMWATER APPROVE 44 NORTH CAROLINA ENVI h NTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY Date DC6�',. 30._.._:.2096 sbnwaiar Permq No. q5w�ro (,o 1 ob3 RECEIVED NOTES: OCT 2 0 2006 PR03 # PRE —DEVELOPMENT: DRAINAGE AREA = 2.22 ACRES TIME OF CONCENTRATION (Tc) = 15.4 MINUTES LENGTH = 300 FT. AVERAGE SLOPE = 0.015 FT/FT 01 INCH = 0.04 cfs Q2 = 4.71 cfs Ql0 On 9.43 cfs REFERENCES PLANVIEW..... , r r...............................................................................447-6170 S2 OF 10 SECTIONS ............... .....447-6170 S3, 4-7 OF 10 SECTIONS 1............ 447-6170 S8 OF 10 SECTIONS..............:................................. . ..................... ........... .447-6170 S9 OF 10 DETAILS.. , r....................................................................... ........... 447-6170 S10 OF 10 GRADING AND EROSION CONTROL DETAILS ...... . .. . ......... . .. . ......... r ................... r .. 447-6170 GR2-3 OF 3 STORMWATER MANAGEMENT PLAN ....................... . ................. — ..:....... . 447-6170 SM2 OF 2 OCT 19 20, 1 7 7—. T r T.T ' , .. . . r a - N , ! 's� r � ! 1, • , �'Y. s. a, r I I N � !i 11�:� 1�J�.��i�r ,4`�1 ,. f �,y 44704CRI I I I �V ..r,i '. E. .._.�;L.-"- s_1:_�!`....., SITE SA, i 0 Co us Hwy �$8 z 0 z 0 VICINITY MAP N TS NOTES: POST -DEVELOPMENT; DRAINAGE AREA = 1.64 ACRES TIME OF CONCENTRATION (Tc) = 6.2 MINUTES LENGTH = 350 FT, AVERAGE SLOPE = 0,004 FT/FT WET DETENTION BASIN OUTLET: INFLOW AREA = 1.64 ACRES Q1 INCH = 0.00 cfs Q2 0,12 cfs 010 = 0.65 cfs CULVERT 1: INFLOW AREA = 3.00 ACRES Q2 = 3.53 cfs 010 = 14.51 cfs CULVERT 2; INFLOW AREA = 20.00 ACRES Q2 = 20.17 cfs Q10 = 87,35 cfs CULVERT 3; INFLOW AREA = 0.15 ACRES 02 = 0.38 cfs 010 = 1.07 cfs RECEIVED OCT 2 0 2006 DWQ PROD # REFERENCES' sb PLANVIEW................................................................ ..................... 447-6170 S2 OF 10 SECTIONS, .. , ... . ...... 447-6170 S3, 4-7 OF 10 .............................................................. ...... SECTIONS.......................................... ........ ............. ......................... .447-6170 S8 OF 10 SECTIONS...................... . .............. ................................................................................ 447-6170 S9 OF 10 .. DETAILS .................. ................. — L ... 447-6170 S10 OF 10 .............. GRADING AND EROSION CONTROL DETAILS....................................................... 447-6170 GR2-3 OF 3 STORMWATER MANAGEMENT PLAN ........................ ... ......................... 447-6170 SM1 OF 2 NO. REVISIONS DATE ALBEMARLE EMC AND .°'``i. � 1 NCDENR 10/2/06 HERTFORD, NORTH CAROLINA ED STONE} °°qt�� R REQUIREMENTS �..4 ��p••' ••. 2 NCDENR 10/19/06 MORGAN'S CORNER REQUIREMENTS 115 kV TO 15 X 25 kV SUBSTATIOI 762 t = STORMWATER MANAGEMENT PLAN— POS DRAINAGE CHARACTERISITCS J'••"fAGINV�te * * * EXISTING FENCE �•,, C •'•'••.•• �— --- TIME OF CONCENTRATION �''�;STIAN°`°� t}rlBooth&Associates, Inc. EXISTING CONTOURS 1611 Schaub ve I Mrjgh NC2V6% GONBULTINO ENGINEER& •. to /1.& DWN. MSN DATE 09/20/06 DWG. N0, PROPOSE CONTOURS •�•,VEGETATIVE SHELF CKD. 8DM IAPPD.JCT 447-6170 SCALE; 1"; 30' SM2 OF 2 44704GR1 +,I.. G. ,r� i "7 i ,,•.:�: - '�'i_ ri,7rF'y + --� Ti-,s is i ti I}�1��• � �r. f� { �r � s�� -tI � �. Jj� I'I I. ;-i ti��11• jib, st�f, 16, SITE SR Lam - O V5 \A"W-� us Nwr ass z 0 v z VICINITY MAP NTS NOTES: TEMPORARY SEEDING: 1. a) SEED MIXTURE (MAY TO AUGUST) - USE 40lb/ACRE GERMAN MILLET. b) SEED MIXTURE (JANUARY TO MAY, AUGUST TO DECEMBER) - USE 120lb/ACRE RYE (GRAIN). 2, LIME - APPLY 2000lb/ACRE GROUND AGRICULTURAL LIMESTONE AND 750lb/ACRE 10-10-10 FERTILIZER. 3, MULCH - APPLY 4000lb/ACRE STRAW, ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR MULCH ANCHORING TOOL. PERMANENT SURFACE STABILIZATION: 1. SEED MIXTURE (FEB.15 TO APR.30 & SEPT.1 TO OCT.31) - USE 80lb/ACRE TALL FESCUE, 50Ib/ACRE PENSACOLA BAHIAGRASS, 301b/ACRE SERICEA LESPEDEZA, 10lb/ACRE KOBE LESPEDEZA. 2. LIME - APPLY 4000lb/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000lb/ACRE 10-10-10 FERTILIZER, 3. MULCH — APPLY 4000lb/ACRE STRAW, ANCHOR STRAW RY TACKING WITH ASPHALT, ROVING, OR NETTING. 4. SEEDBED PREPARATION AND MAINTENANCE - LOOSEN SOIL JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR AN EQUALLY SUITABLE METHOD, ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED. S. INSTALL APPLICABLE E&S CONTROL MEASURES PRIOR TO ONSET OF ANY DEMOLITION OR LAND DISTURBING ACTIVITIES. DISTURB ONLY WHAT IS NECESSARY TO INSTALL APPLICABLE E&S CONTROL MEASURES. VEGETATION TO BE ESTABLISHED ON SLOPES OR OTHER AREAS WITHIN 21 CALENDAR DAYS OF COMPLETION FOR ANY PHASE OF GRADING ACTIVITIES. VEGETATIVE SHELF 1, INSTALL !:RIS VIRGINICA (SOUTHERN BLUE FLAG IRIS) OR ANY LOCAL AQUATIC PLANT THAT IS DEEMED SUITABLE BY NCDENR. CONSULT WITH LOCAL LANDSCAPER FOR APPROPRIATE PLANTING METHODS, CONSTRUCTION SEQUENCE: 1. OBTAIN £'LAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. FLAG C043TRUCTION LIMITS, 3. INSTALL ROADSIDE CULVERTS WITH INLET AND OUTLET PROTECTION, 4, CLEAR INHAT IS NECESSARY TO INSTALL THE SILT FENCING AND WET DETENTION BASIN WITH A FOREBAY LOCATED ON THE WESTERN SIDE OF THE SITE. ONCE THE BASIN IS STABILIZED, INSTALL THE RIPRAP OUTLETS BELOW THE BASIN ENTERING THE DITCH AND THE TEMPORARY DIVERSIONS TO DIRECT FLOW TO BASIN. 5. COMPLETE THE REMAINING SITE CLEARING TOPSOIL AND DEBRIS SHALL BE REMOVED DAILY TO A NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (NCDENR) PERMITTED LOCATION. 6. INSTALL THE REMAINING SILT FENCING, CHECK DAMS, CONSTRUCTION ENTRANCE, AND ROUGH GRADE SITE PRIOR TO ONSET OF LAND DISTURBING (INCLUDING DEMO) ACTIVITIES. DISTURB ONLY WHAT IS NECESSARY TO INSTALL EROSION CONTROL MEASURES. 7. COMPLEIE GRADING AROUND FENCED AREA AND VEGETATE AND MULCH IMMEDIATELY_ 8. STABILIZE ALL DISTURBED AREAS BY SEEDING AND/ OR MULCHING. 9. COMPLETE FINAL GRADING. 10. ALL EROSION AND SEDIMENT CONTROL PROPERTIES WILL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT, NEEDED REPAIRS WILL BE MADE IMMEDIATELY. 11. STABILIZE ALL DISTURBED AREAS APPROPRIATELY AND INSTALL PERMANENT VEGETATION AND GRASS —LINED CHANNEL. IF THE CITE IS TO REMAIN WITHOUT THE PERMANENT SUBSTATION STONE COVER UNTIL SPRING, INSTALL A 25, WIDE STONE SUFFER ALONG THE PERIMETER ON THE SUBSTATION SITE, AFTER SITE IS STABILIZED, REMOVE ANY SEDIMENT FROM TFE FOREBAY AND BASIN, THE CHECK DAMS AND PERIMETER SILT FENCING ARE TO REMAIN UNTIL PERMANENT VEGETATON IS ESTABLISHED. 12. ESTIMATED TIME BEFORE FINAL STABILIZATION - FIVE (5) MONTHS. GRADING AND BACKFILL MATERIAL: 1, PROPOSED CONTOURS REPRESENT SUBGRADE ELEVATIONS. 2, ALL GRADED AREA WITHIN NEW FENCE SHALL RECEIVE 6" OF STONE (3" CRUSHER RUN AND 3" OF 1 1/2" WASHED STONE), TO BE PROVIDED BY OTHERS. 3. ALL VEGETATION AND DEBRIS SHALL BE REMOVED FROM THE CONSTRUCTION AREA, SUBGRADE SOILS SHALL BE FREE OF ORGANIC MATERIAL AND COMPACTED PRIOR TO THE PLACEMENT OF FILL MATERIAL, 4, ALL FILL MATERIAL USED AT THE SITE SHALL UTILIZE A LOW PLASTICITY SOIL (LIQUID LIMIT LESS THAN 50, PLASTICITY INDEX LESS THAN 25), FREE OF ORGANIC MATERIAL OR DEBRIS. 5. THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR HIRING A REPUTABLE GEOTECHNICAL ENGINEERING FIRM, APPROVED BY THE OWNER OR ENGINEER, TO PERFORM LABORATORY AND FIELD TESTING OF BACKFILL MATERIAL AT THE CONTRACTORS EXPENSE. 6, A STANDARD PROCTOR COMPACTION TEST SHALL BE PERFORMED BY THE APPROVED GEOTECHNICAL ENGINEERING FIRM ON THE MATERIAL TO BE USED AS BACKFILL,7. ALL MATERIAL SHALL BE LACER IVE LL 8, 1=IELDICOM ACTION TESTS SHALL BEDAKENIFTS BY THE GEOTECHNICAL"ENGINEERING FIRM FROM EACH FILL VOLUa��NOT TO EXCEED 12, �� MEASURNG 2000ft2 MAXIMUM x 12" DEEP. 9, ALL FILL AREAS SHALL BE COMPACTED TO AT LEAST 95%; OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY, OCT 2 Q 2006 10. CONTRACTOR IS RESPONSIBLE TO VERIFY LOCATION OF UNDERGROUND FACILITIES PRIOR TO CONSTRUCTION. DWQ - -- PROD # 1. S,H.W.T ELEVATION = 6 (INFORMATION BASED ON SOIL BORINGS PERFORMED BY GEOTECHNOLOGIES, INC. AND FIE.D OBSERVATIONS BY BOOTH & ASSOCIATES, INC.) AND D STONE PROPOSE CONTOURS ' VEGETATIVE SHELF TEMPORARY SILT FENCE REFERENCES PLANVIEW...................................................................................... .447-6170 S2 OF 10 SECTIONS .... . . . . .. . .. I.. I ....................................447-6170 S3, 4-7 OF 10 SECTIONS.................................. ......................................... ..............447-6170 S8 OF 10 SECTIONS...... ............................ ......:::.. . .. . ............................... .........447-6170 S9 OF 10 DETAILS ............................. ........................................................... 447-6170 S10 OF 10 GRADING AND EROSION CONTROL DETAILS....................................................... 447-6170 GR2-3 OF 3 ,y �, '••:.;::••- •tom: 114,;yRISTO' �.•`" 'Tiro iso lo7,f,o6- 't. r T"'?�rT-'r-r+^r-r T r- w�r7rT i �-rrr rr-, r .i '�.;i v�.�.- � � .�j.� , �jj� 7 p, ♦,T:. �, �.. 44704GRI STABILIZE WITH GRAS FLOW evrrun rn cvlcr�ur_ nlrru PLAN 2"-3" COARSE AGG GEOTEXTILE NON —WOVEN FABRIC 1$"x 100' RCP CULVERT CONSTRUCTION ENTRANCE/EXIT DETAIL N.T.S. CLASS B (5"-12" STONE) RIPRAP APRON GRADED GRAVEL FILTER BLANKET RISER -BARREL RIPRAP APRON N.T.S. 12" BED OF COMPACTED CRUSHER RUN n" COMPACTED NATIVE SOIL SUBGRADE ELEVATION 6 OZ. NON —WOVEN GEOTEXTILE FABRIC UNDER CRUSHER RUN SECTION A- A GRAVEL ACCESS DRIVE N.T.S. ..... ..�...x.. ...... f. n' ■111.1 DI—FXM Jr— I I VIV NOTE: N.T.S. INSTALLATION OF NETTING & MATTING SHALL BE CONSTRUCTED TO THOSE STANDARDS AND SPECIFICATIONS AS SHOWN ON PAGES 6.14,E & 6.14.7 OF THE 'STATE OF NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (PAGES ATTACHED). ROAD DITCH 3RIC CGwfYCICn fW nvir_ rot nF i 2"-6" STONE RIPRAP APRON PLAN Of x/,</- — x� xg x io GRADED GRAVEL. FILTER BLANKET CULVERT RIPRAP APRON N.T.S. STEEL FENCE POST WASHED S ACROSS rlrr INLL 1 END DRAIN np%kDWARE CLOTH WASHED STONE FILTER INLET PROTECTION FOR STORM DRAIN UNDER CONSTRUCTION N.T.S. DIVERSION DIKE N.T.S. OVERFLOW 1 /3 PIPE DIA. ( Z YiV 1LkiV V I Yi 101-0"t GRASS -LINED CHANNELS 1 SECTION WITH STRAW AND NETTING N.T.S. TEMPORARY LINER: STRAW MULCH HELD ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH. wu• ...rr .a V r n`ILnvRd\V AND OVERLAPPING. INSTALLATION OF NETTING & MATTING N.T.S. RECEIVED OCT 2 o 20o6 T� Wq PROD # NOTE: INSTALLATION OF NETTING & MATTING SHALL BE CONSTRUCTED TO THOSE STANDARDS AND SPECIFICATIONS AS SHOWN ON PAGES 6.14,6 & 6.14.7 OF THE "STATE OF NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (PAGES ATTACHED). , REFERENCE; GRADING & EROSION CONTROL PLAN 447-6170 GR1 OF 3 ('4_I��FJ '�iLlr4. �:.. �? �}3'. ! r'.:[ i y7'TSl1:'1l3iTn�i.• r?V_ �:. .:� ..- + - I 441 V�FGK1 VEGETATIVE SHELF EL, 8 EMERGENCY SPILLWAY rx - - - - - - - - - - - -- - - - 3. /\ STORAGE - - EL.7— T -d P TEMPORARY POOL 5.5 BARREL 50' X 12"0 RCA OUTLET EL.,g 0 / � / �� � � ,b PERMANENT POOL 4 PVC TEE EMERGENCY RELEASE VALVE FDN, / \ \ FILTER FABR C % 77/ NTI-FLOATATION BLOCK SEDIMENT STORAGE ZONE�/ �/ �/ \\\\\\\\ \\\\\ X ///////�//�/ r \\/ \EL. 3 \/\\/ \/x\/ �/ �� \. \. \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\XX\ \\ \\/// // /\\\\\\\\\\\��\��\��\��\��\��\��\\\\\/\/\/X/, \ /\\ .\\ �\\ TRASH GUARD 4" PVC SCREW TYPE PLUG TEMPORARY POOL VEGETATIVE SHELF EL.7 — - --y - w i PERMANENT POOL EL-6 - - 4" PVC z w EL.5 PVC CAPS W/1,5"o HOL r \ 2'X2'X1' \ EMERGENCY RELEASE FOUNDATION VALVE / BLOCK / EL.3 ANTI -FLOATATION BLOCK RISER —BARREL SECTION BARREL 50' X 12" 0 RCP (OUTLET EL,-5-0) 1. SET STEEL POSTS 2'-0" DEEP AND EXCAVATE A 4" X 8" TRENCH UPSLOPE ALONG THE LINE OF POSTS. 2. ATTACH WIRE FENCING TO THE POSTS. I11i�ili jar, 1 /lll�i►i� ��!l?�1if 15"0 CONCRETE RISER WITH TRASH GUARD TOP INLET EL. 7- CROSS SECTION IN. 12-1 /2 GA. INTERMIDIATE WIRES WET DETENTION BASIN N.T.S. 3, ATTACH THE SILT FENCE GEOTEXTILED FABRIC TO THE SECOND WIRE FROM THE TOP ON THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. THE END OF THE SILT FENCE NEEDS TO BE TURNED UPHILL 5, BACKFILL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH CLASS B RIPRAP APRON 20,0' LONG, 10.0' WIDE 2' THICK WET DETENTION BASIN DESCRIPTION # DESCRIPTION # DESCRIPTION # LENGTH 0 EL, 6 150 EMERGENCY SPILLWAY ELEVATION 8 RISER DIAMETER (IN) 15 WIDE 0 EL. 6 40 TOP OF BERM ELEVATION 10 BARREL DIAMETER (IN) 12 BOTTOM ELEVATION 3 SURFACE AREA (FT2) 6000 BLOCK LENGTH (FT.) 2 PERMANENT POOL EL. 6 STORAGE VOLUME (FT3) 13356 BLOCK WIDTH (FT.) 2 TEMPORARY POOL EL. 7 PVC TEE 0 (IN) 4 BLOCK DEPTH (FT.) 1,0 RISER ELEVATION 6 ?VC CAP HOLE 0 (IN) 1.5 FOREBAY RIPRAP HEIGHT (FT.) 3.5 10.0' (WUR LENGTH) OVER FILL 6" FOR SETTLEMENT ;o EL. 10 a ,S 1 ` FILTER FABRIC CLASS B EROSION CONTROL STONE STONE SECTION NATURAL GROUND RE D OCT 2 0 2006 DWQ PRQJ # / FILTER FABRIC ----------- WIRE: / z •. ica , e/ � �\�i\\�/\\� \ �\1/\\\/'��y�\��i\\! r= i t=i i t=i i REFERENCE: GRADING &EROSION CONTROL PLAN 447-6170 GR1 OF 3 CONSTRUCTION OF A SILT FENCE N.T.S. n 70r4 .�. j71F1 `�.14 f r' 4.� ".I. L,.iR f.1. .5:.�,Ii:•._.tl..,.,. ... „.,r... .. .,r .,., .�, '.,i.��i1¢rl .l�.'i,ti'��d��id'.I;tri/f ...j" - '�1-..R._i �. l k,r f, \\.� SITE �O 05 H'441� 5a U5 HWY 158 z 0 z VICINITY MAP NTS �'. / f i c / f^ / V J / RECEIVED OCT 2 a 2D06 i i NOTES: PRO J # DWQ DRAINAGE AREA \ DRAINAGE AREA = 2.22 ACRES / ' TIME OF CONCENTRATION (Tc) = 15.4 MINUTES '! LENGTH - 300 FT, AVERAGE SLOPE = 0.015 FT/FT DRAINAGE AREA MAP — PRE —DEVELOPMENT SCALE. 1 "=30'—O" LEGEND LIMIT OF DISTURBANCE PROPERTY LINE * * EXISTING FENCE EXISTING CONTOURS T -- --now- TIME OF CONCENTRATION -- — DRAINAGE AREA DRAINAGE AREA 1 REFERENCES PLANVIEW ...................... ................................... .......................... 447-6170 S2 OF 10 SECTIONS.... ............ ................................................ • ...................447-6170 S3, 4-7 OF 10 ..... SECTIONS.................... ..................... .:........... • .. I ...............................447-6170 SS OF 10 SECTIONS...... ....:::....::............................::.....................................1 . 447-6170 S9 OF 10 DETAILS................: . . . ..: . ..:. . :....:. .................................................... 447-6170 S10 OF 10 GRADING AND EROSION CONTROL DETAILS ............ . . .................. ................. 447-6170 GR2-3 OF 3 STORMWATER MANAGEMENT PLAN ...........:.......... I .. • I I..... I ................ 447-6170 SM2 OF 2 DRAINAGE AREA MAP .............................. • ............. 447-6170 DA2 OF 2 T. _ 1 .► �', i j 1 , .--I-T-- ;.-,• may=,-� 6..T:,r ,j r �I_ 151 Irk e f +' fr 44704GR1 \\.� SITE �O 05 H'441� 5a U5 HWY 158 z 0 z VICINITY MAP NTS �'. / f i c / f^ / V J / RECEIVED OCT 2 a 2D06 i i NOTES: PRO J # DWQ DRAINAGE AREA \ DRAINAGE AREA = 2.22 ACRES / ' TIME OF CONCENTRATION (Tc) = 15.4 MINUTES '! LENGTH - 300 FT, AVERAGE SLOPE = 0.015 FT/FT DRAINAGE AREA MAP — PRE —DEVELOPMENT SCALE. 1 "=30'—O" LEGEND LIMIT OF DISTURBANCE PROPERTY LINE * * EXISTING FENCE EXISTING CONTOURS T -- --now- TIME OF CONCENTRATION -- — DRAINAGE AREA DRAINAGE AREA 1 REFERENCES PLANVIEW ...................... ................................... .......................... 447-6170 S2 OF 10 SECTIONS.... ............ ................................................ • ...................447-6170 S3, 4-7 OF 10 ..... SECTIONS.................... ..................... .:........... • .. I ...............................447-6170 SS OF 10 SECTIONS...... ....:::....::............................::.....................................1 . 447-6170 S9 OF 10 DETAILS................: . . . ..: . ..:. . :....:. .................................................... 447-6170 S10 OF 10 GRADING AND EROSION CONTROL DETAILS ............ . . .................. ................. 447-6170 GR2-3 OF 3 STORMWATER MANAGEMENT PLAN ...........:.......... I .. • I I..... I ................ 447-6170 SM2 OF 2 DRAINAGE AREA MAP .............................. • ............. 447-6170 DA2 OF 2 T. _ 1 .► �', i j 1 , .--I-T-- ;.-,• may=,-� 6..T:,r ,j r �I_ 151 Irk e f +' fr 44704GR1 m c AN 7y 'P 0 nr df REFERENCES SITE SR IP-P ?_ _& so US wy 5's VICINITY MAP NTS RECEp�E OCT 20 20 llnoj,# DwQ NOTES: DRAINAGE AREA 1 DRAINAGE AREA = 1.64 ACRES TIME OF CONCENTRATION (Tc) = 6.2 MINUTES LENGTH = 350 FT. AVERAGE SLOPE = 0.004 FT/FT DRAINAGE AREA 2 DRAINAGE AREA = 0.48 ACRES TIME OF CONCENTRATION (Tc) = 9,3 MINUTES LENGTH - 175 FT, AVERAGE SLOPE = 0.020 FT/FT POST DEVELOPMENT DRAINAGE AREA MAP PLAN VIEW 447-6170 32 OF 10 .............................................................................. ....... TIONS .11 ... I .... —6170 S3, 4-7 OF 10 SCALE-. 1"=30'—O" SEC ................ ............ ...... 447 36o) SECTIONS ....... 447-6170 S8 OF 10 ......................... ..................... .............. ..... ................. SECTIONS 447-6170 S9 OF 10 LEGEND ... . .... ... ... ....... . ... .. ......... Pp ?'0 DETAILS 447-6170 S10 OF 10 ........... ....... ...... .. ....... ... 0 GRADING AND EROSION CONTROL DETAILS ................................................ ...... 447-6170 GR2-3 OF 3 LIMIT OF DISTURBANCE STORMWATER MANAGEMENT PLAN ...... ........... .. .. ... ...... . 447-6170 SM 1 OF 2 PROPERTY LINE DRAINAGE AREA MAP ........................... .............................. ................ 447-6170 DA2 OF 2 BOUNDARY LINE DA 1 DRAINAGE AREA 1 O — — — — — — — — RIGHT OF WAY LINE PROPERTY EXTENSION NEW FENCE NO. REVISIONS DATE ALBEMARLE EMC EXISTING FENCE ti�yNCDENR 10/2/06 HERTFORD, NORTH CAROLINA TING b�SrRj EXISTING CONTOURS • REQUIREMENTS 0 cr•2 NCDENR 10/19/06 MORGAN S CORNER PROPOSE CONTOURS DDRAINAGE AREA 2 A 77... TIME OF CONCENTRATION DRAINAGE AREA LIMIT VEGETATIVE SHELF AA7nAnQl