Loading...
HomeMy WebLinkAboutSW3200601_05_SpeedwaySubstation_GeotechReport_20200720REPORT COVER PAGE Geotechnical Engineering Report __________________________________________________________________________ Duke Energy Solar – Speedway Parcel Midland, Cabarrus County, North Carolina September 17, 2019 Terracon Project No. 71195085 Prepared for: Duke Energy Renewables Charlotte, NC Prepared by: Terracon Consultants, Inc. Charlotte, NC Responsive ■Resourceful ■Reliable 1 REPORT TOPICS REPORT SUMMARY ....................................................................................................... i INTRODUCTION ............................................................................................................. 1 SITE CONDITIONS ......................................................................................................... 1 PROJECT DESCRIPTION .............................................................................................. 2 GEOTECHNICAL CHARACTERIZATION ...................................................................... 3 GEOTECHNICAL OVERVIEW ....................................................................................... 4 EARTHWORK................................................................................................................. 5 SHALLOW FOUNDATIONS ........................................................................................... 9 PV PANEL RACKING SYSTEM SUPPORT – PILE FOUNDATIONS .......................... 12 SEISMIC CONSIDERATIONS ...................................................................................... 16 CORROSIVITY.............................................................................................................. 17 GENERAL COMMENTS ............................................................................................... 17 ATTACHMENTS EXPLORATION AND TESTING PROCEDURES SITE LOCATION AND EXPLORATION PLANS EXPLORATION RESULTS SUPPORTING INFORMATION Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable i REPORT SUMMARY A geotechnical investigation has been completed for the proposed solar site to be located at Wallace Road and Bethel Avenue Extension in Midland, North Carolina. Eight borings, designated B-1 through B-8, were performed to depths of approximately 8.5 to 14.9 feet below existing ground surface throughout the project site. Additionally, we have included borings logs from 2018 that were performed on the Troutman property. The following geotechnical considerations were identified from our most recent borings: n Partially weathered rock (PWR) and/or hard residual soils were encountered in each of our borings at depths ranging from approximately 1 to 5 feet below the existing ground surface. PWR was encountered at depths as shallow as 3 feet below existing ground surface, and auger refusal was encountered in Boring B-8 at 8.5 feet. Rock, PWR, and some hard residual soils, if encountered in excavations, will require additional effort to penetrate. Further details are included herein. n Based on our experience with performing full-scale pile load testing, we expect embedment depths on the order of 6 to 9 feet bgs will be sufficient to resist typical racking system design loads. Slightly shallower embedment depths may be acceptable where shallow PWR and pre- drilling and grouting of piles is performed. The actual design capacity for piles should be determined through a preconstruction full-scale pile load testing (PLT) program. The results of a PLT program performed in conjunction with subsurface site characterization are usually successful in reducing the design embedment depth when compared to design based on site characterization and analytical methods alone. n We have provided preliminary geotechnical parameters for foundation evaluation based the results of our subsurface characterization and have used these parameters to perform preliminary pile capacity analyses. Based on the analytical analyses presented in this report, we expect that driven piles will not be able to significantly penetrate PWR, and we expect some production piles will encounter driving refusal on PWR. Piles that encounter shallow refusal could be “proof tested” to demonstrate suitable capacity; however, extremely short piles will likely not develop sufficient lateral or uplift capacities. With a proof testing program, a contingency procedure, such as removal and replacement with a drilled-and-grouted section, should be developed for remediation of unsuitable piles. Alternative foundation types, such as pre-drilled piles, concrete ballast or drilled piers, could also be considered for project design. n Based on the results of our subsurface investigation and the 2018 North Carolina State Building Code, the seismic site classification for this site is C. n The site is expected to be suitable for support of the proposed access roadway when subgrade preparation is performed as described in this report. We also expect the site to be suitable for support of lightly loaded structures and equipment on shallow foundations. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable ii n Borings B-2 and B-8 were tested for pH, soil resistivity, chloride and sulfate to analyze corrosive potential. Based on our review of the subsurface data and laboratory testing, it appears the on-site soils have a generally non-aggressive corrosion potential according to Section 7.5 in the Soil Nail Walls Reference Manual, Publication No. FHWA-NHI-14-007, February 2015. Additional details of the laboratory testing results are provided herein. n The proposed ancillary structures may be supported on shallow footings bearing on natural soils or engineered fill placed over the suitable natural soils following completion of the recommended site preparation measures. A subgrade prepared and tested as recommended in this report should provide adequate support for any ground supported floor slabs associated with the proposed construction. n A geophysical investigation has also been performed by Terracon for the project sites and has been submitted under a separate cover. The results of the geophysical investigation are relatively consistent with the results of our geotechnical field investigation. n A geotechnical investigation was performed by Terracon previously for the Troutman site (Terracon Project No. 71185110). We understand that Duke Energy has acquired permission from Strata Solar to utilize the data collected as part of this previous investigation, and therefore the field information (borings and laboratory testing results) have been included as attachments to this report. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled General Comments should be read for an understanding of the report limitations. Responsive ■Resourceful ■Reliable 1 INTRODUC TION Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel Wallace Road and Bethel Avenue Extension Midland, Cabarrus County, North Carolina Terracon Project No. 71195085 September 17, 2019 INTRODUCTION This report presents the results of our subsurface exploration and geotechnical engineering services performed for the proposed Solar Sites to be located at Wallace Road and Bethel Avenue Extension in Midland, Cabarrus County, North Carolina. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: ■Subsurface soil conditions ■Foundation design and construction ■Site preparation and earthwork ■PV panel racking system ■Excavation considerations ■Seismic site classification per NCSBC ■Corrosivity analysis The geotechnical engineering Scope of Services for this project included the advancement of eight test borings to depths ranging from approximately 8.5 to 14.9 feet below existing site grades. Maps showing the site and boring locations are shown in the Site Location and Exploration Plan sections, respectively. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring logs in the Exploration Results section. SITE CONDITIONS The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Item Description Parcel Information The project is located at Wallace Road and Bethel Avenue Extension in Cabarrus County, North Carolina. The site is comprised of three separate parcels, which total approximately 218 acres with coordinates to the site at approximately 35.218751°, -80.529802°. See Site Location Existing Improvements The sites are currently used as a farmland. Two of the parcels are mostly cleared, and one parcel is used as a tree farm and is wooded. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 2 Item Description Current Ground Cover The site is cultivated farmland (crops and tree harvest areas). Existing Topography (from Google Earth Pro) The northern parcels have elevations ranging from approximately 530 feet to 560 feet. The southern, tree farm parcel has elevations ranging from approximately 500 feet to 540 feet. Geology Piedmont Physiographic Providence. See Geology. PROJECT DESCRIPTION Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows: Item Description Information Provided The project site totals approximately 218 acres located along Wallace Road and Bethel Avenue Extension, in Midland, Cabarrus County, North Carolina. Proposed Structures (assumed) The construction is anticipated to include an array of solar photovoltaic panels on single-axis trackers. The panels will be installed on ground- mounted systems likely supported on driven/drilled piles. Proposed Construction (assumed) The proposed improvements will be driven W-section steel piles (W6x7, W6x15, or similar) and concrete inverter pads. An existing substation located at the northern end of the site is anticipated to be utilized. Maximum Loads (assumed) It is estimated that potential maximum loads (using Allowable Strength Design) will be up to: ■Lateral/Shear = 2,900 lbs. ■Axial Tension = 2,000 lbs. ■Axial Compression = 3,000 lbs. Maximum Allowable Lateral Deflection (assumed) At ground surface: Less than 0.5 inch At top of pile (approx. 5 feet): Less than 3 inches Grading/Slopes Grading plan are currently unavailable, but we expect final grades will be close to existing grades. Final slope angles of 3H:1V (Horizontal: Vertical) or flatter are expected. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 3 GEOTECHNICAL CHARACTERIZATION Geology The project site is located in the Piedmont Physiographic Province. The residual soils in this area are the product of in-place chemical weathering of rock. The typical residual soil profile consists of silty soils near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. Alluvial soils are typically present within floodplain areas along creeks and rivers in the Piedmont. According to the 1985 Geologic Map of North Carolina, the site is within the Carolina Slate Belt. The bedrock underlying the site generally consists of Phyllite and Schist Rock. The boundary between soil and rock in the Piedmont is not sharply defined. A transitional zone termed “partially weathered rock” is normally found overlying the parent bedrock. Partially weathered rock (PWR) is defined for engineering purposes as residual material with a standard penetration test resistance exceeding 100 blows per foot. The transition between hard/dense residual soils and partially weathered rock occurs at irregular depths due to variations in degree of weathering. Groundwater is typically present in fractures within the partially weathered rock or underlying bedrock in upland areas of the Piedmont. Fluctuations in groundwater levels on the order of 2 to 4 feet are typical in residual soils and partially weathered rock in the Piedmont, depending on variations in precipitation, evaporation, and surface water runoff. Seasonal high groundwater levels are expected to occur during or just after the typically cooler months of the year (November through April). Subsurface Profile We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. This characterization forms the basis of our geotechnical calculations and evaluation of site preparation and foundation options. Conditions encountered at each exploration point are indicated on the individual logs found in the Exploration Results. Based on the results of the borings, conditions below the ground surface can be idealized as follows: Stratum Approximate Depth to Bottom of Stratum 1 Material Description Consistency / Relative Density Surface 2 to 4 inches Topsoil N/A 1 3 to 14.5 feet Residual soil consisting of lean clay and inelastic silt with varying amounts of sand Stiff to Hard 22 8.5 to 14.9 feet Partially Weather Rock (PWR)N/A Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 4 3 3 > 8.5 feet Auger Refusal N/A 1.Referenced from the top of ground surface. 2.Encountered in each boring location. 3.Encountered in Boring B-06. Groundwater Considerations The boreholes were observed while drilling and after completion for the presence and level of groundwater. Groundwater was not observed in any of our borings while drilling, or for the short duration the borings could remain open. However, this does not necessarily mean the borings terminated above groundwater, or the water levels summarized above are stable groundwater levels. Due to the low permeability of the soils encountered in the borings, a relatively long period may be necessary for a groundwater level to develop and stabilize in a borehole. Long term observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. GEOTECHNICAL OVERVIEW Partially weathered rock (PWR) and/or hard residual soils were encountered in each of our borings at depths ranging from approximately 1 to 5 feet below the existing ground surface. PWR was encountered at depths as shallow as 3 feet below existing ground surface, and auger refusal was encountered in Boring B-8 at 8.5 feet. Rock, PWR, and some hard residual soils, if encountered in excavations, will require additional effort to penetrate. Further details are included herein. Based on our experience with performing full-scale pile load testing, we expect embedment depths on the order of 6 to 9 feet bgs will be sufficient to resist typical racking system design loads. Slightly shallower embedment depths may be acceptable where shallow PWR and pre-drilling and grouting of piles is performed. The actual design capacity for piles should be determined through a preconstruction full-scale pile load testing (PLT) program. The results of a PLT program performed in conjunction with subsurface site characterization are usually successful in reducing the design embedment depth when compared to design based on site characterization and analytical methods alone. We have provided preliminary geotechnical parameters for foundation evaluation based the results of our subsurface characterization and have used these parameters to perform preliminary pile Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 5 capacity analyses. Based on the analytical analyses presented in this report, we expect that driven piles will not be able to significantly penetrate PWR, and we expect some production piles will encounter driving refusal on PWR. Piles that encounter shallow refusal could be “proof tested” to demonstrate suitable capacity; however, extremely short piles will likely not develop sufficient lateral or uplift capacities. With a proof testing program, a contingency procedure, such as removal and replacement with a drilled-and-grouted section, should be developed for remediation of unsuitable piles. Alternative foundation types, such as pre-drilled piles, concrete ballast or drilled piers, could also be considered for project design. Based on the results of our subsurface investigation and the 2018 North Carolina State Building Code, the seismic site classification for this site is C. The site is expected to be suitable for support of the proposed access roadway when subgrade preparation is performed as described in this report. We also expect the site to be suitable for support of lightly loaded structures and equipment on shallow foundations. Borings (B-2 and B-8) were tested for pH, soil resistivity, chloride and sulfate to analyze corrosive potential. Based on our review of the subsurface data and laboratory testing, it appears the on-site soils have a generally non-aggressive corrosion potential according to Section 7.5 in the Soil Nail Walls Reference Manual, Publication No. FHWA-NHI-14-007, February 2015. Additional details of the laboratory testing results are provided herein. The proposed ancillary structures may be supported on shallow footings bearing on natural soils or engineered fill placed over the suitable natural soils following completion of the recommended site preparation measures. A subgrade prepared and tested as recommended in this report should provide adequate support for any ground supported floor slabs associated with the proposed construction. A geophysical investigation has also been performed by Terracon for the project sites and has been submitted under a separate cover. The results of the geophysical investigation are relatively consistent with the results of our geotechnical field investigation. A geotechnical investigation was performed by Terracon previously for the Troutman site (Terracon Project No. 71185110). We understand that Duke Energy has acquired permission from Strata Solar to utilize the data collected as part of this previous investigation, and therefore the field information (borings and laboratory testing results) have been included as attachments to this report. The General Comments section provides an understanding of the report limitations. EARTHWORK Earthwork is anticipated to include clearing and grubbing, excavations, and fill placement. The following sections provide recommendations for use in the preparation of specifications for the Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 6 work. Recommendations include critical quality criteria, as necessary, to render the site in the state considered in our geotechnical engineering evaluation for foundations, floor slabs, and pavements. Site Preparation Prior to placing fill, existing vegetation and root mat should be removed. Complete stripping of the topsoil should be performed in the proposed building and parking/driveway areas. The subgrade should be proofrolled with an adequately loaded vehicle such as a fully-loaded tandem-axle dump truck. The proofrolling should be performed under the direction of the Geotechnical Engineer. Areas excessively deflecting under the proofroll should be delineated and subsequently addressed by the Geotechnical Engineer. Such areas should either be removed or modified by stabilizing. Excessively wet or dry material should either be removed or moisture conditioned and recompacted. Fill Material Types Earthen materials used for structural fill should meet the following material property requirements: Soil Type 1 USCS Classification Acceptable Parameters On-Site Low Plasticity Soils CL, ML (LL < 50 & PI < 20)All locations and elevations Imported Low Plasticity Soils CL, CL-ML, ML, SM, SC (LL < 50 & PI < 20)All locations and elevations 1.Structural fill should consist of approved materials free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a frozen subgrade. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation prior to use on this site. Fill Compaction Requirements Structural fill should meet the following compaction requirements. Item Structural Fill Maximum Lift Thickness ■8 to 10 inches or less in loose thickness when heavy, self-propelled compaction equipment is used ■4 to 6 inches in loose thickness when hand-guided equipment (i.e. jumping jack or plate compactor) is used Minimum Compaction Requirements 1, 2, 3 ■100% of soils maximum dry density within 1 foot of finished pavement subgrade ■95% of soils maximum dry density above foundations, below floor slabs, and more than 1 foot below finished pavement subgrade Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 7 Item Structural Fill Water Content Range 1 ■Within 3% of optimum moisture content 1.Maximum density and optimum water content as determined by the standard Proctor test (ASTM D 698). 2.High plasticity cohesive fill should not be compacted to more than 100 percent of standard Proctor maximum dry density. 3.If the granular material is a coarse sand or gravel, or of a uniform size, or has a low fines content, compaction comparison to relative density may be more appropriate. In this case, granular materials should be compacted to at least 80% relative density (ASTM D 4253 and D 4254). Utility Trench Backfill For low permeability subgrades, utility trenches are a common source of water infiltration and migration. Utility trenches penetrating beneath the structures should be effectively sealed to restrict water intrusion and flow through the trenches, which could migrate below the structures. The trench should provide an effective trench plug that extends at least 5 feet from the face of the building exterior. The plug material should consist of cementitious flowable fill or low permeability clay. The trench plug material should be placed to surround the utility line. If used, the clay trench plug material should be placed and compacted to comply with the water content and compaction recommendations for structural fill stated previously in this report. Grading and Drainage All grades must provide effective drainage away from the structures during and after construction and should be maintained throughout the life of the structure. Water retained next to the structures can result in soil movements greater than those discussed in this report. Exposed ground should be sloped and maintained at a minimum 5% away from the structures for at least 10 feet beyond the perimeter of the structures. After structure construction and landscaping have been completed, final grades should be verified to document effective drainage has been achieved. Grades around the structure should also be periodically inspected and adjusted, as necessary, as part of the structure’s maintenance program. Where paving or flatwork abuts the structure, a maintenance program should be established to effectively seal and maintain joints and prevent surface water infiltration. Excavations The existing fill and residual soils encountered at the boring locations may be excavated with conventional construction equipment such as bulldozers, backhoes, and trackhoes. Very hard residual soils, PWR, and auger refusal materials were encountered in some of the borings at relatively shallow depths (less than 5 feet) and may be encountered at similar depths in other areas across the site as indicated in the geophysical investigation results performed and reported separately. Relatively deep excavations, such as for underground utility installation, may encounter hard excavation and potential weathered rock that may require blasting or hammering Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 8 to remove efficiently. Smaller equipment may have difficult excavating PWR. A large trackhoe or bulldozer equipped with a single-tooth ripper maybe required to excavate these materials. Some PWR, especially in confined excavations, and rock will require blasting or impact hammering to efficiently excavate. We recommend that unit rates for mass rock and trench rock be included in the bid package to limit disputes in the event that rock-like materials are encountered. It is our opinion that a clear and appropriate definition of rock should be included in the project specifications to reduce the potential for misunderstandings. A sample definition of rock for excavation specifications is provided below: Mass Rock is defined as any material that cannot be dislodged by a Caterpillar D-8 Bulldozer, or equivalent, equipped with a single tooth ripper, without the use of impact hammers or drilling and blasting. Trench Rock is defined as any material that cannot be dislodged by a Caterpillar 325 hydraulic backhoe, or equivalent, without the use of impact hammers or drilling and blasting. Boulders or masses of rock exceeding ½ cubic yard in volume shall also be considered mass or trench rock, respectively, during excavation. These classifications do not include materials such as loose rock, concrete, or other materials that can be removed by means other than impact hammering, but which for any reason, such as economic reasons, the Contractor chooses to remove by impact hammering. Upon completion of filling and grading, care should be taken to maintain the subgrade water content prior to construction of floor slabs. Construction traffic over the completed subgrades should be avoided. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. Water collecting over, or adjacent to, construction areas should be removed. If the subgrade freezes, desiccates, saturates, or is disturbed, the affected material should be removed, or the materials should be scarified, moisture conditioned, and recompacted, prior to floor slab construction. As a minimum, excavations should be performed in accordance with OSHA 29 CFR, Part 1926, Subpart P, “Excavations” and its appendices, and in accordance with any applicable local, and/or state regulations. The grading contractor should be responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean Terracon is assuming responsibility for construction site safety, or the contractor's activities; such responsibility shall neither be implied nor inferred. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 9 Construction Observation and Testing The earthwork efforts should be monitored under the direction of the Geotechnical Engineer. Monitoring should include documentation of adequate removal of vegetation and topsoil, proofrolling, and mitigation of areas delineated by the proofroll to require mitigation. Each lift of compacted fill should be tested, evaluated, and reworked, as necessary, until approved by the Geotechnical Engineer prior to placement of additional lifts. Each lift of fill should be tested for density and water content at a frequency of at least one test for every 2,500 square feet of compacted fill in the building areas and 5,000 square feet in pavement areas. One density and water content test should be performed for every 50 linear feet of compacted utility trench backfill. In areas of foundation excavations, the bearing subgrade should be evaluated under the direction of the Geotechnical Engineer. If unanticipated conditions are encountered, the Geotechnical Engineer should prescribe mitigation options. In addition to the documentation of the essential parameters necessary for construction, the continuation of the Geotechnical Engineer into the construction phase of the project provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes. SHALLOW FOUNDATIONS In our opinion, the proposed ancillary structures and equipment pads can be supported on shallow foundations following the completion of subgrade preparation as described in the earthwork section of this report and additional subgrade evaluation at the time of construction. The following sections present our recommendations for shallow foundation design and construction. If the site has been prepared in accordance with the requirements noted in Earthwork, the following design parameters are applicable for shallow foundations. Spread Footing Foundation Design Item Description Maximum Net Allowable Bearing pressure 1, 2 3,000 psf (bearing within hard residual soils or structural fill) Minimum Foundation Dimensions Columns:24 inches Continuous: 16 inches Ultimate Coefficient of Sliding Friction 3 0.28 (residual soils) 0.35 (granular engineered fill) 0.41 (partially weathered rock) Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 10 Item Description Minimum Embedment below Finished Grade 4 18 inches Estimated Total Settlement from Structural Loads 2 Less than about 1 inch Estimated Differential Settlement 2 About 3/4 over 40 feet 1.The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. An appropriate factor of safety has been applied. Values assume that exterior grades are no steeper than 20% within 10 feet of structure. 2.Values provided are for maximum loads noted in Project Description. 3.Can be used to compute sliding resistance where foundations are placed on suitable soil/materials. Should be neglected for foundations subject to net uplift conditions. 4.Embedment necessary to minimize the effects of frost and/or seasonal water content variations. For sloping ground, maintain depth below the lowest adjacent exterior grade within 5 horizontal feet of the structure. Shallow Mat or Equipment Pad Foundations The base of all foundation excavations should be free of water and loose soil prior to placing concrete. Concrete should be placed as soon as practical after excavating to reduce bearing soil disturbance. Should the soils at bearing level become excessively disturbed or saturated, the affected soil should be removed prior to placing concrete. The foundation bearing materials should be further evaluated at the time of the foundation excavation. A representative of the geotechnical engineer should use a combination of hand auger borings and dynamic cone penetrometer (DCP) testing to determine the suitability of the bearing materials for the design bearing pressure. Excessively soft, loose or wet bearing soils should be overexcavated to a depth recommended by the geotechnical engineer. The footings could then bear directly on these soils at the lower level or the excavated soils could be replaced with compacted engineered fill as described in this report. Item Description Maximum Net Allowable Bearing pressure 1, 2 3,000 psf (bearing within hard residual soils or engineered fill) Maximum Toe Bearing Pressure for Transient Loading Conditions 3,000 psf Vertical Modulus of Subgrade Reaction 10 pci Ultimate Coefficient of Sliding Friction 3 0.28 (residual soils) 0.35 (granular engineered fill) 0.41 (partially weathered rock) Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 11 Item Description Minimum Embedment below Finished Grade 4 18 inches Estimated Total Settlement from Structural Loads 2 Less than about 1 inch 1.The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. An appropriate factor of safety has been applied. Values assume that exterior grades are no steeper than 20% within 10 feet of structure. 2.The foundation settlement will depend upon the variations within the subsurface soil profile, the structural loading conditions, the embedment depth of the footing, the thickness of compacted fill, and the quality of the earthwork operations. Values provided are for maximum loads noted in Project Description. 3.Can be used to compute sliding resistance where foundations are placed on suitable soil/materials. Should be neglected for foundations subject to net uplift conditions. 4.Embedment necessary to minimize the effects of frost and/or seasonal water content variations. For sloping ground, maintain depth below the lowest adjacent exterior grade within 5 horizontal feet of the structure. Shallow Foundation Construction Considerations As noted in Earthwork, the footing excavations should be evaluated under the direction of the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil, prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Excessively wet or dry material or any loose/disturbed material in the bottom of the footing excavations should be removed/reconditioned before foundation concrete is placed. If unsuitable bearing soils are encountered at the base of the planned footing excavation, the excavation should be extended deeper to suitable soils, and the footings could bear directly on these soils at the lower level or on lean concrete backfill placed in the excavations. This is illustrated on the sketch below. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 12 Over-excavation for structural fill placement below footings should be conducted as shown below. The over-excavation should be backfilled up to the footing base elevation, with structural fill placed, as recommended in the Earthwork section. PV PANEL RACKING SYSTEM SUPPORT – PILE FOUNDATIONS We have provided preliminary geotechnical parameters for foundation evaluation based on the results of our subsurface characterization and have used these parameters to perform preliminary pile capacity analyses. PWR and/or very dense/hard residual soils were encountered within less than 8 feet from the existing ground surface in each of the borings and was encountered as shallow as 1 foot below existing ground surface. Additionally, site grading may remove some of the existing overburden soil that currently overlies PWR. Driven piles will not be able to significantly penetrate PWR and we expect some production piles will encounter driving refusal on PWR. Therefore, the following installation options should be considered: Piles can be attempted to be driven to anticipated bearing depths, and piles that encounter shallow refusal could be “proof tested” to demonstrate suitable capacity, however, extremely short piles will likely not develop sufficient lateral or uplift capacities. With a proof testing program, a contingency procedure, such as removal and replacement with a drilled-and-grouted section, should be developed for remediation of unsuitable piles. Alternatively, due to the anticipated driving conditions throughout the site, the production piles could be installed into a pre-drilled hole and grouted in place. While this option may not be more economical than driving piles, it will help to avoid the potential for shallow refusal conditions that could result in the need to remove and replace piles and cause construction delays. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 13 Based on the analytical analyses presented in this report and our experience with performing full- scale pile load testing, we expect that piles driven to embedment depths on the order of 6 to 9 feet bgs at the project site will have the capacity to resist typical racking system design loads. Alternatively, we expect that drilled-and-grouted W-section or other steel pile foundations embedded to a minimum of 6 to 9 feet below planned subgrade will be sufficient for support of typical solar panel racking systems. The actual foundation design should be performed in consideration of preconstruction full-scale pile load testing (PLT) program. The results of a PLT program performed in conjunction with subsurface site characterization are usually successful in reducing the design embedment depth when compared to design based on site characterization and analytical methods alone. The recommended PLT program should be performed when more details regarding foundation type and loads become available. The PLT program should also be performed in consideration of the intended production pile properties including section size, section shape, surface texture (e.g. bare steel, 3mil galvanized, etc.), and installation methods, equipment, and procedures. The final structural design for pile foundations should consider anticipated steel loss due to corrosion and the design loads provided by the racking manufacturer. Preliminary Axial Capacity Design Recommendations The axial tensile (pull-out) capacity can be developed from skin friction while the axial compressive capacity can be developed from skin friction and end bearing of individual piles. The parameters in the following table can be used to preliminarily analyze axial capacity of drilled-and- grouted steel piles in support of solar panel racking systems. These values include a safety factor of 2. Layer Depth1 (feet bgs2) Allowable Unit Skin Friction Allowable Unit End Bearing Resistance 0 – 3 Ignore Ignore 3 – 5.5 400 psf -- 5.5 – 8 850 psf 5,000 psf 8 – 14.5 870 psf 5,000 psf 14.5 – 14.9 1250 psf 5,000 psf 1.Referenced from the top of existing ground surface. 2.bgs = below the ground surface The above indicated skin friction is appropriate for uplift and compressive loading. The skin friction perimeter should be calculated using the “fully-plugged” assumption where the perimeter equals twice the sum of the flange width and web depth. The end bearing area should also be calculated using the “fully-plugged” assumption where the bearing area equals the product of the pile depth Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 14 and flange width. Resistance within the upper 18 inches of soil should be neglected as indicated when calculating skin friction. Piles should have a minimum center-to-center spacing of at least 3 times their largest cross- sectional dimension to prevent reduction in the axial capacities due to group effects. If the piles are designed using the above parameters, settlements are not anticipated to exceed 1 inch. We have calculated the geotechnical axial capacities for drilled-and-grouted W6x9, W6x15, and W6x20 pile sections using the preliminary geotechnical engineering parameters obtained during our subsurface exploration. A plot of this capacity as a function of embedment depth is included in the figure below: Figure 1: Preliminary estimates of axial uplift and axial compressive capacity for various 6-inch deep, wide-flange sections as a function of embedment depth based on the preliminary parameters in Table 4. Preliminary Lateral Capacity Design Recommendations Driven/drilled relatively slender steel pile elements can be considered as foundations for the proposed solar array structures. The design capacity of a single-driven pile is a function of several factors including the size and type of the pile and the engineering properties of the subsurface 4 5 6 7 8 9 10 11 12 13 14 15 0 10,000 20,000 30,000 Embedment Depth, feetEstimated Axial Uplift Capacity, lbs 4 5 6 7 8 9 10 11 12 13 14 15 0 10,000 20,000 30,000 Embedment Depth, feetEstimated Axial Compressive Capacity, lbs Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 15 soils. The pile properties can vary significantly and several manufacturers have proprietary foundation systems which they use for support of the solar arrays. The most effective means of determining and verifying pile capacities for tension, compression, or lateral loads for projects of this type is through pile load testing. The following soil parameters are recommended to estimate the pile capacities in axial tension and compression for planning and estimation purposes. The lateral response can be estimated using L-Pile or similar computer programs. The indicated ultimate skin friction is appropriate for uplift and compressive loading. The skin friction perimeter should be calculated using the “fully-plugged” assumption where the perimeter equals twice the sum of the flange width and web depth. The upper 18 inches of frost-susceptible soils should be neglected when calculating skin friction. Lateral response of the driven pile foundations may be estimated using the L-PILE computer program. The soil profile at the site may be modelled using the properties in the following table: Depth (feet bgs1) [feet bph2] p-y model Effective Unit Weight, γ’ (pcf) Effective Friction Angle, Φ’ Modulus Factor, k (pci) Undrained Cohesion, c (psf) Strain Factor, ε50 0 – 5 [5 – 10]Piedmont Residual3 110 Strength parameters calculated by L-Pile based on N60 values. See L-Pile Technical Manual for more details. 5 – 15 [10 – 20] Stiff Clay w/o water (Reese, 1974)130 ----4,000 0.005 1. Below the ground surface. 2. Below the pile head. 3. The L-Pile Piedmont residual P-y curve requires SPT N60 values for input. Uncorrected SPT N-values can be found on the boring logs. The provided soil parameters above have no factor of safety. The strength of the upper 18 inches of frost susceptible soil should be treated as indicated to account for potential strength loss due to soil disturbance from construction activities, seasonal effects, freeze-thaw behavior, and other factors. Production piles should have a minimum center-to-center spacing of at least 5 times their largest cross-sectional dimension in the direction of lateral loads, or the lateral capacities should be reduced due to group effects. If piles will be spaced closer than 5 times their largest cross- sectional dimension we should be notified to provide supplemental recommendations. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 16 The previous tables provide generalized average soil parameters for the site based on an evaluation of the soil test borings. We recommend consideration of a comprehensive pile load testing program be performed on the selected foundation elements installed in different locations across the site. Construction Considerations Based on the field exploration, it is our opinion that the soils on the site are not generally suitable for pile installation through driving. Driven piles will not be able to significantly penetrate PWR and we expect some production piles will encounter driving refusal on PWR. If piles are driven on site, piles that encounter shallow refusal could be “proof tested” to demonstrate suitable capacity, however, extremely short piles will likely not develop sufficient lateral or uplift capacities. With a proof testing program, a contingency procedure, such as removal and replacement with a drilled- and-grouted section, should be developed for remediation of unsuitable piles. A more appropriate option based on site subsurface conditions could be to pre-drill at each pile location to a depth of 5 to 7 feet and grout the piles in place. Alternative foundation types, such as concrete ballast or drilled piers, could also be considered for project design. Based on our experience, there is a general correlation between pile drive rate and the axial capacity. Therefore, the recommend preconstruction pile load testing program results should be evaluated in conjunction with test pile installation records to develop a base line for production pile acceptance. For production piles, we recommend that the time rate of installation (seconds per foot of embedment) be recorded as part of the overall quality control program. Automated systems to simplify this task come standard on many new, solar pile driving rigs and several aftermarket systems are available for temporary retrofit. Periodic proof testing should be performed on production piles that do not meet the specified installation criteria. SEISMIC CONSIDERATIONS The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure. The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Chapter 20 of ASCE 7. Description Value 2018 North Carolina State Building Code (NCSBC)1 C 2 Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 17 Description Value 1.Seismic site classification in general accordance with the 2018 NCSBC, which refers to ASCE 7. 2.The 2018 NCSBC uses a site profile extending to a depth of 100 feet for seismic site classification. Each boring was extended to an approximate depth of 14.9 feet and an average penetration resistance across the site was used to calculate the site classification. The site properties below the boring depth to 100 feet were estimated based on our experience and knowledge of geologic conditions of the general area. The subsurface materials are not considered subject to liquefaction. CORROSIVITY The table below lists the results of laboratory soluble sulfate, soluble chloride, electrical resistivity, and pH testing. The values may be used to estimate potential corrosive characteristics of the on- site soils with respect to contact with the various underground materials which will be used for project construction. Corrosivity Test Results Summary Boring Sample Depth (feet)1 Soil Description Soluble Sulfate (mg/kg) Soluble Chloride (mg/kg) Electrical Resistivity (Ω-cm) pH B-2 0 – 5’Sandy Lean Clay (CL)ND 2 64.3J 5070 6.8 B-8 0 – 5’Silt with Sand (ML)ND 54.7J 40300 5.4 1.Referenced from the top of ground surface. 2.Not detected. Based on our review of the subsurface data and laboratory testing, it appears the on-site soils have a generally non-aggressive corrosion potential according to Section 7.5 in the Soil Nail Walls Reference Manual, Publication No. FHWA-NHI-14-007, February 2015. GENERAL COMMENTS Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Natural variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable 18 Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Our services and any correspondence or collaboration through this system are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made. Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly impact excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety, and cost estimating including, excavation support, and dewatering requirements/design are the responsibility of others. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing. Responsive ■Resourceful ■Reliable ATTACHMENTS Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable EXPLORATION AND TESTING PROCEDURES 1 of 2 EXPLORATION AND TESTING PROCEDURES Field Exploration Number of Borings Boring Depth (feet)1 Planned Location 8 15 or auger refusal Solar Fields (Howell and Roberts Sites) 31 15 or auger refusal Solar Fields (Troutman Site) 2 1.Referenced from the top of ground surface. 2.A geotechnical investigation was performed by Terracon previously for the Troutman site (Terracon Project No. 71185110). We understand that Duke Energy has acquired permission from Strata Solar to utilize the data collected as part of this previous investigation, Boring Layout and Elevations: Unless otherwise noted, Terracon personnel provided the boring layout. Coordinates were obtained with a handheld GPS unit (estimated horizontal accuracy of about ±10 feet) and approximate elevations were obtained by interpolation from Google Earth. If elevations and a more precise boring layout are desired, we recommend borings be surveyed following completion of fieldwork. Subsurface Exploration Procedures: We advanced the borings with an ATV-mounted rotary drill rig using continuous flight augers. Four samples were obtained in the upper 10 feet of each boring and at intervals of 5 feet thereafter. In the split-barrel sampling procedure, a standard 2-inch outer diameter split-barrel sampling spoon is driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values, are indicated on the boring logs at the test depths. We observe and record groundwater levels during drilling and sampling. For safety purposes, all borings were backfilled with auger cuttings after their completion. The sampling depths, penetration distances, and other sampling information was recorded on the field boring logs. The samples were placed in appropriate containers and taken to our soil laboratory for testing and classification by a Geotechnical Engineer Our exploration team prepared field boring logs as part of the drilling operations. These field logs included visual classifications of the materials encountered during drilling and our interpretation of the subsurface conditions between samples. Final boring logs were prepared from the field logs. The final boring logs represent the Geotechnical Engineer's interpretation of the field logs and include modifications based on observations and tests of the samples in our laboratory. Geotechnical Engineering Report Duke Energy Solar – Speedway Parcel ■ Midland, Cabarrus County, North Carolina September 17, 2019 ■ Terracon Project No. 71195085 Responsive ■Resourceful ■Reliable EXPLORATION AND TESTING PROCEDURES 2 of 2 Laboratory Testing The project engineer reviewed the field data and assigned laboratory tests to understand the engineering properties of the various soil strata, as necessary, for this project. Procedural standards noted below are for reference to methodology in general. In some cases, variations to methods were applied because of local practice or professional judgment. Standards noted below include reference to other, related standards. Such references are not necessarily applicable to describe the specific test performed. ■ASTM D2216 Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass ■ASTM D4318 Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils ■ASTM D1140 Standard Test Method for Determining the Amount of Material Finer than 75-mm (No. 200) Sieve in Soils by Washing The laboratory testing program often included examination of soil samples by an engineer. Based on the material’s texture and plasticity, we described and classified the soil samples in accordance with the Unified Soil Classification System. Responsive ■Resourceful ■Reliable SITE LOCATION AND EXPLORATION PLANS Contents: Site Location Plan (2 pages) Exploration Plan (4 pages) Exploration Plan – GPR (2 pages) SITE LOCATION Duke Speedway Solar Site ■ Midland, NC September 11, 2019 ■ Terracon Project No. 71195085 TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY QUADRANGLES INCLUDE: MIDLAND, NC (1/1/1993). DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES B-1 thru B-5 B-6 thru B-8 Previous Borings B-1 thru B-13C SITE LOCATION Duke Speedway Solar Site ■ Midland, NC September 11, 2019 ■ Terracon Project No. 71195085 DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES AERIAL PHOTOGRAPHY PROVIDED BY MICROSOFT BING MAPS Site EXLORATIN PLAN Duke Speedway Solar Site ■ Midland, NC September 11, 2019 ■ Terracon Project No. 71195085 AERIAL PHOTOGRAPHY PROVIDED BY GOOGLE EARTH PRODIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Legend Approximate Boring Location Approximate Previous Boring Location EXPLORATION PLAN Duke Speedway Solar Site ■ Midland, NC August 16, 2019 ■ Terracon Project No. 71195085 PHOTOGRAPHY PROVIDED BY GOOGLE EARTH PRO DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Legend Approximate Boring Location EXPLORATION PLAN Duke Speedway Solar Site ■ Midland, NC August 16, 2019 ■ Terracon Project No. 71195085 DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES AERIAL PHOTOGRAPHY PROVIDED BY MICROSOFT BING MAPS Legend Approximate Boring Location EXPLORATION PLAN Duke Speedway Solar Site ■ Midland, NC September 17, 2019 ■ Terracon Project No. 71195085 AERIAL PHOTOGRAPHY PROVIDED BY GOOGLE EARTH DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES EXPLORATION PLAN - GPR Duke Speedway Solar Site ■ Midland, NC August 16, 2019 ■ Terracon Project No. 71195085 DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES AERIAL PHOTOGRAPHY PROVIDED BY GOOGLE EARTH PRO Legend Approximate Boring Location SITE LOCATION Duke Speedway Solar Site ■ Midland, NC August 16, 2019 ■ Terracon Project No. 71195085 AERIAL PHOTOGRAPHY PROVIDED BY GOOGLE EARTH PRO DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Legend Approximate Boring Location Responsive ■Resourceful ■Reliable EXPLORATION RESULTS Contents: Boring Logs (B-1 through B-8) Previous Boring Logs (B-1 through B-13C) Laboratory Summary Atterberg Limits Chart Chemical Suite Results (16 pages) 5-8-9 N=17 5-8-14 N=22 14-18-20 N=38 27-28-30 N=58 50/5" 4 INCHES TOPSOIL LEAN CLAY WITH SAND (CL), with manganese, red, light brown, and light gray, very stiff to hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as red, light brown, and gray Sandy CLAY Boring Terminated at 13.9 Feet 0.3 12.0 13.9 545.5+/- 534+/- 532+/- Offset approximately 35 feet north due to minimizing crop disturbance. Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2199° Longitude: -80.5381° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 546 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-1 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 07-25-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 07-25-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 5-8-6 N=14 6-13-15 N=28 14-13-50/4" 50/3" 50/2" 651333-20-13 3 INCHES TOPSOIL SANDY LEAN CLAY (CL), with manganese, red, light brown, and light gray, stiff to very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as red, light brown, and gray Sandy CLAY Boring Terminated at 13.7 Feet 0.3 7.0 13.7 546.5+/- 540+/- 533.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2203° Longitude: -80.535° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 547 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-2 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 07-25-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 07-25-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 10-16-25 N=41 36-36-50/5" 50/5" 50/5" 50/2" 4 INCHES TOPSOIL LEAN CLAY WITH SAND (CL), with manganese, red, light brown, and light gray, stiff to hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as red, light brown, and gray Sandy CLAY Boring Terminated at 13.7 Feet 0.3 3.0 13.7 555.5+/- 553+/- 542.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2209° Longitude: -80.5314° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 556 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-3 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 07-25-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 07-25-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 4-4-5 N=9 9-11-11 N=22 15-17-50 N=67 26-21-32 N=53 21-35-50/5" 3 INCHES TOPSOIL LEAN CLAY WITH SAND (CL), with manganese, red, light brown, and light gray, stiff to very stiff, residuum SANDY LEAN CLAY (CL), with manganese, red, light brown, and light gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as red, light brown, and gray Sandy CLAY Boring Terminated at 14.9 Feet 0.3 5.5 14.5 14.9 551.5+/- 546.5+/- 537.5+/- 537+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2212° Longitude: -80.5289° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 552 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-4 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 07-25-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 07-25-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 7-6-7 N=13 15-14-10 N=24 23-32-32 N=64 38-50/6" 50/2" 831539-24-15 2 INCHES TOPSOIL LEAN CLAY WITH SAND (CL), with manganese, trace sand, red, light brown, and light gray, stiff to very stiff, residuum SANDY LEAN CLAY (CL), with manganese, trace sand, red, light brown, and light gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as red, light brown, and gray Sandy CLAY Boring Terminated at 13.7 Feet 0.2 5.5 8.0 13.7 548+/- 542.5+/- 540+/- 534.5+/- Offset approximately 80 feet north due to minimizing crop disturbance. Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2196° Longitude: -80.5301° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 548 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-5 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 07-25-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 07-25-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 3-6-9 N=15 50/2" 50/3" 50/0" 3 INCHES TOPSOIL SILT WITH SAND (ML), trace manganese, yellowish brown, red, and gray, stiff, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray SILT with Sand Auger Refusal at 8.5 Feet 0.3 3.0 8.5 521.5+/- 519+/- 513.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2078° Longitude: -80.5348° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 522 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-6 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 08-08-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 08-08-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 5-7-12 N=19 42-50/5" 50/3" 50/2" 50/1" 2 INCHES TOPSOIL SILT WITH SAND (ML), yellowish brown, gray, and red, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray with trace yellowish brown SILT with Sand Boring Terminated at 13.6 Feet 0.2 3.0 13.6 533+/- 530+/- 519.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2091° Longitude: -80.5332° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 533 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-7 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 08-08-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 08-08-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE 6-12-15 N=27 11-16-26 N=42 27-40-46 N=86 50/3" 50/0" 731634-26-8 2 INCHES TOPSOIL SILT WITH SAND (ML), yellowish brown, gray, and red, very stiff to hard, residuum SANDY SILT (ML), gray with trace yellowish brown, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray with trace yellowish brown Sandy SILT Boring Terminated at 13.5 Feet 0.2 5.5 8.0 13.5 538+/- 532.5+/- 530+/- 524.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71195085 DUKE SPEEDWAY SOL.GPJ MODELLAYER.GPJ 8/22/19WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 FIELD TESTRESULTSPERCENT FINESWATERCONTENT (%)ATTERBERG LIMITS LL-PL-PI LOCATION Latitude: 35.2104° Longitude: -80.5313° See Exploration Plan GRAPHIC LOGDEPTH ELEVATION (Ft.) Approximate Surface Elev.: 538 (Ft.) +/- Page 1 of 1 Advancement Method: Hollow-stem aguer Abandonment Method: Boring backfilled with auger cuttings upon completion. 2701 Westport Rd Charlotte, NC Notes: Project No.: 71195085 Drill Rig: Geoprobe 7822 BORING LOG NO. B-8 Duke EnergyCLIENT: Charlotte, NC Driller: B. Burnett Boring Completed: 08-08-2019 PROJECT: Duke Speedway Solar Site Elevations approximated using Google Earth Pro. See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Wallace Road and Bethel Ave. Ext. Midland, NC SITE: Boring Started: 08-08-2019 Dry cave-in Groundwater not observed. Dry cave-in WATER LEVEL OBSERVATIONS Groundwater not observed.SAMPLE TYPE Responsive ■Resourceful ■Reliable Previous Boring Logs B-1 Through B-13C 9 538+/- 526.5+/- 6-12-17-29 N=29 50/6" 50/6" 50/5" 50/6" 50/2" Chemical bulk sample taken from 2 feet to 3 feet. 2.0 13.7 SANDY SILT (ML), with rock fragments, yellowish tan, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan, sandy SILT, with rock fragments Boring Terminated at 13.7 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 540 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-01 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-3 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2156° Longitude: -80.5299° 541+/- 534+/- 528.5+/- 528.5+/- 30-27-50/5" 20-50/4" 28-50/5" 50/6" 32-36-50/6" 50/2" 1.0 8.0 13.5 13.7 SILT WITH SAND (ML), with rock fragments, tan and brown, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan, SILT with sand and rock fragments SILT WITH SAND (ML), with rock fragments, yellowish tan PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan, SILT with sand and rock fragments Boring Terminated at 13.7 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 542 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-02 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-4 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2159° Longitude: -80.5316° 67833-25-8 543+/- 533+/- 8-9-23-38 N=32 19-14-50/6" 50/4" 5-25-50/3" 50/5" 50/4" CBR bulk sample taken at 1 feet to 3 feet. Thermal bulk sample taken at 3 feet to 5 feet. 4.0 13.8 SANDY SILT (ML), with rock fragments, yellowish tan and gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan and gray, sandy SILT, with rock fragments Boring Terminated at 13.8 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 547 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-03 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-5 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2168° Longitude: -80.5312° 57 21 9 37-27-10 533+/- 530+/- 523.5+/- 4-5-6-2 N=11 6-6-7-8 N=13 6-9-18-31 N=27 38-43-50/4" 50/6" 50/2" 4.0 7.0 13.7 SANDY LEAN CLAY (CL), with rock fragments, yellowish tan, stiff, residuum SANDY SILT (ML), with rock fragments, yellowish tan and brown, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan and brown, SILT with sand and rock fragments Boring Terminated at 13.7 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 537 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-04 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-6 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.218° Longitude: -80.5308° 537+/- 526+/- 8-10-16 N=26 21-21-50/5" 50/6" 50/3" 50/3" 50/4" 3.0 13.8 SANDY LEAN CLAY (CL), with rock fragments, yelllowish tan, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan, sandy LEAN CLAY, with rock fragments Boring Terminated at 13.8 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 540 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-18-2018 BORING LOG NO. B-05 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-18-2018 Exhibit:B-7 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2182° Longitude: -80.5289° 538+/- 536+/- 526.5+/- 6-5-17-31 N=22 24-31-45-50/3" N=76 50/6" 50/2" 50/2" 50/2" 2.0 4.0 13.7 SILT WITH SAND (ML), with rock fragments, yellowish tan, very stiff, residuum SANDY LEAN CLAY (CL), with rock fragments, yellowish tan and gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan, SILT, with rock fragments Boring Terminated at 13.7 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 540 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-18-2018 BORING LOG NO. B-05A Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-18-2018 Exhibit:B-8 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2183° Longitude: -80.5289° 539+/- 527+/- 4-9-18-27 N=27 50/4" 50/5" 50/2" 50/3" 50/4" 2.0 13.8 SILT WITH SAND (ML), with rock fragments, yellowish tan, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as tan, SILT with sand and rock fragments Boring Terminated at 13.8 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 541 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-05B Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-9 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2182° Longitude: -80.5289° 537.5+/- 526.5+/- 6-7-8-12 N=15 40-50/5" 50/2" 50/2" 50/4" 50/2" 2.5 13.7 SILT WITH SAND (ML), with rock fragments, yellowish tan with brown, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan with brown, SILT with sand and rock fragments Boring Terminated at 13.7 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 540 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-05C Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-10 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2182° Longitude: -80.5289° 540.5+/- 539+/- 535+/- 533+/- 527.5+/- 5-7-13-31 N=20 50/6" 29-50/6" 37-41-50/4" 50/5" 50/1" 0.5 2.0 6.0 8.0 13.6 TOPSOIL, 6-inches SANDY SILT (ML), with rock fragments, yellowish tan and gray, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as fine to coarse grained, yellowish tan and gray, clayey SAND, with rock fragments PARTIALLY WEATHERED ROCK (PWR), sampled as brown and yellowish tan, sandy LEAN CLAY, with rock fragments PARTIALLY WEATHERED ROCK (PWR), sampled as yellowish tan, sandy SILT, with rock fragments Boring Terminated at 13.6 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 541 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-19-2018 BORING LOG NO. B-06 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-19-2018 Exhibit:B-11 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.215° Longitude: -80.5264° 5812 12 28-24-4 540.5+/- 533+/- 532.5+/- 5-6-9-12 N=15 27-42-50/6" 12-23-35-31 N=58 14-25-33-50/6" N=58 50/6" 0.5 8.0 8.5 TOPSOIL, 6-inches SANDY SILT (ML), yellowish tan and red to gray, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as fine to medium grained, yellowish tan, clayey SAND Boring Terminated at 8.5 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 541 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-19-2018 BORING LOG NO. B-06A Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-19-2018 Exhibit:B-12 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.2149° Longitude: -80.5264° 541.5+/- 540+/- 538+/- 537+/- 534+/- 5-5-5-6 N=10 5-30-30-50/5" N=60 31-46-50/4" 50/2" 50/1" 0.5 2.0 4.0 5.0 8.1 TOPSOIL, 6-inches SANDY SILT (ML), with rock fragments, yellowish tan, stiff, residuum SILTY SAND (SM), with rock fragments, fine to coarse grained, yellowish tan and brown, very dense, residuum CLAYEY SAND (SC), with rock fragments, fine to coarse grained, yellowish tan, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as fine to coarse grained, yellowish tan, clayey SAND with rock fragments Boring Terminated at 8.1 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 542 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-19-2018 BORING LOG NO. B-06B Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-19-2018 Exhibit:B-13 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.215° Longitude: -80.5264° 538.5+/- 535+/- 3-4-4-6 N=8 6-7-6-7 N=13 22-50/5" 50/5" 50/2" 4.5 8.2 SANDY SILT (ML), yellowish tan to yellowish tan with gray, loose to medium dense, with rock fragments 2'-4.5', residuum PARTIALLY WEATHERED ROCK (PWR), sampled as fine to medium grained, yellowish tan, clayey SAND, with rock fragments Boring Terminated at 8.2 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 543 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-19-2018 BORING LOG NO. B-06C Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-19-2018 Exhibit:B-14 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.215° Longitude: -80.5264° 19 531+/- 524.5+/- 519+/- 4-3-4-5 N=7 4-25-45-31 N=70 11-15-12-14 N=27 7-19-23-26 N=42 32-50/6" 50/3" Chemical bulk sample taken at 2 feet to 3 feet. 2.0 8.5 13.8 SILT WITH SAND (ML), with rock fragments, brown and gray, medium stiff, residuum SILT WITH SAND (ML), with rock fragments, gray, very stiff to hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as gray, SILT with sand and rock fragments Boring Terminated at 13.8 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 533 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-07 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-15 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.215° Longitude: -80.5284° 536+/- 525.5+/- 4-8-15-23 N=23 17-39-50/3" 50/4" 50/2" 50/2" 50/2" 3.0 13.7 SANDY SILT (ML), with rock fragments, trace sand, yellowish tan and gray to gray, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as gray, SILT, with rock fragments Boring Terminated at 13.7 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 539 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-08 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-16 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2166° Longitude: -80.5286° 681437-29-8 538+/- 537+/- 532+/- 5-10-20-24 N=30 20-35-50/3" 50/2" 50/4" 50/2" 2.0 3.0 8.2 SANDY SILT (ML), with rock fragments, trace sand, yellowish tan and gray, very stiff, residuum SILT (ML), with rock fragments, trace sand, gray, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray, SILT, with rock fragments Boring Terminated at 8.2 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 540 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-08A Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-17 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2166° Longitude: -80.5286° 533.5+/- 529.5+/- 5-9-10-10 N=19 7-10-19-33 N=29 30-50/5" 50/5" 50/3" 4.5 8.3 SANDY SILT (ML), trace sand, with rock fragment, yellowish tan to gray, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as gray, SILT, with rock fragments Boring Terminated at 8.3 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 538 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-08B Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-18 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2166° Longitude: -80.5287° 535+/- 529+/- 5-9-16-35 N=25 50/4" 50/2" 50/1" 50/2" 2.0 8.2 SANDY SILT (ML), with rock fragments, trace sand, yellowish tan, very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray, SILT, with rock fragments Boring Terminated at 8.2 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 537 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Diedrich D-50 Boring Started: 07-19-2018 BORING LOG NO. B-08C Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: E. Rummage Boring Completed: 07-19-2018 Exhibit:B-19 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2165° Longitude: -80.5287° 10 546.5+/- 542+/- 533.5+/- 4-8-9-8 N=17 11-28-34-36 N=62 16-47-50/4" 50/3" 50/2" 50/1" 0.5 5.0 13.6 TOPSOIL, 6-inches SANDY LEAN CLAY (CL), yellowish tan and red to tan, gray, and brown, very stiff to hard, 2' to 5' with rock fragments, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as tan and gray to gray, SILT with rock fragments Boring Terminated at 13.6 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 547 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-19-2018 BORING LOG NO. B-09 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-19-2018 Exhibit:B-20 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.2158° Longitude: -80.5272° 50931-22-9 551.5+/- 550+/- 548+/- 538.5+/- 4-6-7-15 N=13 13-19-39-50/4" N=58 50/4" 50/6" 50/1" 50/1" 0.5 2.0 4.0 13.6 TOPSOIL, 6-inches CLAYEY SAND (SC), yellowish tan, medium dense, residuum SANDY LEAN CLAY (CL), with rock fragments, gray, hard to very hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as gray, SILT, with rock fragments Sampled as gray, sandy SILT, with rock fragments Boring Terminated at 13.6 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 552 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-10 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-21 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.2172° Longitude: -80.5268° 551.5+/- 550+/- 549+/- 544+/- 4-8-10-14 N=18 15-37-50/3" 50/2" 32-50/5" 50/2" 0.4 2.0 3.0 8.2 TOPSOIL, 5-inches CLAYEY SAND (SC), with rock fragments, brown and tan, medium dense, residuum SANDY SILT (ML), with rock fragments, gray, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray to light gray, sandy SILT, with rock fragments Boring Terminated at 8.2 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 552 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-10A Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-22 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.2171° Longitude: -80.5268° 551.5+/- 550+/- 549+/- 544+/- 5-6-5-7 N=11 16-35-50/2" 38-50/2" 50/5" 50/2" 0.4 2.0 3.0 8.2 TOPSOIL, 5-inches CLAYEY SAND (SC), with rock fragments, yellowish tan, medium dense, residuum SANDY SILT (ML), with rock fragments, light brown, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as light brown to light gray, sandy SILT, with rock fragments Boring Terminated at 8.2 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 552 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-10B Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-23 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.2172° Longitude: -80.5268° 551.5+/- 548+/- 546+/- 544+/- 4-5-4-5 N=9 7-10-2-45 N=12 32-29-39-47 N=68 50/2" 50/1" 0.4 4.0 6.0 8.1 TOPSOIL, 5-inches CLAYEY SAND (SC), with rock fragments, brown and tan, with black to light gray, loose to medium dense, residuum SANDY SILT (ML), with rock fragments, light gray, hard, residuum No Recovery Boring Terminated at 8.1 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 552 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-10C Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-24 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NC No free water observed WATER LEVEL OBSERVATIONS DEPTH LOCATION See Exhibit A-2 Latitude: 35.2172° Longitude: -80.5268° 554.5+/- 553+/- 550.5+/- 541.5+/- 4-6-8-15 N=14 19-26-37-50/5" N=63 38-50/5" 50/2" 50/0" 50/0" 0.4 2.0 4.5 13.5 TOPSOIL, 5-inches SANDY SILT (ML), brownish tan, stiff, residuum SILT (ML), with rock fragments, trace sand, gray and tan, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as gray, SILT, with rock fragments Boring Terminated at 13.5 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 555 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-11 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-25 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2183° Longitude: -80.5259° 591230-25-5 554.5+/- 550+/- 547+/- 4-6-5-7 N=11 9-13-17-35 N=30 19-40-50/2" 50/2" 50/0" 0.4 5.0 8.0 TOPSOIL, 5-inches SANDY SILT (ML), with rock fragments, red and gray to red and yellowish tan, stiff to very stiff, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as brown and tan, sandy SILT, with rock fragments Boring Terminated at 8 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 555 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-11A Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-26 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2183° Longitude: -80.5259° 554.5+/- 553+/- 551+/- 548.5+/- 547+/- 5-11-25-46 N=36 50/5" 36-45-50/5" 40-50/5" 50/0" 0.4 2.0 4.0 6.5 8.0 TOPSOIL, 5-inches SANDY SILT (ML), with rock fragments, red and tan, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as light tan, sandy SILT, wih rock fragments SANDY LEAN CLAY (CL), with rock fragments, tan and gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as tan and gray, sandy LEAN CLAY, with rock fragments Boring Terminated at 8 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 555 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-11B Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-27 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2183° Longitude: -80.526° 554.5+/- 553+/- 547+/- 4-17-26-46 N=43 50/5" 29-50/4" 50/0" 50/2" 0.4 2.0 8.2 TOPSOIL, 5-inches SANDY SILT (ML), gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as light gray, sandy LEAN CLAY, with rock fragments Boring Terminated at 8.2 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 555 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-11C Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-28 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2183° Longitude: -80.5259° 791727-21-6 539.5+/- 536+/- 534+/- 526.5+/- 526+/- 4-5-5-7 N=10 8-9-10-17 N=19 17-26-45-50/5" N=71 14-26-33-34 N=59 15-11-19-26 N=30 50/6" 0.4 4.0 6.0 13.5 14.0 TOPSOIL, 5-inches SILTY CLAY WITH SAND (CL-ML), yellowish tan and gray, stiff to very stiff, residuum SILTY SAND (SM), grayish tan, very dense, residuum SANDY LEAN CLAY (CL), with rock fragments, grayish tan to yellowish tan and brown, very stiff to hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as fine to medium grained, yellowish tan, silty SAND, with rock fragments Boring Terminated at 14 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 540 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-12 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-29 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2184° Longitude: -80.5238° 7518 13 34-24-10 559+/- 557+/- 547.5+/- 4-5-5-7 N=10 15-20-29-39 N=49 50/5" 50/3" 50/2" 50/0" 2.0 4.0 13.5 SILT WITH SAND (ML), tan and gray, medium stiff, residuum SANDY LEAN CLAY (CL), with rock fragments, gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as tan and brown, sandy CLAY, with rock fragments Boring Terminated at 13.5 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 561 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-17-2018 BORING LOG NO. B-13 Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-17-2018 Exhibit:B-30 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2208° Longitude: -80.5274° 560.5+/- 559+/- 557+/- 547.5+/- 4-3-4-6 N=7 7-15-37-50/5" N=52 50/5" 50/0" 50/0" 50/0" 0.5 2.0 4.0 13.5 TOPSOIL, 6-inches SILT WITH SAND (ML), red, yellow, and tan, medium stiff, residuum LEAN CLAY WITH SAND (CL), with rock fragments, yellowish tan, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as gray and tan, CLAY with sand and rock fragments Boring Terminated at 13.5 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 561 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-17-2018 BORING LOG NO. B-13A Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-17-2018 Exhibit:B-31 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2208° Longitude: -80.5274° 559.5+/- 558+/- 556+/- 546.5+/- 3-3-4-5 N=7 5-6-30-50/3" N=36 50/5" 50/5" 50/4" 50/0" 0.5 2.0 4.0 13.5 TOPSOIL, 6-inches SILT WITH SAND (ML), red, yellow, and tan, medium stiff, residuum LEAN CLAY (CL), with rock fragments, yellowish tan, hard, residuum PARTIALLY WEATHERED ROCK (PWR), sampled as gray and tan, CLAY with sand and rock fragments Boring Terminated at 13.5 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 560 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-17-2018 BORING LOG NO. B-13B Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-17-2018 Exhibit:B-32 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2208° Longitude: -80.5274° 560.5+/- 559+/- 554+/- 553+/- 547.5+/- 3-5-5-5 N=10 28-47-41-40 N=88 21-32-35-16 N=67 5-33-50/2" 50/3" 50/0" 0.3 2.0 7.0 8.0 13.5 TOPSOIL, 4-inches SILT WITH SAND (ML), yellowish tan, stiff, residuum SANDY LEAN CLAY (CL), with rock fragments, light tan to light gray, hard, residuum PARTIALLY WEATHERED ROCK (PWR), Sampled as light gray, brown, and tan, sandy CLAY, with rock fragments PARTIALLY WEATHERED ROCK (PWR), Sampled as yellowish tan, sandy SILT, with rock fragments Boring Terminated at 13.5 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 71185110 BEGONIA SOLAR SIT.GPJ TERRACON_DATATEMPLATE.GDT 8/30/18PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS ELEVATION (Ft.) Approximate Surface Elev: 561 (Ft.) +/-WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 SAMPLE TYPEFIELD TESTRESULTS Wallace Road Midland, NC SITE: Page 1 of 1 Advancement Method: Hollow Stem Auger Abandonment Method: Boring backfilled with soil cuttings upon completion. Notes: Project No.: 71185110 Drill Rig: Geoprobe 7822DT Boring Started: 07-18-2018 BORING LOG NO. B-13C Strata Solar, LLCCLIENT: Chapel Hill, NC Driller: B. Burnette Boring Completed: 07-18-2018 Exhibit:B-33 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Approximate elevations based on Google Earth. PROJECT: Begonia Solar Site 2701 Westport Rd Charlotte, NCDry Cave-In WATER LEVEL OBSERVATIONS No free water observed Dry Cave-In DEPTH LOCATION See Exhibit A-2 Latitude: 35.2208° Longitude: -80.5273° B-2 0 - 5 A-6 (6)13 33 20 13 65.0 B-5 1 - 2.5 A-6 (13)15 39 24 15 83.3 B-8 0 - 5 A-4 (5)16 34 26 8 72.5 PAGE 1 OF 1SUMMARY OF LABORATORY RESULTS PROJECT: Duke Speedway Solar Site PROJECT NUMBER: 71195085 CLIENT: Duke Energy Charlotte, NC SITE: Wallace Road and Bethel Ave. Ext. Midland, NC PH. 704-509-1777 FAX. 704-509-1888 2701 Westport Rd Charlotte, NC THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. SMART LAB SUMMARY-LANDSCAPE_A 71195085 DUKE SPEEDWAY SOL.GPJ TERRACON_DATATEMPLATE.GDT 9/11/19Liquid Limit % FinesBORING ID Soil Classification AASHTO Water Content (%) Plastic Limit Plasticity IndexDepth (Ft.) 0 10 20 30 40 50 60 0 20 40 60 80 100CH or OHCL or OLML or OL MH or OH"U" Line"A" Line ATTERBERG LIMITS RESULTS ASTM D4318 P L A S T I C I T Y I N D E X LIQUID LIMIT PROJECT NUMBER: 71195085 SITE: Wallace Road and Bethel Ave. Ext. Midland, NC PROJECT: Duke Speedway Solar Site CLIENT: Duke Energy Charlotte, NC 2701 Westport Rd Charlotte, NC LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 71195085 DUKE SPEEDWAY SOL.GPJ TERRACON_DATATEMPLATE.GDT 8/16/1933 39 34 20 24 26 13 15 8 CL CL ML SANDY LEAN CLAY LEAN CLAY with SAND SILT with SAND DescriptionUSCSFinesPIPLLLBoring ID Depth B-2 B-5 B-8 0 - 5 1 - 2.5 0 - 5 65 83 73 CL-ML #=CL# August 19, 2019 LIMS USE: FR - VICTORIA LARSON LIMS OBJECT ID: 92440998 92440998 Project: Pace Project No.: RE: Victoria Larson 2020 Starita Rd Suite E Charlotte, NC 28206 Duke Speedway Solar 71195085 Dear Victoria Larson: Enclosed are the analytical results for sample(s) received by the laboratory on August 12, 2019. The results relate only to the samples included in this report. Results reported herein conform to the most current, applicable TNI/NELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report. If you have any questions concerning this report, please feel free to contact me. Sincerely, Taylor Ezell taylor.ezell@pacelabs.com Project Manager (704)875-9092 Enclosures REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 1 of 16 #=CP# CERTIFICATIONS Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Kansas Certification IDs 9608 Loiret Boulevard, Lenexa, KS 66219 Missouri Inorganic Drinking Water Certification #: 10090 Arkansas Drinking Water Arkansas Certification #: 19-016-0 Arkansas Drinking Water Illinois Certification #: 004455 Iowa Certification #: 118 Kansas/NELAP Certification #: E-10116 Louisiana Certification #: 03055 Nevada Certification #: KS000212018-1 Oklahoma Certification #: 9205/9935 Florida: Cert E871149 SEKS WET Texas Certification #: T104704407-18-11 Utah Certification #: KS000212018-8 Illinois Certification #: 004592 Kansas Field Laboratory Accreditation: # E-92587 Missouri SEKS Micro Certification: 10070 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 2 of 16 #=SS# SAMPLE SUMMARY Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Lab ID Sample ID Matrix Date Collected Date Received 92440998001 B-2 (0-5)Solid 07/25/19 13:00 08/12/19 16:32 92440998002 B-8 (0-5)Solid 08/08/19 11:00 08/12/19 16:32 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 3 of 16 #=SA# SAMPLE ANALYTE COUNT Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Lab ID Sample ID Method Analytes Reported LaboratoryAnalysts 92440998001 B-2 (0-5)ASTM D2974 1 PASI-KDWC EPA 9045 1 PASI-KCNB EPA 120.1 Resistivity 1 PASI-KLDB EPA 9056 2 PASI-KMGS 92440998002 B-8 (0-5)ASTM D2974 1 PASI-KDWC EPA 9045 1 PASI-KCNB EPA 120.1 Resistivity 1 PASI-KLDB EPA 9056 2 PASI-KMGS REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 4 of 16 #=HO# SUMMARY OF DETECTION Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Parameters AnalyzedResult Lab Sample ID Report Limit QualifiersUnitsMethod Client Sample ID 92440998001 B-2 (0-5) Percent Moisture 19.6 %08/15/19 13:510.50ASTM D2974 pH at 25 Degrees C 6.8 Std. Units 08/19/19 14:580.10EPA 9045 Resistivity 5070 ohms-cm 08/19/19 15:41100EPA 120.1 Resistivity Chloride 64.3J mg/kg 08/17/19 17:30121EPA 9056 92440998002 B-8 (0-5) Percent Moisture 15.3 %08/15/19 13:510.50ASTM D2974 pH at 25 Degrees C 5.4 Std. Units 08/19/19 15:030.10EPA 9045 Resistivity 40300 ohms-cm 08/19/19 15:41100EPA 120.1 Resistivity Chloride 54.7J mg/kg 08/17/19 18:21119EPA 9056 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 5 of 16 #=NA# PROJECT NARRATIVE Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Method: Client:Terracon NC EPA 9045 Date:August 19, 2019 Description:9045 pH Soil General Information: 2 samples were analyzed for EPA 9045. All samples were received in acceptable condition with any exceptions noted below or on the chain-of custody and/or the sample condition upon receipt form (SCUR) attached at the end of this report. Hold Time: The samples were analyzed within the method required hold times with any exceptions noted below. Method Blank: All analytes were below the report limit in the method blank, where applicable, with any exceptions noted below. Laboratory Control Spike: All laboratory control spike compounds were within QC limits with any exceptions noted below. Matrix Spikes: All percent recoveries and relative percent differences (RPDs) were within acceptance criteria with any exceptions noted below. Duplicate Sample: All duplicate sample results were within method acceptance criteria with any exceptions noted below. Additional Comments: REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 6 of 16 #=NA# PROJECT NARRATIVE Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Method: Client:Terracon NC EPA 120.1 Resistivity Date:August 19, 2019 Description:Resistivity General Information: 2 samples were analyzed for EPA 120.1 Resistivity. All samples were received in acceptable condition with any exceptions noted below or on the chain-of custody and/or the sample condition upon receipt form (SCUR) attached at the end of this report. Hold Time: The samples were analyzed within the method required hold times with any exceptions noted below. Method Blank: All analytes were below the report limit in the method blank, where applicable, with any exceptions noted below. Laboratory Control Spike: All laboratory control spike compounds were within QC limits with any exceptions noted below. Matrix Spikes: All percent recoveries and relative percent differences (RPDs) were within acceptance criteria with any exceptions noted below. Additional Comments: REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 7 of 16 #=NA# PROJECT NARRATIVE Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Method: Client:Terracon NC EPA 9056 Date:August 19, 2019 Description:9056 IC Anions General Information: 2 samples were analyzed for EPA 9056. All samples were received in acceptable condition with any exceptions noted below or on the chain-of custody and/or the sample condition upon receipt form (SCUR) attached at the end of this report. Hold Time: The samples were analyzed within the method required hold times with any exceptions noted below. Sample Preparation: The samples were prepared in accordance with EPA 9056 with any exceptions noted below. Method Blank: All analytes were below the report limit in the method blank, where applicable, with any exceptions noted below. Laboratory Control Spike: All laboratory control spike compounds were within QC limits with any exceptions noted below. Matrix Spikes: All percent recoveries and relative percent differences (RPDs) were within acceptance criteria with any exceptions noted below. Duplicate Sample: All duplicate sample results were within method acceptance criteria with any exceptions noted below. Additional Comments: This data package has been reviewed for quality and completeness and is approved for release. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 8 of 16 #=AR# ANALYTICAL RESULTS Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Sample:B-2 (0-5)Lab ID:92440998001 Collected:07/25/19 13:00 Received:08/12/19 16:32 Matrix:Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units DF Prepared Analyzed CAS No.QualMDLLimit Report Analytical Method: ASTM D2974Percent Moisture Percent Moisture 19.6 %08/15/19 13:510.50 0.50 1 Analytical Method: EPA 90459045 pH Soil pH at 25 Degrees C 6.8 Std. Units 08/19/19 14:580.10 0.10 1 Analytical Method: EPA 120.1 ResistivityResistivity Resistivity 5070 ohms-cm 08/19/19 15:4110050.0 1 Analytical Method: EPA 9056 Preparation Method: EPA 90569056 IC Anions Chloride 64.3J mg/kg 08/17/19 17:30 16887-00-608/16/19 16:0012138.9 10 Sulfate ND mg/kg 08/17/19 17:30 14808-79-808/16/19 16:0012124.3 10 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 9 of 16 #=AR# ANALYTICAL RESULTS Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Sample:B-8 (0-5)Lab ID:92440998002 Collected:08/08/19 11:00 Received:08/12/19 16:32 Matrix:Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units DF Prepared Analyzed CAS No.QualMDLLimit Report Analytical Method: ASTM D2974Percent Moisture Percent Moisture 15.3 %08/15/19 13:510.50 0.50 1 Analytical Method: EPA 90459045 pH Soil pH at 25 Degrees C 5.4 Std. Units 08/19/19 15:030.10 0.10 1 Analytical Method: EPA 120.1 ResistivityResistivity Resistivity 40300 ohms-cm 08/19/19 15:4110050.0 1 Analytical Method: EPA 9056 Preparation Method: EPA 90569056 IC Anions Chloride 54.7J mg/kg 08/17/19 18:21 16887-00-608/16/19 16:0011938.0 10 Sulfate ND mg/kg 08/17/19 18:21 14808-79-808/16/19 16:0011923.7 10 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 10 of 16 #=QC# QUALITY CONTROL DATA Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. QC Batch: QC Batch Method: Analysis Method: Analysis Description: 603433 ASTM D2974 ASTM D2974 Dry Weight/Percent Moisture Associated Lab Samples:92440998001, 92440998002 Parameter Units Blank Result Reporting Limit Qualifiers METHOD BLANK:2467583 Associated Lab Samples:92440998001, 92440998002 Matrix:Solid AnalyzedMDL Percent Moisture %ND 0.50 08/15/19 13:500.50 Parameter Units Dup Result Max RPD QualifiersRPDResult 60311785001 2467584SAMPLE DUPLICATE: Percent Moisture %13.0 1 2012.9 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 11 of 16 #=QC# QUALITY CONTROL DATA Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. QC Batch: QC Batch Method: Analysis Method: Analysis Description: 603936 EPA 9045 EPA 9045 9045 pH Associated Lab Samples:92440998001, 92440998002 Parameter Units Dup Result Max RPD QualifiersRPDResult 92440998001 2469672SAMPLE DUPLICATE: pH at 25 Degrees C Std. Units 6.7 1 36.8 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 12 of 16 #=QC# QUALITY CONTROL DATA Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. QC Batch: QC Batch Method: Analysis Method: Analysis Description: 603737 EPA 9056 EPA 9056 9056 IC Anions Associated Lab Samples:92440998001, 92440998002 Parameter Units Blank Result Reporting Limit Qualifiers METHOD BLANK:2468593 Associated Lab Samples:92440998001, 92440998002 Matrix:Solid AnalyzedMDL Chloride mg/kg ND 10.0 08/17/19 11:363.2 Sulfate mg/kg ND 10.0 08/17/19 11:362.0 Parameter Units LCS Result % Rec Limits Qualifiers% RecConc. 2468594LABORATORY CONTROL SAMPLE: LCSSpike Chloride mg/kg 482500 96 80-120 Sulfate mg/kg 471500 94 80-120 Parameter Units MS Result % Rec Limits Qual% RecConc. 2468596MATRIX SPIKE & MATRIX SPIKE DUPLICATE: MSSpike Result 60311060010 2468597 MSD Result MSD % Rec RPD RPD Max MSDMS Spike Conc. Chloride mg/kg 629 87 80-12086 1 1562974.8J 620 613 Sulfate mg/kg 629 107 80-120104 1 1562984715201500 Parameter Units Dup Result Max RPD QualifiersRPDResult 60311060002 2468595SAMPLE DUPLICATE: Chloride mg/kg 92.5J 1592.4J Sulfate mg/kg ND 15ND REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 13 of 16 #=QL# QUALIFIERS Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 DEFINITIONS DF - Dilution Factor, if reported, represents the factor applied to the reported data due to dilution of the sample aliquot. ND - Not Detected at or above adjusted reporting limit. TNTC - Too Numerous To Count J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL - Adjusted Method Detection Limit. PQL - Practical Quantitation Limit. RL - Reporting Limit - The lowest concentration value that meets project requirements for quantitative data with known precision and bias for a specific analyte in a specific matrix. S - Surrogate 1,2-Diphenylhydrazine decomposes to and cannot be separated from Azobenzene using Method 8270. The result for each analyte is a combined concentration. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean-Up U - Indicates the compound was analyzed for, but not detected. Acid preservation may not be appropriate for 2 Chloroethylvinyl ether. A separate vial preserved to a pH of 4-5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and Acrylonitrile by EPA Method 8260. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270. The result reported for each analyte is a combined concentration. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited analytes. TNI - The NELAC Institute. LABORATORIES Pace Analytical Services - Kansas CityPASI-K REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 14 of 16 #=CR# QUALITY CONTROL DATA CROSS REFERENCE TABLE Pace Project No.: Project: 92440998 Duke Speedway Solar 71195085 Lab ID Sample ID QC Batch Method QC Batch Analytical Method Analytical Batch 92440998001 603433B-2 (0-5)ASTM D2974 92440998002 603433B-8 (0-5)ASTM D2974 92440998001 603936B-2 (0-5)EPA 9045 92440998002 603936B-8 (0-5)EPA 9045 92440998001 603969B-2 (0-5)EPA 120.1 Resistivity 92440998002 603969B-8 (0-5)EPA 120.1 Resistivity 92440998001 603737 604026B-2 (0-5)EPA 9056 EPA 9056 92440998002 603737 604026B-8 (0-5)EPA 9056 EPA 9056 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC.Date: 08/19/2019 05:49 PM Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Page 15 of 16 Page 16 of 16 Responsive ■Resourceful ■Reliable SUPPORTING INFORMATION Contents: General Notes Unified Soil Classification System Duke Speedway Solar Site Midland, NC Terracon Project No. 71195085 0.25 to 0.50 > 4.00 2.00 to 4.00 1.00 to 2.00 0.50 to 1.00 less than 0.25 Unconfined Compressive Strength Qu, (tsf) Grab Sample Split Spoon Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. GRAIN SIZE TERMINOLOGY RELATIVE PROPORTIONS OF FINESRELATIVE PROPORTIONS OF SAND AND GRAVEL DESCRIPTIVE SOIL CLASSIFICATION LOCATION AND ELEVATION NOTES SAMPLING WATER LEVEL FIELD TESTS N (HP) (T) (DCP) UC (PID) (OVA) Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Unconfined Compressive Strength Photo-Ionization Detector Organic Vapor Analyzer Medium 0Over 12 in. (300 mm) >12 5-12 <5 Percent of Dry Weight TermMajor Component of Sample Modifier With Trace Descriptive Term(s) of other constituents >30Modifier <15 Percent of Dry Weight Descriptive Term(s) of other constituents With 15-29 High Trace PLASTICITY DESCRIPTION Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. DESCRIPTION OF SYMBOLS AND ABBREVIATIONS GENERAL NOTES > 30 11 - 30 1 - 10Low Non-plastic Plasticity Index #4 to #200 sieve (4.75mm to 0.075mm Boulders 12 in. to 3 in. (300mm to 75mm)Cobbles 3 in. to #4 sieve (75mm to 4.75 mm)Gravel Sand Passing #200 sieve (0.075mm)Silt or Clay Particle Size Water Level After a Specified Period of Time Water Level After a Specified Period of Time Water Initially Encountered Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Standard Penetration or N-Value Blows/Ft. Descriptive Term (Density) CONSISTENCY OF FINE-GRAINED SOILS Hard 15 - 30Very Stiff> 50Very Dense 8 - 15Stiff30 - 50Dense 4 - 8Medium Stiff10 - 29Medium Dense 2 - 4Soft4 - 9Loose 0 - 1Very Soft0 - 3Very Loose (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance STRENGTH TERMS > 30 Descriptive Term (Consistency) Standard Penetration or N-Value Blows/Ft. RELATIVE DENSITY OF COARSE-GRAINED SOILS (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse-Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu ³ 4 and 1 £ Cc £ 3 E GW Well-graded gravel F Cu < 4 and/or [Cc<1 or Cc>3.0]E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F, G, H Fines classify as CL or CH GC Clayey gravel F, G, H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu ³ 6 and 1 £ Cc £ 3 E SW Well-graded sand I Cu < 6 and/or [Cc<1 or Cc>3.0]E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G, H, I Fines classify as CL or CH SC Clayey sand G, H, I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic:PI > 7 and plots on or above “A” line J CL Lean clay K, L, M PI < 4 or plots below “A” line J ML Silt K, L, M Organic:Liquid limit - oven dried < 0.75 OL Organic clay K, L, M, N Liquid limit - not dried Organic silt K, L, M, O Silts and Clays: Liquid limit 50 or more Inorganic:PI plots on or above “A” line CH Fat clay K, L, M PI plots below “A” line MH Elastic Silt K, L, M Organic:Liquid limit - oven dried < 0.75 OH Organic clay K, L, M, P Liquid limit - not dried Organic silt K, L, M, Q Highly organic soils:Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve. B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay. E Cu = D60/D10 Cc = 6010 2 30 DxD )(D F If soil contains ³ 15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains ³ 15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains ³ 30% plus No. 200 predominantly sand, add “sandy” to group name. MIf soil contains ³ 30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI ³ 4 and plots on or above “A” line. O PI < 4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line.