Loading...
HomeMy WebLinkAboutAtlantic Coast Pipeline Project - Raleigh Region - ACP General Permit Application 10-20-17_v1 Dominion Energy Services,Inc. ' Dominion Glen DominionVA boulevard Energy' Glen Allen,VA corn DominlanEnergy.wm October 17,2017 N.C.Division of Water Quality(DWQ) Raleigh Regional Office 3800 Barrett Drive Raleigh,NC 27609 Attention: Robert Patterson Reference: State Stormwater Notice of Intent(NOI) SWG040000—General Permit to Construct a Linear Utility Line and Associated Incidental Built-Upon Area(SWG04) Atlantic Coast Pipeline Raleigh Region North Carolina Mr.Patterson: Dominion Energy Transmission Inc.(DETI)on behalf of Atlantic Coast Pipeline, LLC is submitting the enclosed SWG04 General Stormwater Management Permit package for the built-upon areas of the Atlantic Coast Pipeline project within the Raleigh Region. The work is being completed in association with Atlantic Coast Pipeline,LLC's October 13,2017 Certificate of Public Convenience and Necessity from the Federal Energy Regulatory Commission(FERC)to construct and operate the Atlantic Coast Pipeline(ACP). DETI is seeking a General Permit from the DWQ. The proposed ACP is an interstate natural gas transmission pipeline that would serve multiple public utilities and their growing energy needs in Virginia and North Carolina. Atlantic Coast Pipeline LLC,a company formed by four major,regionally based energy companies: Dominion,Duke Energy,Piedmont Natural Gas and Southern Company Gas,will develop,construct and operate the Atlantic Coast Pipeline. The built-upon area in the DWQ Raleigh Region stormwater jurisdiction is approximately 1.24 acres and approximately 0.1%of the total project area within the Raleigh Region. This application is directed towards construction activities that will result in permanent facilities that will be located in areas subject to North Carolina's post-construction stormwater permitting requirements. DETI has separately submitted Erosion and Sediment Control Plans for approval,and sought coverage under North Carolina's NPDES general permit for construction stormwater Dominion Energy Services.Inc. Dominion Glen Dominion Boulevard 060 OW Energy' Glen Allen,io Boule DeminionEnergy.mm discharges associated with the Atlantic Coast Pipeline. The permanent facilities include one valve site and two permanent access roads. Only existing roads to receive additional built-upon area and new roads within the State stormwater program area are included with this application. A site plan showing the location and proposed erosion and sediment control best management practices are included with this package. Upon completion of pipeline construction,the valve site and access roads will remain in place and the right-of-way will be restored to the pre- construction conditions. If you should have any questions or require additional information concerning this letter or attachments,please contact Robert Hare—Manager,Environmental— Atlantic Coast Pipeline,Dominion Energy Services,Inc.at 804-314-2832 at your convenience or via e-mail at robert.p.hare@dominionenergy.com. Sincerely, d` Leslie Hartz Vice President—Pipeline Nnstruction Dominion Energy Transmission Inc. Attachment 1: SWG04—General Permit Application and Fees Attachment 2: Figure 1—USGS Project Overview Map Attachment 3: Figure 2—USGS Regional Overview Map Attachment 4: Site Plan cc: Robert Hare—Dominion Energy Services,Inc. Scott Robinson—ERM Tiffini Smith-ERM Attachment 1 SWG04 - General Permit Application and Fees FOR AGENCY USE ONLY N . C . DIVISION OF WATER QUALITY Date ReceivedYear Month Day SURFACE WATER PROTECTION SECTION Certificate of Coverage STATE STORMWATER NOTICE OF INTENT ( NOI ) S W G 0 1 1 Check # Amount SWG040000 - GENERAL PERMIT TO CONSTRUCT A LINEAR UTILITY LINE Permit Assigned to AND ASSOCIATED INCIDENTAL BUILT- UPON AREA State Stormwater Management Application Notice of Intent for coverage under the General Stormwater Management Permit to construct a utility line and incidental built - upon area associated with a linear utility project including water , sewer , gas , telephone , and electric . For the construction , operation and maintenance of incidental impervious areas associated with the construction of a linear utility line . Incidental built- upon area associated with the utility project includes small , single pump stations , access roads which minimize their built - upon area , concrete pads , manhole covers , etc . ( Please print or type ) 1 . Mailing address of owner/developer : ( The address to which all permit correspondence will be mailed. ) Owner/ Developer Name Atlantic Coast Pipeline , LLC c/o Dominion Energy Transmission Inc . Street Address 707 East Main Street City Richmond State VA ZIP Code 23219 Telephone No . (804 ) 771 -4468 Fax ( ) 2 . Proposed Project Information : Project Name Atlantic Coast Pipeline Project Street Address of the Project See Attachment 1 , Table 1 City State ZIP Code County Contact Person Leslie Hartz - VP Pipeline Construction Mailing Address 707 East Main Street City Richmond State VA ZIP Code 23219 Telephone No . ( 804) 771 -4468 Fax ( ) 3 . Physical Location Information : Please provide the street address of the project and describe how to get to the project , using street names , state road numbers , and the distance and direction from the nearest major intersection : See Attachment 1 , Table 1 4 . What is the name of the receiving stream ? See Attachment 1 , Table 1 5 . River Basin See Attachment 1 , Table 1 Receiving Stream Classification See Attachment 1 , Table 1 6 . This Certificate of Coverage is being submitted as a result of : 1A New or proposed project ❑ Modification to an existing project Existing COC or Permit Number : Date project is scheduled to begin construction November 2017 7 . What is the total project area above mean high water ? 87 , 365 , 839 ft2 8 . What is the total amount of built upon area proposed at this site ? 54 , 033 ft2 ( Please include all manhole covers , pump stations , concrete pads , and gravel access roads) SWU - 116 - 17FEB2010 Page 1 of 3 9 . What type of utility project will be constructed ? ❑ Water ❑ Sewer IN Gas ❑ Telephone ❑ Electric ❑ Other 10 . Has the built - upon area been minimized to the extent practicable ? EYES ❑ NO 11 . Is the runoff from the built - upon area outside the vegetative buffer directed away from surface waters , to the extent practicable ? /:1 YES ❑ NO 12 . Is the project within 575 ' of the Mean High Water line of class ORW waters ? ❑ YES ( Please show the 575 ' AEC line on plans ) X NO ( If yes, total built-upon area must be less than or equal to 25% of the total project area within the AEC above mean high water.) 13 . Are there any wetlands on the site ? YES ( please delineate on the plans ) ❑ NO Name and affiliation of person making this determination : ERM 14 . Please list all Best Management Practices employed at this site : The total built- upon area within the NCDEQ stormwater jurisdiction in the Raleigh region is 0 . 1 % of the total project area . With the exception of the built- upon area , all workspace will be restored to pre - conditions to the extent practicable . Structural stormwater management BMPs are not utilized due to the built- upon area representing only a small percentage of impervious 15 . Certification : area relative to the overall project footprint in the Raleigh region . North Carolina General Statute 143 - 215 . 6B ( i ) provides that : Any person who knowingly makes any false statement , representation , or certification in any application , record , report , plan , or other document filed or required to be maintained under this Article or a rule implementing this Article ; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article ; or who falsifies , tampers with , or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $ 10 , 000 . ( 18 U . S . C . Section 1001 provides a punishment by a fine of not more than $ 10 , 000 or imprisonment of not more than 5 years , or both , for a similar offense . ) I hereby request coverage under the referenced General Permit . I understand that coverage under this permit will constitute the permit requirement for the project and is enforceable in the same manner as an individual permit . I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true , complete , and accurate . .. /r Printed name o erson og s ning : L‘_?6. /thi..ez/DJ, `r- �1Title : ,-� . _ � : c � �� , � liars LA, e rz l6 r7 Al7 (Signature of 4 pp!icant) (Date signed) A check or money order must accompany this Notice of Intent for $505. 00, made payable to : NCDENR. Your application will be returned unprocessed unless all of the following items are submitted : ❑ This completed form ❑ Two sets of site and grading plans ❑ A check for $ 505 . 00 ❑ A USGS map with the project clearly located on it . Mail the entire package to : NCDENR Division of Water Quality Surface Water Protection Section — Stormwater at the Appropriate Contact Address ( see the following page) Note : The submission of this document does not guarantee the issuance of a Certificate of Coverage under the General Permit . SWU - 116 - 17FEB2010 Page 2 of 3 For questions,please contact the DWQ Central Office or Regional Office for your area. Win. •n-Sale U . A 4-1-tespipip, II r .cilialW,".1iF,. . . ItIA '. :iiiiir,,-,u,.._ . .. . ‘ riL .„7, 411., .,.,, e,. --,,,, r -.1,r< z .... . , < . - 'lle • ,ram 1 1Miliingian \J DWQ Regional Office Contact Information: ASHEVILLE REGIONAL OFFICE FAYETTEVILLE REGIONAL OFFICE MOORESVILLE REGIONAL OFFICE 2090 US Highway 70 225 Green Street 610 East Center Avenue/Suite 301 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 HQW&ORW Projects in Counties Above (910) 433-3300 HQW&ORW Projects in Counties Above HQW&ORW Projects in Counties Above RALEIGH REGIONAL OFFICE WASHINGTON REGIONAL OFFICE WILMINGTON REGIONAL OFFICE 1 3800 Barrett Drive 943 Washington Square Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 HQW&ORW Projects in Counties Above Coastal Storm water,HQW&ORW Projects in Counties Coastal Storm water,HQW&ORW Projects in I Above Counties Above WINSTON-SALEM REGIONAL 1 CENTRAL OFFICE OFFICE 1617 Mail Service Center "To preserve, prated 585 Waughtown Street Raleigh, NC 27699-1617 e! and enhance Winston-Salem, NC 27107 (919) 807-6300 North Carolina's water.." (336) 771-5000 Phase 2 Post-Construction Projects not covered HQW&ORW Projects in Counties Above by local government SWU-116-17FEB2010 Page 3 of 3 Table 1-Summary of Built-Upon Area(NOI Item Nos.2,3,4 and 5) County Facility MP 2)Proposed Project Information 3)Physical Location Information 4)Receiving Stream 5)River Basin 5)Stream Classification 8)Built-Upon Area(BUA) 12)575 ft Within MHW of (acres) ORW Waters? Parcel:027560 Valve Site 27 is located in Whita kers,NC approximately 1 mile Nash Valve site 27 64.3 Owner:Barney Cecil Pearson from exit 150 on 1-95.From 1-95,take exit 150 to NC-33 toward Bloomery Swamp Neuse C;NSW 0.06 No Address:10776 Simms Rd,Bailey NC 27807 Whitakers.Turn right on NC-33.Turn right on NC-48(NC-4).After approximately 0.5 miles,ACP Valve Site 27 is located on the left. Parcel:025126 Access Road 18-047-AR1 is located in Rocky Mount,NC Owner:Jackie S.Ennis Address:Null approximately 5.5 miles from exit 141 on 1-95.From 1-95,take Nash 18-047-AR1 41.6 exit 141 to NC-43/Dortches toward Red Oak/Rocky Mount.Turn Flat Rock Branch Tar-Pamlico C;NSW 0.83 No Parcel:048727 right on Dortches Blvd(NC-43).Continue on Red Oak Blvd(NC- 43).After approximately 1.6 miles,ACP Access Road 18-047-AR1 Owner:James U.Ennis and Jackie S.Ennis Address:Null is located on the right. Parcel:027560 Access Road 18-235.AR1 is located in Bailey,NC approximately Owner:Barney Cecil Pearson 5.9 miles from exit 127 on 1-95.From 1-95,take exit 127 toward E Address:10776 Simms Rd,Bailey NC 27807 NC-97.Turn right on E NC-97(E NC Highway 97).Turn left on Nash 18-235.AR1 64.3 Sandy Fork Rd.Turn right on Old Silver Lake Rd.Turn left on Old Bloomery Swamp Neuse C;NSW 0.35 No Parcel:315001 Bailey Hwy.Turn right on W Homes Church Rd.Turn left on Owner:Dollie U.Griffin Simms Rd.After approximately 0.3 miles,ACP Access Road 18- Address:W Homes Church Rd 235.AR1 is located on the right. Total BUA= 1.24 Attachment 2 Figure 1 - USGS Project Overview Map van r,..!-- _ y - _-- ---' uS 5t3�-. � I ''6s. " ` John Kerr Virginia Green,�eville -' - 36o VIRGIN �* Reservoir / v A ._.:P a X Spread 0 300 �'o-- �} — — eppvn_I / ��_: — — — — — Spread f3 0 :i AF?". ,H co R.I . .i, Hy co • North Carolina Lake Vance ,ql, Northampton Person i \' Warren ' 888 ft I • i Gr anvitle '---1--\.-stE - —' Henderson Halifax r ' Hal - :hi ? Ta, l,,,,, tsa , ea ` Durham I qQ. _- , Franklin sir dill*�a. I -i [Durham Nash r;....t_., r.1,1.11 It 543 rt 2145 it 50 Spread 9 Cary Raleigh .d ake B Everett am Jordar Wilson Lake Vl - • __l©-_ ,r•=�,I III.: Johnston ;, c� .$c'lr7f Ord H ar i-ter _S.r. - i `� 1000 c" ..ale,atneixCs I•I •born . 469 ft d �le1s Coharie h.nr t..lr • -'^dts 3 Spread 10 Len of r - 04 —r - - -- Cumberland'-Ill' aona . Sampson ilia,,,, 150e . f4. - tit. 1.1 k:sorl•. r - - jI i ._S 1 ' Robeson .) R��L I� Lumberton _ :, • \P �rY i-t 3: 1�, 0 10 20 Miles \N This information i�,nvironmental review purposes only. - Legend Atlast ntic ^,/FayettevilleRegion Atlantic Coast Pipeline Project Pipeline ,. Raleigh Region Figure 1 lr 0 Milepost Region Overview Map , ' Dominion Regional Office Boundary North Carolina C. Spread Break Start RI \\USMINFS01\Data\Team\DMMV\GIS\Clients\D-F\DOM\SRPP\_ArcGIS\2017\09\29_NC_Post_Construction_Permit_Analysis\_Overview.mxd 1 REVISED:10/03/2017 I SCALE:1:1,150,000 DRAWN BY:SDB Attachment 3 Figure 2 - USGS Regional Overview Map Lake Gaston (/ John H Karr R�grVo,. Virginia VIFGINIA Spread. ,,,,,,����.. Spread W vp-- - 0----— Karr Lake Saari 0 .. . Recreation Area L. 10 North Carolina Nnstnamt)roq ftoarroke apid. ¢V7 fl 10 Northampton • 6 ,568r+ ' / Hvrr.lc.r i„ --.9h Halifax 20 / he r 30 - 0 Enfield r3 M''a•,r. Scotland fi I. Louisburg 40 O 18-047-AR 1 Ft Oat Nash Wake Forest 1i.r tl}rre. — n at C7 50 s'=ky Mount 60 Spread CIO,0 ' .,.a,��' ` Bethel Knlghtda le ,;,y dcll ffi 18-235.AR1 70 O Wilson rl a- d F, rc �� Clayton f...,s y�F! ®p 80 1. e_ • 'r„t Greenville,y 1 Farm wine 057R cr e Vb' .e-, er P SAW?�'`,- Johnston,, --- 2jz" 241 fr 90 k Ryden °r+_,.v Hill Fou aks • Cf °5 1100 °th. La Grange f87 N -..a-_w Kinston Biladla I S Sampson 0 2.5 5 I 0 Miles This information is for environmental review purposes only. Atlantic Legend Pipeline /./Fayetteville Region ij Spread Break Start Atlantic Coast Pipeline Project Pipeline ".„,"Raleigh Region Q Valve Site Figure 2 11` T, Regional Office Boundary-Access Road Raleigh Region Dominion North Carolina Page 1 of 2 \\usmiNFS01\Data\Team\DMMv\CIS\Clients\D-F\DOM\SRPP\_ArcGIS\2017\09\29_Nc_Post_constmction_Permit_Analysis\_Reg,on_maps.mxd I REVISED:10/03/2017 I SCALE:1.755,723 DRAWN BY:SDB Attachment 4 Site Plan © 2017 GAI Consultants, Inc. I I I I I I I I I II I II NOTE: 600 X 600 STATIONING SHOWN ON * o * 2161+78 0 THE DRAWING IS BASED I�-a o N '�' cm>N EDGE OF WOLLETT r ON SLOPE MEASUREMENTS. 500 ^' N N N m N o al z '�' cn o0 0 �' = MILL RD lo, o,I ZN zN �o� �N Z CD o+ oU, 65 m+O I 2161+55 4; z�) I�w 500 *+ c° ���„ 11>+ ZN �''� zN 'i,X �+ g+ =N EDGE OF WOLLETT q rmx o� Z+ zo Z+ �+ �+ �+ >nJ Otn M� 0cr DN y� E >+ + >o > cn z OD Z rn I MILL RD N z = =O >CO >W Z� >o .ZJrr7o cL0 + LcN =W = O Z 00 >00 0 400 0 _ _- > =c° cn z+ cnrn z+ o o o0, cn� =J w 400 z N O fN =J >� =CNTI COo c° 7. NJ NJ �+ > Ow -- N O ''I m I -r7 COTI -r� I O XTI 0l °) D p W 0_ 300 N N N N N N N N N N O w (0 N ry N ry N N N N CA N O - o = 9+ O+ OJ O 300 O N °) 00 O N CD CA N N N N N N D G•I N D O N TI N_ N N c) 0 0 0) Do O N + + + + + + + co O N J O CD O CO 00 Cn� °' m O O) O O O O O 8 O O O O O O O p 0 0 - + O ± O X + O N + + + + Cl 200 _� co co co o o O __-- ---- ----- ---- ---- ----- --- ---- ----- _ O O - ---- - O --- O - O ---- O 1 o o 0 200 z <5% -- --- <5% 5-1 % <5% 5-10% <5% <5% <5% <5% --_ - <5% 5-10% 5-10% 5-10% <5% 0_ 10-20% <5% 10-20% 5-10% <5% <5% 5-10% <5% 5-10% <5% <5% <5% w O <5% <5% �, (1)PROFILE VIEW 10o STATION EQUATION 100 0 STATION = 2121+20.88 BK. H O R Z: 1 " = 200' STATION = 2120+35.52 AHD. LLJ VERT: 1 " = 200' 0 0 0 o_ o- 2161+63 2162+22 a 2161+51 1 +1 0 N N N N N N N N N N N N N N / N_ _ _ _ N _ _ _ _ N •A •A NN _ N N 07 U UI 01 Ui N N P N 0) 0) 0 01 O O N w . 4, O O (0 0 j U, N G, . 01 (r U, J CO 0 w O ISI� + + ^+' PROPOSED TEMPORARY R.O.W. o + + o c+, cn + + + + ����� ����� + + rn����� ����'� + + -, z )0 4' u" ,, w w > > °, w N G�G�I,N N .1_�G�I, G�I_�I, N o.1_�G�I,o ' N °, D /10 w Z/7 /=4 /=7=/-7 /= T% 4 T= T T . °' . N T/ T/T 0,I�� ��00 N �� . _ _ o Cii o N PROPOSED PERMANENT R.O.W, �, �, o cNr- PROPOSED 36" AP-2 PIPELINE > rn N c), cn PROPOSED PERMANENT R.O.W. w .. cn o 0) ,,/ N o I- T/T/T//////� /T �/T -1- /- /li_ ////, T N N Y r.3 PRO ZZ1-1- POSED TEMPORARY R.O.W. Z 2160+s4 /11/1///// N N cm N N ISV N rn co N N N N 2160+80-,- (Tr; A N z + + N N + + N N N N + + N N N N + + N N N + ,ticl,llllarr 1 w 4, w co •: 0 0, w LT, 0 N 0 co w Ill cn cn / / Co . `' G A r'' STATIONING & J N m o N w ± w ± "� H �•' o f/-„,,;' CD • .p J � J � c0 rn rn o 0 00 0o rn rn w w � / / �,•OF C ;co aD U, a co co w w ,, J 4, o o c� •.'sS'1Q' CONSTRUCTION LIMITS TOPSOIL SEGREGATION AREA N - din cn LL-18-049 J �'' r+ LL-18-042 + + + + LL-18-048 + d + N/F + i! /� SA ti`4, cD LL-18-045 o LL-18-047 J o 4. c° JACKIE S. & LOTTIE S. ENNIS rn = (,.p I cn N/F N N/F N N/FN u' CO N/F w (0 PARCEL I.D. #0251 19 c"' ' Cr,.' Cxli\i �� C-:- BETTYRJ. ROAN JACKIE S. ENNIS T Qd I LL-18-049 I JOHN F. JR. & I I I ,. 7. \ JACKIE S. & 964 •LF LOTTIE S. ENNIS N F EUNICE P. GRIFFIN FAMILY LL-18-049 /'f/ ' q• `1'.`‘ PARCEL I.D. #027502 I I PARCEL I.D. #025126 I FARMS I I I N/F `'I I J I I I'`� 1- 947 LF PARCEL I.D. #025124 1040 LF JACKIE S. ENNIS PARCEL I.D. #102620 JACKIE S. & ENNIS D 2395 LF PARCEL I.D. #025119 O ROW ONLY 499 LF PARCEL I.D. #025119 _ w PROPERTY OWNERSHIP 5456 SF 192 LF \v`) cc ERM NC,[NC. / / _ � � / - • - \ �\ \ � \ \ \\ �\ \ / ' - - -- \ \\ \ �� - . 4 _ _ _ 0 •-• -_, , L --.7 ! ..-- . . • ,. _, .. __ •.• .. . -- . ___ ...\\ `-., s-- \ N. -__ --,--.. -- --_ -..„,. - --- ......-- -----'„,...- - .----- - ,,St N -\ 1g , r - __ ___-- 7: - __: ,_.\ y CD -......_ ____--11..PW 4.41", co / \ _ \ • , _ / / / • / / J N LL-18 \ \ \ \ 1 \ \ JOHN F. JR. & EUNICE P. GRIFFIN \ \ \ CO I- \ \ / I / / - V , \ / C/0 GRIFFIN -FAMILY - - . - N I ._-. . •, •-\\ \ \ \ j w ( / � --\ \\� �� \ / // // / / / '- • -• � � - � - -- N/F \ � \ `- ` \�\ \\~ �I L1 I PARCEL IX. # 1' •20 \\ _ - \� �\ N 0 J \ \ 1 •. . '.. ., .. - . . : / / / / - JACKIE S. a LO E S. ENNIS \\ ( ) I 1 I / / \ \ \ \ \\ O J O - r \ 1 / / / > \ PARCEL LD. 025124 \ \ \ \ ' I ) \ ., .\ bPO a) hi*, _.. ___-,--__ ___ _ _ _, \ . -................ \ i.0 / / / \ 'I I '1 I I PI 21 6+68 h • • Z � /A I / / / / // / ® // \\ - / . / / I .\ \ 1 I I 1 / / I / . �h \ � \` \ - w + Z - \ L \ \ \._ -1741 4 Z m/ / , _ / / \_ - - - ���� ( I I \ \ I I c0 `: SNAH4 / WETLAND - -- A \ 172- - �- D- J Oct / o / i (PI 2162+09 .. Y. \SNAHO29 �o j O o y 62 / �16 PI 21 • \ WETLAND ' '' N 4N WIDE , 2154+42 WNAH009F i r \\ __/ , < to / (PI 2133+13 IWJAHof�F N N •, N ¢ W N W v w W Q \\ i1�� 1./"/ ) IPI 2141+60 I ( / HUNTING a I U Nal - - \ N , N / -/60� , ��► \4 WIDE �� .. cV = - om / 7LANDIRO PIN / l N \. �= , I + STAND N , ' .. \ N lam` �� \\ Q 0- N- - / AH012F / / _ /' / N �' \ \ \ ' 'I $ o I c +/• / + ; c \ N v 0� �' _ \\ o mw N N ; , • . ;y, ; ; , ' ' /N / oo +o o+ + + ao \ 0 . c , . 't , ♦ __, .y- 0 , / / , r ` ►-v /g \ . .L$ * $ o �o n \y. \ -. \ I tHW 4 -4 N / O O O O \ + I / / �L i, .. 1�♦ ✓�Ii ` O7 i. + , y , i v \ \ j21 1+45 N 74 , , o I o o \ m I; . ♦ . g , , , i CL Z Q Z m m, .. �� \ W Omo o , i , 00 , , , i , , o / _ •-_ _ c izi �� ( I �. / _ ' ,�• I j •'q �, - .�, ' , . • Q oZZ J O [ \ , ,p•• • O t� i V / - _ 4 .'I ,� .=,, ,, ii ` / ( 1 r_ X' ' • , , • ' ,�' ' ' U U (n,.., , ,, • ,.� _ • C ; _ ', , , ' , • ' , • ' ' . r"' I I I � L I� I I �V d -- `. -•'• i� /!'�,i v_ L , . ' ; , • � / 0� / - m , •o , , , • ' , ' ; � :1 _ NJ 4y; , - J , ._. -_ ... n / -- /--, �,�. ��� ��/ IPA . _ ' �, 1 4 / / I ,,,Ti, ) . • // y , .��gi�%at�.'.4�s � i C.) 0 0 A . - , e.. , • \ AACCI W y , • -ri • ♦ - - r ' _ , • ,. I \ - L_[wa. AV/_ ,f / I , , , � r 'I , , ; ; , / / \ , • ; �� i ; ;' • , • � 31 • A _ ;_ J \ '\� Z _ • • •I Ira F , . •v 4. , • • • , • , • , , �Ii�l�� \\ t\ / / I ( j / l ��.. I I i , SNAHb05 9 I I,y ' , • ' ' \ • - . ' ' • • , , • � ' ' , ',', ', • •,'. ; ;; , it•. • , •� ;),� Z U W - 2.Z,:I_a` 7- I_._ , ' ' ; , ' • VIi!• - - \ - \ % a / / l I , 6' iMDE / , , • '/ EL;I�ID \ r • ' , • , • ' ' , ' • , \ \ O(n r ��. / •- � , , • • , , \ \ \ . / 4 ) / / / - _ I • T`010F LL-18-049__ \' a • , • , • y `.,- CN • •, • ' • , , , � 12136+4 4 I l I I / / / / I / I` / \ `, \ , ' , ' , , "r U 6) l , • , • , \� �� �_ �� cpd, g0 o co co v cv (o a I ( / - • J , • , , • • �; Q z , ) - - - \ i , • ' •, , • ' O� c5' i1 _�', _� coCO N ^ ^ V >'n / - / - • - _ ' ' ' 'I' O / Y O - -7: I m o d' 1 `� '� o,. d 1�-04� / PI 2165+84W , , Q ix ; , f I y \ \ \\ \ / I I T I T I ( / / /I - "OSE ACC -• 1: • �' S co cocfl t.. �� 1� 1 �- \ o\ IIII ' , , • ' trh - 'In 3 0 \ \ \ \ t / I I I I I I 118 047 � I'I I r. (JA K S. ENNIS - - \ \ \ �6 lu� , (no . o m a \ _ . • \ ' I I I I I I. / Lo. # 02512/6 _172 - �/ �� '6 wE NDz '� • ,MI c I \ \ I 1 ) ) I I I I I I I I' I I / / / �� wWAH 34F O 1 104o LF W 1 \ \ - -1. \ / / / / ( I I I I I \ I I I ( � / LL N/� / I ( l i . 174� 7t�If r'� ` \\ . OQ\ \ A. \ . / ON PIN STATION EQUATION / / p SI MUR $ r - _ - ,: .1• \ \ �' . aLL-18-d4s ct \ / I I 1 I 1 \ \ \ \ ) ) I : I PHY \ \D \ \ :Z \ / / STATION = 2121+20.88 BK. ' / ( P RCEL 1.D # 02 11 - I J - - \ ♦ N/F / \ \ \ *In \ / / STATION = 2120+35.52 AHD. \ \ / / ( ( I ( \ \ \ •1 ( 1 I I I ( ( / \-. \ \ JACKIE S. & LOTHE\gg ENNIS rn • - I / / \ \ \ : PARCEL I.D. # 02 11� - - l 1 I Ill / I/ / 1/ l I EXISTING ROAD ,� 1 - - ` _ - \ \ \\ ` ROW ONLY s SF \ Z \ \ / I \ / - \ / / / / MAJOR UPGRADE �' ` N\ w L�N� 2 \ \ \ ( ( ( II II I I ) ) 1 / �I / / \\ \ \ \ / i -1,,, / ROBERT`� & BETTY\J. .' / \ \ / • / I = -' . I I' / -/ - _ - - IL: • \ \ \ \ \ PARCEL;I.D. # 027502 \ N ,� / / / \ ( I I I //// . / / - \ \ \ ' \ \ SCALE: AS SHOWN / / / 947 LF - 1 \ \ -/ r / / / \ \ I 1 �'I / / //// I. I / / / / \ \ 1 " - ' ) 11116%, ( ( t '. . / i I . / 7 , -, ..1 ��� / / �- + \ , / \ \ SCALE: 1 = 200 DATE: 08 04 17 w \ \ N - - - -. -_ _ `�_ - J / / /, / + ;H�' _ / J / �� I II I ) 200' 0 200' 400' DRAWN: GPT i - / ._ \ \ _ f - J = ' / l -. .� / I • l7 / / / - \ CHECKED: DLH CC w APPROVED: NET u) Q D' PIPE SPECIFICATION I STATION EQUATION 2144+31 I I I EDGE OF WOLLETT �� EDGE OF WOLLETT 0 STATION = 2121+20.88 BK. MILL RD m MILL RD WETLAND WNAH011F gal consultants NC, inc. STATION = 2120+35.52 AHD. Z X N N N N N N N N N N N N N N N N N Z+ N I N N N IN N IN N 0°) N N N N N 4198 COX ROAD �j N N N N ) w w c w w w � � > � ci) cn cn cn cn 0) A I 0) 0) 0) 0) rn SUITE 114 Z + + I + I + + + + + + + + + + + + + I I 0 + + O N I rn I 00 0 .c" N o) 00 CO GLEN ALLEN, VA 23060 O o O O O O O O o O o O O O o O O o 0 o O X o O O D N O o O O O O o O o O O O O O O O O O o O O f O O O O O 0 O O c) f• 1 1 I 1 I. 1 I I I' I I I I I I - I I I o I I I I I I I o I 4- m o 0 � N.C. COL #F-0269 r m m (nA �� X M r =N =N VlN Z_ cn j ZNI I�'j I �fT1 N_ ZN �N I ZN N_ ZNI ZN_ nN �0 I �O Z� XG) ZN_ N �-+ C70 06) O C 7 0 I O>O O O > O N Z cm O O O J o O Cr),-,O O W Om o O z z �� z� cn zcn mcr zcr z j �°' I I z cn� z+ + >0) >00 Z� .Z7 f'l0 >J Z� >Cr �+ >+ >0) =N �� �O >J Z > >GI O Ln (n co >o J c0 0 N me N .'0(r > > V7 CO CO Z CO O o o > IN Cf) o = =o fX ow =o =o = OJ o0 O STRING VIEW BAND j I � o 0 o H I I M CO 0 CA (.,4 ct w Q NOTES: D- = LEGEND V PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY-UTM WITH NAD83 DATUM,ZONE 17,US SURVEY FOOT,CENTRAL MERIDIAN 81°W. I- 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS,INC FROM 11-03-2014 THRU 11-07-2014. / _ _ - ,IIIIII 7 TEMPORARY WATERBAR/SLOPE BREAKER BELTED SILT RETENTION PROPERTY LINE - STORM SEWER , ****1 3. IMAGERY TAKEN FROM GOOGLE EARTH. ,e## #, EXTRA WORK SPACE J���� I TOPSOIL SEGREGATION AREA TRENCH BREAKER/PLUG FENCE(BSRF) 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS&TAX ASSESSMENT RECORDS(PROVIDED BY OTHERS).GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE E UNDERGROUND ELECTRIC ,,,,,,, rl COIR LOG ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. I X X FENCE ����� A f 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. CD o STREAM CROSSING 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. PROJECT NO./DASH N 0. STREAM W WATER LINE COMPOST FILTER SOCK 7• ALL STATIONING SHOWN IS SLOPE STATIONING. '�.1.1.1.1.1. AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. USFWS STREAM CROSSING X( ORANGE SAFETY FENCE 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL C 140468 SAN SANITARY SEWER WITH ENHANCED CONTROLS 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES-1) EXISTING ROADS NO IMPROVEMENTS,2)EXISTING ROADS MINOR IMPROVEMENTS,3)EXISTING ROADS MAJOR IMPROVEMENTS G G EXISTING GAS PIPELINE _ _ _ _ ROADSIDE DITCH W y . CONSTRUCTION ENTRANCE WITH DITCH AND 4)NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING TASK NO. SUB TASK NO. z OH OVERHEAD UTILITY LINES EDGE OF GRAVEL w' WETLAND 0 UTILITY POLE .--` I CULVERT AS NEEDED Cub SOIL TYPE DRAINAGE;DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. W 10. 'ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE 005 00 W . W W ,,, (COLOR SHOWN TO PROVIDE CLARITY ONLY) CULVERT/ACCESS ROAD WATERBARS ♦ GENERALIZED SURFACE WATER FLOW NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. _I ACCESS ROAD - - - PROPOSED PERMANENT EASEMENT 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS GROUP ID DRAWING NO. OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS,AS APPROPRIATE. NOTE:THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE SURFACE WATER FLOW WITHIN ROW D E047 PROPOSED GAS PIPELINE - - PROPOSED GAS PIPELINE (NO GROUND SURVEY) E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). U Q WATERBAR OUTLET(PLAN VIEW) WATERBAR(PLAN VIEW) 47 OF 1 89 .7 CD THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. © 2017 GAI Consultants, Inc. STOATIONING SHOWN ON THE 600 o u) •• 600 DRAWING IS BASED ON 0 I o z w SLOPE MEASUREMENTS. o N N ao o 500 w oo In+ z±CO CD 1 Z+ 500 >m o o oo • • p xi N cD Oo N O 400 N 400 In o D w 0_ to U ::: ! IJ LIJ cA NNCA CA CoOoJ OJN4, 0) o ++ + + + O0oOoOOOOO---- --+----�- H---____i_J —� I-----+ H-----I- ----+ —I ----+----� ---+ 200 ce Z <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% <5% a in z PROFILE VIEW 100 STATION EQUATION 100 o W HORZ: 1 " = 200' PI STATION = 3282+29.97 BK. PI STATION = 3282+63.10 AHD. • f' VERT: 1 " = 200' 0 0 0_ 0_ a w CA CA CA w w w w 0 CND j CCD (NO CO CND (,+ Crl N N c,4 O N W O) J N Cs, O W U —I (n J►,,,,i J N + + cD cD o PROPOSED TEMPORARY R.O.W. + J����� + N N �� r7 T7 T� LTA iiii LTA T�7 T� / i i i i / T1 iiii T17 0) — — — — — — — — — — — — — — — /1 n� " PROPOSED PERMANENT R.O.W. PROPOSED 36" AP-2 PIPELINE n N n o �!1 L',I ,Lr N 0+0 w PROPOSED PERMANENT R.O.W. ,, 0, 00 w / r-. o , PROPOSED TEMPORARY R.O.W./ / / T�l�/1Z%Z//Till/�1Z/�l/T/��'/1/l/T/T/Z/1/1/T/T/T/1/1/1/T/T/1\3 X 0 CD CA mra• .r.r.r _E� ••I►,!,,,,, co N N cA N Z W , o CD -, N ,tilll,Illdrr,I CA CA CA CA STATIONING & �f TOPSOIL SEGREGATION AREA N4 co 7 "��,,c� GARO �f�;�, + + + + OaF ssio' CONSTRUCTION LIMITS 3293+77 N N iv • ' C w .Q W Crl (rl W d W (" )N v N N N W �'. a..e 'co cD00 OD cD J O+ + + LL-18-236 + + + LL-18-239 + f /% r s ` �, LL-18-225 LL-18-235 p LL-18-235 LL-18-237 LL-18-238 �,, : r j) 4 01 N/F rn oo N/F ^) l Ct1iN ' ''N/F I N/F !I BARNEY CECIL I N/Foil N/F I N/F I SHIRLEY BATTEN & O DOLLIE U. GRIFFIN BARNEY CECIL SR. PEARSON BARNEY CECIL SR. PEARSON JACK W. & PATSY BISSETTE WILLIAM G. THOMPSON f, TT'A.'RQ.3� PARCEL I.D. #025488 PARCEL I.D. #027560 SR. PEARSON PARCEL I.D. #027560 PARCEL I.D. #027625 PARCEL I.D. #002219 •GREG C. WILLIAMS I PARCEL I.D. #027549 I I I I PARCEL I.D. #104476 /�� `""""```� 1395 LF 454 LF 295 LF 689 LF 983 LF 1556 LF 808 LF PROPERTY OWNERSHIP r . � I/1' SHEET 109-17 LL-18-235/F `\ / e / 0 -'' BARNEY CECIL SR. PEARSCN \ / — _ _ // w I EXISTING ROAD i PARCEL I.D. #027560 \ - - .,- _ / Lu I MINOR UPGRADE I PROPOSED ACCESS ROAD LF — M' /"IF-- • I PI 3278+85 0 18-235-AR 1 I' 6489 SNA0002 \\ LL-18-237 / o \ , ( , 2 WIDE / N/F ♦ n // O \\ = • i /7t.A co •••3 '',,, JACK W. & PATSY BISSETTE 0 Q c N iv ; CO w PARCEL I.D. #027625 •T — - / ' ± + ', a► 1 N �' w - - - _ ' kAA 4 N 983 LF -ci- / .2 �°/ in i. =I•:,,:- $ -' �2$ + `� 4 (PI 3297+79 — — _ — _ _ LL- �F239 o I L LL-18-225 Na, - i -- ► $ _ + + kc N " - • ♦ BATTE GREG C. WILLIAMS — 0 o r I N F , ' ` __ y - ., ��� ^� , g + y " "- �` .- - P� 04476 `� I J V co is PARCEL I.D. 1 • DOLLIE U GRIFFIN- c+' `� w- -iiiii �i ,c .-`. '.-` `-"- '" PARCEL 1.9.4025488 N� -!OC o _ 7'— = `�' "w . / _ _ - . 0 > 1399 LF k / V r ' "r �.1r � • ...�' -- - " -'R-" �"CZt 6- _ — i c Q z LL1 w MILE 6 p . , _444 ` - o ►� — W -F Z al o VA S� $ • . s 6 ' L'*!�r �l� 4= ���:�i".�i �\ ,- "" �- - + "cb.- �''c,, MILE 65 �� ��� _ 'a / ON 1.S �. - VALVE SITE • rri� " .�". + , I— (1 CO o v N / o<y . 27 VOCHOA -"�"` " " Y .$ ` �- ""o ' -` -- �, I— o m w cr ` ' Iv -W (n z LL-18-223 to N / N �� .r - - -- " ' . ' - ` �. . - " .tv". �► w`'� N ~ o N/F c ut DA L CREAMER N ' k r STATION EQUA ON -�� • - - . " y, ,P A-CP A- IZ Li.l z O O m Y I.D. #044805 _ �0 - - - - " q�" - tN N %c Q z v 99 , '^ rm k PI STATION - �282+29.97 BK. �X - "$- ."•" - ` "� N - ® M o U cn t ' • PI STATION = 82+63.10 AHD. PO 0 8 " - - - , w ,o>'.`#��, •'"y ` r. Z Q o �/ . •` ill P.� � IRO PIN v " " - - - •-_ SHIRLEY, - + IM Q z O w --<'lillt IP U. 8-236 �- ��i:� �� �` v 45 BARNEY CECIL . P - • ON '19' - ` .- - I►y Z U • �r fit% �� % ` LL-18-234 •PARCEL LD. #02 549 - _I n i Q Z Lo / -cn ��- - lir �n N/F 295 LF ''"1 . I' ,c — I— I— cv . . - Wit►' — - - a `'� • ff i Fyn WILUAM E GLOVER ET AL - " ��� 1 °) Z ..�� ,SV PI 3266+66 o � _ �� . ort. J T. PARCEL I.D. �019904 , - - s. ". - - ct 11P N i^ ' ► �` �.�,�! `�,!<� LL- /F238 / (PI 3323+; Z >- + -o < y dt 46 es< 11 WIWAM G. THOMPSON WETLAND // -20C- _ LL-18-240 > 0 a �� •o:CoJ`p '�, ply `ot .i� PARCEL I.D. 002219 WNA0002F y 9� /F —, j 1556 LF 0� ♦ It n MARTY MELVIN/dt ct ^fin► Jo ,GO VP;1- 4- ♦ 0 �.� '-A. DALE W MU; Y cn n LL-18- 4e e6 9R y �O$ % '��''' • C c��, �� C ,� m ,• • / /� a <� PARCEL I.D. 1234: z OPHER`sl do �y y '�' �.� d tz-io �oG �i / / `\ L -- — _o — — y/ N 2� �. O PARCEL- #944528 • • aT1 * / ,/ ♦ ♦ _ — "b ; ��m� / ♦ 47 \111111111111111L\ — — _ / �!Fi SCALE: AS SHOWN 1 LL-18-226- a'�'$y ♦ �. /� SCALE: 1 " = 200' DATE: 08/04/17 N/F _ _ _ _ VICTOR L & SHARON R GALIPI • \Ii1 PARCEL I.D. 035835 / I 200' 0 200' 4 0 0' DRAWN: GPT / • I CHECKED: DLH CC w APPROVED: NET cn Q D' PIPE SPECIFICATION 1 m gai consultants - NC, inc. I c", w c.., w w w c-., w w w c., (,+ • c,, c,+ (,, • w w w w w w w w w w w • w c, 4198 COX ROAD N N N N N N I N N N N N N N N N W W W W W W W W W W W W U v J J J J W CO 00 03 OD CO c0 c0 CO c0 O O O O O N N N SUITE 114 Z p N 4, 0) Co O N A O 0o o N ? 0) 0o o N ? O 0o o N •A O 0o O N VA 23060 pO O O O O O O O O O O O O O O O O O O O O O O O O O p p o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 4, GLEN ALL EN, Q � N.C. Coo #F 50269 cD I I I I I I F 1 . I I I I I I I I I I I I I I I I I I I I -o m * ' * I co N o I ow cn in L4>- I STATION EQUATION zr c-, o N o w I +o — PI STATION = 3282+29.97 BK. K N • co o ' o in x) up PI STATION = 3282+63.10 AHD. z+ ; o N . , o N O p o 0 o STRING VIEW BAND o o o CC w Q NOTES: D' = LEGEND v PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY-UTM WITH NAD83 DATUM,ZONE 17,US SURVEY FOOT,CENTRAL MERIDIAN 81°W. I— 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS,INC FROM 11-03-2014 THRU 11-07-2014. / — — ,IIIIII, 7 TEMPORARY WATERBAR/SLOPE BREAKER BELTED SILT RETENTION PROPERTY LINE - STORM SEWER ,,,,,,, 3. IMAGERY TAKEN FROM GOOGLE EARTH. U) ,,v 4 EXTRA WORK SPACE J���� I TOPSOIL SEGREGATION AREA TRENCH BREAKER/PLUG FENCE(BSRF) 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS&TAX ASSESSMENT RECORDS(PROVIDED BY OTHERS).GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE E UNDERGROUND ELECTRIC ,,,,,,, Il COIR LOG ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 1 X X FENCE ����� A f 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. CD O STREAM CROSSING 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. PROJECT NO./DASH N 0. STREAM W WATER LINE COMPOST FILTER SOCK 7, ALL STATIONING SHOWN IS SLOPE STATIONING. '�.�.�.�.x.x. AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. USFWS STREAM CROSSING x( ORANGE SAFETY FENCE 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 140468 SAN SANITARY SEWER WITH ENHANCED CONTROLS 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES-1) EXISTING ROADS NO IMPROVEMENTS,2)EXISTING ROADS MINOR IMPROVEMENTS,3)EXISTING ROADS MAJOR IMPROVEMENTS G G EXISTING GAS PIPELINE _ _ _ _ ROADSIDE DITCH AND 4)NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING TASK NO. SUB TASK NO. zW y W CULVERT AS NEEDEDRANCE WITH DITCH Cub SOIL TYPE DRAINAGE;DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. z OH OVERHEAD UTILITY LINES EDGE OF GRAVEL ' W W W WETLAND r'' UTILITY POLE < / 10. 'ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE 005 00 W ,,, W ,,, W ,,, W ,,, (COLOR SHOWN TO PROVIDE CLARITY ONLY) / CULVERT/ACCESS ROAD WATERBARS ♦ GENERALIZED SURFACE WATER FLOW NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. J ACCESS ROAD — — — PROPOSED PERMANENT EASEMENT 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS GROUP ID DRAWING N0. OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS,AS APPROPRIATE. NOTE:THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE SURFACE WATER FLOW WITHIN ROW D E071 PROPOSED GAS PIPELINE — — PROPOSED GAS PIPELINE (NO GROUND SURVEY) E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10). Q WATERBAR OUTLET(PLAN VIEW) WATERBAR(PLAN VIEW) 71 OF 1 89 Q THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. © 2017 GAI Consultants, Inc. — ___ , , ir ^1 4. b. ,,:taf-- LL-18-045—A002 N w o PARCEL I.D. #037973 N - z a \ LL-18-045—A001 i PARCEL LD. 037973 \\ LL— 8-04 m o PARC�EL,I D • , , /t- Sao _ \ '--------, - Q---,...Aiip- - mite + «, o lor 007 cc / — � �_ OOl - r r 1 A" 1... a fa 0 • PROPOSED ; /m a o_ - 18-047 ':' LL-18-046 .r m ..4 a ci • - y - EL LD. #037974 -1 Z a • EXISTING ROAD ` �� c' 0 Z U '�sy _ — MAJOR UPGRADE -,..� • /�i� m m a c*.s., ‘," •, ' ..: :*: . ' ',. / 'lihirT Ilik 1 0 \ \ ` ♦ %i a. `.<..�. \ • PARCEL-LL �� �,,, III+d:, 4.4_ „„.-- at s., . \ N _ f 1- -, ..„. --',--:-N. z %....„„....... _ -18-049 • \ \ PARCEL I.D. \ \ 192LFv�� Q 964 LF \ \ IR,,,\ .INC. w ♦ \\ \ 0 N \ \♦\ Q + \ V Ln ACCESS ROAD U DETAIL 11 I 0 w - \ - V) �.. r / / \ co\ - t. .x. 'le,/ s1.' .. , .. 4/ ‘-'n.'f. '••:..i-:‘,00.-":4'.. ,..,.., ... Z > 1.-1 . ii, / ?,..Li „...„..."....10 ... ,- . .s. • .., .., .c....., , .. •. ., ,_ .., ,. . __ . z w _1 _ z . u) ......, . _..._pi.,, .... .5 ..,..„,..„ ,_ _,„, -V t ' I , -. _I Z 1- 1 w '� i 1° .,, i I *tv r r e•' 'V.a .,_ .:...._. Q LiJ- o Imo�� . •`-- Ya t :.-!.• • i/. \ •t mil'.• li -�'�" `L 7 �,f t'� .e- t F _ - \\ W Q N w 1 i t C ,'"' - ^� ya+ .fir, .�. i \ J' \ t Osi Q O in ) LL-18-143 �� , .; 01 C� V M Q o Its \ PARCEL I.D. 0003414 a = (p U = U o \ 1159 LF \ A. y �` M Q ¢ w (. '� I ; to Z t z I— (n \ • r Z U iiir w " 'f 1 ^\ -#3,�, N' PROPOSED ACCESS ROAD - -•Fb _ �.- ..,` , " _: — —175-, j :2: 18-123—AR 1 EXISTING ROAD — \ - N CD t MAJOR UPGRADE / \ 1—_, cn Z \ \ e - / .-y' \ \\ I ' 1 — OD, 4 y�0D1 = ' `- . w WETLAND LOD — _ 1 _ ► > •• _ — — — S. _ WNAG011 F 90'� aoi L�— LOD LOD _ _ 1 — ''' .- O is LOD LOD - \ \ m�� 1 M _; . \ a, ?. I SCALE: AS SHOWN I ' — — \ \ . / 'moo /� N • / ;.. DATE: 08/04/17 /) •* t _k — — _ LL-18-044 - ,.... -/ 'r / DRAWN: GPT U) — — — — — // / \ \ ARCEL I.D. #002599 // - s r.., / \ 1438 LF I / \ \_ CHECKED: DLH / ��0 icG r /r \ s. 4' w i I \ _' / / APPROVED: NET _ / \ . - . \ / ' / Q / \ I \ LL-18-1 1 I / — / Q PARCEL • LD. _ / i I / — `!� — — ' ' gai consultants - NC, inc. #003077 ` 4` - , / — I 569 LF r- / .• / / /) _ ' Q R 4 : • '�'+ �, I' 4198 COX ROAD CS , , • / / / / • ' a ` SUITE 114 Z / • _ i; ��� / `4 � ;rr.y r GLEN ALLEN, VA 23060 r / / , e - I / / - at _.4f .1 804-270-9357 Q N.C. COL #F-0269 C� ACCESS ROAD cn in DETAIL 12 in I 0 o SCALE: 1 " = 200' i ct Lu 200' 0 200' 400' Q NOTES: cL = LEGEND V PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY-UTM WITH NAD83 DATUM,ZONE 17,US SURVEY FOOT,CENTRAL MERIDIAN 81°W. I— 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS,INC FROM 11-03-2014 THRU 11-07-2014. PROPERTY LINE - - STORM SEWER IIIIII� 0 TEMPORARY WATERBAR/SLOPE BREAKER BELTED SILT RETENTION ,,,,,,, B SR I- 3. IMAGERY TAKEN FROM GOOGLE EARTH. ,e## #4 EXTRA WORK SPACE J�j-�� I TOPSOIL SEGREGATION AREA TRENCH BREAKER/PLUG FENCE(BSRF) 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS&TAX ASSESSMENT RECORDS(PROVIDED BY OTHERS).GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE E UNDERGROUND ELECTRIC , ,,,,, rl I COIR LOG ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. I X X FENCE ������A f 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM . D <> .STREAM CROSSING 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. PROJECT NO./DASH N 0. — STREAM W WATER LINE COMPOST FILTER SOCK 7, ALL STATIONING SHOWN IS SLOPE STATIONING. '�.�.�.�.I.I. AREA OF NO DISTURBANCE / PROPOSED TEMPORARY R.O.W. USFWS STREAM CROSSING X ORANGE SAFETY FENCE 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL 140468 WITH ENHANCED CONTROLS G G EXISTING GAS PIPELINE SAN SANITARY SEWER / ROADSIDE DITCH 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES-1) EXISTING ROADS NO IMPROVEMENTS,2)EXISTING ROADS MINOR IMPROVEMENTS,3)EXISTING ROADS MAJOR IMPROVEMENTS CONSTRUCTION ENTRANCE WITH DITCH AND 4)NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING TASK NO. SUB TASK NO. z S 3 AND 4. OH OVERHEAD UTILITY LINES EDGE OF GRAVEL W W W W W . W WETLAND r! UTILITY POLE CULVERT AS NEEDED CUB SOIL TYPE 10. DRAINAGE; IS SOLELY RESPONSIBLE FOR NAGE FEATURES ITHE NALL BE TUOREDAND ED FLOOCAR �ION OF THE DEPADS IN RCEED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE 005 00 w W . W _1W . „ (COLOR SHOWN TO PROVIDE CLARITY ONLY) CULVERT/ACCESS ROAD WATERBARS ♦ GENERALIZED SURFACE WATER FLOW NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. mg ® ACCESS ROAD — — — PROPOSED PERMANENT EASEMENT 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS GROUP I D D RAW I N G NO. �- NOTE:THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE SURFACE WATER FLOW WITHIN ROW OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS,AS APPROPRIATE. UPROPOSED GAS PIPELINE — ii ii — PROPOSED GAS PIPELINE (NO GROUND SURVEY) E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12). Q WATERBAR OUTLET(PLAN VIEW) D E 106 WATERBAR(PLAN VIEW) AR-106 Q CD THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS. © 2017 GAI Consultants, Inc. \ 111-7,...1*.x..„,-,-. . , . ...,„ �\ :ems . f- t :. 7t+.Y .''.: � °-t' $ fi cp t. j, ,. ` may. r " •. :1:T.,. f .,4 I:f,f'• _..... , .4,-.**:-..* I I / .� fiey a �I40 , ft , ., f w \ Iry <, s'e .•1�! +Y: 1 art zi: ut<T r.\\ • 1'- ' *►' .;�_, - •yy,�,S �1,, �r • t•y,. ` .__ t 'try. �' b ,.1f i #` "4 ".\ VAL4*".:, \ _',r I I ( '. '#; '� _� _ •. =ti`�1�., _ �.. .l!'> ` • ', p�. •r3i�"`��a r �Stic t�: '''�^- h� '� ,{ y lireiVK It 1 �� i . \ . ♦ ti ticyy�� yy . cn o n , . at ( ''n$:` '34. / ' I `•'!s , ' 3I',- �`" y � . r '�• w \, `. I, - I I �. _�s'3..� ► `\ yi P ♦+ �. \ 44 ,¢, Y j I...;0( {: rr �"�ii "- U LLI ‘, " (0 *4 - -' -1-V: -• \% 4e ,. \ ... 4:4.14k...4:, -..? i, ,*, ,,.. -I. _,,,,,,,,... -,,,,. ,,,. ,.---: , . - i f. . i ,3,.._ 1.-- ......_ ..,.... . . . . , N ..... . . ...„ • k co / �' cd 4°1" ' . fl / ` • ,:,.. -4:4.nt,•• 1 f war 771 \ / 1 \ V "1 . z0 ..14, tit4:10:t, ,,,•.: I \ / I • d - __------ I / . / \ \ - / \ . '-'- - "K -,,:!ellitinw7,:t, . 0_ /, - / PROPOSED ACCESS ROAD r- 11 I \ ii I \l \ \ Iv " , •• -,Ri; . ' '` _ : o ' - / 18-235-AR 1 I \ \ / / 1 \ _ // , / ^ -\ EXISTING ROAD I I \ \ I / / / ` \ 1 - `. `." 1 \ MINOR UPGRADE I \ \ I \\ / / \ / ' , / A \ I \ \ \ \` J/ I 1 / o • '. I b \ \ J / // / MATCH LINE. \ I r — — I / / w �. 1 / P" SHEET 71 J 1 ��' \ / o 0 • / \ • MATCH LINE o I / LL-18-235 SNAOO n l z *--------)' ,4.. I 90 a !. I/i SHEET 109-17 PARCEL I.D. #027560 N yylp \ �' / ,Il,l,,,l,r, I 1 , 454 LF Ilk,. ,,‘ GA,RO f, ' N •° ` o I VALVE SITE 689 LF \ N 1 O. �, r �'i_, i�;R ~'t... : /` : ; # / / 04 27 VOCHOA \ I WETLAND 0 .'�� �SIp'' ., ' 4 J` a , . `� . I /' N W \ l WNA0002F Q ,,,.... . . ,.� / co N , rY n,elY1 / 01 i. LL-18-237 0 } y_ -. I I ....7... .1.- • c a_. N \ I PARCEL I.D. #027625 ,' /{// '<= I �''� -- ; _t fi c�° N \ 983 LF - C •'•'c,�'GINS ,'•y�j s .� \ _ / - - ' - IA. _ - __�: o \\ �v :. 'a TA. �ta���� ,. LL 18-225 . 4 __ .` I I r �R • z \ PARCEL�D. /02$488/ �'� `�� ' , rilf_ •- - ► w , �\ �399 LF J - -tc •i.0� —— ���_���!��ii coil ` • :,•". < / / � o��� -_ -_ Ke..)•fib . C) LL-18-222 / N� \ $plili -- �� PARCEL7 1111104.1 -t:i � �f,��i� - \ A./ ` •" • • ``•"•- PARCEL I.D. #028875 / o I.D. r \ \ " r""""•"".•-•` 0 1095 LF k --- '' ' - - 4' 295 LF •ate r ►•%�f` I. • o LL-18-223 ' N $ �� PARCEL I.D. #019904 -0 ' L Wei te: J.�`, �` �• • • • . " 0 0 PARCEL IUD #0441305 I \ ii/ , • ;° / ��f��: • • ` • • " ". ` . cL (n LLJ U ACCESS ROAD o DETAIL 17 < o z J W J W N \ \ — it 4 L, :b '�Y d fs'� /\ \ \ \ \� N \ \ I / / / / Y / LLI —I = Z Z F- I N \ \ \ \ _ .. ., 1 \ �� 'ter, +VOD \ I. / f / / / / J o w \ \ \ N \J , -1 \ 0 ♦\ I / / / / / L...l p z N i 8 (� o w \ \ \ N \\ \ 1 • rt 1 / / / l / /� / �/ /' LL-20-152-A004 \ / - 1 I z w \ \ \ �- I \ \ I / / / / N / PARCEL I.D. # 15L12029 / ( o o O m \ .. 'v- \ ,_06 Gol), 1 \ \ \ v7 ,-, / 0 0_ 0 I ,� \ \ 1 117- _ — ti od o \ \ \ \ I / / goo I I ('r,•• \ .. I - . ) • .ti _ / Q L.L.1 c~n U Z c-) o \ \ I I ' \\ \ \ \ �\ \ \ I \ \ \. ti I /,' / / i LL-2o-157-A003 Y co o O o 0 li cL • \ \ - \ 1 1 / PARCEL I.D. # 15L120 f Q Lu / LL-20-152-A002 \ 1 LL-20-152-A003 .. \• \ \\ \ \ %'\ \ \ \ °.) \ N \ I / �` 1120 LF �i• ~ / PARCEL I.D. # 15L12021A 1 EL I.D. # 15L1 • \ \ \ \ ,r \ \ \ \ \ �_' I ( ' I Y / Z \ _ Li EL _ \ I 1 \ \ \ \ \ \ \ \ 2122� \\ ��,•. y - \\ , - I ` \\ j_ \ // I^ Q V / / 1 \ \ \.- ..0 \ 1j �26 4- \ '& \ I l .0' \ oo_ — z Q CD I I I \Lo 41' \\. - - �. a. I \ I I r�� \ \ \ I ,. \ ( LL 20 156-A003 I EL I 1 I LOp — �0"► / I ( / .. \ \ \` \ \ o,;. / I / I ./ <,. \___,,..\ PARCEL I.D. # 15L12019 h L 1 I \ \ \ L w I // I I Lop - --- _ . - - _- ) �� - * EXISTING ROAD '\rn 0, \ \ \- \ `` i' / 1,14,. , \ / 1 / 1 °01 I � 1 ( ;_l, MINOR UPGRADE '•1 \ \\ \ I .I \I I too\ \ / _ I \�- \ 1 1 / / ° PROPOSED20 57 AR ROAD / 1 I Y i I I b I 1 Q, \ 1' r • � \ _ � 1in I ly S � . 1 N ' I i I I 0 ' Ali I 17-, ,.. -1\\ \\ '7\ :17- ' 'ci\ ; :\ .---- 'N' c;. c(87 c'sc?- EL o\. Ii3 ..--------- I / 4 ��\ \ \ 1 1 '{ \ ,,. \ \ \\ \ �I o �1 0' g \� \ - _ - / 1I 1 SCALE: AS SHOWN _ I 1 1 \ / `. ,'-\ \ \ \ \ I I • N ; •�. 001 -- __DATE: v QC" � °p� • / 1 I ( 1 /� // \ • " ' � '` —\ \ \\ \I 111 yII i f / N •l I �11 • / DRAWN: GPT / �j ® r- — _ — _ I ) / / \ \ \ \ \ I III '.I I \ ` `\NE / \- 1 CHECKED: DLH <- 48� p o 144 / / \ \ I I 1 ' \ CH APPROVED: NET o, _ / \ \ I I \ ;h o EEC jog 1 cn s :; -/4s� ` \� _ - -14s- ' _ ,�\ / /- -142� \ \� J �` � ' / \ \ 111 I I . I ,� \\ \\ rx, H E cL I \ \ / /i \• 1 / / 1 I I I • 1tN tool 9.16 /' ',,,,,_.,,./:I(11,: Q - - \.� , 'fix `. ^ _ re._ / / / \ \ •�: ca - l N ,,, \ — - / / / / / / / / " / 1 1.,1 \ \ o I 1 gai consultants NC, inc. EL I.D. # 15L12I' i o \ \ ' r - - _ - - _ � / / / / / /,. . I 1 h •LL-20-152-A001 \ ,- .- • — — _ -_ — / - , \ / / / / f / <. ./ / I \ N.\ I ` ) \ 4198 COX ROAD SUITE 114 z I 1 M % PARCEL LD. # 15L12020 ` \: \` 1 —— — ^ _ _ y�, \ // // //// f/ / f ( I I I I \ \ \ GLEN ALLEN, VA 23060 \:: 4 ., - \ -` \ - _ - _ 1 \ _ / / / 1 I I I I I I \ \ \ 804-270-9357 Q \ - _ r / / / \ I \ SO,. / N.C. COL F-0269 5 P EL I.D. 15L12016A /` / \ a "'�. / // // V / \ \\ `'• \ \ ) \ -`3x ��" rn Ln in ACCESS ROAD I DETAIL 18 SCALE: 1 " = 200' CL 200' 0 200' 400' Q NOTES: EL = LEGEND v PERMANENT WATERBAR/SLOPE BREAKER LOD LIMIT OF DISTURBANCE 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY-UTM WITH NAD83 DATUM,ZONE 17,US SURVEY FOOT,CENTRAL MERIDIAN 81°W. TEMPORARY WATERBAR/SLOPE BREAKER BELTED SILT RETENTION 2. CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS,INC FROM 11-03-2014 THRU 11-07-2014. PROPERTY LINE - - STORM SEWER 0 tf Jl�, 3. IMAGERY TAKEN FROM GOOGLE EARTH. Cr) EXTRA WORK SPACE TOPSOIL SEGREGATION AREA TRENCH BREAKER/PLUG FENCE(BSRF) 4. THE PROPERTY LINES SHOWN ARE BASED ON GIS&TAX ASSESSMENT RECORDS(PROVIDED BY OTHERS).GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE L._ X X FENCE E UNDERGROUND ELECTRIC r I 3 COIR LOG ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. I 5. STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. o STREAM CROSSING 6. EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY.ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS. PROJECT NO./DASH NO. � �/�/ WATER LINE � •••••••••••••••••�'•••••••••••••••• :, COMPOST FILTER SOCK STREAM 7. ALL STATIONING SHOWN IS SLOPE STATIONING. 14O46H ,�.1.1.1.�.1. AREA OF NO DISTURBANCE PROPOSED TEMPORARY R.O.W. O USFWS STREAM CROSSING x( ORANGE SAFETY FENCE 8. SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL SAN SANITARY SEWER WITH ENHANCED CONTROLS 9. ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES-1) EXISTING ROADS NO IMPROVEMENTS,2)EXISTING ROADS MINOR IMPROVEMENTS,3)EXISTING ROADS MAJOR IMPROVEMENTS G G EXISTING GAS PIPELINE ROADSIDE DITCH AND 4)NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2,3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING TASK N O- SUB TASK NO. z . . W CONSTRUCTION ENTRANCE WITH DITCH DRAINAGE;DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4. z OH OVERHEAD UTILITY LINES EDGE OF GRAVEL W W W WETLAND UTILITY POLE CULVERT AS NEEDED Cub SOIL TYPE 00CJ 00 10. 'ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE LLJ W i W J ,, W W (COLOR SHOWN TO PROVIDE CLARITY ONLY) CULVERT/ACCESS ROAD WATERBARS ♦ GENERALIZED SURFACE WATER FLOW NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. ACCESS ROAD — — — PROPOSED PERMANENT EASEMENT 11. WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONS GROUP ID DRAWING NO. NOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THE SURFACE WATER FLOW WITHIN ROW OBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS,AS APPROPRIATE. U PROPOSED GAS PIPELINE PROPOSED GAS PIPELINE (NO GROUND SURVEY) E&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12). WATERBAR OUTLET(PLAN VIEW) D E 109 WATERBAR(PLAN VIEW) AR-109 Q CD THIS DRAWING WAS PRODUCED WITH COMPUTER AIDED DRAFTING TECHNOLOGY AND IS SUPPORTED BY ELECTRONIC DRAWING FILES. DO NOT REVISE THIS DRAWING VIA MANUAL DRAFTING METHODS.