Loading...
HomeMy WebLinkAboutSW7060521_CURRENT PERMIT_20060921STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW74(2t�� DOC TYPE ECURRENT PERMIT l ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 9�POgo�I YYWMMDD waR-a Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality September 21, 2006 Mr. John Bassett, VP Paradigm Development Group, LLC PO Box 46 Edenton, NC 27932 Subject: Stormwater Permit No. SW7060521 Edenton Medical Park High Density Subdivision Project Chowan County Dear Mr. Bassett: The Washington Regional Office received a complete Stormwater Management Permit Application for Edenton Medical Park on September 1, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7060521, dated September 21, 2006 to Paradigm Development Group, LLC for modification to an existing wet detention pond to serve the proposed roadway improvements, the BB&T site, Filbert Creek Apartments, and lots 3-10 located on Claire Drive in Edenton, NC. This permit shall be effective from the date of issuance until September 21, 2016, and shall be subject to the conditions and limitations as specified therein. This permit shall replace permit SW7041113 issued April 4, 2005. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. Sincerely, t Al Hodge Regional Supervisor Surface Water Protection Section AH/sav: C:STORMWATERIPERMIT1SW7060521 cc: James Bowen, PE Judy H.E. Adams Chowan County Building Inspections ,^ashington Regional Office Central Files North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Intemet: ulvw.newatergualitv.or943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer — 50% Recycted110% Post Consumer Paper I�tCarolina ura!!y State Stormwater Management Systems s Permit No. SW7060521 c STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Paradigm Development Group, LLC Edenton Medical Park Chowan County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 21, 2016 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit. The commercial subdivision is permitted for proposed roadway improvements,, the BB&T site, Filbert Creek Apartments, and lots 3-10. See attachment for the allowance of square feet of built -upon area for each lot. The development of lots 1, 2 & 12 are not covered under this permit. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 8 State Stormwater Management Systems ' Permit No. SW7060521 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, acres: 24.06 b. Total Impervious Surfaces, ac: 9.69 C. Pond Depth, feet: 5.00 d. TSS removal efficiency: 90% e. Design Storm: 1" f. Permanent Pool Elevation, FMSL: 6.00 g. Permitted Surface Area @PP, ft2: 29,659 h. Permitted Storage Volume, ft3: 53,960 i. Storage Elevation, FMSL: 7.50 j. Controlling Orifice: 3.00" O pipe k. Permanent Pool Volume, ft3: 101,843 I. Forebay Volume, ft3: 19,147 m. Receiving Stream / River Basin: UT to Pembroke Creek I Chowan n. Stream Index Number: 26-1-1 o. Classification of Water Body: "B; NSW' 11. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the lot owner of the responsibility to maintain compliance with the permitted BUA limit. Page 3 of 8 State Stormwater Management Systems Permit No. SW7060521 4. The permittee shall submit to, the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7060521, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. Page 4 of 8 State Stormwater Management Systems Permit No. SW7060521 d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is (see attachment) square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Each new lot owner must receive an Off -site State Stormwater Permit by the Division of Water Quality prior to any construction being started on the lot. h. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. 13. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of- recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds, 14. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 15. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and.Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 16. Records of maintenance activities must be kept and made available upon request to. authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 17. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 5 of 8 State Stormwater Management Systems Permit No. SW7060521 18. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. �. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in . accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 215t day of September, 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7060201 Page 6 of 8 4 State Stormwater Management Systems Permit No. SW7060521 Edenton Medical Park Page 1 of 2 Stormwater Permit No. SW7060521 Chowan County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (period icallylweeklylfull time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW7060521 Certification Requirements: Page 2 of 2 .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted . amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. fi. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Washington Regional Office Chowan County Building Inspections Page 8 of 8 SPREADSHEET SHOWING IMPERVIOUS LOT COVERAGE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT B LOT 9 LOT 10 LOT 12 FILBERT CREEK BASIN INFORMATION BRAND- SWM PUMP EXISTING NEW NEW TOTALS SPIGAL POND STATION I ROAD ROAD 1 ROAD 2 RECEIVING STREAM NAME UNNAMED TRIBUTARY TO PEMBROKE CREEK RECEIVING STREAM CLASS B NSW B NSW B NSW I B NSW B NSW B NSW B NSW B NSW 1 B NSW B NSW B NSW B NSW B NSW B NSW B NSW B NSW B NSW B NSW B NSW DRAINAGE AREA AC 0.00 0.00 1.08 0.94 0.78 1.37 0.73 0.69 1.17 2.72 3.14 4.00 1.48 0.60 2.16 0.10 1.82 0.79 0.49 24.06 EXISTING IMPERVIOUS AREA AC 0 0 0 0 0 0 0 0 0 0 0 1.44 0.69 0 0 0.02 0.90 0 0 0 PROPOSED IMPERVIOUS AREA(AC)-0.00 0.00 0.70 0.61 0.51 0.90 0.48 0.45 0.76 1.57 0.00 0.00 0.00 0.00 0.00 0.00 0 0.40 0.27 9.69 IMPERVIOUS AREA TOTAL #DIV/0! #DIV/01 65% 65% 65% 65% 65% 65% 65% 58% 0% 36% 47% 0% Doh 22% 50% 50% . 54% 40% IMPERVIOUS ON -SITE BUILDING SF 10,000 10,000 8,000 15,000 8,000 7,500 12,000 26,681 25,700 5,272 128,133 ON -SITE STREETS SF 10,000 9,000 8,000 14,000 7,250 6,500 12,000 28,885 15,246 7,000 1.000 39,344 1 17,404 11,578 187,207 ON -SITE PARKING SF 7,000 51000 4,000 7,000 3,500 4,000 6,500 10,593 13,504 15,000 76,097 ON -SITE SIDEWALK SF 3,500 2,750 2.000 3,000 2,000 1,500 2,500 2,277 6,098 3,000 28,625 OTHER ON -SITE SF 2,178 2,178 OFF -SITE SF 0 EXISTING SF TOTAL IMPERVIOUS 0 0 30,500 26,750 22,000 39,000 20,750 19,500 33,000 68,416 0 62,726 30,272 0 0 1,000 39.344 17,404 11.578 422,240 SITE DRAINING TO POND 46,841 41,093 33,897 59,783 31,937 29,876 51,062 118,556 136,779 174,241 64,443 26,117 93,877 4,465 79,260 34,560 21,288 1,048,075 State Stormwater Management Systems Permit No. SW7060521 Edenton Medical Park Stormwater Permit No. SW7060521 ChowanC_ounty Designer's Certification Page 1 of 2 I, .�drt.,ti S L3out� , as a duly registered P�ot~ESSto+� &PJ6xt�16flLin the State of North Carolina, having been authorized to observe (Period ice ll week ull time) the construction of the project, D &0 t c A-L_ P/-QK (Project) �P, t.LG for PAKA0%r►M _c>eg6 .oP+�-4�T Ca (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to: be built within substantial compliance and intent of the approved plans and specifications. The checkiist of items on page 2 of this form are a part of this. Certification. Noted deviations from approved plans and specifications: 3, A$ Lois ARe D6JELo PED bg.A-AI (, w %LL BE P6RFoR.r� �o Tn D 1 rt E c�- w A•r-e¢ -M -r w E Pe*j v. 4. RoaF wu u Be 1P%R•6GTE'o Ac, L-Wrs DGv�+.,oPEO, 8. P2o_x-cT S I rG HAh a6eo Kq PaD sdG o6-0• Signature 4el2l, -A,(-( ' Registration Number 30,4 34 Date 3 1 4-, 0 -7 MAIR 19 2007 SEAL y..��t►tt!�t�l� G R R 0 .tea• � -���� 4 SEAL. r, 030434 Page 7 of 8 A 0 JA92 o r o till State Stormwater Management Systems Permit'No. 5W7060521 Certification Requirements: Page 2 of 2 ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted sEE amount of built -upon area. All the built -upon area associated with the project is graded such that the s runoff drains to the system. e6'i'4 All roof drains are located such that the:runoff'is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided.on the outlet/bypass structure. SE 6 DC -IQ 'Am 0*J 8. All slopes are grassed with permanent`vegetation. 9. Vegetated slopes are no,steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of'the system. V/ 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12.. Required drawdown devices. are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a 'forebay, and the vegetated filter. dimensions 15. The required of the system are provided, per the approved plan. CC' NCDENR-DWQ Washington Regional Office Chowan County Building Inspections - Page 8 of 8 0 Hobbs, Upchurch & Associates, P.A. Consulting Engineers 2522 S. Croatan Highway • Suite 2A - P.O. Drawer 1929 • Nags Head, North Carolina 27959 March 16, 2007 Scott Vinson NCDENR-WRO 943 Washington Square Mall Washington, NC 27889 RE: Final Certification — Edenton Medical Park Application No. SW7060521 Dear Air. Vinson: Enclosed please find the final certification for the above project. � 4 � We appreciate your help in permitting this project. Please contact me if you have any questions or require any additional information. Sincerely, HOBBS, UPCHURCH & ASSOCIATES, P.A. pmeswven, P.E. Project Manager Nags Head, NC • Telephone 252-441-3913 • Fax 252-441-2100 • e-mail: info@hobbsupchurch.com Southern Pines - Myrtle Beach • Raleigh Charlotte DEMLR USE ONLY Date Received Fee Paid Permit Number lot o s -• r 7(y 6 o _5­3f] STORMWATER PERMITTING FORM 7: MINOR MODIFICATION Standard Permitting Program — No Fee for Minor Modification Express Permitting Program — See Express Fee Schedule Only complete applications packages will be accepted and reviewed. This form and the required items (with original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating the project on the interactive online map at: htt ://de .nc. ov/contact/re ional-offices. This form is to only to be used by the current permittee to notify the Division of a minor modification. Pursuant to Rule 15A NCAC 02H .1002, a minor modification is a change to the project that: 1) does not increase the net built -upon area; and/or 2) does not change the size or design of the SCM(s). A. GENERAL INFORMATION ]RECEIVED JUL 1 9 2019 0 1. State Stormwater Permit Number: SW706521 2. Current Permit Holder's Company Name/Organization: Paradigm Development Group, LLC 3. Signing Official's Name: Al R. Chesson 4. Signing Official's Title: Manager 5. Mailing Address: PO Box 1147 City: Williamston State: NC ZIP: 27892 6. Street Address (if different): : 315 West Main Street City: Williamston State: NC ZIP: 27892 7. Phone: (252) 792-4486 Email: al(a1archesson.com 8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach additional pages or supporting tables similar to Section IV.10 of the original application, if needed): Updating proposed impervious areas for Lots 4 & 5_ No revision or reallocation to the permitted allowable impervious area on Lots 4 and 5. B. SUBMITTAL REQUIREMENTS Please mark "Y" to confirm the items are included with this form. Please mark X'if previously provided. if not applicable or not available, please mark N/A.: Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form. N/A 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the originally approved plan sheets). N/A 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective covenants OR the proposed recorded deed restrictions and protective covenants documenting the changes and a signed agreement to provide the final recorded document. NIA 4. If applicable, the appropriate Express review fee. Stormwater Permit Form 7: Minor Modification Page 1 of 2 July 14, 2017 C. CONTACT INFORMATION 1. The Design Professional who is authorized to provide information on the Applicant's behalf: Design Professional's Name: Bryan C. Fa undus Consulting Firm: Ark Consulting Group, PLLC Mailing Address:2755-B Charles Blvd. City: Greenville State: NC Zip:27858 Phone: (252) 588-0888 Fax: Email: bryan(oarkconsultinggroup.com 2. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name & Title: Organization: Mailing Address: City: Phone: L� Email: D. CERTIFICATION OF PERMITTEE State: Zip: Fax: { I, Paradigm Development Group, LLC, the current permittee, certify that I have authorized the minor modifications listed in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and complete to the best of my�knowlledd. Signature: 1�`-x- f L- �It� Date: JI,1 !U Zd/ I, 1?,; � �,ti -. U3 1 1 a Notary Public for t e State of i'V 0 C l 0 - County of C.1 f1 do h reby certify that eS personally appeared before me this the O day of 20 , and acknovrledge the due execution of the forgoing instrument. Witness r0hand and official seal, (Notary'Seai, f (votary Signature My commission expires C�S�d3I CQ n SUMMARY OF IMPERVIOUS AREA SW706521 LOTS 4 AND 5 REVISED Lot # Lot Area (SF) Permitted Impervious (SF) % Impervious Permitted (SF) Existing Impervious (SF) Proposed Impervious (SF) Total Impervious After Minor Mod. (SF) 4 41,093 30,820 75% 25,717 1,971 27,688 5 33,897 25,423 75% 0 7,806 7,806 DEMLR USE ONLY Date Received Fee Paid Permit Number STORMWATER PERMITTING FORM 7: MINOR MODIFICATION Standard Permitting Program — No Fee for Minor Modification Express Permitting Program — See Express Fee Schedule Only complete applications packages will be accepted and reviewed. This form and the required items (with original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating the project on the interactive online map at: http://deg.nc.gov/contact/regional-offices. This form is to only to be used by the current permittee to notify the Division of a minor modification. Pursuant to Rule 15A NCAC 02H .1002, a minor modification is a change to the project that: 1) does not increase the net built -upon area; and/or 2) does not change the size or design of the SCM(s). A. GENERAL INFORMATION gS 1V,ED JUL 1 9 IVS 1. State Stormwater Permit Number: SW706521 2. Current Permit Holder's Company Name/Organization: Paradigm Development Group, LLC 3. Signing Official's Name: Al R. Chesson 4. Signing Official's Title: Manager 5. Mailing Address: PO Box 1147 City: Williamston State: NC ZIP: 27892 6. Street Address (if different): : 315 West Main Street City: Williamston State: NC ZIP: 27892 T Phone: (252) 792-4486 Email: alCdarchesson.com 8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach additional pages or supporting tables similar to Section 1V.10 of the original application, if needed): Updating proposed_ impervious areas for Lots 4 & 5. No revision or reallocation to the permitted allowable impervious area on Lots 4 and 5. B. SUBMITTAL REQUIREMENTS Please mark "Y" to confirm the items are included with this form. Please mark `X" if previously provided. If not applicable or not available, please mark N/A.: Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form. NIA 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the originally approved plan sheets). NIA 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective covenants OR the proposed recorded deed restrictions and protective covenants documenting the changes and a signed agreement to provide the final recorded document. NIA 4. If applicable, the appropriate Express review fee. Stormwater Permit Form 7: Minor Modification Page 1 of 2 July 14, 2017 C. CONTACT INFORMATION 1. The Design Professional who is authorized to provide information on the Applicant's behalf: Design Professional's Name: Bryan C. Fagundus _ Consulting Firm: Ark Consulting Group, PLLC Mailing Address:2755-B Charles Blvd. City: Greenville State: NC Zip27858 Phone: (252) 588-0888 _ Fax: Email: bryan(darkconsultinggroup.com (OPTIONAL) If you would like to designate another person to answer questions about the project: Name & Title: Organization: Mailing Address: City: S Phone: ( ) Email: D. CERTIFICATION OF PERMITTEE I, Paradi m Development Group, LLC, the current permittee, certify that I have authorized the minor modifications listed in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and complete to the/best of m kno edge. ...3t Signature: / r J/(l� �(j Date: 44 y I, B 11 I-, 2 W tl,`�Ot1 a Notary Public for the State of IV Of-j f in 0.- County of _ �_ do hereby certify that C SSon p6rsahally appeared before me this the IDday of 20and acknowledge -the due execution of the forgoing instrument. Witness rRy hand and official seal, (Notary Seals Notary Signature My commission expires 0, 0.3 Permit No. S Z4 0_5' ) (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM __r-v j; -1". /,.— WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original SEP 0 12006 DWQ Stormwater Management Plan Review: �' t.'r; Q t I r to A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: EDENTON MEDICAL PARK Contact Person: JAMES BOWEN, PE Phone Number: ( 252) 441 —3913 For projects with multiple basins, specify which basin this worksheet applies to: CHOWAN elevations Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation areas Permanent Pool Surface Area Drainage Area Impervious Area volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SAIDA I Diameter of Orifice Design Rainfall Design TSS Removal Z Form SWU-102 Rev 3.99 1.0 ft. (floor of the basin) 6.0 ft. (elevation of the orifice) 7.5 ft. (elevation of the discharge structure overflow) 29,659 sq. ft. (water surface area at the orifice elevation) 24.1 ac. (on -site and off -site drainage to the basin) 9.7 ac. (on -site and off -site drainage to the basin) 101,843 cu. ft. (combined volume of main basin and forebay) 53,960 cu. ft. (volume detained above the permanent pool) 19,147 cu. ft. (approximately 20% of total volume) 2.8 (surface area to drainage area ratio from DWQ table) 3.0 in. (2 to 5 day temporary pool draw -down required) 1.0 in_ 90 % (minimum 85% required) Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 901/6 TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials JHB a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). JHB b. The forebay volume is approximately equal to 20% of the basin volume. JHB c. The temporary pool controls runoff from the design storm event. JHB d. The temporary pool draws down in 2 to 5 days. N/A e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) JHB f. The basin length to width ratio is greater than 3:1. JHB g. The basin side slopes above the permanent pool are no steeper than 3:1. JHB h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). JHB i. Vegetative cover above the permanent pool elevation is specified. JHB j. A trash rack or similar device is provided for both the overflow and orifice. JHB k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. N/A 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. JHB m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 8 does not incorporate }pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads -�3^ feet in the main pond, the sediment shall be removed. 3.75( When the permanent pool depth reads ­1-3' feet in the forebay, the sediment shall be removed. BASIN DIAGRAM oil in the blanks) Permanent Pool Elevation 6•0 Sediment Re oval El. 2.3 75 o ------------- - Sediment Removal Elevation 2.3 75% Bottom E!e tion 1.0 %-------------------------------------------- ----- Bottom Elevation 1 • 0 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. 1 acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name:.. _�0- 84 F,G• SSA roT - Title: VICZ PPZS• Address: PO BOX 46 EDENTON NC 27959 ot.,.— 252 482-596F; Dote: The iegaily responsible party should not be a homeowners association unless more than 500/6 of the lots have been sold and a resident of the subdivision has been named the president. 1, A� a . _ , a Notary Public for the State of N" � , County of , do hereby certify that personally appeared before me this day of _, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ``��rtrlA. lr��►�� , F _ • �OTAR�. _ s A �•o _ COUN��`• SEAL My commission expires April 13, 2008 Form SWU-102 Rev 3.99 Page 4 of 4