HomeMy WebLinkAboutSW7060521_CURRENT PERMIT_20060921STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW74(2t��
DOC TYPE
ECURRENT PERMIT
l
❑ APPROVED PLANS
❑ HISTORICAL FILE
DOC DATE
9�POgo�I
YYWMMDD
waR-a
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
September 21, 2006
Mr. John Bassett, VP
Paradigm Development Group, LLC
PO Box 46
Edenton, NC 27932
Subject: Stormwater Permit No. SW7060521
Edenton Medical Park
High Density Subdivision Project
Chowan County
Dear Mr. Bassett:
The Washington Regional Office received a complete Stormwater Management Permit
Application for Edenton Medical Park on September 1, 2006. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW7060521, dated September 21, 2006 to Paradigm Development Group, LLC for
modification to an existing wet detention pond to serve the proposed roadway improvements,
the BB&T site, Filbert Creek Apartments, and lots 3-10 located on Claire Drive in Edenton,
NC.
This permit shall be effective from the date of issuance until September 21, 2016, and shall
be subject to the conditions and limitations as specified therein. This permit shall replace
permit SW7041113 issued April 4, 2005. Please pay special attention to the Operation and
Maintenance requirements in this permit. Failure to establish an adequate system for
operation and maintenance of the stormwater management system will result in future
compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within thirty (30) days
following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office
of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such
demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact Scott Vinson, or me at (252) 946-6481.
Sincerely,
t
Al Hodge
Regional Supervisor
Surface Water Protection Section
AH/sav: C:STORMWATERIPERMIT1SW7060521
cc: James Bowen, PE
Judy H.E. Adams
Chowan County Building Inspections
,^ashington Regional Office
Central Files
North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service
Intemet: ulvw.newatergualitv.or943 Washington Square Mall, Washington, NC 27889 1-877-623-6748
An Equal OpportunitylAffirmative Action Employer — 50% Recycted110% Post Consumer Paper
I�tCarolina
ura!!y
State Stormwater Management Systems
s Permit No. SW7060521
c
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Paradigm Development Group, LLC
Edenton Medical Park
Chowan County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Water Quality and
considered a part of this permit.
This permit shall be effective from the date of issuance until September 21, 2016 and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.5 on page 3 of this permit. The commercial
subdivision is permitted for proposed roadway improvements,, the BB&T site,
Filbert Creek Apartments, and lots 3-10. See attachment for the allowance of
square feet of built -upon area for each lot. The development of lots 1, 2 & 12 are
not covered under this permit.
3. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
Page 2 of 8
State Stormwater Management Systems '
Permit No. SW7060521
5. The following design elements have been permitted for this wet detention pond
stormwater facility, and must be provided
in the system at all times.
a.
Drainage Area, acres:
24.06
b.
Total Impervious Surfaces, ac:
9.69
C.
Pond Depth, feet:
5.00
d.
TSS removal efficiency:
90%
e.
Design Storm:
1"
f.
Permanent Pool Elevation, FMSL:
6.00
g.
Permitted Surface Area @PP, ft2:
29,659
h.
Permitted Storage Volume, ft3:
53,960
i.
Storage Elevation, FMSL:
7.50
j.
Controlling Orifice:
3.00" O pipe
k.
Permanent Pool Volume, ft3:
101,843
I.
Forebay Volume, ft3:
19,147
m.
Receiving Stream / River Basin:
UT to Pembroke Creek I Chowan
n.
Stream Index Number:
26-1-1
o.
Classification of Water Body:
"B; NSW'
11. SCHEDULE OF COMPLIANCE
1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature
(such as swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving
approval from the Division.
2. The permittee is responsible for verifying that the proposed built -upon area for
the entire lot, including driveways and sidewalks, does not exceed the allowable
built -upon area. Once the lot transfer is complete, the built -upon area may not be
revised without approval from the Division of Water Quality, and responsibility for
meeting the built -upon area limit is transferred to the individual property owner.
3. If an Architectural Review Board or Committee is required to review plans for
compliance with the BUA limit, the plans reviewed must include all proposed
built -upon area. Any approvals given by the Board do not relieve the lot owner of
the responsibility to maintain compliance with the permitted BUA limit.
Page 3 of 8
State Stormwater Management Systems
Permit No. SW7060521
4. The permittee shall submit to, the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of all or part of the project area.
The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval or a CAMA Major
permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
5. The Director may determine that other revisions to the project should require a
modification to the permit.
6. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
7. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
8. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
9. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification.
10. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
11. Permanent seeding requirements for the stormwater control must follow the
guidelines established in the North Carolina Erosion and Sediment Control
Planning and Design Manual.
12. Prior to the sale of any lot, the following deed restrictions must be recorded:
a. The following covenants are intended to ensure ongoing compliance with
State Stormwater Management Permit Number SW7060521, as issued by
the Division of Water Quality under NCAC 2H.1000.
b. The State of North Carolina is made a beneficiary of these covenants to
the extent necessary to maintain compliance with the Stormwater
Management Permit.
C. These covenants are to run with the land and be binding on all persons
and parties claiming under them.
Page 4 of 8
State Stormwater Management Systems
Permit No. SW7060521
d. The covenants pertaining to stormwater may not be altered or rescinded
without the express written consent of the State of North Carolina, Division
of Water Quality.
e. Alteration of the drainage as shown on the approved plans may not take
place without the concurrence of the Division of Water Quality.
f. The maximum built -upon area per lot is (see attachment) square feet.
This allotted amount includes any built -upon area constructed within the
lot property boundaries, and that portion of the right-of-way between the
front lot line and the edge of the pavement. Built upon area includes, but is
not limited to, structures, asphalt, concrete, gravel, brick, stone, slate,
coquina and parking areas, but does not include raised, open wood
decking, or the water surface of swimming pools.
g. Each new lot owner must receive an Off -site State Stormwater Permit by
the Division of Water Quality prior to any construction being started on the
lot.
h. All runoff on the lot must drain into the permitted system. This may be
accomplished through providing roof drain gutters, which drain to the
street, grading the lot to drain toward the street, or grading perimeter
swales and directing them into the pond or street. Lots that will naturally
drain into the system are not required to provide these measures.
i. Built -upon area in excess of the permitted amount will require a permit
modification.
13. A copy of the recorded deed restrictions must be submitted to the Division within
30 days of the date of- recording the plat, and prior to selling lots. The recorded
copy must contain all of the statements above, the signature of the Permittee, the
deed book number and page, and the stamp/signature of the Register of Deeds,
14. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ
personnel. The facility must be in compliance with all permit conditions. Any
items not in compliance must be repaired or replaced to design condition prior to
the transfer. Records of maintenance activities performed to date will be
required.
15. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
function at optimum efficiency. The approved Operation and.Maintenance Plan
must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of structures, orifice, catch basins and
piping.
g. Access to all components of the system must be available at all times.
16. Records of maintenance activities must be kept and made available upon
request to. authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
17. This permit shall become voidable unless the facilities are constructed in
accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
Page 5 of 8
State Stormwater Management Systems
Permit No. SW7060521
18. Built upon area includes, but is not limited to, structures, asphalt, concrete,
gravel, brick, stone, slate, coquina and parking areas, but does not include
raised, open wood decking, or the water surface of swimming pools.
III. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. In the event there is either a desire for the facilities to
change ownership, or there is a name change of the Permittee, a
"Name/Ownership Change Form" must be submitted to the Division of Water
Quality accompanied by appropriate documentation from the parties involved.
This may include, but is not limited to, a deed of trust, recorded deed restrictions,
Designer's Certification and a signed Operation and Maintenance plan. The
project must be in good standing with DWQ. The approval of this request will be
considered on its merits and may or may not be approved.
�. The permittee is responsible for compliance with all of the terms and conditions
of this permit until such time as the Director approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in .
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Permittee grants permission to staff of the DWQ to access the property for the
purposes of inspecting the stormwater facilities during normal business hours.
8. The permittee shall notify the Division of any name, ownership or mailing address
changes within 30 days.
9. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
Permit issued this the 215t day of September, 2006.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW7060201
Page 6 of 8
4 State Stormwater Management Systems
Permit No. SW7060521
Edenton Medical Park Page 1 of 2
Stormwater Permit No. SW7060521
Chowan County
Designer's Certification
I, , as a duly registered in
the State of North Carolina, having been authorized to observe (period icallylweeklylfull
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form are a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 7 of 8
State Stormwater Management Systems
Permit No. SW7060521
Certification Requirements:
Page 2 of 2
.1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted .
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
fi. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.
cc: NCDENR-DWQ Washington Regional Office
Chowan County Building Inspections
Page 8 of 8
SPREADSHEET SHOWING IMPERVIOUS LOT COVERAGE
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT B LOT 9 LOT 10 LOT 12 FILBERT
CREEK
BASIN INFORMATION
BRAND- SWM PUMP EXISTING NEW NEW TOTALS
SPIGAL POND STATION I ROAD ROAD 1 ROAD 2
RECEIVING STREAM NAME
UNNAMED TRIBUTARY
TO PEMBROKE CREEK
RECEIVING STREAM CLASS
B NSW
B NSW
B NSW
I B NSW
B NSW
B NSW
B NSW
B NSW
1 B NSW
B NSW
B NSW
B NSW
B NSW
B NSW
B NSW
B NSW
B NSW
B NSW
B NSW
DRAINAGE AREA AC
0.00
0.00
1.08
0.94
0.78
1.37
0.73
0.69
1.17
2.72
3.14
4.00
1.48
0.60
2.16
0.10
1.82
0.79
0.49
24.06
EXISTING IMPERVIOUS AREA AC
0
0
0
0
0
0
0
0
0
0
0
1.44
0.69
0
0
0.02
0.90
0
0
0
PROPOSED IMPERVIOUS AREA(AC)-0.00
0.00
0.70
0.61
0.51
0.90
0.48
0.45
0.76
1.57
0.00
0.00
0.00
0.00
0.00
0.00
0
0.40
0.27
9.69
IMPERVIOUS AREA TOTAL
#DIV/0!
#DIV/01
65%
65%
65%
65%
65%
65%
65%
58%
0%
36%
47%
0%
Doh
22%
50%
50%
. 54%
40%
IMPERVIOUS
ON -SITE BUILDING SF
10,000
10,000
8,000
15,000
8,000
7,500
12,000
26,681
25,700
5,272
128,133
ON -SITE STREETS SF
10,000
9,000
8,000
14,000
7,250
6,500
12,000
28,885
15,246
7,000
1.000
39,344 1
17,404
11,578
187,207
ON -SITE PARKING SF
7,000
51000
4,000
7,000
3,500
4,000
6,500
10,593
13,504
15,000
76,097
ON -SITE SIDEWALK SF
3,500
2,750
2.000
3,000
2,000
1,500
2,500
2,277
6,098
3,000
28,625
OTHER ON -SITE SF
2,178
2,178
OFF -SITE SF
0
EXISTING SF
TOTAL IMPERVIOUS
0
0
30,500
26,750
22,000
39,000
20,750
19,500
33,000
68,416
0
62,726
30,272
0
0
1,000
39.344
17,404
11.578
422,240
SITE DRAINING TO POND
46,841
41,093
33,897
59,783
31,937
29,876
51,062
118,556
136,779
174,241
64,443
26,117
93,877
4,465
79,260
34,560
21,288
1,048,075
State Stormwater Management Systems
Permit No. SW7060521
Edenton Medical Park
Stormwater Permit No. SW7060521
ChowanC_ounty
Designer's Certification
Page 1 of 2
I, .�drt.,ti S L3out� , as a duly registered P�ot~ESSto+� &PJ6xt�16flLin
the State of North Carolina, having been authorized to observe (Period ice ll week ull
time) the construction of the project,
D &0 t c A-L_ P/-QK
(Project)
�P, t.LG
for PAKA0%r►M _c>eg6 .oP+�-4�T Ca (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to: be built within substantial
compliance and intent of the approved plans and specifications.
The checkiist of items on page 2 of this form are a part of this. Certification.
Noted deviations from approved plans and specifications:
3, A$ Lois ARe D6JELo PED bg.A-AI (, w %LL BE P6RFoR.r� �o Tn
D 1 rt E c�- w A•r-e¢ -M -r w E Pe*j v.
4. RoaF wu u Be 1P%R•6GTE'o Ac, L-Wrs DGv�+.,oPEO,
8. P2o_x-cT S I rG HAh a6eo Kq PaD sdG o6-0•
Signature 4el2l,
-A,(-( '
Registration Number 30,4 34
Date 3 1 4-, 0 -7
MAIR 19 2007
SEAL
y..��t►tt!�t�l�
G R R 0
.tea• � -����
4 SEAL. r,
030434
Page 7 of 8
A 0
JA92
o r o
till
State Stormwater Management Systems
Permit'No. 5W7060521
Certification Requirements: Page 2 of 2
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2.
The drainage area to the system contains no more than the permitted
sEE
amount of built -upon area.
All the built -upon area associated with the project is graded such that the
s
runoff drains to the system.
e6'i'4
All roof drains are located such that the:runoff'is directed into the system.
✓ 5.
The outlet/bypass structure elevations are per the approved plan.
6.
The outlet structure is located per the approved plans.
7.
Trash rack is provided.on the outlet/bypass structure.
SE 6
DC -IQ 'Am 0*J 8.
All slopes are grassed with permanent`vegetation.
9.
Vegetated slopes are no,steeper than 3:1.
✓ 10.
The inlets are located per the approved plans and do not cause short-
circuiting of'the system.
V/ 11.
The permitted amounts of surface area and/or volume have been
provided.
✓ 12..
Required drawdown devices. are correctly sized per the approved plans.
13.
All required design depths are provided.
14.
All required parts of the system are provided, such as a vegetated shelf, a
'forebay, and the vegetated filter.
dimensions
15.
The required of the system are provided, per the approved
plan.
CC' NCDENR-DWQ Washington Regional Office
Chowan County Building Inspections -
Page 8 of 8
0 Hobbs, Upchurch & Associates, P.A.
Consulting Engineers
2522 S. Croatan Highway • Suite 2A - P.O. Drawer 1929 • Nags Head, North Carolina 27959
March 16, 2007
Scott Vinson
NCDENR-WRO
943 Washington Square Mall
Washington, NC 27889
RE: Final Certification — Edenton Medical Park
Application No. SW7060521
Dear Air. Vinson:
Enclosed please find the final certification for the above project.
� 4 �
We appreciate your help in permitting this project. Please contact me if you have any
questions or require any additional information.
Sincerely,
HOBBS, UPCHURCH & ASSOCIATES, P.A.
pmeswven, P.E.
Project Manager
Nags Head, NC • Telephone 252-441-3913 • Fax 252-441-2100 • e-mail: info@hobbsupchurch.com
Southern Pines - Myrtle Beach • Raleigh Charlotte
DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
lot
o
s -• r 7(y 6 o _53f]
STORMWATER PERMITTING FORM 7:
MINOR MODIFICATION
Standard Permitting Program — No Fee for Minor Modification
Express Permitting Program — See Express Fee Schedule
Only complete applications packages will be accepted and reviewed. This form and the required items (with
original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating
the project on the interactive online map at: htt ://de .nc. ov/contact/re ional-offices.
This form is to only to be used by the current permittee to notify the Division of a minor
modification. Pursuant to Rule 15A NCAC 02H .1002, a minor modification is a change to the project that:
1) does not increase the net built -upon area; and/or
2) does not change the size or design of the SCM(s).
A. GENERAL INFORMATION
]RECEIVED JUL 1 9 2019
0
1. State Stormwater Permit Number: SW706521
2. Current Permit Holder's Company Name/Organization: Paradigm Development Group, LLC
3. Signing Official's Name: Al R. Chesson
4. Signing Official's Title: Manager
5. Mailing Address: PO Box 1147
City: Williamston State: NC ZIP: 27892
6. Street Address (if different): : 315 West Main Street
City: Williamston State: NC ZIP: 27892
7. Phone: (252) 792-4486 Email: al(a1archesson.com
8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach
additional pages or supporting tables similar to Section IV.10 of the original application, if needed):
Updating proposed impervious areas for Lots 4 & 5_ No revision or reallocation to the permitted allowable
impervious area on Lots 4 and 5.
B. SUBMITTAL REQUIREMENTS
Please mark "Y" to confirm the items are included with this form. Please mark X'if previously provided. if not
applicable or not available, please mark N/A.:
Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form.
N/A 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the
originally approved plan sheets).
N/A 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective
covenants OR the proposed recorded deed restrictions and protective covenants documenting
the changes and a signed agreement to provide the final recorded document.
NIA 4. If applicable, the appropriate Express review fee.
Stormwater Permit Form 7: Minor Modification Page 1 of 2 July 14, 2017
C. CONTACT INFORMATION
1. The Design Professional who is authorized to provide information on the Applicant's behalf:
Design Professional's Name: Bryan C. Fa undus
Consulting Firm: Ark Consulting Group, PLLC
Mailing Address:2755-B Charles Blvd.
City: Greenville State: NC Zip:27858
Phone: (252) 588-0888 Fax:
Email: bryan(oarkconsultinggroup.com
2. [OPTIONAL] If you would like to designate another person to answer questions about the project:
Name & Title:
Organization:
Mailing Address:
City:
Phone: L�
Email:
D. CERTIFICATION OF PERMITTEE
State: Zip:
Fax: {
I, Paradigm Development Group, LLC, the current permittee, certify that I have authorized the minor modifications
listed in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and
complete to the best of my�knowlledd.
Signature: 1�`-x- f L- �It� Date: JI,1 !U Zd/
I, 1?,; � �,ti -. U3 1 1 a Notary Public for t e State of i'V 0 C l 0 -
County of C.1 f1 do h reby certify that eS
personally appeared before me this the O day of 20 , and
acknovrledge the due execution of the forgoing instrument. Witness r0hand and official seal,
(Notary'Seai,
f (votary Signature
My commission expires C�S�d3I CQ n
SUMMARY OF IMPERVIOUS AREA SW706521 LOTS 4 AND 5 REVISED
Lot #
Lot Area (SF)
Permitted
Impervious (SF)
% Impervious
Permitted (SF)
Existing
Impervious (SF)
Proposed
Impervious (SF)
Total Impervious
After Minor Mod. (SF)
4
41,093
30,820
75%
25,717
1,971
27,688
5
33,897
25,423
75%
0
7,806
7,806
DEMLR USE ONLY
Date Received Fee Paid Permit Number
STORMWATER PERMITTING FORM 7:
MINOR MODIFICATION
Standard Permitting Program — No Fee for Minor Modification
Express Permitting Program — See Express Fee Schedule
Only complete applications packages will be accepted and reviewed. This form and the required items (with
original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating
the project on the interactive online map at: http://deg.nc.gov/contact/regional-offices.
This form is to only to be used by the current permittee to notify the Division of a minor
modification. Pursuant to Rule 15A NCAC 02H .1002, a minor modification is a change to the project that:
1) does not increase the net built -upon area; and/or
2) does not change the size or design of the SCM(s).
A. GENERAL INFORMATION
gS 1V,ED JUL 1 9 IVS
1. State Stormwater Permit Number: SW706521
2. Current Permit Holder's Company Name/Organization: Paradigm Development Group, LLC
3. Signing Official's Name: Al R. Chesson
4. Signing Official's Title: Manager
5. Mailing Address: PO Box 1147
City: Williamston State: NC ZIP: 27892
6. Street Address (if different): : 315 West Main Street
City: Williamston State: NC ZIP: 27892
T Phone: (252) 792-4486 Email: alCdarchesson.com
8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach
additional pages or supporting tables similar to Section 1V.10 of the original application, if needed):
Updating proposed_ impervious areas for Lots 4 & 5. No revision or reallocation to the permitted allowable
impervious area on Lots 4 and 5.
B. SUBMITTAL REQUIREMENTS
Please mark "Y" to confirm the items are included with this form. Please mark `X" if previously provided. If not
applicable or not available, please mark N/A.:
Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form.
NIA 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the
originally approved plan sheets).
NIA 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective
covenants OR the proposed recorded deed restrictions and protective covenants documenting
the changes and a signed agreement to provide the final recorded document.
NIA 4. If applicable, the appropriate Express review fee.
Stormwater Permit Form 7: Minor Modification Page 1 of 2 July 14, 2017
C. CONTACT INFORMATION
1. The Design Professional who is authorized to provide information on the Applicant's behalf:
Design Professional's Name: Bryan C. Fagundus _
Consulting Firm: Ark Consulting Group, PLLC
Mailing Address:2755-B Charles Blvd.
City: Greenville State: NC Zip27858
Phone: (252) 588-0888 _ Fax:
Email: bryan(darkconsultinggroup.com
(OPTIONAL) If you would like to designate another person to answer questions about the project:
Name & Title:
Organization:
Mailing Address:
City: S
Phone: ( )
Email:
D. CERTIFICATION OF PERMITTEE
I, Paradi m Development Group, LLC, the current permittee, certify that I have authorized the minor modifications
listed in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and
complete to the/best of m kno edge. ...3t
Signature: / r J/(l� �(j Date: 44 y
I, B 11 I-, 2 W tl,`�Ot1 a Notary Public for the State of IV Of-j f in 0.-
County of _ �_ do hereby certify that C SSon
p6rsahally appeared before me this the IDday of 20and
acknowledge -the due execution of the forgoing instrument. Witness rRy hand and official seal,
(Notary Seals
Notary Signature
My commission expires 0, 0.3
Permit No. S Z4 0_5' )
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM __r-v j; -1". /,.—
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original SEP 0 12006
DWQ Stormwater Management Plan Review: �' t.'r; Q t I r
to
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name: EDENTON MEDICAL PARK
Contact Person: JAMES BOWEN, PE Phone Number: ( 252) 441 —3913
For projects with multiple basins, specify which basin this worksheet applies to: CHOWAN
elevations
Basin Bottom Elevation
Permanent Pool Elevation
Temporary Pool Elevation
areas
Permanent Pool Surface Area
Drainage Area
Impervious Area
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SAIDA I
Diameter of Orifice
Design Rainfall
Design TSS Removal Z
Form SWU-102 Rev 3.99
1.0
ft.
(floor of the basin)
6.0
ft.
(elevation of the orifice)
7.5
ft.
(elevation of the discharge structure overflow)
29,659
sq. ft.
(water surface area at the orifice elevation)
24.1
ac.
(on -site and off -site drainage to the basin)
9.7
ac.
(on -site and off -site drainage to the basin)
101,843 cu. ft. (combined volume of main basin and forebay)
53,960 cu. ft. (volume detained above the permanent pool)
19,147 cu. ft. (approximately 20% of total volume)
2.8 (surface area to drainage area ratio from DWQ table)
3.0 in. (2 to 5 day temporary pool draw -down required)
1.0 in_
90 % (minimum 85% required)
Page I of 4
Footnotes:
When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 901/6 TSS removal.
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
JHB
a.
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
JHB
b.
The forebay volume is approximately equal to 20% of the basin volume.
JHB
c.
The temporary pool controls runoff from the design storm event.
JHB
d.
The temporary pool draws down in 2 to 5 days.
N/A
e.
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
JHB
f.
The basin length to width ratio is greater than 3:1.
JHB
g.
The basin side slopes above the permanent pool are no steeper than 3:1.
JHB
h.
A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
JHB
i.
Vegetative cover above the permanent pool elevation is specified.
JHB
j.
A trash rack or similar device is provided for both the overflow and orifice.
JHB
k.
A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
N/A
1.
If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
JHB
m.
A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does 8 does not incorporate }pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads -�3^ feet in the main pond, the sediment shall be removed.
3.75(
When the permanent pool depth reads 1-3' feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
oil in the blanks)
Permanent Pool Elevation 6•0
Sediment Re oval El. 2.3 75 o
------------- - Sediment Removal Elevation 2.3 75%
Bottom E!e tion 1.0 %-------------------------------------------- -----
Bottom Elevation 1 • 0 25%
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Page 3 of 4
7. All components of the wet detention basin system shall be maintained in good working order.
1 acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name:.. _�0- 84 F,G• SSA roT -
Title: VICZ PPZS•
Address: PO BOX 46 EDENTON NC 27959
ot.,.— 252 482-596F;
Dote: The iegaily responsible party should not be a homeowners association unless more than 500/6 of the lots have been sold and a
resident of the subdivision has been named the president.
1, A� a . _ , a Notary Public for the State of N" � ,
County of , do hereby certify that
personally appeared before me this day of _, and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
``��rtrlA.
lr��►�� ,
F
_ • �OTAR�.
_ s A �•o _
COUN��`•
SEAL
My commission expires April 13, 2008
Form SWU-102 Rev 3.99 Page 4 of 4