Loading...
HomeMy WebLinkAboutSW7051002_CURRENT PERMIT_20121220STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ZU,SII%D�, DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YA`!J YYYYMMDD NCDENR . North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Walkid Dee Freeman Governor Director Secretary DIVISION OF WATER QUALITY December 20, 2012 X.S. Smith, Inc. Attn: Mr. Richard W. Smith Jr. 932 Page Road Washington, NC 27889 Subject: Dear Mr. Smith: Stormwater Permit No. SW7051002 Industry Ready Building, Lot 4 High Density Stormwater Project Beaufort County The Washington Regional Office received your request for a Name/Ownership change for the subject project on October 1, 2012. An inspection conducted by Bill Moore on November 19, 2012 revealed that the stormwater systems are constructed and working properly, with only a few minor maintenance issues noted. An engineer's certification was submitted on December 19, 2012 by Mr. Sam Jarvis indicating that the stormwater system is built substantially according to approved plans. Based on our review of your project/request, we are forwarding Permit No. SW7051002 dated December 20, 2012 to X.S. Smith, Inc. This permit shall be effective from the date of issuance until December 20, 2020 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to"the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. North Carolina Division of Water Quality Internet: www.ncwaterquality.� 943 Washington Square Mall Phone. 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal OpporturitylA#firmative Action Employer— 50% Recycled110% Post Consumer Paper NorfhCarolina ,aturally k Page-2 of 2 X.S. Smith, Inc. December 20, 2012 Page Two If you have any questions, or need additional information concerning this matter, please contact Mr. Bill Moore of our Washington Regional Office at (252)948-3919. Sincerely, ;J Charles Wakild, PE cc: Jarvis Associates Beaufort County Planning/Inspections WARD Stormwater Files State Stormwater Management Systems Permit No. SW7051002 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the -provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO X.S. Smith, Inc Beaufort County FOR THE construction, operation and maintenance of innovative. stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for (4) subsurface infiltration systems to serve the Industry Ready Building, Lot 4, located off SR1456 (Page Road) near Washington, NC. This permit shall be effective from the date of issuance until December 20, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The project built -upon area shall be limited as stipulated on page 4 of this permit, and as shown on the approved plans. 3 DIVISION OF WATER QUALITY PROJECT DATA Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body Total Site Area: Allowable Impervious Area By Drainage Basin: Required Storage Volume: (based on 1-inch) Storage Volume Provided in Subsurface Stone Beds: Porous Concrete Areas Provided: Beaufort County Industry Ready Building, Lot 4 SW7051002 Beaufort County X.S. Smith, Inc 932 Page Road Washington, NC 21889 10/01/2012; original. 12/19/2012; complete UT -Maple Branch C-NSW 8.45 acres 1.31 ac - Basin B 0.43 ac - Basin C 0.56 ac - Basin D 1.01 ac - Basin E 4785 cf - Basin B 1631 cf - Basin C 2060 cf - Basin D 3672 cf - Basin E 4785 cf - Basin B 1631,cf - Basin C 2060 cf - Basin D 3872 cf - Basin E 60 sf - Basin B 70 sf - Basin C 75 sf - Basin D 24 sf - Basin E Subsurface Stone Bed 6700 sf @ 1.70 ft depth - Basin B Storage Areas: 5796 sf'@ 0.67 ft depth - Basin C 4900 sf @ 1.00 ft depth - Basin D 13,050 sf @ 0.67 ft depth - Basin E Note: Each subsurface infiltration system is designed with a drawdown device constructed ofiPVC pipe embedded in the stone layer. The outlet pipes have been sized to drawdown the design storm from the stone beds in less than 5 days. 4 ;1 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as' swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built - upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the, changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built - upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: 5 A4 a. Semi-annual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of inlets, outlets, orifice devices and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, Forth Carolina, 27889, attention Division of Water Quality. 7. A copy of the approved plans and specifications small be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does riot preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. At least 6 months prior to the expiration date, The Permittee shall request in writing to have the permit extended. IV. SPECIAL CONDITIONS 1. The porous concrete sections must be maintained properly in order to infiltrate the design storm. In addition to the maintenance activities contained in the signed operation and maintenance agreement, the following requirements apply to each of the porous concrete sections: a. Inspect each porous concrete section after each rainfall event, and at.least monthly. b. Remove any accumulated debris, sediment, oil, grease, or any other foreign materials for proper disposal. c. Use high pressure washing and vacuum truck procedures to clean each porous concrete section at least once per year, or more often if needed. Aftereach major cleaning, use clean water to test the infiltration capacity of the porous concrete sections. d. To protect the porous concrete sections, immediately remove any significant hydrocarbon or grease spills from the parking/pavement areas and dispose of properly. 2. The permittee shall maintain a permanent record of all operation and maintenance activities for these systems. These records must include, at a minimum; dates, times, weather observations, condition of system components, maintenance activities, spills, corrective actions and name of inspector. 3. The permittee shall maintain the area on the approved site plan, designated as "contingency treatment system (wet detention)", for the life of this permit, or as it may be modified, or reissued by the Division. 4. In the event of failure of these innovative systems to meet the requirements of the Stormwater Rules and this permit, the permittee shall submit, upon notice from the Division of 7 Water Quality, a stormwater application for a permit modification including plans and specifications for a wet detention pond system, or other alternative system that meets the requirements of the stormwater rules. Permit issued this the 20 th day of December, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Charles Waki1 P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7051002 H. r Stormwater Permit SW7051002 X.S. Smith, Inc Industrial Building, Lot 4 Washington, NC (4) Porous Concrete/Subsurface Infiltration Systems Designer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project) (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date A State of North Carolina C C E IVE D Department of Environment and Natural ResourceA %L. R Division of Water Quality al- OCT - 1 2012 WS0 STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION s_A0d9 ®WQ_WARC7 Stormwater Management Permit Number: �� 2. Project Name: 3. Current Permit Holder's Company Name/Organization: ,b,.d�'T'%;J_J<. 4. Signing Official's Name: W04DtkW Y _ Title: 5. Mailing Address: _ O. D is�i City: 6. Phone: State: ,G . Zip: 2f — O 6>= Fax:( II. PROPOSED PERMITTEE / OWNER / PROJECT / ADDRESS INFORMATION This request is for: (please check all that apply) ❑'ICame change of the owner (Please complete Items 1, 2 and 3 below) ❑ N me change of project (Please complete Item 5 below) [Mange in ownership of the property/company (Please complete Items 1, 2, 3, and 4 below) [� Mailing address / phone number change. (Please complete Item 4 below) ❑ Other (please explain): 1. Proposed permittee's company name/organization}�r- 2. Proposed permittee's signing official's name:Ei/,�1-_� 3. Proposed permittee's title: 4. Mailing Address:r3Z�'",b:�G.' City: r ter-'' z�. - State://. <�. Zip: Phone: {7� _ �j� _ �o�o Fax: ( r 5. New•Pro ec� tiName to•be_placed,on Please check the appropriate box. The proposed permittee listed above is: ❑ HOA or POA (Attach documentation showing that the HOA or POA owns, controls, or has a recorded easement for all areas that contain stormwater system features. Print name of HOA or POA in #1 above and provide name of HOA/POA's authorized representative in #2 above) he property owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final approval of this transfer will be granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information on page 4) 923- 03c1l-, q¢ 3 - 7472 SSW N/O Change Rev24Sept2012 Page 1 of 4 I] i • N • h,:v �r'c ^� � .tea„ icy `i �l�` ��„� >� It .�;.• Ms, ..� �� i �i 4� 43 III. REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer. 1. This completed and signed form. Tlhis'certificatiori must.be complet_ed' and signed by both- the' `-2. Legal documentation of the property transfer to a new owner. �3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit. • 4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from each DWQ Regional office), if required by the permit and if not already submitted to DWQ. 5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability company, or other corporate entity, provide documentation showing the authority of the named representative to act on behalf of the proposed permittee. 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV. CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement: ❑ Check here if the current permittee is only changing hi�/ er/its name, the project name, or mailing address, but will retain the permit. I, 9 ILI , the current permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing address and/or I am changing the name of the permitted project. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. �ck here if current permittee is transferring the property to a new owner and will not retain own e shi of the permit. I, a-� We 0.0A.LLFP , the current permittee, am submitting this application for a transfer of ownership for permit #S I hereby notify DWQ of the sale or other legal transfer of the stormwater system associated with this permit. I have provided a copy of the most recent permit, the designer's certification for each BMP, any recorded deed restrictions, covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved operation and maintenance agreement, past maintenance records, and the most recent DWQ stormwater inspection report to the proposed permittee named in Sections 11 and V of this form. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. I assign all rights and obligations as permittee to the proposed permittee named in Sections II and V of this form. I understand that this transfer of ownership cannot be approved by the DWQ unless and until the facility is in compliance with the permit. t Signature: Date: jo- 1 Z aY Z C, S i �J a Notary Public for the State of /Vp27Ai 0_4-ui_;)A __ County of , do hereby certify that personally appeared before me this the j 53 day of I) C 10B C_u , 20 I.1 , and acknowledge the due execution of the ttttn^rrrrrr forgoing instrument. Witness my hand and official seal,j;1ryUSea�,�.,,' c..� �� Gi j+'' ti• N&Vy Signature _ i ,t4074 MyComm'=' n E*s January 3 2015 SSW N/O Change Rev24Sept2012 Page 2 of 4 o''••.....•••'' qr C 0 oll 14 �ii�L1�cC��.i3 Cj��ll,'�G rj,`,(15�, �u jG�C •, . • , � , , s 'r � V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permi a for all transfers of ownership) I, is .U• �S' ri �.J , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. acknowledge and attest that I have received a copy of: (check all that apply to this permit) the most recent permit the designer's certification for each BMP Eany recorded deed restrictions, covenants, or easements ["the DWQ approved plans and/or approved as -built plans Rthe approved operation and maintenance agreement [-past maintenance records from the previous permittee (where required) �j DWQ stormwater inspection report showing compliance within 90 days prior to this transfer I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and complete to the best of m e e. i understand that if all required parts of this application are not co ted or ' fired supp rtin formation and attachments listed above are not included 1— ion p� a wi as incomplete. Signature: : —1 z �-. I— Z oyZ a Notary Public for the State of �6r cc County of ZPeatu-1 on , do hereby certify that 1'1 fGhca-d (J• �:�h i personally appeargo"— fo a me this the Ap day of _(�nA,,_ , 20 1Z, and aci dge execution of the forgoi instrumen Witnes my hand and official Nbfary Signature lq&�*,y C-p«es & n. L, Z3, Z o/ Co seal, 4 0 Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed above is not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee / developer and the property owner will appear on the permit as permittees. SSW N/O Change Rev24Sept2012 Page 3 of 4 'A VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION If the Proposed Permittee listed in Sections I/ and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information below and sign this form: Printed Name: �D Organization: Title within the Organization: Street Address: —Z Z�2=cLa L aE0 j City: �l�l��-f State:Zip: Mailing Address: S�-r7tC (if different from street address) City: State: Zip: Phone: 2S 2 --- Email: Fax: I certify that I own the property identified in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a permittee along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure too erate and maintain the stormwater treatment facility in accordance with the permit is a viol of N General Statute (NCGS) 143-215.1, and may result in appropriate enfo_r. e t ion incl n the assessment of civil penalties of up to $25,000 per day, pub Signature of the property owner /o- 2- Zo/Z I,6.Z,aotary Public for the State of 14 orb non. I iNA- , County of __9eau4' r 4- , do hereby certify that ich rr_j '3IYrA jr, personally appeared before me this the I day of DC k d P�!, , 20 /Z , and acknowledge the due execution of the forgoi g instrument. Wit n ss my hand and official seal, rotary Wary Signature ti ok,at g p,,,s J/ere, 231 Zola SSW N/O Change Rev24Sept2012 Page 4 of 4 r 2 3 o 3 6 Central Files: APS SWP 11/15/12 Permit Number' SW7051002 Permit Tracking Slip Program Category Status Project Type State SW Active New Project Permit Type Version Permit Classification State Stormwater 1.00 Individual Primary Reviewer bill.moore Coastal SW Rule Coastal Stormwater- 1995 Permitted Flow Permit Contact Affiliation 440 - so6v Facility ouC',.- Faciiity Name Major/Minor Region Quick Start Industry Facility jC s• f lnC Minor Washington 404 z Location Address County Sr 1456 Beaufort Washington NC 27889 Facility Contact Affiliation Owner Owner Name Cwre` Owner Type Beaufort County nt Government - County Owner Affiliation Paul Spruill , ��• �'� PO Box 1027 Dates/Events Washington NC 27889 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice issue Effective Expiration 12/20/05 10/03/05 12/20/05 12/20/05 12/20/14 ulated Activities State Stormwater - ptIternative Desi n 3,31 C4� Outfall NULL Waterbody Name A16 l/C G ? gD PrC".r nested/Received Events Deed restriction requested Deed restriction received Additional information received Additional information requested 10/12/05 Additional information requested 11/16/05 Additional information received 12/14/05 Stream Index Number Current Class Subbasin Permit Number: 5 W ; 7051po2 (to be provided by DWQ) Drainage Area Number: A.L.L_. Infiltration Trench Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the infiltration trench will be carefully managed to reduce the sediment load to the sand filter. — The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The grass filter strip or Areas of bare soil and/or Regrade the soil if necessary to other pretreatment area erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide Iime and a one-time fertilizer application. Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure (if applicable) of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. RECEIVED OCT - 1 2012 DWQ-WARD Form SW401-Infiltration Trench O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The trench Water is ponding on the Remove the accumulated sediment surface for more than 24 from the infiltration system and hours after a storm, dispose in a location that will not impact a stream or the BMP. The depth in the trench is Remove the accumulated sediment reduced to 75% of the original from the infiltration system and design depth. dispose in a location that will not impact a stream or the BMP. Grass or other plants are Remove the plants, preferably by growing on the surface of the hand. If pesticide is used, wipe it on trench. the planLs rather than spraying. The observation well(s) The water table is within one Contact the DWQ Stormwater Unit foot of the bottom of the immediately at 919-733-5083. system for a period of three consecutive months. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. The emergency overflow Erosion or other signs of The emergency overflow berm will berm damage have occurred at the be repaired or replaced if beyond outlet. repair. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Trench O&M-Rev.3 Page 2 of 3 ti Permit Number: W % O S/ vo z (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: IN Print name name Titre: I Address:— Phone:- Signature:- Date:— /6 -- 1 '— z 0) 7 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 15 A (A , a Notary Public for the State of Alorlk �a,- liV'q , County of 'Tj00,�t �- , do hereby certify that iclyrc[ (.J• 3i'> ;lh Jdl_ personally appeared before me this day of (,��ei�, , ZO),,� , and acknowledge the due execution of the forgoing infiltration trench maintenance requirements. Witness my hand and official seal, � v� %®`9G SEAL My commission expires L,JP_t^o,,L,c. 23 20JQ Form SW401-Infiltration Trench O&M-Rev.3 Page 3 of 3 • •, � t -% .. � �, � 7 :n :� v �,i � �'t. ..: � �t Stormwater Permit SW7051002 Beaufort County Industry Ready Building, Lot 4 Washington, NC (4) Porous Concrete/Subsurface Infiltration Systems Designer's Certification I, RECEIVED D EC 1 9 2012 DWQ-WARO as a duly registered Professional Engineer in the State of No_ ft Carolina, having been authorized to observe (periodically/weekly/full mime) the construction of the project, 4) � 107 1 jk -F:t:,PL4 FF, for -:t Owner) hereby state that to the best of my abilities, uue care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date J \A C'AIJO05%, � 0 aa����a•bsa�. /A_� SEAL s a ,}v� 1P • 62-4-9 i a a -•�aarrforsam*•- 10 -